Prior art keywords
support column
forging
fixed beam
easy
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920930617.1U
Other languages
Chinese (zh)
Inventor
Xiaojun Pan
潘小军
Zhihong Zhou
周志宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGZHOU WUJIN SECOND FLANGE FORGING Co Ltd
Original Assignee
CHANGZHOU WUJIN SECOND FLANGE FORGING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGZHOU WUJIN SECOND FLANGE FORGING Co Ltd filed Critical CHANGZHOU WUJIN SECOND FLANGE FORGING Co Ltd
Priority to CN201920930617.1U priority Critical patent/CN210193244U/en
Application granted granted Critical
Publication of CN210193244U publication Critical patent/CN210193244U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The forging hoisting rack for the flange easy to operate mainly comprises a hoisting frame and a hoisting tool; the gallows mainly includes the support frame and sets up in the crossbeam at two support frame tops, the hoist is including setting up the electric block on the crossbeam and connecting the hanging frame on the electric block lifting hook, the support frame is the herringbone, including two spinal branch vaulting poles, two spinal branch vaulting pole bottoms set up the fixed beam, the fixed beam evenly sets up a plurality of vertically supported holes along length direction, set up corresponding support column in the supported hole, set up a plurality of horizontal round pin shaft holes along the direction of height on the support column, the supported hole lateral wall sets up horizontal through-hole, support column and fixed beam are by round pin hub connection, this handling rack construction design science, transport efficiently, easy operation.

Description

Easy-to-operate forging lifting rack for flange
Technical Field
The utility model relates to a flange field of making especially relates to an easy forging handling frame for operation flange.
Background
A Flange (Flange), also known as a Flange collar or Flange. The flange is a part for connecting the shafts and is used for connecting pipe ends; there are also flanges on the inlet and outlet of the device for connection between two devices.
The forging process of the flange generally comprises the following procedures of selecting high-quality steel billets for blanking, heating, forming, cooling after forging.
The forging device is forged to the forging removal of need transporting behind the billet unloading calcination formation forging, and at present miniature forging all transports by the manual work, and the workman utilizes the instrument to carry the connection steel pole of holding the forging tip, transports the forging to the forging device on, and whole process is hard consuming time to transport the process and also scald easily, efficiency is not high.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome the not enough of prior art, provide a structural design science, transport efficiently, easy operation's easy operation forging handling frame for flange.
For realizing the utility model provides the following technical scheme:
the forging hoisting rack for the flange easy to operate mainly comprises a hoisting frame and a hoisting tool; the hanger mainly comprises support frames and cross beams arranged at the tops of the two support frames, the hanger comprises an electric hoist arranged on the cross beams and a hanging frame connected to a hanging hook of the electric hoist, the hanging frame is in an inverted T shape and comprises a horizontal part and a vertical part, a hanging hole is formed in the top end of the vertical part, the hanging hook of the electric hoist is hooked in the hanging hole, a plurality of connecting holes are uniformly formed in the horizontal part along the length direction, and chains are arranged in the connecting holes; the support frame is herringbone, and includes two spinal branch vaulting poles, two spinal branch vaulting pole bottoms set up fixed beam, fixed beam evenly sets up a plurality of vertically supported holes along length direction, set up corresponding support column in the supported hole, set up a plurality of horizontal round pin shaft holes along the direction of height on the support column, the supported hole lateral wall sets up horizontal through-hole, the support column is connected by the round pin axle with fixed beam.
Furthermore, a clamping block is arranged at the center of the bottom of the supporting column and clamped into the sliding track, and buffer layers are arranged on the contact surfaces of the supporting column and the sliding track.
Furthermore, an inclined reinforcing rib is arranged between the horizontal part and the vertical part of the hanging frame.
Further, pulleys are further arranged at two ends of the bottom of the fixed beam and are arranged in the sliding track.
Furthermore, a handle is arranged at the top of the support column.
The utility model discloses an useful part:
firstly, the method comprises the following steps: the electric hoist and the hanging frame are utilized, a plurality of forgings can be conveyed at the same time, the efficiency is high, and the operation is simple and safe;
secondly, the method comprises the following steps: the pulleys are arranged at the two ends of the bottom of the fixed beam, so that the moving position of the hanging bracket is convenient, the hanging bracket can move among a plurality of forging stations, and the enterprise cost is saved;
thirdly, the method comprises the following steps: the fixed beam is provided with a support column, and the support column is connected with the fixed beam through a pin shaft; during movement, the pin shaft is connected with a pin shaft hole at the lower part of the side wall of the support column, and the support column is folded; when the hanger is fixed, the pin shaft is connected with a pin shaft hole in the upper part of the side wall of the support column, the support column sinks, a clamping block in the center of the bottom of the support column is clamped into the sliding track, and the hanger is fixed.
Drawings
Fig. 1 is a front view of the present invention.
Fig. 2 is a side view of the hanger.
Fig. 3 is a schematic view of a support column structure.
In the figure: 1 is a support frame, 1.1 is a support rod, 2 is a beam, 3 is an electric hoist, 3.1 is a lifting hook, 4 is a hanging frame, 4.1 is a horizontal part, 4.2 is a vertical part, 4.3 is a hanging hole, 4.4 is a connecting hole, 4.5 is a chain, 4.6 is a reinforcing rib, 5 is a fixed beam, 5.1 is a support hole, 6 is a support column, 6.1 is a pin shaft hole, 6.2 is a clamping block, 6.3 is a lifting handle, 7 is a pin shaft, 8 is a pulley, 9 is a sliding rail, 10 is a forging piece, and 10.1 is a connecting steel rod.
Detailed Description
In order to make the technical problem, technical solution and advantageous effects to be solved by the present invention more clearly understood, the following description is given in conjunction with the accompanying drawings and embodiments to illustrate the present invention in further detail. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the invention.
It will be understood that when an element is referred to as being "secured to" or "disposed on" another element, it can be directly on the other element or be indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or be indirectly connected to the other element.
It will be understood that the terms "length," "width," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in an orientation or positional relationship indicated in the drawings for convenience in describing the invention and to simplify the description, and are not intended to indicate or imply that the device or element so referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
The forging hoisting rack for the flange easy to operate mainly comprises a hoisting frame and a hoisting tool; the hanger mainly comprises support frames 1 and cross beams 2 arranged at the tops of the two support frames 1, the hanger comprises an electric hoist 3 arranged on the cross beam 2 and a hanging frame 4 connected to a hanging hook 3.1 of the electric hoist 3, the hanging frame 4 is in an inverted T shape and comprises a horizontal part 4.1 and a vertical part 4.2, a hanging hole 4.3 is formed in the top end of the vertical part 4.2, the hanging hook 3.1 of the electric hoist 3 is hooked in the hanging hole 4.3, the horizontal part 4.1 is uniformly provided with a plurality of connecting holes 4.4 along the length direction, and chains 4.5 are arranged in the connecting holes 4.4; the support frame 1 is herringbone and comprises two support rods 1.1, the bottom parts of the two support rods 1.1 are provided with fixed beams 5, a plurality of vertical supporting holes 5.1 are uniformly arranged along the length direction of the fixed beam 5, corresponding supporting columns 6 are arranged in the supporting holes 5.1, a plurality of horizontal pin shaft holes 6.1 are arranged on the supporting column 6 along the height direction, horizontal through holes are arranged on the side wall of the supporting hole 5.1, the supporting column 6 is connected with the fixed beam 5 by a pin shaft 6, a clamping block 6.2 is arranged at the center of the bottom of the supporting column 6, the clamping blocks 6.2 are clamped in the sliding track 9, buffer layers are arranged on the contact surfaces of the supporting columns 6 and the sliding track 9, an inclined reinforcing rib 4.6 is arranged between the horizontal part 4.1 and the vertical part 4.2 of the hanging frame 4, fixed beam 5 bottom both ends still set up pulley 8, pulley 8 is arranged in slip track 9, handle 6.3 are still established at 6 tops of support column.
The working principle of the lifting rack is as follows:
lifting the support column 6 by using the lifting handle 6.3, aligning a pin shaft hole 6.1 at the lower part of the side wall of the support column 6 with a horizontal through hole of the side wall of the support hole 5.1, fixing by using a pin shaft 6, and enabling the hanger to move along the sliding track 9; after the hanger is moved to a designated position, the pin shaft 6 is pulled out, the support pillar 6 is put down, a pin shaft hole 6.1 at the upper part of the side wall of the support pillar 6 is aligned with a horizontal through hole at the side wall of the support hole 5.1, the clamping block 6.2 is clamped into the sliding track 9 and fixed by the pin shaft 6, and the hanger is fixed; open electric block 3 and will hang frame 4 and remove to burning furnace one side, utilize the instrument will calcine connecting steel pole 10.1 at forging 10 top and collude on chain 4.5, collude good back and move electric block 3, will hang frame 4 and remove to forging device one side, take down the forging, place in forging device, can forge, whole process easy operation, transport efficiency is high.
The present invention is not limited to the above-mentioned easy-to-operate frame for lifting forged pieces for flanges, and those skilled in the art can make various changes according to the above-mentioned embodiments, but any changes equivalent or similar to the present invention are also included in the scope of the claims of the present invention.

Claims (5)

1. Easy operation forging handling frame for flange, its characterized in that: mainly comprises a hanger and a lifting appliance; the hanger mainly comprises support frames and cross beams arranged at the tops of the two support frames, the hanger comprises an electric hoist arranged on the cross beams and a hanging frame connected to a hanging hook of the electric hoist, the hanging frame is in an inverted T shape and comprises a horizontal part and a vertical part, a hanging hole is formed in the top end of the vertical part, the hanging hook of the electric hoist is hooked in the hanging hole, a plurality of connecting holes are uniformly formed in the horizontal part along the length direction, and chains are arranged in the connecting holes; the support frame is herringbone, and includes two spinal branch vaulting poles, two spinal branch vaulting pole bottoms set up fixed beam, fixed beam evenly sets up a plurality of vertically supported holes along length direction, set up corresponding support column in the supported hole, set up a plurality of horizontal round pin shaft holes along the direction of height on the support column, the supported hole lateral wall sets up horizontal through-hole, the support column is connected by the round pin axle with fixed beam.
2. The forging lifting rack for the easy-to-operate flange according to claim 1, characterized in that: the center of the bottom of the support column is provided with a fixture block which is clamped into the sliding track, and the contact surfaces of the support column and the sliding track are provided with buffer layers.
3. The forging lifting rack for the easy-to-operate flange according to claim 1, characterized in that: an inclined reinforcing rib is further arranged between the horizontal part and the vertical part of the hanging frame.
4. The forging lifting rack for the easy-to-operate flange according to claim 1, characterized in that: pulleys are further arranged at two ends of the bottom of the fixed beam and are arranged in the sliding rail.
5. The forging lifting rack for the easy-to-operate flange according to claim 1, characterized in that: and a lifting handle is also arranged at the top of the supporting column.
CN201920930617.1U 2019-06-20 2019-06-20 Easy-to-operate forging lifting rack for flange Expired - Fee Related CN210193244U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920930617.1U CN210193244U (en) 2019-06-20 2019-06-20 Easy-to-operate forging lifting rack for flange

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920930617.1U CN210193244U (en) 2019-06-20 2019-06-20 Easy-to-operate forging lifting rack for flange

Publications (1)

Publication Number Publication Date
CN210193244U true CN210193244U (en) 2020-03-27

Family

ID=69871253

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920930617.1U Expired - Fee Related CN210193244U (en) 2019-06-20 2019-06-20 Easy-to-operate forging lifting rack for flange

Country Status (1)

Country Link
CN (1) CN210193244U (en)

Similar Documents

Publication Publication Date Title
CN109987390B (en) Horizontal spraying pretreatment and shelving device for aluminum profile
WO2020140695A1 (en) Novel pipe cutting apparatus
CN106514254B (en) Suspension type motor -cycle frame assembly assembly system and method
CN201864452U (en) Mechanically-controlled lifting device for ring piece
CN210193244U (en) Easy-to-operate forging lifting rack for flange
CN208135446U (en) A kind of steel structure frame assembly profile transport device
CN102476776A (en) Ring lifting tool with function of mechanical control
CN104495602A (en) Stretcher jaw equipment lifting method and device thereof
CN102001583A (en) Semi-automatic brick hanging fixture
CN206305732U (en) Suspension type motor -cycle frame assembly assembles device
CN205820693U (en) Multiple degrees of freedom steel ingot demoulding sling
CN214032677U (en) Automatic piece feeding device for vacuum coating
CN210236845U (en) Adjustable hanger for component steel reinforcement cage
CN211169550U (en) Hoisting device for maintaining and replacing speed reducer
CN202358831U (en) Clamp for crucible
CN216334474U (en) Conveyor of walking wheel production usefulness
CN201980854U (en) Semi-automatic brick-suspending clamp
CN105151746A (en) Workpiece inversion mechanism
CN209919847U (en) Automatic turning supporting device for section steel
CN211769996U (en) Movable gantry hanging bracket
CN210261947U (en) Automatic discharging galvanizing hanger
CN210796591U (en) Special tooling hanger for air cooling coil pipe
CN218753105U (en) Empty frame lifting conveying system
CN210420106U (en) Material frame for homogenizing aluminum alloy cast ingot
CN210388884U (en) Line that production resin grinding wheel was used hangs couple and contains line of hanging couple hangs device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200327

CF01 Termination of patent right due to non-payment of annual fee