CN209636844U - Stake method taper pile jacket construction system after the non-embedding rock of one kind - Google Patents

Stake method taper pile jacket construction system after the non-embedding rock of one kind Download PDF

Info

Publication number
CN209636844U
CN209636844U CN201920081284.XU CN201920081284U CN209636844U CN 209636844 U CN209636844 U CN 209636844U CN 201920081284 U CN201920081284 U CN 201920081284U CN 209636844 U CN209636844 U CN 209636844U
Authority
CN
China
Prior art keywords
jacket
steel
pipe pile
pile
packer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920081284.XU
Other languages
Chinese (zh)
Inventor
汪冬冬
王大鹏
黄延琦
潘晓炜
吴亚波
张悦然
高健岳
吕东良
许卫士
孙兆斌
杜炎丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongjiao Harbour (shanghai) Technology Co Ltd
China Construction Third Engineering Bureau Co Ltd
CCCC Shanghai Third Harbor Engineering Science and Technology Research Institute Co Ltd
CCCC Shanghai Harbour Engineering Design and Research Institute Co Ltd
Original Assignee
Zhongjiao Harbour (shanghai) Technology Co Ltd
China Construction Third Engineering Bureau Co Ltd
CCCC Shanghai Third Harbor Engineering Science and Technology Research Institute Co Ltd
CCCC Shanghai Harbour Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongjiao Harbour (shanghai) Technology Co Ltd, China Construction Third Engineering Bureau Co Ltd, CCCC Shanghai Third Harbor Engineering Science and Technology Research Institute Co Ltd, CCCC Shanghai Harbour Engineering Design and Research Institute Co Ltd filed Critical Zhongjiao Harbour (shanghai) Technology Co Ltd
Priority to CN201920081284.XU priority Critical patent/CN209636844U/en
Application granted granted Critical
Publication of CN209636844U publication Critical patent/CN209636844U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

This application discloses stake method taper pile jacket construction systems after a kind of non-embedding rock, the system includes: jacket, steel-pipe pile, guide pad and packer, steel-pipe pile sinks in jacket setting and its circumferential weld and is inoculated with slurry, packer is located at the bottom inside of jacket, and guide pad is located on the inner wall of jacket;It is fixed temporarily between steel-pipe pile by " 7 letter stencil " at the top of jacket;After temporary fixing lifting, welded between steel-pipe pile using ring flat-plate at the top of jacket.The application construction precision is high, Potential Working Time For Operation At Sea is saved, to ensure that jacket installation construction quality provides a strong guarantee.

Description

Stake method taper pile jacket construction system after the non-embedding rock of one kind
Technical field
The application belongs to jacket construction technical field, and in particular to stake method taper pile jacket construction system after the non-embedding rock of one kind System.
Background technique
Jacket basis as it is a kind of it is light-weight, sea bed geological conditions adaptability is good, stability is good, overall stiffness is big, by To the environmental loads such as wave and water flow effect it is smaller the advantages that, have been widely used for offshore wind farm blower foundation, marine rise Pressure station basis and offshore production platform basis.Electric energy as marine wind electric field collects center, and offshore boosting station is wherein defeated change The key facility of electricity, while being the key that entire marine wind electric field success or failure.Alpha Ventus (Germany), Belwind Demo The external offshore boosting station such as (Belgium), Thornton Bank (Belgium), Walney (Britain) and Ormonde (Britain) Structural shape mostly uses greatly jacket structure form, passes through grouting connection between jacket and steel-pipe pile.Jiangsu Luneng East Platform, river In a large amount of coastal waters Wind Power Projects such as the strand Su great Tang, Jiangsu Three Gorges great Feng, Zhejiang Putuo 6# wind power plant, offshore boosting station basis Stake method taper pile jacket base form after structure mostly uses.
Jacket is divided according to installation and the sequencing of piling construction in ocean engineering and offshore wind farm engineering, there are two types of Structure type: first drive piles jacket and rear piling jacket.For rear stake method jacket construction, in existing construction technology Common problem has: tentatively leveling there are jacket that difficulty is big, steel-pipe pile lifting pitching pile process in jacket installation work progress Middle packer is easy to damage, jacket accurate leveling and fixation are not in place, jacket grouting is preceding because of jacket bottom sea near-bed Mud is washed serious and causes the technical problems such as jacket integral sinking, these problems seriously affected subsequent grouting construction and Jacket foundation construction quality.
Utility model content
The shortcomings that for the above-mentioned prior art or deficiency, the application technical problems to be solved are to provide a kind of non-embedding Stake method taper pile jacket construction system after rock, construction precision is high, saves Potential Working Time For Operation At Sea, to ensure that jacket installation is constructed Quality provides a strong guarantee.
In order to solve the above technical problems, the application has following constitute:
Present applicant proposes stake method taper pile jacket construction systems after a kind of non-embedding rock, comprising: jacket, is led at steel-pipe pile To block and packer,
The steel-pipe pile, which is sunk in the jacket setting and its circumferential weld, is inoculated with slurry, and the packer setting is led described The bottom inside of pipe support, the guide pad are arranged on the inner wall of the jacket on the packer;
Wherein, it is fixed temporarily between the steel-pipe pile by " 7 letter stencil " at the top of the jacket;Temporary fixing lifting Afterwards, ring flat-plate permanent weld is used between the steel-pipe pile at the top of the jacket.
Further, described " 7 letter stencil " is evenly arranged along steel-pipe pile circumferencial direction, and " 7 letter stencil " and the steel pipe It is to be fully welded connection between stake, the jacket.
The application also proposed stake method taper pile jacket construction method after the non-embedding rock of one kind, include the following steps:
S1, jacket measurement and positioning and sweeps extra large leveling;
S2, jacket installation ship near point stay position;
S3, jacket lifting installation;
S4, steel-pipe pile lifting installation and pitching pile operation;
S5, jacket tentatively level;
S6 is laid with protection against erosion river bottom protection in jacket bottom;
S7, steel-pipe pile pile sinking;
S8, jacket accurate leveling and fixation;
S9 is in the milk in the circumferential weld that jacket and steel-pipe pile are formed;
S10, fixed catheter frame and steel-pipe pile.
Further, in step s 4, pitching pile operation is sequentially completed using diagonal pitching pile mode.
Further, it is first inserted into steel-pipe pile in the high-end of the jacket, is inserted into steel-pipe pile after low side.
Further, when the stake bottom absolute altitude of steel-pipe pile from be sink to guide pad, packer designed elevation when, make steel-pipe pile according to The region between jacket bottom guide block and packer is slow transitted through by self weight.
Further, when steel-pipe pile bottom absolute altitude is from the designed elevation for being sink to guide pad, packer, steel-pipe pile can not be relied on Self weight continues through the region between jacket bottom guide block and packer, slings steel-pipe pile to certain altitude, adjusts position Self weight is re-started to sink.
Further, in step s 5, it drowns oneself to steel-pipe pile after stablizing, the levelness of jacket is measured, It is adjusted by levelness of the loop wheel machine to jacket, after preliminary leveling, by using " 7 at the top of jacket between steel-pipe pile The mode of letter stencil " welding is fixed temporarily between jacket and steel-pipe pile;Wherein reserve jacket top and steel-pipe pile Between be first not fixed for level operation.
Further, in step s 8, constantly measurement jacket position and levelness, jacket sinking in place after, press Diagonal interleaved order carries out leveling operation to jacket, the tune when beating, until steel-pipe pile is sink to designed elevation;Reach in steel-pipe pile Designed elevation and after completing the whole accurate leveling of jacket, by using " 7 words between steel-pipe pile at the top of jacket The mode of plate " welding is fixed temporarily between jacket and steel-pipe pile.
Further, in step slo, " 7 letter stencil " temporary consolidation at the top of jacket between steel-pipe pile is released, then Ring flat-plate permanent weld is used between steel-pipe pile at the top of jacket.
Compared with prior art, the application has the following technical effect that
(1) the application tentatively levels the big problem of difficulty for jacket during taper pile jacket construction, proposes logical It crosses and seeks deviation, check and approve jacket motion direction and distance, and the method for moving jacket again by more people's repetition measurements, effectively Solves the problems, such as this;
(2) it aiming at the problem that the application damages packer during steel-pipe pile lifting pitching pile, proposes and " first proposes stake-adjustment The resolving ideas of position-pitching pile again " reduces the risk that packer is damaged during pitching pile;
(3) the application proposes during piling aiming at the problem that jacket being easy to appear in jacket installation sinks, Using " 7 letter stencil " to being fixed temporarily by way of welding at the top of steel-pipe pile and jacket at the top of jacket, alternating is beaten The temporary consolidation between jacket and steel-pipe pile is released to the stake position of piling when stake, the temporary consolidation by other positions undertakes conduit The method that the mode of frame self weight prevents jacket from sinking;
(4) it after the application is completed for the problem that piling, accurate leveling, to prevent filling process jacket from sinking, mentions It is applied out by using " 7 letter stencil " to grouting is carried out after being fixed between steel-pipe pile at the top of jacket again at the top of jacket Work;
(5) the application is suitable for stake method taper pile jacket construction after non-embedding rock, versatile, particularly suitable offshore boosting station Taper pile jacket foundation construction can effectively improve construction effect, reduce construction risk, it is ensured that construction quality.
Detailed description of the invention
By reading a detailed description of non-restrictive embodiments in the light of the attached drawings below, the application's is other Feature, objects and advantages will become more apparent upon:
Fig. 1: stake method taper pile jacket construction system schematic one after the non-embedding rock of the application;
Fig. 2: stake method taper pile jacket construction system schematic two after the non-embedding rock of the application;
Fig. 3: the partial enlarged view of structure as shown in Figure 1;
Fig. 4: the partial enlarged view of structure as shown in Figure 3;
Fig. 5: stake method taper pile jacket construction method flow diagram after the non-embedding rock of the application.
Specific embodiment
It is described further below with reference to technical effect of the attached drawing to the design of the application, specific structure and generation, with It is fully understood from the purpose, feature and effect of the application.
As shown in Figures 1 to 4, stake method taper pile jacket construction system after the non-embedding rock of the present embodiment, comprising: jacket 10, Steel-pipe pile 20, guide pad (not shown in figure) and packer 30, the steel-pipe pile 20 sink to the jacket 10 setting and Slurry is inoculated in its circumferential weld, wherein be in the milk region M as shown in Fig. 2 in grouting region, and the setting of packer 30 is led described The bottom inside of pipe support 10, the guide pad are arranged on the inner wall of the jacket 10 on the packer 30.
In the present embodiment, it is specifically described for four steel-pipe piles 20 are set, wherein the setting of steel-pipe pile 20 Quantity does not cause to limit to the protection scope of the application.
In the present embodiment, the guide pad is preferably provided at the jacket 10 close to the inner wall of its bottom and top On;The guide pad is used for the inclination installation to the steel-pipe pile 20 and plays guiding role, when guide pad is arranged in jacket 10 On the inner wall of bottom and when the top of packer 30 is arranged in it, the guide pad, which also acts as, protects the packer 30 Effect, effectively prevent the steel-pipe pile 20 pitching pile and piling during to caused by the packer 30 damage etc..
Wherein, pass through between 10 top of the jacket and the steel-pipe pile 20 " 7 letter stencils " it 40 is fixed temporarily;It releases interim After fixation, ring flat-plate permanent weld is used between 10 top of jacket and the steel-pipe pile 20.
The mode that is fixed temporarily in the present embodiment efficiently solves in the installation of jacket 10 and is easy in filling process Existing 10 subsidence problems of jacket;By being used at the top of jacket 10 " 7 letter stencils " 10 top of 40 pairs of steel-pipe piles 20 and jacket The mode welded is fixed temporarily, and is released when alternately driving piles to the stake position of piling interim between jacket 10 and steel-pipe pile 20 Consolidation, the mode that the temporary consolidation by other positions undertakes the self weight of jacket 10 prevent jacket 10 from sinking.
Wherein, described " 7 letter stencils " it 40 is evenly arranged along 20 circumferencial direction of steel-pipe pile, and described " 7 letter stencils " 40 and the steel It is to be fully welded connection between tubular pole 20, the jacket 10.
It is described " 7 letter stencils " 40 setting quantity can be selected according to the actual situation, it is not right that quantity is specifically set The protection scope of the application causes to limit.
As shown in figure 5,10 construction method of stake method taper pile jacket after the non-embedding rock of the present embodiment, includes the following steps:
Step 1,10 measurement and positioning of jacket and sweeps extra large leveling;
The plan-position of jacket 10 and elevation are the key that control 10 measurement and positionings of jacket, are installed in jacket 10 Before, it carries out the wire drag survey in 10 region of jacket and carries out lathe leveling, confirm whether mud face absolute altitude and opposite height difference meet Design requirement after verifying is qualified, transfers loop wheel machine main hook, the location and installation of jacket 10 is carried out after survey crew's measurement.
The measurement and positioning of the jacket 10 needs to measure the center of the axis in length and breadth of jacket 10 on jacket 10 Point, and select longitudinal and transverse one side as jacket 10 and measure control point, center identification is carried out in advance.
Wherein, when loop wheel machine main hook is when being down to mud face 500mm, loop wheel machine brakes to stationary state, and survey crew carries out Measurement.
Survey crew should carry out accurate measurement and positioning to position is fixed on jacket 10 and calculate this, find out deviation Value checks and approves the motion direction and distance of jacket 10, moves jacket 10 again.
Divided after survey crew measurement by other two survey crews for the accuracy for being further ensured that measurement data It carry out not duplex measurement.
The present embodiment seeks deviation by above-mentioned, checks and approves 10 motion direction of jacket and distance, and again by more people's repetition measurements The method of secondary mobile jacket 10, jacket tentatively levels that difficulty is big to ask during effective solution taper pile jacket construction Topic.
Step 2,10 installation ship near point of jacket stay position;
When Specific construction operation, 6 grades of wind speed of actual measurement should be selected hereinafter, wave height is less than the weather of 1m, ship is stayed position into point, done Good preparation.
Step 3, the lifting installation of jacket 10;
After the completion of ship near point, wirerope is hung up properly, and tie up cable wind rope.Slowly sling jacket 10, lifting distance transport After ship clamping plate certain altitude, cargo ship is removed, and keeps the original lifting state of crane ship, will under the action of crane ship anchor hawser Crane ship is moved to 10 design centre of jacket and is positioned, and transfers jacket 10 to sea bed face after the completion of positioning, slowly loose Wirerope.
Wherein, in the present embodiment, cable wind rope preferably arranges two, is arranged in 10 two sides of jacket.Wherein, cable Wind rope one end is fixed on jacket 10, and the other end is fixed on the hoist engine on crane ship.
In the present embodiment, the height about 1m of jacket 10 is sling, specific height can be adjusted slightly according to the actual situation.
In this step, after jacket 10 sinks and stablizes, 10 absolute altitude of jacket, center line etc. are measured.If no Meet design requirement, needs to relocate, transfer, until meeting design requirement.
Step 4, the lifting of steel-pipe pile 20 installation and pitching pile operation;
Steel-pipe pile 20 ensures that suspension hook and wirerope are put down gently to the lifting lug of steel-pipe pile 20 when lifting by crane, and avoids applying pile body anti-corrosion Layer generates impact and abrasion.After lifting, by the cooperation of major-minor suspension hook, turn over steel-pipe pile 20 slowly by horizontality to setting The tilt angle of meter transfers steel-pipe pile 20, carries out pitching pile construction operation.
When Specific construction operation, hang stake leave barge moment it is steady, be unable to towing post.
After the completion of the turn of steel-pipe pile 20, cantilever crane is rotated to 10 orientation of jacket, and crane ship acts on adjusting angle by anchor hawser Degree, major-minor suspension hook synchronous ascending, so that steel-pipe pile 20 to certain altitude can smoothly enter into 10 top stake mouth of jacket.
When the decentralization of steel-pipe pile 20 is to when turning over lifting lug close to 10 top stake mouth of jacket, auxiliary body turning hoist cable is unloaded, cuts off and turns over Body lifting lug, steel-pipe pile 20 are drowned oneself after stabilization, are extractd wirerope, are sequentially completed its excess-three steel-pipe pile 20 using diagonal pitching pile mode Pitching pile operation.Wherein, in the present embodiment, the steel-pipe pile 20 is preferably four.
Wherein, it is first inserted into steel-pipe pile 20 in the high-end of the jacket 10, is inserted into steel-pipe pile 20 after low side, that is, pitching pile is suitable Sequence is to insert principle after high-end first slotting, least significant end.
As a further improvement, when the stake bottom absolute altitude of steel-pipe pile 20 is sink to the designed elevation of guide pad, packer 30 certainly When, pile sinking speed should be reduced, slow transit through steel-pipe pile 20 between 10 bottom guide block of jacket and packer 30 by self weight Region.
When 20 bottom absolute altitude of steel-pipe pile is from the designed elevation for being sink to guide pad, packer 30, steel-pipe pile 20 can not be by certainly The region between 10 bottom guide block of jacket and packer 30 is continued through again, slings steel-pipe pile 20 to certain altitude, adjustment Position re-starts self weight and sinks.
The present embodiment is reduced by using the construction method of " first mentioning stake-adjustment position-pitching pile again " in pitching pile process The risk of middle damage packer 30.
Step 5, jacket 10 tentatively level;
It is drowned oneself after stablizing to steel-pipe pile 20, the levelness of jacket 10 is measured, by loop wheel machine by jacket 10 levelness are adjusted to design requirement, after preliminary leveling, by adopting between 10 top of jacket and steel-pipe pile 20 With " 7 letter stencils " 40 welding modes be fixed temporarily between jacket 10 and steel-pipe pile 20.
It wherein reserves 10 top of a jacket to be first not fixed with steel-pipe pile 20 for leveling operation, that is, be fixed temporarily wherein The jacket 10 of three corresponding settings of steel-pipe pile 20, the jacket 10 of the corresponding setting of a remaining steel-pipe pile 20 Between be then first not fixed.
As a further improvement, described being fixed temporarily is to be faced jacket 10 and steel-pipe pile 20 by 7 letter stencils When be welded and fixed.
Wherein, described " 7 letter stencils " it 40 is evenly arranged along 20 circumferencial direction of steel-pipe pile, and described " 7 letter stencils " 40 and the steel It is to be fully welded connection between tubular pole 20, the jacket 10.
Preferably, described " 7 letter stencils " 40 setting quantity needs obtained according to checking computations.
The present embodiment at the top of jacket 10 by using " 7 letter stencil " to welding at the top of steel-pipe pile 20 and jacket 10 The mode connect is fixed temporarily, and releases the temporary consolidation between jacket 10 and steel-pipe pile 20 to the stake position of piling when alternately driving piles, The mode that temporary consolidation by other positions undertakes the self weight of jacket 10 prevents jacket 10 from sinking.
Step 6 is laid with protection against erosion river bottom protection in 10 bottom of jacket;
After leveling at the beginning of completing jacket 10,10 position of jacket is substantially stationary, by diver work to 10 bottom of jacket The sea bed face of mouth is laid with sand by river bottom protection, and 10 bottom of jacket is prevented to be washed.
It should be noted that in hammer piling, trend is too urgent, suspends pile sinking when surging excessive, keeps a close eye on crane ship The working condition of anchor hawser position, stake and platform and hydraulic hammer.Such as occurs pile penetration abnormality in work progress, pile body declines suddenly Phenomenon should stop hammering immediately, ascertain the reason, adopt an effective measure in time.
Step 7,20 pile sinking of steel-pipe pile;
After lifting hydraulic hammer is inserted in stake top, loop wheel machine hoist should slowly reduce, and after piling, start liquid with the smallest energy Hammer starts pile sinking, measures leveling to jacket 10 in pile driving process.
Measurement should be repeated in the leveling during the pile driving process, until reaching designed elevation.
The levelness of repetition measurement jacket 10 after pile sinking does not such as reach design requirement and continues to finely tune, until leading Pipe support 10 carries out being fully welded fixation after reaching design requirement.
Step 8,10 accurate leveling of jacket and fixation;
During piling, constantly measure position and the levelness of jacket 10,10 sinking of jacket in place after, by diagonal Interleaved order carries out leveling operation to jacket 10, the tune when beating, until steel-pipe pile 20 is sink to designed elevation.
Wherein, leveling operation be pitching pile, piling, pile sinking in place after, by four steel-pipe piles, 20 therein three steel pipes Stake 20 is fixed temporarily with jacket 10, is first leveled to an angle of jacket 10.
After steel-pipe pile 20 reaches designed elevation and completes the whole accurate leveling of jacket 10, by jacket 10 Between top and steel-pipe pile 20 using " 7 letter stencils " and by the way of 40 welding it is temporarily solid to being carried out between jacket 10 and steel-pipe pile 20 It is fixed.
Wherein, described " 7 letter stencils " it 40 is evenly arranged along 20 circumferencial direction of steel-pipe pile, and described " 7 letter stencils " 40 and the steel It is to be fully welded connection between tubular pole 20, the jacket 10.
Preferably, described " 7 letter stencils " 40 setting quantity needs obtained according to checking computations.
In this step, the present embodiment uses " 7 letter stencil " to steel-pipe pile 20 and jacket also through at the top of jacket 10 The mode that 10 tops are welded is fixed temporarily, and is released between jacket 10 and steel-pipe pile 20 when alternately driving piles to the stake position of piling Temporary consolidation, the temporary consolidation by other positions undertake jacket 10 self weight mode prevent jacket 10 sink.
Step 9 is in the milk in the circumferential weld that jacket 10 and steel-pipe pile 20 are formed, grouting region M as shown in Figure 2;
Grouting material is filled into 20 shape of jacket 10 and steel-pipe pile by the way of pumping mud jacking by the grouting connection of jacket 10 At circumferential weld between.
Wherein, any displacement cannot generates in filling process between jacket 10 and steel-pipe pile 20.
Step 10, fixed catheter frame 10 and steel-pipe pile 20.
It completes after waiting grouting materials to harden and reach design strength after being in the milk, releases 10 top of jacket and steel-pipe pile 20 Between " 7 letter stencils " 40 temporary consolidations, ring flat-plate permanent weld then is used between 10 top of jacket and steel-pipe pile 20, it is right Jacket 10 is completed after welding position touch-up paint to construct.
Present application addresses there are jackets 10 just to level in 10 work progress of stake method taper pile jacket after existing non-embedding rock Difficult, steel-pipe pile 20 lifts by crane packer 30, piling and filling process jacket 10 easily sinking, jacket easy to damage during pitching pile 10 accurate levelings and the leading pipe support 10 that is in the milk fix the technical problems such as not in place.The application has construction precision height, safety coefficient The features such as height, equipment requirement is low, saves Potential Working Time For Operation At Sea and construction cost and high-quality 10 installation of jacket, is true Marine 10 installation quality of jacket is protected to provide a strong guarantee.
Above embodiments are only to illustrate the technical solution of the application and non-limiting, referring to preferred embodiment to the application into Detailed description is gone.Those skilled in the art should understand that the technical solution of the application can be modified or be waited With replacement, without departing from the spirit and scope of technical scheme, should all cover within the scope of claims hereof.

Claims (2)

1. stake method taper pile jacket construction system after a kind of non-embedding rock, which is characterized in that
It include: jacket, steel-pipe pile, guide pad and packer,
The steel-pipe pile, which is sunk in the jacket setting and its circumferential weld, is inoculated with slurry, and the packer is arranged in the jacket Bottom inside, the guide pad is arranged on the inner wall of the jacket on the packer;
Wherein, it is fixed temporarily between the steel-pipe pile by " 7 letter stencil " at the top of the jacket;After temporary fixing lifting, institute It states between jacket top and the steel-pipe pile using ring flat-plate permanent weld.
2. system according to claim 1, which is characterized in that " 7 letter stencil " is evenly arranged along steel-pipe pile circumferencial direction, It and is to be fully welded connection between " 7 letter stencil " and the steel-pipe pile, the jacket.
CN201920081284.XU 2019-01-17 2019-01-17 Stake method taper pile jacket construction system after the non-embedding rock of one kind Active CN209636844U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920081284.XU CN209636844U (en) 2019-01-17 2019-01-17 Stake method taper pile jacket construction system after the non-embedding rock of one kind

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920081284.XU CN209636844U (en) 2019-01-17 2019-01-17 Stake method taper pile jacket construction system after the non-embedding rock of one kind

Publications (1)

Publication Number Publication Date
CN209636844U true CN209636844U (en) 2019-11-15

Family

ID=68478267

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920081284.XU Active CN209636844U (en) 2019-01-17 2019-01-17 Stake method taper pile jacket construction system after the non-embedding rock of one kind

Country Status (1)

Country Link
CN (1) CN209636844U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109594580A (en) * 2019-01-17 2019-04-09 中交上海三航科学研究院有限公司 Stake method taper pile jacket construction method and system after the non-embedding rock of one kind

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109594580A (en) * 2019-01-17 2019-04-09 中交上海三航科学研究院有限公司 Stake method taper pile jacket construction method and system after the non-embedding rock of one kind

Similar Documents

Publication Publication Date Title
CN109594580A (en) Stake method taper pile jacket construction method and system after the non-embedding rock of one kind
CN105386408B (en) Deep-water bridge pile foundation construction method
CN107542101B (en) Construction method of offshore four-buoy-buoyancy tank combined foundation structure
CN108571621B (en) Pipeline immersed tube construction method by using floating box type water floating gantry crane method
CN104480865B (en) A kind of Large Steel open caisson accurate positioning method
CN102322062B (en) Transportation and installation process of base barrel body of barrel type breakwater
US9238896B2 (en) Floating structure for supporting a wind turbine
CN110924307A (en) Trestle construction method for bare rock geology
CN101429761A (en) Deep sea bare rock pier protection barrel, positioning pile, underwater cofferdam integrated platform and construction method
CN106812144A (en) Double-wall steel cofferdam construction method
CN101200898A (en) Construction method of drilling pile base for bare rock and shallow overburden
CN102021901B (en) Method for putting up steel pipe pile platform of abrupt slope bare rock
CN201746845U (en) Pile foundation type foundation structure applicable to ocean engineering
CN109853531A (en) A kind of pile foundation construction process of cast-in-situ bored pile
CN109024525A (en) A kind of artificial island structure and its construction method considering underground space development
CN218506092U (en) C-shaped assembly type floating transportation structure for split floating transportation of offshore substation
CN209636844U (en) Stake method taper pile jacket construction system after the non-embedding rock of one kind
EP2796713B1 (en) Floating precast-concrete structure for supporting a wind turbine
CN108222069A (en) A kind of underwater immersed tube, the device and construction method for setting up underwater immersed tube
CN108792922B (en) Hoisting method for special-shaped sections of pouring jacket
CN104060592B (en) Method for 1/4 land territory preassembling and overwater dispersion of large cylinder main grids of cellular steel sheet piles
CN107761751A (en) A kind of Double-Wall Steel Boxed Cofferdam and its construction method
CN207143999U (en) A kind of underwater immersed tube and the device for setting up underwater immersed tube
CN111005396A (en) Steel cofferdam installation process
CN106677075B (en) A kind of cofferdam for Bridge Pier Construction hangs stake and method of passing the flood period