CN210140823U - Construction platform for quickly assembling steel pipe pile and vibration hammer - Google Patents

Construction platform for quickly assembling steel pipe pile and vibration hammer Download PDF

Info

Publication number
CN210140823U
CN210140823U CN201920680346.9U CN201920680346U CN210140823U CN 210140823 U CN210140823 U CN 210140823U CN 201920680346 U CN201920680346 U CN 201920680346U CN 210140823 U CN210140823 U CN 210140823U
Authority
CN
China
Prior art keywords
platform
vibration hammer
steel pipe
pipe pile
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920680346.9U
Other languages
Chinese (zh)
Inventor
李亚军
王博
杨妍
张兵
吴小勇
李松
李晓龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GENERAL CONTRACTING BRANCH Co OF CCCC FIRST HARBOR ENGINEERING Co Ltd
CCCC First Harbor Engineering Co Ltd
Original Assignee
GENERAL CONTRACTING BRANCH Co OF CCCC FIRST HARBOR ENGINEERING Co Ltd
CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GENERAL CONTRACTING BRANCH Co OF CCCC FIRST HARBOR ENGINEERING Co Ltd, CCCC First Harbor Engineering Co Ltd filed Critical GENERAL CONTRACTING BRANCH Co OF CCCC FIRST HARBOR ENGINEERING Co Ltd
Priority to CN201920680346.9U priority Critical patent/CN210140823U/en
Application granted granted Critical
Publication of CN210140823U publication Critical patent/CN210140823U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a construction platform for fast assembling and splicing steel pipe piles and a vibration hammer, which comprises a turnover shaft, a turnover support, an upper platform, a jack, a lower platform, a walking steel wheel, a track and a traction winch; when the pile overturning device is operated, hoisting equipment is used for hoisting the vibration hammer, moving the vibration hammer to the position above the platform, and dropping the vibration hammer to enable the pile overturning shaft to fall on the pile overturning support; continuously dropping the vibration hammer to enable the vibration hammer to turn to one side under the action of gravity, and stacking sleepers on the platform to enable the vibration hammer to be horizontally placed on the platform; then starting a winch, and dragging the platform and the vibration hammer to the steel pipe pile along a rail to enable the steel pipe pile to be inserted into a clamp of the vibration hammer; and then opening the vibration hammer clamp to enable the clamp to clamp the steel pipe pile. The utility model can realize the assembly of the steel pipe pile and the vibration hammer quickly and accurately during the construction of the steel pipe pile; the construction method has the advantages of being convenient and fast to construct, ensuring the operation safety, reducing the construction cost and the like.

Description

Construction platform for quickly assembling steel pipe pile and vibration hammer
Technical Field
The utility model relates to a wind-powered electricity generation field, particularly a construction platform that is used for steel-pipe pile and quick spelling of vibratory hammer.
Background
With the development of engineering technology, single-pile or multi-pile foundations formed by steel pipe piles are increasingly applied to river-crossing bridges, sea-crossing bridges, high-pile wharfs, offshore wind power and other projects. When the pile is sunk by adopting the vibration hammer mode, the steel pipe pile and the vibration hammer are mainly assembled and spliced in two modes, one mode is that when the steel pipe pile is horizontally placed, the vibration hammer is lifted by using double hooks of hoisting equipment and then turned over to be horizontal, then the vibration hammer and the steel pipe pile are moved to be assembled and spliced, and the other mode is that after the steel pipe pile is firstly erected by adopting a pile stabilizing measure, the vibration hammer is lifted by using the hoisting equipment and then assembled and spliced in high altitude.
However, when the steel pipe pile is horizontally placed for assembly, the pituitary body swings to some extent after the vibration hammer is lifted by the hoisting equipment, especially during the construction on water, the crane ship is mostly used for hanging the hammer, the steel pipe pile is placed on the transport ship, and the mutual swinging of the crane ship and the transport ship is large, so that the assembly of the vibration hammer and the steel pipe pile is difficult to accurately and quickly realize; therefore this patent is one kind here is used for the construction platform of quick assembly of steel-pipe pile and vibratory hammer, the assembly of completion vibratory hammer and steel pipe that can be quick accurate.
SUMMERY OF THE UTILITY MODEL
Therefore, in order to solve the above-mentioned not enough, the utility model provides a construction platform that is used for quick spelling of steel-pipe pile and vibratory hammer here, the completion vibratory hammer that can be accurate fast has construction convenience swiftly with the spelling of steel pipe, reduces advantages such as the spelling degree of difficulty.
The utility model is realized in such a way that a construction platform for rapidly assembling and splicing the steel pipe pile and the vibration hammer is constructed, and the platform comprises a turnover shaft, a turnover bracket, an upper platform, a jack, a lower platform, a walking steel wheel and a traction winch; the turnover shaft is arranged on the vibrating hammer, the jack is arranged between the upper platform and the lower platform, the turnover support is arranged on the upper platform, the walking steel wheel is arranged below the lower platform, the whole body formed by the upper platform and the lower platform is connected with the winch, and the turnover shaft can move under the traction of the winch. This patent can be quick accurate completion vibratory hammer and the spelling of steel pipe, has that construction convenience is swift, reduces advantages such as the spelling degree of difficulty.
Preferably, the platform further comprises a limiting track used for controlling the moving direction of the platform, and the limiting track corresponds to the walking steel wheels in position.
Preferably, the overturning shaft is arranged on one side of the vertical line of the gravity center of the vibratory hammer in a vertical state.
Optimally, the upper platform and the lower platform are nested together; a sleeper is arranged above the upper platform.
Preferably, the jacks are multiple groups and are respectively arranged at two ends between the upper platform and the lower platform, and the height of the vibration hammer is adjusted by lifting of the jacks.
Preferably, the walking steel wheel is a steel pipe. The winding engine is 2 groups.
The utility model has the advantages of as follows: the patent provides a platform for quickly assembling offshore wind power steel pipe piles and a vibration hammer, which comprises a turnover shaft, a turnover support, an upper platform, a jack, a lower platform, a walking steel wheel, a track and a traction winch, wherein the turnover support is arranged on the turnover shaft; the turnover shaft is arranged on the vibrating hammer, the jack is arranged between the upper platform and the lower platform, the turnover support is arranged on the upper platform, the walking steel wheel is arranged below the lower platform, and the whole body is moved under the traction of the traction winch.
When the pile overturning device is operated, hoisting equipment is used for hoisting the vibration hammer, moving the vibration hammer to the position above the platform, and dropping the vibration hammer to enable the pile overturning shaft to fall on the pile overturning support; continuously dropping the vibration hammer to enable the vibration hammer to turn to one side under the action of gravity, and stacking sleepers on the platform to enable the vibration hammer to be horizontally placed on the platform; then starting a winch, and dragging the platform and the vibration hammer to the steel pipe pile along a rail to enable the steel pipe pile to be inserted into a clamp of the vibration hammer; and then opening the vibration hammer clamp to enable the clamp to clamp the steel pipe pile. The utility model can realize the assembly of the steel pipe pile and the vibration hammer quickly and accurately during the construction of the steel pipe pile; the construction method has the advantages of being convenient and fast to construct, ensuring the operation safety, reducing the construction cost and the like.
Drawings
FIG. 1 is a schematic view of the vibratory hammer of the present patent positioned on a platform;
fig. 2 is a schematic diagram of the assembly of the vibration hammer and the steel pipe pile.
Wherein: 1. a vibratory hammer; 2. a turning shaft; 3. an upper support shaft bracket; 4. turning over the bracket; 5. an upper platform; 6. a jack; 7. a lower platform; 8. a traveling steel wheel; 9. a limiting track; 10. a winch; 11. crossties; 12. steel pipe piles; 13. and (6) pile support.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings 1-2, wherein the technical solutions in the embodiments of the present invention are clearly and completely described, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a construction platform for fast assembling and splicing steel pipe piles and a vibration hammer through improvement, which can be implemented as follows as shown in the figure; the platform comprises a turnover shaft 2, a turnover support 4, an upper platform 5, a jack 6, a lower platform 7, a walking steel wheel 8 and a traction winch 10; the turnover shaft 2 is arranged on the vibration hammer 1, the jack 6 is arranged between the upper platform 5 and the lower platform 7, the turnover support 4 is arranged on the upper platform 5, the walking steel wheel 8 is arranged below the lower platform 7, the whole body formed by the upper platform 5 and the lower platform 7 is connected with the winch 10, and the movement is realized under the traction of the winch 10.
As shown in fig. 1, the platform further comprises a limit track 9 for controlling the moving direction of the platform; the position of the limit track 9 corresponds to the position of the walking steel wheel 8. The traveling steel wheel 8 is a steel pipe; the hoist 10 is 2 groups.
The jacks 6 are arranged at two ends between the upper platform 5 and the lower platform 7 respectively, and the height of the vibration hammer 1 is adjusted by lifting the jacks 6. The turning shaft 2 is installed on one side of a perpendicular line of the center of gravity of the vibratory hammer 1 in a vertically-placed state. The upper platform 5 and the lower platform 7 are nested together; above the upper platform 5 there is a sleeper 11.
This patent is used for steel-pipe pile and vibratory hammer spelling's operating procedure as follows:
step 1: and hoisting the vibration hammer 1 by using hoisting equipment, moving the vibration hammer 1 to the upper part of the platform, and dropping the vibration hammer 1 to enable the pile turning shaft to fall on the pile turning support 4.
Step 2: and continuously dropping the vibration hammer 1, so that the vibration hammer 1 is turned to one side under the action of gravity, and sleepers 11 are stacked on the platform, so that the vibration hammer can be horizontally placed on the platform.
And step 3: and starting the winch 10, pulling the platform and the vibration hammer to the steel pipe pile 12 along the rail, and inserting the steel pipe pile 12 into a clamp of the vibration hammer.
And 4, step 4: and opening the vibration hammer clamp to enable the clamp to tightly clamp the steel pipe pile 12.
To sum up, this patent provides a construction platform that is used for quick assembly of steel-pipe pile and vibratory hammer, and this platform includes trip shaft, upset support, upper mounting plate, jack, lower platform, walking steel wheel, track, traction winch to constitute, and wherein, the trip shaft is installed on the vibratory hammer, has the jack between upper mounting plate and the lower platform, installs the upset support on the upper mounting plate, and there is the walking steel wheel below the lower platform, and the whole of constitution realizes removing under traction winch's the traction. This patent can be quick accurate completion vibratory hammer and the spelling of steel pipe, has that construction convenience is swift, reduces advantages such as the spelling degree of difficulty.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (7)

1. The construction platform is used for quickly assembling and splicing the steel pipe pile and the vibration hammer and is characterized in that the steel pipe pile and the vibration hammer are assembled and spliced together; the platform comprises a turnover shaft (2), a turnover support (4), an upper platform (5), a jack (6), a lower platform (7), a traveling steel wheel (8) and a traction winch (10); the turnover mechanism is characterized in that the turnover shaft (2) is installed on the vibration hammer (1), a jack (6) is arranged between the upper platform (5) and the lower platform (7), the turnover support (4) is installed on the upper platform (5), a walking steel wheel (8) is arranged below the lower platform (7), the whole body formed by the upper platform (5) and the lower platform (7) is connected with a winch (10), and the turnover mechanism is pulled by the winch (10) to move.
2. The construction platform for the rapid assembling of the steel pipe pile and the vibration hammer according to claim 1, characterized in that; the platform also comprises a limiting track (9) used for controlling the moving direction of the platform, and the position of the limiting track (9) corresponds to that of the walking steel wheel (8).
3. The construction platform for the rapid assembling of the steel pipe pile and the vibration hammer according to claim 1, characterized in that; the turnover shaft (2) is arranged on one side of a gravity center vertical line of the vibration hammer (1) in a vertical state.
4. The construction platform for the rapid assembling of the steel pipe pile and the vibration hammer according to claim 1, characterized in that; the upper platform (5) and the lower platform (7) are nested together; a sleeper (11) is arranged above the upper platform (5).
5. The construction platform for the rapid assembling of the steel pipe pile and the vibration hammer according to claim 1, characterized in that; the jacks (6) are arranged at two ends between the upper platform (5) and the lower platform (7) respectively, and the height of the vibration hammer (1) is adjusted by lifting the jacks (6).
6. The construction platform for the rapid assembling of the steel pipe pile and the vibration hammer according to claim 1, characterized in that: the walking steel wheel (8) is a steel pipe.
7. The construction platform for the rapid assembling of the steel pipe pile and the vibration hammer according to claim 1, characterized in that; the winding engine (10) is 2 groups.
CN201920680346.9U 2019-05-14 2019-05-14 Construction platform for quickly assembling steel pipe pile and vibration hammer Expired - Fee Related CN210140823U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920680346.9U CN210140823U (en) 2019-05-14 2019-05-14 Construction platform for quickly assembling steel pipe pile and vibration hammer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920680346.9U CN210140823U (en) 2019-05-14 2019-05-14 Construction platform for quickly assembling steel pipe pile and vibration hammer

Publications (1)

Publication Number Publication Date
CN210140823U true CN210140823U (en) 2020-03-13

Family

ID=69733673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920680346.9U Expired - Fee Related CN210140823U (en) 2019-05-14 2019-05-14 Construction platform for quickly assembling steel pipe pile and vibration hammer

Country Status (1)

Country Link
CN (1) CN210140823U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158577A (en) * 2019-05-14 2019-08-23 中交第一航务工程局有限公司 Operation platform and operating method for steel-pipe pile and the quick spelling of vibration hammer

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158577A (en) * 2019-05-14 2019-08-23 中交第一航务工程局有限公司 Operation platform and operating method for steel-pipe pile and the quick spelling of vibration hammer
CN110158577B (en) * 2019-05-14 2024-01-19 中交第一航务工程局有限公司 Construction platform for rapid assembly of steel pipe pile and vibrating hammer and operation method

Similar Documents

Publication Publication Date Title
EP2372143B1 (en) Device and method for erecting at sea a large slender body, such as the monopile of a wind turbine
TW201130713A (en) Deck-elevation-type operation platform-like vehicle and construction method for marine wind power generation facility
CN206143757U (en) It expands bored concrete pile stake pipe and pile driver to add elongated immersed tube rammer
CN210140823U (en) Construction platform for quickly assembling steel pipe pile and vibration hammer
CN207484441U (en) Movable type piling assistance platform
CN110130342B (en) Piling equipment and piling method for underwater reinforced concrete prefabricated sheet pile construction
CN204609435U (en) The auxiliary tower that hoists of emergent repairing tower
CN112030968A (en) Novel construction process for solving holding pressure pile sinking difficulty
CN110158577B (en) Construction platform for rapid assembly of steel pipe pile and vibrating hammer and operation method
JP5555272B2 (en) Construction method for offshore wind power generation facilities
CN211312514U (en) Movable ground anchor device for mounting conical section of steel structure cooling tower
CN209353221U (en) A kind of packaged type cantilever job platform for the construction of side guardrail
RU89130U1 (en) PILING UNIT
CN204982888U (en) Piling machine
CN211058437U (en) Intelligent electric pole inclination prevention device
CN209816963U (en) Excavator detection platform
CN105568862A (en) Girder erecting device and girder erecting method
CN206970086U (en) A kind of hanging apparatus
CN202298652U (en) Wall-form whole-piece sliding type dismantling device
JP7374063B2 (en) Body raising system and how to install the body vertically
JPH11256552A (en) Constructing method for inclined foundation structure
CN221091844U (en) Horizontal transportation strorage device of hydraulic pile hammer
CN202157356U (en) Movable unearthed hanging device for hole-digging piles
CN219862799U (en) Device for assisting pile inserting and positioning of steel pipe pile
CN214993215U (en) Culvert wall body support and whole sideslip device of template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200313