CN207484441U - Movable type piling assistance platform - Google Patents

Movable type piling assistance platform Download PDF

Info

Publication number
CN207484441U
CN207484441U CN201721380154.3U CN201721380154U CN207484441U CN 207484441 U CN207484441 U CN 207484441U CN 201721380154 U CN201721380154 U CN 201721380154U CN 207484441 U CN207484441 U CN 207484441U
Authority
CN
China
Prior art keywords
assistance platform
piling
jacket
pile
suction anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721380154.3U
Other languages
Chinese (zh)
Inventor
黄海龙
代万宝
袁汝华
边大勇
沈健
李敏雪
杜颖
李晓明
陈曦
潘峰
高绍涛
周健
丛雅娣
李兰杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cnooc Shenzhen Ocean Engineering Technology Service Co ltd
Offshore Oil Engineering Co Ltd
Original Assignee
Offshore Oil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Offshore Oil Engineering Co Ltd filed Critical Offshore Oil Engineering Co Ltd
Priority to CN201721380154.3U priority Critical patent/CN207484441U/en
Application granted granted Critical
Publication of CN207484441U publication Critical patent/CN207484441U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of mobile piling assistance platform, including:Jacket is mounted on the piling assistance platform on jacket top mounted on the suction anchor foundation of jacket lower part, using casing flange inserting and bolt connecting mode, is fixed on the pile gripper driven piles on assistance platform;Wherein, several tubulose lifting lugs are provided on jacket.The utility model using the suction sinker of suction anchor and jacking recycling function, not only avoid it is cumbersome play grouser and group pile driving construction operation, solve the problems, such as to be rapidly assembled and disassembled, reduce construction cost and construction risk;Moreover, making full use of the high-precision levelling function of suction anchor foundation, Large-diameter Steel sunk pile precision problem is solved, greatly improves construction efficiency;It is meanwhile reusable.

Description

Movable type piling assistance platform
Technical field
The utility model is related to platform more particularly to a kind of mobile piling assistance platforms.Belong to Offshore Engineering neck Domain.
Background technology
At present, accurate pile sinking is the difficult point and key point of piling work, especially at sea wind-powered electricity generation large diameter single pile foundation In piling work, the requirement of pile sinking verticality is very high, generally within 2/1000ths.Therefore, the installation of offshore wind farm single-pile foundation, It is generally necessary to special jack up wind turbine installation vessel or assistance platform of driving piles temporarily.But build a special jack up Wind turbine installation vessel expense is too high, and drive piles temporarily assistance platform manufacture and mounting cost relative moderate, still, interim piling auxiliary Platform due to that before each construction, need to accomplish fluently several auxiliary piles, then, then install temporary operating platform in advance, therefore, during operation Between it is longer, it is less efficient;And due to treating pile sinking operation after the completion of, auxiliary pile and temporary operating platform must remove recycling, need Special special boat especially dials stake, and difficulty of construction is larger, and risk is higher.It is existing in order to ensure the verticality of pile sinking operation During interim assistance platform installation, leveling is needed, and leveling difficulty is big, the leveling activity duration is longer.And existing assistance platform is in itself Leveling precision is not high, can not ensure high-precision large diameter single sunk pile operation.
Utility model content
The main purpose of the utility model is that overcoming disadvantages mentioned above of the existing technology, and a kind of movable type is provided and is beaten Stake assistance platform under conditions of grouser is not played, using the suction sinker of suction anchor and jacking recycling function, not only avoids It is cumbersome to play grouser and dial pile driving construction operation, it solves the problems, such as to be rapidly assembled and disassembled;Moreover, make full use of suction anchorage The high-precision levelling function of plinth solves Large-diameter Steel sunk pile precision problem.
The purpose of this utility model is realized by following technical scheme:
A kind of mobile piling assistance platform, it is characterised in that:Including:Jacket, the suction mounted on jacket lower part Anchor foundation is mounted on the piling assistance platform on jacket top using casing flange inserting and bolt connecting mode, is fixed on and beats Pile gripper on stake assistance platform;Wherein, several tubulose lifting lugs are provided on jacket.
A several assistance platform suspension centres are provided on the piling assistance platform.
The pile gripper includes:For hold piling bar top tightly upper pile gripper arm, for hold piling bar lower part tightly lower armful Stake device arm, leading truck and hydraulic device on piling assistance platform.
The beneficial effects of the utility model:The utility model due to the adoption of the above technical scheme, utilizes the suction of suction anchor Sinker and jacking recycling function, not only avoid it is cumbersome play grouser and dial pile driving construction operation, solve Fast Installation and tear open Problem is unloaded, reduces construction cost and construction risk;Moreover, make full use of high-precision levelling function and the pile holding of suction anchor foundation Device accurate limiting straightening function solves Large-diameter Steel sunk pile precision problem, greatly improves construction efficiency;Meanwhile repeatable make With.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model.
Fig. 2 is the utility model pile gripper opening state schematic diagram.
Major Symbol explanation in figure:
1. piling bar, 2. pile grippers, 3. leading trucks, 41. first assistance platform suspension centres, 42. second assistance platform suspension centres, 43. Third assistance platform suspension centre, 44. the 4th assistance platform suspension centres, 5. piling assistance platforms, 6. casing flanges, 7. tubulose lifting lugs, 8. Jacket, 9. suction anchor foundations, 10. bolts, 11. times pile gripper arms, pile gripper arm on 12..
Specific embodiment
Such as Fig. 1, shown in Fig. 2, the utility model includes:Jacket 8 is mounted on 8 lower part of jacket using welding manner Suction anchor foundation 9, inserted using casing flange 6 and 10 connection mode of bolt be mounted on 8 top of jacket piling assistance platform 5th, the pile gripper 2 being fixed on using bolt or welding manner on piling assistance platform 5;Wherein, several pipes are provided on jacket 8 Shape lifting lug 7 is used as permanent lifting lug, is hung when facilitating 8 integral hoisting operation of jacket and unloads steel wire rope.
Above-mentioned pile gripper 2 includes:For hold 1 top of piling bar tightly upper pile gripper arm 12, for holding 1 lower part of piling bar tightly Lower pile gripper arm 11, leading truck 3 and hydraulic device on piling assistance platform 5, wherein, pile gripper 2 can be protected effectively The precision of the marine pile sinking operation of barrier, meanwhile, make pile sinking operation, break away from the dependence to special jack up ship.
A several assistance platform suspension centres are provided on above-mentioned piling assistance platform 5, the present embodiment is:First assistance platform is hung The 41, second assistance platform suspension centre 42 of point, third assistance platform suspension centre 43, the 4th assistance platform suspension centre 44.
The operation principle of the utility model:
According to GPS positioning, 9 installation site of suction anchor foundation is determined, the lifting of jacket 8 is completed using tubulose lifting lug 7 Operation, adjustment suction anchor foundation 9 complete the installation of jacket 8 and suction anchor foundation 9 in place with preliminary leveling, and then, utilization is auxiliary The first assistance platform suspension centre 41, the second assistance platform suspension centre 42, the third assistance platform suspension centre the 43, the 4th helped on platform assists flat Platform suspension centre 44 completes piling assistance platform 5 and the installation of pile gripper 2 is in place, and jacket 8 is completed by casing flange 6 and bolt 10 With the connection for assistance platform 5 of driving piles, reuse suction anchor foundation 9 and accurate leveling is carried out to assistance platform 5 of entirely driving piles.Start The hydraulic device of pile gripper 2 slowly opens upper pile gripper arm 12 and lower pile gripper arm 11;Crane barge ship slings piling bar 1, delays Slowly close to piling assistance platform 5, and slowly enter the arm center of pile gripper 2, finely tune piling bar 1, and slowly tighten and embrace Stake device arm 12, lower pile gripper arm 11 gradually make piling bar 1 accurate in place, after free pile sinking, piling bar righting leveling, piling, It is completed to piling bar pile sinking, pile gripper arm 12 and lower pile gripper arm 11 in opening.Dismounting piling assistance platform 5 and jacket 8 Connection bolt 10, and integral hoisting recycling piling assistance platform 5, and load onto ship transport next position to;Start suction anchor foundation 9 Jack-up system, recycled in its entirety suction anchor foundation 9 and jacket 8, so as to complete the piling bar piling pile sinking operation of a stake position.
Above-mentioned pile gripper, jacket are the prior art, and the technology of not specified (NS) is the prior art.So it will not be repeated.
The above descriptions are merely preferred embodiments of the present invention, and not the utility model is made in any form Limitation, it is every according to the technical essence of the utility model to above example made it is any it is simple modification, equivalent variations with Modification, in the range of still falling within technical solutions of the utility model.

Claims (3)

1. a kind of mobile piling assistance platform, it is characterised in that:Including:Jacket, the suction anchor mounted on jacket lower part Basis is mounted on the piling assistance platform on jacket top using casing flange inserting and bolt connecting mode, is fixed on piling Pile gripper on assistance platform;Wherein, several tubulose lifting lugs are provided on jacket.
2. mobile piling assistance platform according to claim 1, it is characterised in that:It is set on the piling assistance platform There are a several assistance platform suspension centres.
3. mobile piling assistance platform according to claim 1, it is characterised in that:The pile gripper includes:For embracing The upper pile gripper arm on tight piling bar top, for hold piling bar lower part tightly lower pile gripper arm, mounted on piling assistance platform Leading truck and hydraulic device.
CN201721380154.3U 2017-10-25 2017-10-25 Movable type piling assistance platform Active CN207484441U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721380154.3U CN207484441U (en) 2017-10-25 2017-10-25 Movable type piling assistance platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721380154.3U CN207484441U (en) 2017-10-25 2017-10-25 Movable type piling assistance platform

Publications (1)

Publication Number Publication Date
CN207484441U true CN207484441U (en) 2018-06-12

Family

ID=62477204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721380154.3U Active CN207484441U (en) 2017-10-25 2017-10-25 Movable type piling assistance platform

Country Status (1)

Country Link
CN (1) CN207484441U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110239665A (en) * 2019-05-28 2019-09-17 浙江海洋大学 A kind of ocean platform casts anchor, solves anchor method
CN110468840A (en) * 2019-09-16 2019-11-19 江苏亨通蓝德海洋工程有限公司 A kind of negative pressure barrel type single pile pile gripper construction mechanism and its construction method
CN110644487A (en) * 2019-09-17 2020-01-03 天津港航工程有限公司 Construction method based on box-cylinder type pile stabilizing platform
CN114215058A (en) * 2021-12-14 2022-03-22 四川中核艾瑞特工程检测有限公司 Piling tool and method for detecting foundation pile in narrow space

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110239665A (en) * 2019-05-28 2019-09-17 浙江海洋大学 A kind of ocean platform casts anchor, solves anchor method
CN110468840A (en) * 2019-09-16 2019-11-19 江苏亨通蓝德海洋工程有限公司 A kind of negative pressure barrel type single pile pile gripper construction mechanism and its construction method
WO2021052174A1 (en) * 2019-09-16 2021-03-25 江苏亨通蓝德海洋工程有限公司 Negative-pressure barrel type single pile gripper construction mechanism and construction method thereof
CN110644487A (en) * 2019-09-17 2020-01-03 天津港航工程有限公司 Construction method based on box-cylinder type pile stabilizing platform
CN114215058A (en) * 2021-12-14 2022-03-22 四川中核艾瑞特工程检测有限公司 Piling tool and method for detecting foundation pile in narrow space

Similar Documents

Publication Publication Date Title
CN207484441U (en) Movable type piling assistance platform
CN101812849B (en) Offshore single-pile base structure and installation method thereof
EP1058787A1 (en) Method for installation of wind turbines at sea, foundation for wind turbines and use of such foundation
EP1101935A2 (en) Method and vessel for installation of off-shore windmills
JP2004001750A (en) Special working ship and execution method for offshore structure
CN104153384A (en) On-sea sandwich steel pipe pile foundation and construction method
CN112012237A (en) Multi-cylinder reinforced composite single-pile foundation of offshore wind turbine and construction method
CN112726548B (en) Construction method for split jacket foundation of deep-open sea converter station
CN201534977U (en) Bolt connection circumferential box-shaped prefabricated assembly type concrete tower crane foundation
CN209795746U (en) novel assembled is tied and is leaned on ship device
CN111980049A (en) Foundation device of deep riverbed mast type wharf crane and construction method
CN105239572A (en) Offshore construction method for large-diameter single pile fan foundation structure
CN214993830U (en) Matching device of hydraulic hammer of ultra-large piling ship
CN210827544U (en) Composite foundation for improving bearing performance of cylindrical foundation by using auxiliary piles
CN212688952U (en) Negative pressure bucket type single pile gripper construction mechanism
CN211228573U (en) Temporary locking device for skirt pile type jacket and steel pipe pile by using rear pile method
CN204212171U (en) marine sandwich steel pipe pile foundation
CN210140823U (en) Construction platform for quickly assembling steel pipe pile and vibration hammer
CN204226097U (en) Be fixed on water-bed tidal current energy generating equipment
CN210341975U (en) Major diameter single pile steel-pipe pile interpolation changeover portion grouting construction system
CN202577324U (en) Reinforced-concrete combined hanging box
CN208233312U (en) A kind of offshore anemometer tower
CN209636844U (en) Stake method taper pile jacket construction system after the non-embedding rock of one kind
CN110593298A (en) Composite foundation for improving bearing performance of cylindrical foundation by using auxiliary piles and construction method thereof
CN201874007U (en) Offshore single-pile foundation structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230830

Address after: Room 202-f105, 2 / F, Ligang building podium, No. 82, West 2nd Road, Tianjin Binhai New Area pilot free trade zone (Airport Economic Zone)

Patentee after: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee after: COOEC SUBSEA TECHNOLOGY Co.,Ltd.

Address before: No. 1078, Danjiang Road, Binhai New Area, Tianjin 300451

Patentee before: OFFSHORE OIL ENGINEERING Co.,Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: Room 202-f105, 2 / F, Ligang building podium, No. 82, West 2nd Road, Tianjin Binhai New Area pilot free trade zone (Airport Economic Zone)

Patentee after: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee after: CNOOC Shenzhen Ocean Engineering Technology Service Co.,Ltd.

Address before: Room 202-f105, 2 / F, Ligang building podium, No. 82, West 2nd Road, Tianjin Binhai New Area pilot free trade zone (Airport Economic Zone)

Patentee before: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee before: COOEC SUBSEA TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder