CN110158577A - Operation platform and operating method for steel-pipe pile and the quick spelling of vibration hammer - Google Patents
Operation platform and operating method for steel-pipe pile and the quick spelling of vibration hammer Download PDFInfo
- Publication number
- CN110158577A CN110158577A CN201910396270.1A CN201910396270A CN110158577A CN 110158577 A CN110158577 A CN 110158577A CN 201910396270 A CN201910396270 A CN 201910396270A CN 110158577 A CN110158577 A CN 110158577A
- Authority
- CN
- China
- Prior art keywords
- vibration hammer
- steel
- platform
- pipe pile
- hammer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000011017 operating method Methods 0.000 title claims abstract description 7
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 29
- 239000010959 steel Substances 0.000 claims abstract description 29
- 230000007306 turnover Effects 0.000 claims abstract description 15
- 230000035939 shock Effects 0.000 claims abstract description 8
- 241001669679 Eleotris Species 0.000 claims abstract description 7
- 230000005484 gravity Effects 0.000 claims abstract description 7
- 238000010276 construction Methods 0.000 abstract description 9
- 230000008901 benefit Effects 0.000 abstract description 7
- 239000000203 mixture Substances 0.000 description 5
- 238000005457 optimization Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 2
- 206010062767 Hypophysitis Diseases 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/28—Prefabricated piles made of steel or other metals
- E02D5/285—Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The invention discloses a kind of operation platforms and operating method for steel-pipe pile and the quick spelling of vibration hammer, including torsion shaft, turnover bracket, upper mounting plate, jack, lower platform, walking steel wheel, track, rack winch;When operation, vibration hammer is sling using lifting equipment, above mobile vibration hammer to platform, Drop shock hammer makes to turn over an axis to fall in and turn on a bracket;Continue Drop shock hammer, flips to one side vibration hammer under the effect of gravity, sleeper is stacked on platform, vibration hammer is enable to lie on platform;Then start hoist engine, by platform and vibration hammer along track drawing to steel-pipe pile, be inserted into steel-pipe pile in the fixture of vibration hammer;It is then turned on vibration hammer fixture, fixture is made to step up steel-pipe pile.The present invention quickly can accurately realize the spelling of steel-pipe pile and vibration hammer in steel pipe pile driving construction;With convenient and quick construction, the advantages that guaranteeing operation safety, reduce construction cost.
Description
Technical field
The present invention relates to wind-powered electricity generation fields, are specifically a kind of operation platforms for steel-pipe pile and the quick spelling of vibration hammer
And operating method.
Background technique
With the development of engineering technology, in the engineerings such as crossing bridge, Oversea bridge, long piled wharf, offshore wind farm, steel pipe
The single pile of stake composition or more pile foundations have obtained more and more applications.When using vibration hammer mode pile sinking, steel-pipe pile and vibration
Hammer spelling is overturn after being sling vibration hammer using lifting equipment double hook there are mainly two types of mode one is when steel-pipe pile is laid flat
To level, vibration hammer and steel-pipe pile spelling are then moved, after another way is takes steady stake measure first to erect steel-pipe pile, then
Vibration hammer is sling into rear high-altitude with lifting equipment and carries out spelling.
However, after being sling vibration hammer due to lifting equipment, hypophysis has certain rolling when steel-pipe pile lays flat progress spelling
It is dynamic, when especially constructing on the water, use crane ship sash weight, cargo ship placing steel tubes stake, due to crane ship and cargo ship more
Mutually shake it is larger, so be difficult to accurately and fast realization vibration hammer and steel-pipe pile spelling;Therefore one kind is used for this patent herein
The operation platform of steel-pipe pile and the quick spelling of vibration hammer, can be with the spelling of the completion vibration hammer and steel pipe of fast accurate.
Summary of the invention
Therefore, in order to solve above-mentioned deficiency, the present invention provides a kind of for steel-pipe pile and the quick spelling of vibration hammer herein
Operation platform and operating method can have convenient and quick construction, reduce with the spelling of the completion vibration hammer and steel pipe of fast accurate
The advantages that spelling difficulty.
The invention is realized in this way constructing a kind of operation platform for steel-pipe pile and the quick spelling of vibration hammer, this is flat
Platform includes torsion shaft, turnover bracket, upper mounting plate, jack, lower platform, walking steel wheel and rack winch;Wherein, torsion shaft
It is mounted on vibration hammer, there is jack between upper mounting plate and lower platform, turnover bracket is installed on upper mounting plate, is had below lower platform
Walking steel wheel, is connect by the entirety that upper mounting plate and lower platform form with hoist engine, and movement is realized under the traction of hoist engine.This is specially
Benefit can have many advantages, such as convenient and quick construction, reduce spelling difficulty with the spelling of the completion vibration hammer and steel pipe of fast accurate.
Optimization, which further includes the limit track for control platform moving direction, limit track and walking steel wheel
Position it is corresponding.
Optimization, torsion shaft is mounted on the side that vibration hammer stands up center of gravity vertical line under state.
Optimization, upper mounting plate is nested together with lower platform;There is sleeper above upper mounting plate.
Optimization, jack is multiple groups, is separately mounted to the both ends between upper mounting plate and lower platform, utilizes the liter of jack
The height of the whole vibration hammer of falling tone.
Optimization, walking steel wheel is steel pipe.Hoist engine is 2 groups.
The present invention has the advantage that this patent provides one kind for offshore wind farm steel-pipe pile and the quick spelling of vibration hammer
Platform, including torsion shaft, turnover bracket, upper mounting plate, jack, lower platform, walking steel wheel, track, rack winch;Its
In, torsion shaft is mounted on vibration hammer, and there is jack between upper mounting plate and lower platform, turnover bracket is installed on upper mounting plate, under
There is walking steel wheel below platform, the whole of composition realizes movement under the traction of rack winch.
When operation, vibration hammer is sling using lifting equipment, above mobile vibration hammer to platform, Drop shock hammer makes to turn over
Stake axis, which is fallen in, to be turned on a bracket;Continue Drop shock hammer, flips to one side vibration hammer under the effect of gravity, stacked on platform
Sleeper enables vibration hammer to lie on platform;Then start hoist engine, by platform and vibration hammer along track drawing to steel-pipe pile
Place is inserted into steel-pipe pile in the fixture of vibration hammer;It is then turned on vibration hammer fixture, fixture is made to step up steel-pipe pile.The present invention can be with
The spelling of steel-pipe pile and vibration hammer is quickly accurately realized in steel pipe pile driving construction;With convenient and quick construction, guarantee operation peace
Entirely, the advantages that reducing construction cost.
Detailed description of the invention
Fig. 1 is that the vibration hammer of this patent is placed on the schematic diagram of platform;
Fig. 2 is the vibration hammer and steel-pipe pile spelling schematic diagram of this patent.
Wherein: 1, vibration hammer;2, torsion shaft;3, upper support bracing strut;4, turnover bracket;5, upper mounting plate;6, jack;7,
Lower platform;8, walking steel wheel;9, limit track;10, hoist engine;11, sleeper;12, steel-pipe pile;13, stake support.
Specific embodiment
Below in conjunction with attached drawing 1- Fig. 2, the present invention is described in detail, technical solution in the embodiment of the present invention into
Row clearly and completely describes, it is clear that described embodiments are only a part of the embodiments of the present invention, rather than whole realities
Apply example.Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without making creative work
Every other embodiment, shall fall within the protection scope of the present invention.
The present invention provides a kind of operation platform for steel-pipe pile and the quick spelling of vibration hammer by improving herein, as schemed institute
Show, can be practiced as follows;The platform includes torsion shaft 2, turnover bracket 4, upper mounting plate 5, jack 6, lower flat
Platform 7, walking steel wheel 8 and rack winch 10;Wherein, torsion shaft 2 is mounted on vibration hammer 1, upper mounting plate 5 and lower platform 7 it
Between have jack 6, turnover bracket 4 is installed on upper mounting plate 5, have below lower platform 7 walking steel wheel 8, by upper mounting plate 5 and lower platform
The entirety of 7 compositions is connect with hoist engine 10, and movement is realized under the traction of hoist engine 10.
As shown in Figure 1, the platform further includes limit track 9, it to be used for control platform moving direction;Limit track 9 and walking
The position of steel wheel 8 is corresponding.Walking steel wheel 8 is steel pipe;Hoist engine 10 is 2 groups.
Jack 6 is multiple groups, is separately mounted to the both ends between upper mounting plate 5 and lower platform 7, utilizes the lifting of jack 6
Adjust the height of vibration hammer 1.Torsion shaft 2 is mounted on the side that vibration hammer 1 stands up center of gravity vertical line under state.Upper mounting plate 5 is put down with lower
Platform 7 nests together;There is sleeper 11 above upper mounting plate 5.
This patent is used for the operating method of steel-pipe pile and vibration hammer spelling, as follows:
Step 1: being sling vibration hammer 1 using lifting equipment, above mobile vibration hammer 1 to platform, Drop shock hammer 1 makes to turn over stake
Axis, which is fallen in, to be turned on a bracket 4.
Step 2: continuing Drop shock hammer 1, flip to one side vibration hammer 1 under the effect of gravity, pillow is stacked on platform
Wood 11, enables vibration hammer to lie on platform.
Step 3: starting hoist engine 10 inserts steel-pipe pile 12 by platform and vibration hammer along track drawing to steel-pipe pile 12
Enter in the fixture of vibration hammer.
Step 4: opening vibration hammer fixture, fixture is made to step up steel-pipe pile 12.
To sum up, this patent provides a kind of operation platform for steel-pipe pile and the quick spelling of vibration hammer, which includes
Torsion shaft, turnover bracket, upper mounting plate, jack, lower platform, walking steel wheel, track, rack winch composition, wherein torsion shaft
It is mounted on vibration hammer, there is jack between upper mounting plate and lower platform, turnover bracket is installed on upper mounting plate, is had below lower platform
Walking steel wheel, the whole of composition realize movement under the traction of rack winch.This patent can be vibrated with the completion of fast accurate
The spelling of hammer and steel pipe has many advantages, such as convenient and quick construction, reduces spelling difficulty.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention.
Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention
It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one
The widest scope of cause.
Claims (8)
1. being used for the operation platform of steel-pipe pile and the quick spelling of vibration hammer, it is characterised in that;The platform includes torsion shaft (2), turns over
Turn bracket (4), upper mounting plate (5), jack (6), lower platform (7), walking steel wheel (8) and rack winch (10);Wherein, it turns over
Shaft (2) is mounted on vibration hammer (1), is had between upper mounting plate (5) and lower platform (7) jack (6), and upper mounting plate is installed on (5)
Have turnover bracket (4), there are walking steel wheel (8) below lower platform (7), the entirety and volume be made of upper mounting plate (5) and lower platform (7)
Machine (10) connection is raised, movement is realized under the traction of hoist engine (10).
2. the operation platform according to claim 1 for steel-pipe pile and the quick spelling of vibration hammer, it is characterised in that;This is flat
Platform further includes the limit track (9) for control platform moving direction, and limit track (9) is opposite with the walking position of steel wheel (8)
It answers.
3. the operation platform according to claim 1 for steel-pipe pile and the quick spelling of vibration hammer, it is characterised in that;It is described
Torsion shaft (2) is mounted on the side that vibration hammer (1) stands up center of gravity vertical line under state.
4. the operation platform according to claim 1 for steel-pipe pile and the quick spelling of vibration hammer, it is characterised in that;It is upper flat
Platform (5) is nested together with lower platform (7);There are sleeper (11) above upper mounting plate (5).
5. the operation platform according to claim 1 for steel-pipe pile and the quick spelling of vibration hammer, it is characterised in that;It is very heavy
Pushing up (6) is multiple groups, is separately mounted to the both ends between upper mounting plate (5) and lower platform (7), utilizes the lift adjustment of jack (6)
The height of vibration hammer (1).
6. the operation platform according to claim 1 for steel-pipe pile and the quick spelling of vibration hammer, it is characterised in that: walking
Steel wheel (8) is steel pipe.
7. the operation platform according to claim 1 for steel-pipe pile and the quick spelling of vibration hammer, it is characterised in that: elevator
Machine (10) is 2 groups.
8. the operating method according to claim 1 for steel-pipe pile and the operation platform of the quick spelling of vibration hammer, special
Sign is: the following steps are included:
Step 1: vibration hammer (1) is sling using lifting equipment, above mobile vibration hammer (1) to platform, Drop shock hammers (1) into shape,
Make to turn over an axis to fall in and turn on a bracket (4);
Step 2: continuing Drop shock hammer (1), flip to one side vibration hammer 1 under the effect of gravity, sleeper is stacked on platform
(11), vibration hammer is enable to lie on platform;
Step 3: starting hoist engine (10) makes steel-pipe pile (12) by platform and vibration hammer at track drawing to steel-pipe pile (12)
It is inserted into the fixture of vibration hammer;
Step 4: opening vibration hammer fixture, fixture is made to step up steel-pipe pile (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910396270.1A CN110158577B (en) | 2019-05-14 | 2019-05-14 | Construction platform for rapid assembly of steel pipe pile and vibrating hammer and operation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910396270.1A CN110158577B (en) | 2019-05-14 | 2019-05-14 | Construction platform for rapid assembly of steel pipe pile and vibrating hammer and operation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110158577A true CN110158577A (en) | 2019-08-23 |
CN110158577B CN110158577B (en) | 2024-01-19 |
Family
ID=67634354
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910396270.1A Active CN110158577B (en) | 2019-05-14 | 2019-05-14 | Construction platform for rapid assembly of steel pipe pile and vibrating hammer and operation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110158577B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0199922A2 (en) * | 1985-05-02 | 1986-11-05 | Gebr. Lindenmeyer GmbH & Co. Maschinenfabrik | Vibrating ram with a unbalance control mechanism |
JP2003027469A (en) * | 2001-07-17 | 2003-01-29 | Oak:Kk | Steel pipe pile, foundation pile producing method using the same and device of the method |
US20090293379A1 (en) * | 2007-06-20 | 2009-12-03 | Anchor Systems (Europe) Ltd. | Anchor Post |
CN104047289A (en) * | 2014-06-25 | 2014-09-17 | 中交第三航务工程局有限公司 | Pile position disperse splicing and single hammer disperse hitting technology for lattice type steel sheet pile large cylinder auxiliary lattice |
CN205369222U (en) * | 2015-12-31 | 2016-07-06 | 上海霍普建筑设计事务所有限公司 | Miniature steel -pipe pile device of hammering |
JP2016169591A (en) * | 2015-03-09 | 2016-09-23 | 新日鐵住金株式会社 | Construction method of rotary press-in steel pipe pile |
CN208633111U (en) * | 2018-07-27 | 2019-03-22 | 南京同力建设集团股份有限公司 | A kind of vibration hammer injection steel-pipe pile positioning device |
CN210140823U (en) * | 2019-05-14 | 2020-03-13 | 中交第一航务工程局有限公司 | Construction platform for quickly assembling steel pipe pile and vibration hammer |
-
2019
- 2019-05-14 CN CN201910396270.1A patent/CN110158577B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0199922A2 (en) * | 1985-05-02 | 1986-11-05 | Gebr. Lindenmeyer GmbH & Co. Maschinenfabrik | Vibrating ram with a unbalance control mechanism |
JP2003027469A (en) * | 2001-07-17 | 2003-01-29 | Oak:Kk | Steel pipe pile, foundation pile producing method using the same and device of the method |
US20090293379A1 (en) * | 2007-06-20 | 2009-12-03 | Anchor Systems (Europe) Ltd. | Anchor Post |
CN104047289A (en) * | 2014-06-25 | 2014-09-17 | 中交第三航务工程局有限公司 | Pile position disperse splicing and single hammer disperse hitting technology for lattice type steel sheet pile large cylinder auxiliary lattice |
JP2016169591A (en) * | 2015-03-09 | 2016-09-23 | 新日鐵住金株式会社 | Construction method of rotary press-in steel pipe pile |
CN205369222U (en) * | 2015-12-31 | 2016-07-06 | 上海霍普建筑设计事务所有限公司 | Miniature steel -pipe pile device of hammering |
CN208633111U (en) * | 2018-07-27 | 2019-03-22 | 南京同力建设集团股份有限公司 | A kind of vibration hammer injection steel-pipe pile positioning device |
CN210140823U (en) * | 2019-05-14 | 2020-03-13 | 中交第一航务工程局有限公司 | Construction platform for quickly assembling steel pipe pile and vibration hammer |
Also Published As
Publication number | Publication date |
---|---|
CN110158577B (en) | 2024-01-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107244382A (en) | The assemble method of lashing bridge and container ship | |
JP2011183835A (en) | Deck lifting-lowering workbench ship and construction method of offshore wind power generation facility | |
CN113957892B (en) | Pile sinking construction equipment and technology for semi-submersible crane ship | |
CN215830051U (en) | Prefabricated superimposed sheet's transportation supporting frame structure based on BIM technique | |
CN210917364U (en) | Steel pipe pile positioning platform for crane ship | |
CN113026563A (en) | Suspension bridge high-low displacement girder trestle girder hoisting facility and construction method thereof | |
CN110158577A (en) | Operation platform and operating method for steel-pipe pile and the quick spelling of vibration hammer | |
CN111809654A (en) | Assembled tower crane foundation structure | |
CN102587377B (en) | Drop hammer type pile sinking device and pile sinking method thereof | |
CN216615834U (en) | Marine wind-power single-pile foundation construction special-purpose ship | |
CN207861722U (en) | A kind of Simple water floating type gantry crane | |
CN210140823U (en) | Construction platform for quickly assembling steel pipe pile and vibration hammer | |
CN115787645A (en) | Quick pile sinking construction process for four-pile jacket foundation by offshore wind power deepwater pile-first method | |
CN202577926U (en) | Fixed operating platform for elevator shaft | |
CN215854760U (en) | Marine double-jib crane | |
JP5555272B2 (en) | Construction method for offshore wind power generation facilities | |
CN204416961U (en) | Single mast single-sheaved block group lifting derrick | |
CN114644085A (en) | Method for quickly balancing buoyancy of ship during rolling loading and rolling unloading of oversized goods transported in waterway | |
CN202492846U (en) | Drop hammer pile-sinking device | |
CN105568862A (en) | Girder erecting device and girder erecting method | |
CN201843083U (en) | V-shaped support frame | |
CN106320525B (en) | Light shaft ceiling large span round steel tubular truss rotation-sliding construction method | |
JP2020070114A (en) | Work ship with tower crane and its operating method | |
CN114319136B (en) | Rapid construction method for pushing steel bridge floating crane in navigable water area | |
CN212222218U (en) | Single-point hoisting pile erecting system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |