CN110158577B - Construction platform for rapid assembly of steel pipe pile and vibrating hammer and operation method - Google Patents

Construction platform for rapid assembly of steel pipe pile and vibrating hammer and operation method Download PDF

Info

Publication number
CN110158577B
CN110158577B CN201910396270.1A CN201910396270A CN110158577B CN 110158577 B CN110158577 B CN 110158577B CN 201910396270 A CN201910396270 A CN 201910396270A CN 110158577 B CN110158577 B CN 110158577B
Authority
CN
China
Prior art keywords
platform
vibrating hammer
steel pipe
pipe pile
hammer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910396270.1A
Other languages
Chinese (zh)
Other versions
CN110158577A (en
Inventor
董孟永
王博
张兵
李亚军
杨妍
曹宇
李晓龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cccc First Harbor Engineering Bureau Co ltd General Contracting Engineering Branch
CCCC First Harbor Engineering Co Ltd
Original Assignee
Cccc First Harbor Engineering Bureau Co ltd General Contracting Engineering Branch
CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cccc First Harbor Engineering Bureau Co ltd General Contracting Engineering Branch, CCCC First Harbor Engineering Co Ltd filed Critical Cccc First Harbor Engineering Bureau Co ltd General Contracting Engineering Branch
Priority to CN201910396270.1A priority Critical patent/CN110158577B/en
Publication of CN110158577A publication Critical patent/CN110158577A/en
Application granted granted Critical
Publication of CN110158577B publication Critical patent/CN110158577B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses a construction platform for quickly assembling a steel pipe pile and a vibrating hammer and an operation method, wherein the construction platform comprises a turnover shaft, a turnover support, an upper platform, a jack, a lower platform, a walking steel wheel, a track and a traction winch; when the pile turning device is operated, the lifting equipment is used for lifting the vibrating hammer, the vibrating hammer is moved to the upper part of the platform, and the vibrating hammer falls down, so that the pile turning shaft falls down on the pile turning support; continuing to fall down the vibrating hammer to enable the vibrating hammer to turn over to one side under the action of gravity, stacking sleepers on the platform, and enabling the vibrating hammer to be horizontally placed on the platform; then starting a winch, and pulling the platform and the vibrating hammer to the steel pipe pile along the track, so that the steel pipe pile is inserted into a clamp of the vibrating hammer; and then opening the clamp of the vibrating hammer to enable the clamp to tighten the steel pipe pile. The invention can quickly and accurately realize the assembly of the steel pipe pile and the vibrating hammer during the construction of the steel pipe pile; the method has the advantages of convenient and quick construction, safe operation, low construction cost and the like.

Description

Construction platform for rapid assembly of steel pipe pile and vibrating hammer and operation method
Technical Field
The invention relates to the field of wind power, in particular to a construction platform for quickly assembling a steel pipe pile and a vibrating hammer and an operation method.
Background
Along with the development of engineering technology, single pile or multi-pile foundations formed by steel pipe piles are increasingly applied to engineering of river-crossing bridges, sea-crossing bridges, high-pile wharfs, offshore wind power and the like. When the pile is driven by the vibrating hammer, the steel pipe pile and the vibrating hammer are assembled in two main modes, one mode is that when the steel pipe pile is horizontally laid, the vibrating hammer is lifted by using a double hook of a lifting device and then turned to be horizontal, then the vibrating hammer is moved to be assembled with the steel pipe pile, and the other mode is that after the pile stabilizing measure is adopted, the steel pipe pile is firstly lifted, and then the vibrating hammer is lifted by using a lifting device and then assembled at high altitude.
However, when the steel pipe pile is horizontally laid for assembly, as the lifting device lifts the vibrating hammer, the pituitary body has certain shaking, particularly when in construction on water, the lifting hammer of the crane ship is mostly used, and the steel pipe pile is placed on the transport ship, and as the mutual shaking of the crane ship and the transport ship is large, the assembly of the vibrating hammer and the steel pipe pile is difficult to accurately and quickly realize; so this patent is here a construction platform that is used for steel-pipe pile and quick group of vibratory hammer to piece together, the completion vibratory hammer that can be quick accurate is pieced together with the steel pipe.
Disclosure of Invention
Therefore, in order to solve the defects, the invention provides the construction platform and the operation method for quickly assembling the steel pipe pile and the vibrating hammer, which can quickly and accurately complete the assembly of the vibrating hammer and the steel pipe and have the advantages of convenient and quick construction, reduction of assembly difficulty and the like.
The invention is realized in such a way, a construction platform for quickly assembling the steel pipe pile and the vibrating hammer is constructed, and the platform comprises a turning shaft, a turning bracket, an upper platform, a jack, a lower platform, a walking steel wheel and a traction winch; the turnover shaft is arranged on the vibrating hammer, a jack is arranged between the upper platform and the lower platform, a turnover support is arranged on the upper platform, a walking steel wheel is arranged below the lower platform, the whole body formed by the upper platform and the lower platform is connected with the winch, and movement is realized under the traction of the winch. This patent can be quick accurate accomplish the assembly of vibratory hammer and steel pipe, has construction convenient and fast, reduces advantages such as the assembly degree of difficulty.
Optimally, the platform also comprises a limit rail for controlling the moving direction of the platform, and the limit rail corresponds to the position of the walking steel wheel.
Preferably, the overturning shaft is arranged at one side of the vertical line of the gravity center of the vibratory hammer in the vertical state.
Optimally, the upper platform and the lower platform are nested together; a sleeper is arranged above the upper platform.
Preferably, the jacks are arranged at the two ends between the upper platform and the lower platform respectively, and the heights of the vibrating hammers are adjusted by lifting the jacks.
Optimally, the walking steel wheel is a steel pipe. The winches are in 2 groups.
The invention has the following advantages: the patent provides a platform for quickly assembling a marine wind power steel pipe pile and a vibrating hammer, which comprises a turnover shaft, a turnover support, an upper platform, a jack, a lower platform, a walking steel wheel, a track and a traction winch; the turnover shaft is arranged on the vibrating hammer, a jack is arranged between the upper platform and the lower platform, the turnover support is arranged on the upper platform, the walking steel wheel is arranged below the lower platform, and the whole is moved under the traction of the traction winch.
When the pile turning device is operated, the lifting equipment is used for lifting the vibrating hammer, the vibrating hammer is moved to the upper part of the platform, and the vibrating hammer falls down, so that the pile turning shaft falls down on the pile turning support; continuing to fall down the vibrating hammer to enable the vibrating hammer to turn over to one side under the action of gravity, stacking sleepers on the platform, and enabling the vibrating hammer to be horizontally placed on the platform; then starting a winch, and pulling the platform and the vibrating hammer to the steel pipe pile along the track, so that the steel pipe pile is inserted into a clamp of the vibrating hammer; and then opening the clamp of the vibrating hammer to enable the clamp to tighten the steel pipe pile. The invention can quickly and accurately realize the assembly of the steel pipe pile and the vibrating hammer during the construction of the steel pipe pile; the method has the advantages of convenient and quick construction, safe operation, low construction cost and the like.
Drawings
FIG. 1 is a schematic view of the vibratory hammer of the present patent in a platform;
fig. 2 is a schematic diagram of the assembly of the vibratory hammer and the steel pipe pile of the present patent.
Wherein: 1. a vibratory hammer; 2. a turnover shaft; 3. an upper support shaft bracket; 4. overturning the bracket; 5. a top platform; 6. a jack; 7. a lower platform; 8. a walking steel wheel; 9. a limit rail; 10. a hoist; 11. a sleeper; 12. a steel pipe pile; 13. and (5) a pile support.
Detailed Description
The following detailed description of the present invention will provide clear and complete description of the technical solutions of embodiments of the present invention, with reference to fig. 1-2, and it is apparent that the described embodiments are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
The invention provides a construction platform for quickly assembling a steel pipe pile and a vibrating hammer by improving the construction platform, which can be implemented in the following manner as shown in the figure; the platform comprises a turnover shaft 2, a turnover bracket 4, an upper platform 5, a jack 6, a lower platform 7, a walking steel wheel 8 and a traction winch 10; the turnover shaft 2 is arranged on the vibrating hammer 1, a jack 6 is arranged between the upper platform 5 and the lower platform 7, the turnover support 4 is arranged on the upper platform 5, a walking steel wheel 8 is arranged below the lower platform 7, the whole body formed by the upper platform 5 and the lower platform 7 is connected with a winch 10, and the movement is realized under the traction of the winch 10.
As shown in fig. 1, the platform also comprises a limit track 9 for controlling the moving direction of the platform; the limit rail 9 corresponds to the position of the walking steel wheel 8. The walking steel wheel 8 is a steel pipe; the winches 10 are of 2 groups.
The jacks 6 are arranged at two ends between the upper platform 5 and the lower platform 7 respectively, and the height of the vibrating hammer 1 is adjusted by lifting the jacks 6. The turning shaft 2 is arranged at one side of the vertical line of the gravity center of the oscillating weight 1 in the standing state. The upper platform 5 and the lower platform 7 are nested together; above the upper platform 5 is a sleeper 11.
The operation method for assembling the steel pipe pile and the vibrating hammer comprises the following steps:
step 1: lifting the vibrating hammer 1 by using lifting equipment, moving the vibrating hammer 1 to the position above the platform, and falling the vibrating hammer 1 to enable the pile turning shaft to fall on the pile turning support 4.
Step 2: the vibrating hammer 1 is continuously dropped, so that the vibrating hammer 1 is turned to one side under the action of gravity, sleepers 11 are stacked on the platform, and the vibrating hammer can be horizontally placed on the platform.
Step 3: the hoist 10 is started, and the platform and the vibration hammer are pulled to the position of the steel pipe pile 12 along the track, so that the steel pipe pile 12 is inserted into the clamp of the vibration hammer.
Step 4: the vibratory hammer clamp is opened to tighten the clamp against the steel pipe pile 12.
To sum up, this patent provides a construction platform that is used for steel-pipe pile and quick group of vibratory hammer to piece together, and this platform includes tilting shaft, upset support, upper platform, jack, lower platform, walking steel wheel, track, traction hoist engine are constituteed, and wherein, the tilting shaft is installed on the vibratory hammer, has the jack between upper platform and the lower platform, installs the upset support on the upper platform, and the lower platform below has the walking steel wheel, and the whole of constituteing realizes removing under traction of traction hoist engine. This patent can be quick accurate accomplish the assembly of vibratory hammer and steel pipe, has construction convenient and fast, reduces advantages such as the assembly degree of difficulty.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (3)

1. A construction platform that is used for steel-pipe pile and vibratory hammer to make up fast, its characterized in that: the platform comprises a turnover shaft (2), a turnover bracket (4), an upper platform (5), a jack (6), a lower platform (7), a walking steel wheel (8) and a traction winch (10); the turnover shaft (2) is arranged on the vibrating hammer (1), and the turnover shaft (2) is arranged on one side of a vertical line of the gravity center of the vibrating hammer (1) in a standing state; the upper platform (5) and the lower platform (7) are nested together, a jack (6) is arranged between the upper platform (5) and the lower platform (7), a sleeper (11) is arranged above the upper platform (5), a turnover bracket (4) is further arranged on the upper platform (5), a walking steel wheel (8) is arranged below the lower platform (7), the whole body formed by the upper platform (5) and the lower platform (7) is connected with a winch (10), movement is realized under the traction of the winch (10), and the number of the winches (10) is 2;
the platform also comprises a limit rail (9) for controlling the moving direction of the platform, the limit rail (9) corresponds to the position of the walking steel wheel (8), and the walking steel wheel (8) is a steel pipe.
2. The construction platform for rapid assembly of steel pipe piles and vibratory hammers according to claim 1, wherein: the jacks (6) are arranged at two ends between the upper platform (5) and the lower platform (7) respectively, and the height of the vibrating hammer (1) is adjusted by lifting the jacks (6).
3. An operation method of the construction platform for rapid assembly of the steel pipe pile and the vibratory hammer based on the method of claim 1, which is characterized in that: the method comprises the following steps:
step 1: lifting the vibrating hammer (1) by using lifting equipment, moving the vibrating hammer (1) to the upper part of the platform, and falling the vibrating hammer (1) to enable the pile turning shaft to fall on the pile turning support (4);
step 2: continuously dropping the vibrating hammer (1) to enable the vibrating hammer (1) to turn to one side under the action of gravity, stacking sleepers (11) on the platform, and enabling the vibrating hammer to be horizontally placed on the platform;
step 3: starting a winch (10), and pulling the platform and the vibrating hammer to the position of the steel pipe pile (12) along the track so that the steel pipe pile (12) is inserted into a clamp of the vibrating hammer;
step 4: and opening the clamp of the vibrating hammer to enable the clamp to clamp the steel pipe pile (12).
CN201910396270.1A 2019-05-14 2019-05-14 Construction platform for rapid assembly of steel pipe pile and vibrating hammer and operation method Active CN110158577B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910396270.1A CN110158577B (en) 2019-05-14 2019-05-14 Construction platform for rapid assembly of steel pipe pile and vibrating hammer and operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910396270.1A CN110158577B (en) 2019-05-14 2019-05-14 Construction platform for rapid assembly of steel pipe pile and vibrating hammer and operation method

Publications (2)

Publication Number Publication Date
CN110158577A CN110158577A (en) 2019-08-23
CN110158577B true CN110158577B (en) 2024-01-19

Family

ID=67634354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910396270.1A Active CN110158577B (en) 2019-05-14 2019-05-14 Construction platform for rapid assembly of steel pipe pile and vibrating hammer and operation method

Country Status (1)

Country Link
CN (1) CN110158577B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0199922A2 (en) * 1985-05-02 1986-11-05 Gebr. Lindenmeyer GmbH & Co. Maschinenfabrik Vibrating ram with a unbalance control mechanism
JP2003027469A (en) * 2001-07-17 2003-01-29 Oak:Kk Steel pipe pile, foundation pile producing method using the same and device of the method
CN104047289A (en) * 2014-06-25 2014-09-17 中交第三航务工程局有限公司 Pile position disperse splicing and single hammer disperse hitting technology for lattice type steel sheet pile large cylinder auxiliary lattice
CN205369222U (en) * 2015-12-31 2016-07-06 上海霍普建筑设计事务所有限公司 Miniature steel -pipe pile device of hammering
JP2016169591A (en) * 2015-03-09 2016-09-23 新日鐵住金株式会社 Construction method of rotary press-in steel pipe pile
CN208633111U (en) * 2018-07-27 2019-03-22 南京同力建设集团股份有限公司 A kind of vibration hammer injection steel-pipe pile positioning device
CN210140823U (en) * 2019-05-14 2020-03-13 中交第一航务工程局有限公司 Construction platform for quickly assembling steel pipe pile and vibration hammer

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0711903D0 (en) * 2007-06-20 2007-07-25 Anchor Systems Europ Ltd Post anchor

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0199922A2 (en) * 1985-05-02 1986-11-05 Gebr. Lindenmeyer GmbH & Co. Maschinenfabrik Vibrating ram with a unbalance control mechanism
JP2003027469A (en) * 2001-07-17 2003-01-29 Oak:Kk Steel pipe pile, foundation pile producing method using the same and device of the method
CN104047289A (en) * 2014-06-25 2014-09-17 中交第三航务工程局有限公司 Pile position disperse splicing and single hammer disperse hitting technology for lattice type steel sheet pile large cylinder auxiliary lattice
JP2016169591A (en) * 2015-03-09 2016-09-23 新日鐵住金株式会社 Construction method of rotary press-in steel pipe pile
CN205369222U (en) * 2015-12-31 2016-07-06 上海霍普建筑设计事务所有限公司 Miniature steel -pipe pile device of hammering
CN208633111U (en) * 2018-07-27 2019-03-22 南京同力建设集团股份有限公司 A kind of vibration hammer injection steel-pipe pile positioning device
CN210140823U (en) * 2019-05-14 2020-03-13 中交第一航务工程局有限公司 Construction platform for quickly assembling steel pipe pile and vibration hammer

Also Published As

Publication number Publication date
CN110158577A (en) 2019-08-23

Similar Documents

Publication Publication Date Title
US8911178B2 (en) Device and method for erecting at sea a large slender body, such as the monopile of a wind turbine
TW201130713A (en) Deck-elevation-type operation platform-like vehicle and construction method for marine wind power generation facility
CN210655774U (en) Steel reinforcement cage of bored concrete pile hangs puts device
CN110158577B (en) Construction platform for rapid assembly of steel pipe pile and vibrating hammer and operation method
CN210140823U (en) Construction platform for quickly assembling steel pipe pile and vibration hammer
NO331621B1 (en) A method of removing a chassis from a drilling or production rig as well as a vessel provided with a device for this
CN211312514U (en) Movable ground anchor device for mounting conical section of steel structure cooling tower
CN210917364U (en) Steel pipe pile positioning platform for crane ship
CN105819352B (en) Lifting device for detachable door type mast building and construction method thereof
CN204609435U (en) The auxiliary tower that hoists of emergent repairing tower
CN207904921U (en) A kind of simple floating driving plant
CN115233730B (en) Top plate jacking device for V-shaped column and jacking construction method
CN111157211A (en) Large-scale hydraulic pile hammer test bench
JP3700306B2 (en) Wind power generator construction method
CN202247850U (en) Dynamic compactor capable of hoisting and dropping arm support conveniently
CN112412154B (en) Ultra-high voltage transmission line construction process with floating type overwater platform as operation surface
RU89130U1 (en) PILING UNIT
JPH11256552A (en) Constructing method for inclined foundation structure
CN206681004U (en) A kind of efficient piling machine accelerated based on electromagnetism
AU2004100459A4 (en) Structure upending sub
CN212356279U (en) Auxiliary device is erect to large-scale pipe
CN216863518U (en) Lifting structure of shot blasting vehicle for ship body
CN214935509U (en) Tower crane system with hammer pile function
CN217420408U (en) Concrete operation platform is pour to short column on ground convenient to integration construction
CN221091844U (en) Horizontal transportation strorage device of hydraulic pile hammer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant