CN204326548U - A kind of building floor leveling unit - Google Patents
A kind of building floor leveling unit Download PDFInfo
- Publication number
- CN204326548U CN204326548U CN201420826205.0U CN201420826205U CN204326548U CN 204326548 U CN204326548 U CN 204326548U CN 201420826205 U CN201420826205 U CN 201420826205U CN 204326548 U CN204326548 U CN 204326548U
- Authority
- CN
- China
- Prior art keywords
- track
- leveling
- support
- beams
- clamping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 65
- 239000010959 steel Substances 0.000 claims description 65
- 239000011150 reinforced concrete Substances 0.000 claims description 10
- 239000004567 concrete Substances 0.000 claims description 8
- 230000000712 assembly Effects 0.000 claims description 3
- 238000000429 assembly Methods 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 8
- 238000000034 method Methods 0.000 description 4
- 230000001174 ascending effect Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000011179 visual inspection Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及建筑施工装置,特别涉及一种建筑地面找平装置。The utility model relates to a building construction device, in particular to a building ground leveling device.
背景技术Background technique
目前的房屋建筑,建筑底层地面和楼层地面,都通过混凝土浇筑,再进行人工找平;The current housing construction, the ground floor and the floor of the building are all poured with concrete, and then manually leveled;
通过测厚仪器进行厚度测量,判断是低于标高,还是高于标高,但是这种填补方式很容出现填补过量,因为测厚仪器插入混凝土中,并不直接显示高度差值,其次测厚仪器不能将平面的所有点都测量,没有测量到的地方只能人工目测进行找平;The thickness is measured by the thickness measuring instrument to judge whether it is lower than the elevation or higher than the elevation, but this filling method is prone to overfilling, because the thickness measuring instrument is inserted into the concrete and does not directly display the height difference. Secondly, the thickness measuring instrument It is not possible to measure all points of the plane, and the unmeasured places can only be leveled by manual visual inspection;
此种方法,无法针对面积上的所有点进行测量,其次人工整平大部分区域需要人工通过肉眼去判断,进而很容易出现高度差,且人工整平需要大量的人力以及时间;This method cannot measure all points on the area. Secondly, manual leveling of most areas requires manual judgment by the naked eye, which is prone to height differences, and manual leveling requires a lot of manpower and time;
现有的整平技术,控制不可靠,多依赖于人工目测,继而导致效率低下,整平效果不好,同时存在浪费混凝土的问题,最终大大增加了建筑成本。The existing leveling technology has unreliable control and mostly relies on manual visual inspection, which leads to low efficiency, poor leveling effect, waste of concrete, and ultimately greatly increased construction costs.
发明内容Contents of the invention
本实用新型针对上述技术问题,提出一种高效率,可设定标准高度的辅助建筑地面找平装置。Aiming at the above technical problems, the utility model proposes a high-efficiency auxiliary building ground leveling device that can set a standard height.
为达到以上目的,通过以下技术方案实现的:In order to achieve the above purpose, it is realized through the following technical solutions:
一种建筑地面找平装置,包括:支撑柱,轨道梁和找平装置;A building ground leveling device, comprising: a support column, a track beam and a leveling device;
轨道梁每两个平行设置,形成一个轨道组,且每一个轨道梁都由大于等于2个支撑柱支撑,并固定在支撑柱上;Every two track beams are arranged in parallel to form a track group, and each track beam is supported by more than or equal to 2 support columns and fixed on the support columns;
轨道梁上端面设置有与轨道梁延伸方向相同的第一滑动轨道;The upper end surface of the track beam is provided with a first sliding track in the same extending direction as the track beam;
其中,根据建筑地面的面积决定轨道梁的装配数量,每两个轨道梁之间区域为整平区域;Among them, the assembly quantity of track beams is determined according to the area of the building ground, and the area between every two track beams is the leveling area;
找平装置包括:Leveling devices include:
两个相互平行设置的承重梁,承重梁与轨道梁垂直,且每个承重梁两端都设置有滑轮与两个平行设置轨道梁上端面的第一滑动轨道配合实现滑动;Two load-bearing beams arranged parallel to each other, the load-bearing beams are perpendicular to the track beams, and pulleys are arranged at both ends of each load-bearing beam to cooperate with the first sliding track on the upper end surface of the two parallel track beams to realize sliding;
此结构主要实现,承重梁能够沿着第一滑动轨道滑动,提供一个工作区域内的主要移动方向;This structure mainly realizes that the load-bearing beam can slide along the first sliding track, providing a main moving direction in the working area;
承重梁下端面设置有与承重梁延伸方向相同的第二滑动轨道;The lower end surface of the load-bearing beam is provided with a second sliding track in the same extension direction as the load-bearing beam;
两个相互平行设置的承重梁之间设置有两个相互平行的支架横梁,且支架横梁与承重梁垂直;Two parallel support beams are arranged between two mutually parallel load-bearing beams, and the support beams are perpendicular to the load-bearing beams;
支架横梁上端设置有与第二滑动轨道配合滑动的滑轮Ⅰ;The upper end of the bracket beam is provided with a pulley I that slides in cooperation with the second sliding track;
此结构主要实现,支架横梁能够沿着第二滑动轨道移动,实现另一个移动方向;This structure mainly realizes that the support beam can move along the second sliding track to realize another moving direction;
两个相互平行设置的支架横梁之间设置有两个相互平行的支架纵梁,且支架纵梁与支架横梁垂直;Two parallel support beams are arranged between two support beams arranged parallel to each other, and the support longitudinal beams are perpendicular to the support beams;
每个支架纵梁上设置有两个螺纹升降装置;Two threaded lifting devices are arranged on each support longitudinal beam;
螺纹升降装置包括:旋转螺母和与旋转螺母螺纹配合的提升螺纹杆;The thread lifting device includes: a rotating nut and a lifting threaded rod that is threadedly matched with the rotating nut;
旋转螺母转动装配于支架纵梁上,且旋转螺母内部螺纹配合的提升螺纹杆的延伸方向为垂直向下;The rotating nut is rotatably assembled on the longitudinal beam of the bracket, and the extension direction of the lifting threaded rod matched with the inner thread of the rotating nut is vertically downward;
每个支架纵梁下方都通过螺纹升降装置的提升螺纹杆下端吊装有标高梁,提升螺纹杆下端与标高梁为自由转动装配,且标高梁延伸方向与支架纵梁延伸方向相同;An elevation beam is hoisted below each support longitudinal beam through the lower end of the lifting threaded rod of the threaded lifting device. The lower end of the lifting threaded rod and the elevation beam are assembled freely, and the extension direction of the elevation beam is the same as that of the support longitudinal beam;
每一个标高梁下端面都设置有与其延伸方向相同的第三滑动轨道;The lower end surface of each elevation beam is provided with a third sliding track in the same extension direction;
标高梁下方设置有一条与标高梁垂直的整平梁,且整平梁上端两侧设置有两个滑轮Ⅱ,且一个滑轮Ⅱ与其中一条标高梁下端的第三滑动轨道配合滑动,另一个滑轮Ⅱ则与另一条标高梁下端的第三滑动轨道配合滑动;A leveling beam perpendicular to the leveling beam is set under the leveling beam, and two pulleys II are set on both sides of the upper end of the leveling beam, and one pulley II cooperates with the third sliding track at the lower end of one of the leveling beams, and the other pulley Ⅱ slides with the third sliding track at the lower end of another elevation beam;
此结构,标高梁主要通过旋转螺母旋转使提升螺纹杆伸缩,进而实现提升或者下降标高梁,标高梁的位置确定后,可通过锁紧装置锁紧(此处的锁紧装置可选用在升螺纹杆装配锁紧螺母实现,或者通过顶丝进行位置定位),同时实现整平梁能够沿着标高梁的延伸方向移动;In this structure, the elevation beam is mainly rotated by the rotating nut to make the lifting threaded rod expand and contract, and then the elevation beam can be lifted or lowered. After the position of the elevation beam is determined, it can be locked by the locking device (the locking device here can be selected in the ascending thread The rod is assembled with a lock nut, or the position is positioned by the top screw), and at the same time, the leveling beam can move along the extension direction of the elevation beam;
整平梁下端设置有与其延伸方向相同的第四滑动轨道;整平梁下方设置有与整平梁延伸方向相同的整平刮板,且整平刮板上端设置有滑轮Ⅲ与第四滑动轨道配合滑动;The lower end of the leveling beam is provided with the fourth sliding track in the same extension direction; the leveling scraper is provided under the leveling beam in the same extension direction as the leveling beam, and the upper end of the leveling scraper is provided with pulley III and the fourth sliding track Cooperate with sliding;
此结构主要实现,整平刮板能够在整平梁上横向移动,进而可调整整平刮板的整平区域;This structure mainly realizes that the leveling scraper can move laterally on the leveling beam, and then the leveling area of the leveling scraper can be adjusted;
上述技术方案,通过多个滑轮与轨道的配合实现相互垂直的两个整平方向,同时整平刮板能够进行横移,进而保证整平刮板的整平区域完全覆盖两个平行轨道梁之间区域;并且标高梁的可调节,可定位设置,确定了整平刮板整平高度,进而能够完成高度统一的整平操作。The above technical solution achieves two mutually perpendicular leveling directions through the cooperation of multiple pulleys and rails, and at the same time, the leveling scraper can move laterally, thereby ensuring that the leveling area of the leveling scraper completely covers between two parallel track beams In addition, the height beam can be adjusted and positioned to determine the leveling height of the leveling scraper, so as to complete the leveling operation with a uniform height.
作为优选结构,支撑柱为钢筋混凝土支柱时,轨道梁两端通过顶紧器(在轨道梁两端装配可伸缩顶紧器即可)顶紧固定于钢筋混凝土支柱之间;As a preferred structure, when the support column is a reinforced concrete pillar, the two ends of the track beam are tightened and fixed between the reinforced concrete pillars through a jacking device (it is enough to assemble a telescopic jacking device at both ends of the track beam);
当支撑柱为未浇筑混凝土状态时,轨道梁与支撑柱通过紧箍套与此时支撑柱裸露在外的钢筋紧箍固定形成一个稳固的支撑整体;When the support column is in the state of unpoured concrete, the track beam and the support column are fixed with the exposed steel bars of the support column through the clamp sleeve to form a stable support whole;
紧箍套包括:罩置于支撑柱外壁的钢板外罩和用于夹持支撑柱突出钢筋的内部夹持件;The tight hoop includes: a steel plate cover placed on the outer wall of the support column and an internal clamp for clamping the protruding steel bars of the support column;
钢板外罩根据支撑柱外壁轮廓由多个外罩钢板头尾想接围成,且每相邻两个外罩钢板都由螺栓紧固件连接固定;The steel plate cover is surrounded by a plurality of cover steel plates head to tail according to the outline of the outer wall of the support column, and every two adjacent cover steel plates are connected and fixed by bolt fasteners;
内部夹持件包括:与外罩钢板数量相同的夹持钢板和少于外罩钢板数量的夹持角钢;The internal clamping parts include: the same number of clamping steel plates as the number of outer cover steel plates and less clamping angle steels than the number of outer cover steel plates;
夹持角钢与夹持钢板通过紧固螺栓形成一组夹持组,且每一个夹持组夹持支撑柱其中一侧钢筋,其中夹持钢板位于靠近外罩钢板端,夹持角钢的垂直伸出边,向支撑柱中心轴线伸出;The clamping angle steel and the clamping steel plate form a group of clamping groups through fastening bolts, and each clamping group clamps the steel bar on one side of the support column, wherein the clamping steel plate is located near the steel plate end of the outer cover, and the vertical extension of the clamping angle steel side, protruding toward the central axis of the support column;
当夹持角钢装配数量大于2个时,在两个夹持角钢的垂直伸出边通过十字支撑杆连接加固;When the number of clamping angle steel assemblies is greater than 2, the vertical protruding sides of the two clamping angle steels shall be connected and reinforced by cross support rods;
支撑柱剩余钢筋,通过两块夹持钢板与螺栓形成夹持组夹持紧固;The remaining steel bars of the support column are clamped and fastened by two clamping steel plates and bolts to form a clamping group;
位于轨道梁延伸方向上的两块相对设置的外罩钢板外壁通过螺栓装配有轨道梁固定座;The outer walls of the two opposite outer cover steel plates located in the extending direction of the track beam are equipped with track beam fixing seats through bolts;
上述技术方案,主要针对支撑柱为钢筋混凝土支柱时,通过钢筋混凝土支柱本身特性,实现支撑与紧固。The above technical solution is mainly aimed at realizing support and fastening through the characteristics of the reinforced concrete pillar itself when the supporting column is a reinforced concrete pillar.
采用上述技术方案的本实用新型与现有技术相比,具有以下优势:Compared with the prior art, the utility model adopting the above-mentioned technical solution has the following advantages:
1、结构架设简单;1. Simple structure erection;
2、整个机构横纵操作灵活,整平刮板覆盖区域全面,进而大大提高了工作效率;2. The whole mechanism is flexible in horizontal and vertical operations, and the leveling scraper covers a comprehensive area, thereby greatly improving work efficiency;
3、省时,省力,大大降低了工作成本;3. Save time and effort, greatly reduce the cost of work;
4、能够最大限度的利用整平前地面的混凝土,最大限度的避免了混凝土浪费。4. It can maximize the utilization of the concrete before leveling the ground, and avoid the waste of concrete to the greatest extent.
综上,本实用新型为,工作区域设定简单,操作简单灵活,高统一度整平,高效率,省时省力的一种建筑地面找平装置。To sum up, the utility model is a building ground leveling device with simple setting of the working area, simple and flexible operation, high leveling uniformity, high efficiency, and time-saving and labor-saving.
上述说明仅是本实用新型技术方案的概述,为了能够更清楚了解本实用新型的技术手段,而可依照说明书的内容予以实施,并且为了让本实用新型的上述和其他目的、特征和优点能够更明显易懂,以下特举较佳实施例,并配合附图,详细说明如下。The above description is only an overview of the technical solutions of the present utility model. In order to better understand the technical means of the present utility model, it can be implemented according to the contents of the description, and in order to make the above-mentioned and other purposes, features and advantages of the present utility model better It is obvious and easy to understand. The preferred embodiments are specifically cited below, together with the accompanying drawings, and detailed descriptions are as follows.
附图说明Description of drawings
本实用新型共8幅附图,其中:The utility model has 8 drawings in total, in which:
图1为本实用新型的单条工作区域时俯视结构示意图。Fig. 1 is a schematic diagram of the top view structure of a single working area of the present invention.
图2为本实用新型的轨道梁通过顶紧器固定时找平装置侧视结构示意图。Fig. 2 is a schematic side view structure diagram of the leveling device when the track beam of the present invention is fixed by a jacking device.
图3为本实用新型的轨道梁通过顶紧器固定时找平装置主视结构示意图。Fig. 3 is a front structural schematic diagram of the leveling device when the track beam of the present invention is fixed by a jacking device.
图4为本实用新型的找平装置单独支撑使用时俯视结构示意图。Fig. 4 is a top view structural diagram of the leveling device of the present invention when it is supported alone.
图5为本实用新型的找平装置单独支撑使用时侧视结构示意图。Fig. 5 is a schematic diagram of the side view structure of the leveling device of the present invention when it is independently supported and used.
图6为本实用新型的找平装置单独支撑使用时主视结构示意图。Fig. 6 is a schematic diagram of the front view of the leveling device of the present invention when it is used alone.
图7为本实用新型的紧箍套俯视结构示意图。Fig. 7 is a structural schematic diagram of a top view of the tightening collar of the present invention.
图8为本实用新型的紧箍套剖面结构示意图。Fig. 8 is a schematic cross-sectional structure diagram of the tight collar sleeve of the present invention.
图中:1、支撑柱,2、轨道梁,3、找平装置,3.1、承重梁,3.2、第二滑动轨道,3.3、支架横梁,3.4、滑轮Ⅰ,3.5、支架纵梁,3.6、标高梁,3.7、第三滑动轨道,3.8、整平梁,3.9、第四滑动轨道,3.10、整平刮板,3.11、滑轮Ⅱ,3.12、滑轮Ⅲ,4、旋转螺母,5、提升螺纹杆,6、紧箍套,6.1、外罩钢板,6.2、螺栓紧固件,6.3、夹持钢板,6.4、夹持角钢,6.5、轨道梁固定座,7、支墩。In the figure: 1. Support column, 2. Track beam, 3. Leveling device, 3.1, Bearing beam, 3.2, Second sliding track, 3.3, Bracket beam, 3.4, Pulley I, 3.5, Bracket longitudinal beam, 3.6, Elevation beam , 3.7, third sliding track, 3.8, leveling beam, 3.9, fourth sliding track, 3.10, leveling scraper, 3.11, pulley II, 3.12, pulley III, 4, rotating nut, 5, lifting threaded rod, 6 , Hoop sleeve, 6.1, outer cover steel plate, 6.2, bolt fastener, 6.3, clamping steel plate, 6.4, clamping angle steel, 6.5, rail beam fixing seat, 7, buttress.
具体实施方式Detailed ways
如图1、图2、图3、图5和图6所示的一种建筑地面找平装置,包括:支撑柱1,轨道梁2和找平装置3;A building ground leveling device as shown in Figure 1, Figure 2, Figure 3, Figure 5 and Figure 6, comprising: a support column 1, a track beam 2 and a leveling device 3;
轨道梁2每两个平行设置,形成一个轨道组,且每一个轨道梁2都由大于等于2个支撑柱1支撑,并固定在支撑柱1上;Every two track beams 2 are arranged in parallel to form a track group, and each track beam 2 is supported by more than or equal to two supporting columns 1 and fixed on the supporting columns 1;
轨道梁2上端面设置有与轨道梁2延伸方向相同的第一滑动轨道;The upper end surface of the track beam 2 is provided with a first sliding track which extends in the same direction as the track beam 2;
其中,根据建筑地面的面积决定轨道梁2的装配数量,每两个轨道梁2之间区域为整平区域;Wherein, the assembly quantity of the track beam 2 is determined according to the area of the building ground, and the area between every two track beams 2 is a leveling area;
找平装置3包括:Leveling device 3 includes:
两个相互平行设置的承重梁3.1,承重梁3.1与轨道梁2垂直,且每个承重梁3.1两端都设置有滑轮与两个平行设置轨道梁2上端面的第一滑动轨道配合实现滑动;Two load-bearing beams 3.1 arranged parallel to each other, the load-bearing beams 3.1 are perpendicular to the track beam 2, and both ends of each load-bearing beam 3.1 are provided with pulleys to cooperate with the first sliding track on the upper end surface of the two track beams 2 parallel to realize sliding;
此结构主要实现,承重梁3.1能够沿着第一滑动轨道滑动,提供一个工作区域内的主要移动方向;This structure mainly realizes that the load-bearing beam 3.1 can slide along the first sliding track, providing a main moving direction in the working area;
承重梁3.1下端面设置有与承重梁3.1延伸方向相同的第二滑动轨道3.2;The lower end surface of the load-bearing beam 3.1 is provided with a second sliding track 3.2 which extends in the same direction as the load-bearing beam 3.1;
两个相互平行设置的承重梁3.1之间设置有两个相互平行的支架横梁3.3,且支架横梁3.3与承重梁3.1垂直;Two parallel support beams 3.3 are arranged between the two load-bearing beams 3.1 arranged parallel to each other, and the support beams 3.3 are perpendicular to the load-bearing beam 3.1;
支架横梁3.3上端设置有与第二滑动轨道3.2配合滑动的滑轮Ⅰ3.4;The upper end of the bracket beam 3.3 is provided with a pulley I 3.4 that slides with the second sliding track 3.2;
此结构主要实现,支架横梁3.3能够沿着第二滑动轨道3.2移动,实现另一个移动方向;This structure mainly realizes that the support beam 3.3 can move along the second sliding track 3.2 to realize another moving direction;
两个相互平行设置的支架横梁3.3之间设置有两个相互平行的支架纵梁3.5,且支架纵梁3.5与支架横梁3.3垂直;Two parallel support beams 3.5 are arranged between the two parallel support beams 3.3, and the support longitudinal beams 3.5 are perpendicular to the support beams 3.3;
每个支架纵梁3.5上设置有两个螺纹升降装置;Two thread lifting devices are arranged on each support longitudinal beam 3.5;
螺纹升降装置包括:旋转螺母4和与旋转螺母4螺纹配合的提升螺纹杆5;The thread lifting device comprises: a rotating nut 4 and a lifting threaded rod 5 threadedly engaged with the rotating nut 4;
旋转螺母4转动装配于支架纵梁3.5上,且旋转螺母4内部螺纹配合的提升螺纹杆5的延伸方向为垂直向下;The rotating nut 4 is rotated and assembled on the bracket longitudinal beam 3.5, and the extension direction of the lifting threaded rod 5 that is threaded inside the rotating nut 4 is vertically downward;
每个支架纵梁3.5下方都通过螺纹升降装置的提升螺纹杆5下端吊装有标高梁3.6,提升螺纹杆5下端与标高梁3.6为自由转动装配,且标高梁3.6延伸方向与支架纵梁3.5延伸方向相同;Below each support longitudinal beam 3.5, the elevation beam 3.6 is hoisted by the lifting threaded rod 5 lower end of the thread lifting device, and the lifting threaded rod 5 lower end and the elevation beam 3.6 are free-rotating assemblies, and the extension direction of the elevation beam 3.6 extends with the support longitudinal beam 3.5 same direction;
每一个标高梁3.6下端面都设置有与其延伸方向相同的第三滑动轨道3.7;The lower end surface of each elevation beam 3.6 is provided with a third sliding track 3.7 in the same extension direction;
标高梁3.6下方设置有一条与标高梁3.6垂直的整平梁3.8,且整平梁3.8上端两侧设置有两个滑轮Ⅱ3.11,且一个滑轮Ⅱ3.11与其中一条标高梁3.6下端的第三滑动轨道3.6配合滑动,另一个滑轮Ⅱ3.11则与另一条标高梁3.6下端的第三滑动轨道3.6配合滑动;A leveling beam 3.8 perpendicular to the leveling beam 3.6 is arranged below the leveling beam 3.6, and two pulleys II 3.11 are arranged on both sides of the upper end of the leveling beam 3.8, and one pulley II 3.11 is connected to the second pulley at the lower end of one of the leveling beams 3.6. The three sliding tracks 3.6 cooperate to slide, and the other pulley II 3.11 cooperates to slide with the third sliding track 3.6 at the lower end of another elevation beam 3.6;
此结构,标高梁3.6主要通过旋转螺母4旋转使提升螺纹杆5伸缩,进而实现提升或者下降标高梁3.6,标高梁3.6的位置确定后,可通过锁紧装置锁紧(此处的锁紧装置可选用在升螺纹杆5装配锁紧螺母实现,或者通过顶丝进行位置定位),同时实现整平梁3.8能够沿着标高梁3.6的延伸方向移动;In this structure, the elevation beam 3.6 is mainly rotated by the rotating nut 4 to make the lifting threaded rod 5 telescopic, and then realize lifting or lowering the elevation beam 3.6. After the position of the elevation beam 3.6 is determined, it can be locked by a locking device (the locking device here It can be realized by assembling a lock nut on the ascending threaded rod 5, or position positioning by jacking screws), and at the same time realize that the leveling beam 3.8 can move along the extension direction of the elevation beam 3.6;
整平梁3.8下端设置有与其延伸方向相同的第四滑动轨道3.9;整平梁3.8下方设置有与整平梁3.8延伸方向相同的整平刮板3.10,且整平刮板3.10上端设置有滑轮Ⅲ3.12与第四滑动轨道3.9配合滑动;The lower end of the leveling beam 3.8 is provided with the fourth sliding track 3.9 in the same extension direction; the leveling scraper 3.10 is provided under the leveling beam 3.8 in the same extension direction as the leveling beam 3.8, and the upper end of the leveling scraper 3.10 is provided with a pulley Ⅲ3.12 cooperates with the fourth sliding track 3.9 to slide;
此结构主要实现,整平刮板3.10能够在整平梁3.8上横向移动,进而可调整整平刮板3.10的整平区域;This structure mainly realizes that the leveling scraper 3.10 can move laterally on the leveling beam 3.8, and then the leveling area of the leveling scraper 3.10 can be adjusted;
上述技术方案,通过多个滑轮与轨道的配合实现相互垂直的两个整平方向,同时整平刮板3.10能够进行横移,进而保证整平刮板3.10的整平区域完全覆盖两个平行轨道梁2之间区域;并且标高梁的可调节,可定位设置,确定了整平刮板3.10整平高度,进而能够完成高度统一的整平操作。The above technical solution realizes two mutually perpendicular leveling directions through the cooperation of multiple pulleys and rails, and at the same time, the leveling scraper 3.10 can move laterally, thereby ensuring that the leveling area of the leveling scraper 3.10 completely covers the two parallel tracks The area between the beams 2; and the height of the beam can be adjusted and positioned, which determines the leveling height of the leveling scraper 3.10, and thus can complete the leveling operation with a uniform height.
其中,如图4所示,找平装置3可单独使用,只需要为承重梁3.1提供有效支撑(通常选用单独设置支墩7,将两个承重梁3.1平行支撑,支墩7的数量根据实际支撑情况而定;)即可实现找平装置3的单独装配使用,找平装置3的使用过程与上述技术方案相同,且找平装置3工作有效区域则为找平装置3正投影覆盖面积。Among them, as shown in Figure 4, the leveling device 3 can be used alone, and only needs to provide effective support for the load-bearing beam 3.1 (usually select a separate buttress 7 to support the two load-bearing beams 3.1 in parallel, and the number of buttresses 7 depends on the actual support. Depending on the situation;) can realize the separate assembly and use of the leveling device 3, the use process of the leveling device 3 is the same as the above technical solution, and the effective area of the leveling device 3 is the coverage area of the leveling device 3 orthographic projection.
如图7和图8所示,作为优选结构,支撑柱1为钢筋混凝土支柱时,轨道梁2两端通过顶紧器顶紧固定于钢筋混凝土支柱之间;As shown in Figure 7 and Figure 8, as a preferred structure, when the support column 1 is a reinforced concrete pillar, the two ends of the track beam 2 are tightened and fixed between the reinforced concrete pillars by a jacking device;
当支撑柱1为未浇筑混凝土状态时,轨道梁2与支撑柱1通过紧箍套6与此时支撑柱1裸露在外的钢筋紧箍固定形成一个稳固的支撑整体;When the support column 1 is in the state of unpoured concrete, the track beam 2 and the support column 1 are fixed to form a stable supporting whole through the tightening hoop 6 and the exposed reinforcement hoop of the support column 1 at this time;
紧箍套6包括:罩置于支撑柱1外壁的钢板外罩和用于夹持支撑柱1突出钢筋的内部夹持件;The hoop cover 6 includes: a steel plate cover placed on the outer wall of the support column 1 and an internal clamping piece for clamping the protruding steel bars of the support column 1;
钢板外罩根据支撑柱1外壁轮廓由多个外罩钢板6.1头尾想接围成,且每相邻两个外罩钢板6.1都由螺栓紧固件6.2连接固定;The steel plate cover is surrounded by a plurality of cover steel plates 6.1 head to tail according to the outline of the outer wall of the support column 1, and every two adjacent cover steel plates 6.1 are connected and fixed by bolt fasteners 6.2;
内部夹持件包括:与外罩钢板6.1数量相同的夹持钢板6.3和少于外罩钢板6.1数量的夹持角钢6.4;The internal clamping parts include: clamping steel plate 6.3 with the same number as the outer cover steel plate 6.1 and clamping angle steel 6.4 with less number than the outer cover steel plate 6.1;
夹持角钢6.4与夹持钢板6.3通过紧固螺栓形成一组夹持组,且每一个夹持组夹持支撑柱1其中一侧钢筋,其中夹持钢板6.3位于靠近外罩钢板6.1端,夹持角钢6.4的垂直伸出边,向支撑柱1中心轴线伸出;The clamping angle steel 6.4 and the clamping steel plate 6.3 form a group of clamping groups by fastening bolts, and each clamping group clamps the steel bars on one side of the support column 1, wherein the clamping steel plate 6.3 is located near the end of the outer cover steel plate 6.1, and the clamping The vertical protruding edge of the angle steel 6.4 protrudes toward the central axis of the support column 1;
当夹持角钢6.4装配数量大于2个时,在两个夹持角钢6.4的垂直伸出边通过十字支撑杆连接加固;When the assembly quantity of the clamping angle steel 6.4 is greater than 2, the vertical protruding sides of the two clamping angle steels 6.4 are connected and reinforced by cross support rods;
支撑柱1剩余钢筋,通过两块夹持钢板6.3与螺栓形成夹持组夹持紧固;The remaining steel bars of the support column 1 are clamped and fastened by two clamping steel plates 6.3 and bolts to form a clamping group;
位于轨道梁2延伸方向上的两块相对设置的外罩钢板6.1外壁通过螺栓装配有轨道梁固定座6.5;The outer walls of two opposite outer cover steel plates 6.1 located in the extending direction of the track beam 2 are equipped with a track beam fixing seat 6.5 through bolts;
上述技术方案,主要针对支撑柱1为钢筋混凝土支柱时,通过钢筋混凝土支柱本身特性,实现支撑与紧固。The above technical solution is mainly aimed at realizing support and fastening through the characteristics of the reinforced concrete pillar itself when the supporting column 1 is a reinforced concrete pillar.
综上,本实用新型为,工作区域设定简单,操作简单灵活,高统一度整平,高效率,省时省力的一种建筑地面找平装置。To sum up, the utility model is a building ground leveling device with simple setting of the working area, simple and flexible operation, high leveling uniformity, high efficiency, and time-saving and labor-saving.
以上所述,仅是本实用新型的较佳实施例而已,并非对本实用新型作任何形式上的限制,虽然本实用新型已以较佳实施例揭露如上,然而并非用以限定本实用新型,任何熟悉本专业的技术人员在不脱离本实用新型技术方案范围内,当可利用上诉揭示的技术内容做出些许更动或修饰为等同变化的等效实施例,但凡是未脱离本实用新型技术方案的内容,依据本实用新型的技术实质对以上实施例所做的任何简单修改、等同变化与修饰,均仍属于本实用新型技术方案的范围内。The above are only preferred embodiments of the present utility model, and do not limit the utility model in any form. Although the utility model has been disclosed as above with preferred embodiments, it is not intended to limit the utility model. Any Those who are familiar with this profession can use the technical content disclosed in the appeal to make some changes or modify them into equivalent embodiments without departing from the technical solution of the utility model without departing from the technical solution of the utility model. Any simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the utility model still belong to the scope of the technical solution of the utility model.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420826205.0U CN204326548U (en) | 2014-12-23 | 2014-12-23 | A kind of building floor leveling unit |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420826205.0U CN204326548U (en) | 2014-12-23 | 2014-12-23 | A kind of building floor leveling unit |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204326548U true CN204326548U (en) | 2015-05-13 |
Family
ID=53162921
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420826205.0U Expired - Fee Related CN204326548U (en) | 2014-12-23 | 2014-12-23 | A kind of building floor leveling unit |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204326548U (en) |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109208877A (en) * | 2018-10-25 | 2019-01-15 | 浙江百施通智能科技有限公司 | Floor leveling work head |
| CN109235897A (en) * | 2018-10-29 | 2019-01-18 | 武汉星级工长建材有限公司 | The levelling constructing device of small area |
| CN110261576A (en) * | 2019-05-28 | 2019-09-20 | 河海大学 | A kind of smooth sink Neihuang County sand drift build-up surface device in laboratory |
| CN110344594A (en) * | 2019-07-25 | 2019-10-18 | 丽水中影机械科技有限公司 | A kind of automatic cement pours device |
| CN111535560A (en) * | 2020-05-19 | 2020-08-14 | 罗发鑫 | Rolling device for concrete floor leveling |
| CN111852027A (en) * | 2020-07-13 | 2020-10-30 | 沈禹荣 | Concrete strickling device and strickling method for building construction |
| CN115288371A (en) * | 2022-09-01 | 2022-11-04 | 中铁十一局集团有限公司 | Slope roof concrete pouring construction method |
| CN116024864A (en) * | 2022-11-28 | 2023-04-28 | 民航机场建设工程有限公司 | Novel airport channel quick leveling system |
-
2014
- 2014-12-23 CN CN201420826205.0U patent/CN204326548U/en not_active Expired - Fee Related
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109208877A (en) * | 2018-10-25 | 2019-01-15 | 浙江百施通智能科技有限公司 | Floor leveling work head |
| CN109235897A (en) * | 2018-10-29 | 2019-01-18 | 武汉星级工长建材有限公司 | The levelling constructing device of small area |
| CN109235897B (en) * | 2018-10-29 | 2024-02-13 | 武汉星级工长建材有限公司 | Small-area leveling construction device |
| CN110261576A (en) * | 2019-05-28 | 2019-09-20 | 河海大学 | A kind of smooth sink Neihuang County sand drift build-up surface device in laboratory |
| CN110344594A (en) * | 2019-07-25 | 2019-10-18 | 丽水中影机械科技有限公司 | A kind of automatic cement pours device |
| CN111535560A (en) * | 2020-05-19 | 2020-08-14 | 罗发鑫 | Rolling device for concrete floor leveling |
| CN111535560B (en) * | 2020-05-19 | 2021-06-22 | 苏中市政工程有限公司 | Rolling device for concrete floor leveling |
| CN111852027A (en) * | 2020-07-13 | 2020-10-30 | 沈禹荣 | Concrete strickling device and strickling method for building construction |
| CN115288371A (en) * | 2022-09-01 | 2022-11-04 | 中铁十一局集团有限公司 | Slope roof concrete pouring construction method |
| CN116024864A (en) * | 2022-11-28 | 2023-04-28 | 民航机场建设工程有限公司 | Novel airport channel quick leveling system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204326548U (en) | A kind of building floor leveling unit | |
| CN102472050B (en) | Sheet formwork system | |
| CN204225145U (en) | A kind of simple and easy orientation tool for basic embedding anchor bolts | |
| CN108442693A (en) | Quick-moving installation support system | |
| CN106065681B (en) | It is a kind of based on BIM technology overall assembled building in superimposed sheet hoard strip construction method | |
| CN105696789A (en) | Vertical aluminum mould building system and construction method thereof | |
| CN104755681A (en) | A panel support bracket | |
| CN103967273B (en) | Concrete form support device for floor slab pouring | |
| CN103306208A (en) | Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier | |
| CN212534174U (en) | Raft foundation steel bar supporting tool | |
| CN204278223U (en) | Prefabricated case beam steel bar binding clamping fixture | |
| CN102691412A (en) | Prefabricated frame structure connection supporting template with adjustable vertical height | |
| CN207526100U (en) | Wall is poured with aluminum alloy pattern plate leveling and ruggedized construction | |
| CN111502253A (en) | Jacking type formwork-supporting-free system for beam-concentrating system steel structure building floor and construction method | |
| CN202000265U (en) | Concrete construction formwork for high pier of bridge | |
| CN106150105A (en) | A kind of stiffened column installation method | |
| CN109629447B (en) | Variable cross-section cast-in-situ box girder construction and concrete pouring method | |
| CN208310244U (en) | A kind of device for control panel surface evenness | |
| CN213174742U (en) | Top bracing steel stand structure | |
| CN206376275U (en) | A kind of construction elevator base apparatus on basement roof | |
| CN204876577U (en) | Building construction system | |
| CN210976594U (en) | Auxiliary mounting device for laminated plate | |
| CN205116749U (en) | A track strutting arrangement that is used for large -span steel construction wholly to slide | |
| CN203684699U (en) | Control board type structure concrete elevation and smoothness device | |
| CN203361641U (en) | Combined type steel formwork of cast-in-place staircase |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150513 |