CN110644487A CN201910875520.XA CN201910875520A CN110644487A CN 110644487 A CN110644487 A CN 110644487A CN 201910875520 A CN201910875520 A CN 201910875520A CN 110644487 A CN110644487 A CN 110644487A
Authority
CN
China
Prior art keywords
pile
box
truss
stabilizing platform
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910875520.XA
Other languages
Chinese (zh)
Inventor
米刘芳
张佩良
何福渤
丁文智
陈强
高永生
刘宝发
陈官禄
王辉
赵雨来
易振
费文源
赵子江
杨立红
李文
张津
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Port & Channel Engineering Co Ltd
Original Assignee
Tianjin Port & Channel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Port & Channel Engineering Co Ltd filed Critical Tianjin Port & Channel Engineering Co Ltd
Priority to CN201910875520.XA priority Critical patent/CN110644487A/en
Publication of CN110644487A publication Critical patent/CN110644487A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers
    • E02D7/14Components for drivers inasmuch as not specially for a specific driver construction
    • E02D7/16Scaffolds or supports for drivers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure

Abstract

The invention discloses a construction method based on a box-tube type pile stabilizing platform, which comprises the steps of sequentially dragging a pile stabilizing platform assembled by a box tube, a steel tube, a fixed truss and a movable truss to a construction site, synchronously exhausting air at the same speed from the box tube to fix the pile stabilizing platform, lifting the movable truss above the water surface and fixing the truss, then installing a pile driving frame and a pile embracing device on the pile driving frame, hoisting a large-diameter steel tube pile into the pile embracing device, adjusting the verticality by utilizing a pushing device on the pile driving frame, sinking the large-diameter steel tube pile into mud to a stable state and then sinking the pile to a designed elevation position; moving the pile stabilizing platform and repeating the procedures until the construction is finished; the construction method based on the box-cylinder type pile stabilizing platform is convenient to operate, the pile stabilizing platform adopted in the construction process is simple in structure, the horizontal bearing capacity and the construction efficiency of the box-cylinder type pile stabilizing platform are greatly improved, the construction quality of the large-diameter steel pipe pile is further effectively guaranteed, and the construction method is suitable for large-diameter steel pipe pile construction under different water depths and geological conditions.

Description

Construction method based on box-cylinder type pile stabilizing platform
Technical Field
The invention relates to the technical field of offshore wind power large-diameter steel pipe pile construction, in particular to a construction method based on a box-cylinder type pile stabilizing platform.
Background
The offshore wind turbine foundation mainly comprises a gravity type foundation, a single-pile foundation, a jacket foundation, a bearing platform foundation and the like, wherein the single-pile foundation has the advantages of simplicity in manufacture, no need of seabed arrangement, strong adaptability to terrain, quickness in construction and the like, and is most widely applied to the wind turbine foundation. Along with the increasing power of offshore wind power generators, the diameter, the length and the weight of a large-diameter steel pipe pile single-pile foundation are also increased, and the construction quality and the construction efficiency of the single-pile foundation directly influence the engineering quality and the engineering efficiency.
Published patent application 201611027834.7 discloses a box cylinder pile guide frame and construction process thereof, and it includes box cylinder, truss, steel stand and stop device, and box cylinder top rigid coupling has the truss, and truss top rigid coupling has truss top steel sheet, the rigid coupling has the steel stand on the truss top steel sheet, is connected with stop device through the ring flange on the steel stand, and stop device includes upper and lower layer guide frame platform and upper and lower layer guide frame outrigger mechanism. The pile group construction can be carried out by adjusting the telescopic distance and the rotating angle through the guide frame platform and the overhanging mechanism, the purpose of convenient and rapid installation and movement is realized by utilizing the construction process of vacuumizing, negative pressure sinking of the box-tube structure, and the defect that only small-diameter pile group foundations can be constructed and large-diameter steel pipe piles cannot be constructed is overcome.
Published patent application 201910159922.X discloses a pile stabilizing platform, which comprises a truss structure, a plurality of sections of sleeves, sleeve anti-sinking assemblies, connecting flanges and anchor piles; the truss structure, the sleeve and the sleeve anti-sinking assembly form a pile stabilizing platform main body; four anchor pile channels are arranged in the pile stabilizing platform main body, and the pile stabilizing platform main body is sleeved on the anchor piles through the anchor pile channels; the pile stabilizing platform main body is provided with a bolt, and the anchor pile is provided with a jack; four corners of the truss structure are provided with truss anchor pile channels; the sleeve is a hollow cylindrical structure with a sleeve anchor pile channel arranged inside; the plurality of sections of sleeves are connected through the connecting flanges to form a sleeve whole, the top of the sleeve whole is fixed below the truss structure, and the bottom of the sleeve whole is provided with a sleeve anti-sinking assembly; an anchor pile channel of the anti-sinking component is arranged in the center of the sleeve anti-sinking component; the truss structure, the sleeve are integrally arranged with the anchor pile channel in the sleeve anti-sinking assembly in a coaxial mode. This steady pile platform makes steady pile platform can adapt to the operation of different depth of water through setting up the sleeve of different knots, and it is not enough that steady pile platform weight is big, needs large-scale boats and ships of lifting by crane to carry out the handling installation, and the efficiency of construction is low, and ship machine equipment cost is high.
Published patent application 201810493695.X discloses a pile stabilizing platform, which comprises a truss structure consisting of transverse steel pipes, longitudinal steel pipes and oblique steel pipes, wherein four corners of the truss structure are pile leg passage openings for pile legs to pass through, the bottoms of the pile legs are fixed in pile shoes, ring beams are sleeved on the pile legs, the lower end faces of the ring beams are fixedly connected with turnbuckles, connecting rods are vertically arranged on a first transverse steel pipe, a second transverse steel pipe, a third transverse steel pipe and a fourth transverse steel pipe, and when the pile stabilizing platform is adjusted to any position of the pile legs, the pile stabilizing platform and the pile legs are fixedly connected with the turnbuckles through the connecting rods; the center of steady pile platform is provided with the single pile entrance that supplies the single pile to pass through, and a plurality of hydraulic jack use the single pile entrance to be the annular array setting as the centre of a circle, and when the single pile setting was in single pile entrance department, hydraulic jack drive bracing piece's top moved towards the single pile, fixes a position the single pile through hydraulic jack. The invention effectively adjusts the levelness of the pile stabilizing platform and the verticality of a single pile, and has the defects of large weight of the pile stabilizing platform, low construction efficiency and high cost of ship machinery equipment because a large-scale hoisting ship is needed for hoisting and installation.
Disclosure of Invention
The invention aims to provide a construction method based on a box-cylinder type pile stabilizing platform, which solves the problems of low construction efficiency, high ship-plane configuration requirement and the like of the existing offshore wind power large-diameter steel pipe pile.
Therefore, the technical scheme of the invention is as follows:
a construction method based on a box-tube type pile stabilizing platform is characterized in that the box-tube type pile stabilizing platform adopted by the method comprises four box tubes, four steel tubes, a fixed truss, a movable truss, a pile driving frame and a pile embracing device; wherein, the four steel pipes are respectively vertically arranged and fixed at the centers of the top surfaces of the four box cylinders; the fixed truss is of a cubic structure with an opening part on one side, and four top corners of the fixed truss are respectively fixed on the side walls of the bottom ends of the four steel pipes, so that the four box barrels are simultaneously supported at the four top corners of the fixed truss; the sizes and the structures of the movable truss and the fixed truss are the same, four vertex angles of the movable truss and the fixed truss are respectively provided with a sleeve, each sleeve is vertically arranged, the inner diameter of each sleeve is matched with the outer diameter of the steel pipe, and the movable truss is enabled to be capable of adjusting the distance in the axial direction of the steel pipe relative to the fixed truss by respectively sleeving the four sleeves on the four steel pipes; the opening part of the movable truss and the opening part of the fixed truss are positioned at the same side; the pile driving frame is fixed at the center of the top surface of the movable truss; the pile embracing device is fixed on the side wall of one side of the pile driving frame and is positioned above the opening part of the movable truss, the pile embracing device comprises at least two annular embracing arms positioned on the same axis, and a plurality of pushing devices are uniformly distributed on each annular embracing arm along the circumferential direction;
the specific construction method based on the box-cylinder type pile stabilizing platform comprises the following steps:
s1, putting the pile stabilizing platform formed by assembling the four box cylinders, the four steel pipes, the fixed truss and the movable truss into water through a slide way or land hoisting equipment, and dragging the pile stabilizing platform in a floating state to a construction site by using a tugboat;
s2, connecting the air pumping holes of the four tanks with an air pump through pipelines respectively, and pumping the air in each tank at the same speed simultaneously to ensure that the four tanks sink to preset positions synchronously under the action of negative pressure and are in a stable state;
s3, lifting the movable truss upwards to a position above the water surface, fixing four sleeves of the movable truss on corresponding positions of four steel pipes, installing a pile driving frame at the center of the top surface of the movable truss, installing a pile embracing device on the pile driving frame, and enabling annular embracing arms on the pile driving frame to be coaxially arranged and to be positioned above the opening parts of the fixed truss and the movable truss;
s4, opening a plurality of annular embracing arms of the pile embracing device, closing the embracing arms after the large-diameter steel pipe pile is lifted into the pile embracing device, and adjusting the verticality of the large-diameter steel pipe pile through a plurality of pushing devices arranged on the annular embracing arms;
s5, hoisting a pile driving hammer for pile sinking construction after the large-diameter steel pipe pile is self-sunk into mud to a stable state until the large-diameter steel pipe pile is sunk to a designed elevation position;
s6, opening an arm of the pile embracing device, moving the pile driving frame and the pile embracing device down to the bottom of the steel pipe again along with the movable truss and fixing the pile driving frame and the pile embracing device, then inflating the box cylinder through an air pump, pulling up the box cylinder pile stabilizing platform under the action of buoyancy to recover to a floating state, and dragging the box cylinder pile stabilizing platform to the next construction site by using a tugboat;
and S7, repeating the steps S2-S6 until the large-diameter steel pipe piles of the rest machine positions are completely sunk.
Furthermore, the sizes of the opening parts of the fixed truss and the movable truss are matched with the diameter of the large-diameter steel pile, so that the large-diameter steel pile can be arranged on the inner sides of the opening parts of the fixed truss and the movable truss, and meanwhile, the size of the opening part meets the requirement that the whole truss keeps certain strength.
Furthermore, a plurality of reinforcing rib plates are uniformly distributed on the side wall of the bottom end of each steel pipe along the circumferential direction, each reinforcing rib plate is vertically arranged, the inner side of each reinforcing rib plate is fixed on the side wall of each steel pipe, and the bottom side of each reinforcing rib plate is fixed on the top surface of the box cylinder.
Further, in step S3, when the mud layer under the mud surface at the sinking position of the pile stabilizing platform is deep enough, the box barrel adopts a box barrel with at least one gas compartment inside, so as to ensure that the box barrel sinks to a predetermined position stably, and the inner cavity of the box barrel is filled with mud, so that the box barrel reaches a stable state in the mud; when the mud layer under the mud surface at the sinking position of the pile stabilizing platform is shallow or is difficult to sink under vacuum negative pressure, the box barrel adopts the box barrel internally provided with at least one gas bulkhead and at least one water bag, and after the box barrel is ensured to sink to a preset position stably, the space of the inner cavity of the box barrel, which is not filled with the mud, can fill the space, which is not filled with the mud, with the water filling water bag in a manner of pouring water into the water bag, so that the box barrel reaches a stable state in the mud.
Compared with the prior art, the construction method based on the box-cylinder type pile stabilizing platform is convenient to operate, the pile stabilizing platform adopted in the construction process is simple in structure, the horizontal bearing capacity and the construction efficiency of the box-cylinder type pile stabilizing platform are greatly improved, the construction quality of the large-diameter steel pipe pile is further effectively guaranteed, and the construction method is suitable for large-diameter steel pipe pile construction under different water depths and geological conditions.
Drawings
Fig. 1 is a schematic structural diagram of a box-barrel type pile stabilizing platform based on the construction method of the box-barrel type pile stabilizing platform;
fig. 2 is a schematic structural diagram of a box-cylinder type pile stabilizing platform in a floating state in the construction method based on the box-cylinder type pile stabilizing platform of the invention;
FIG. 3 is a schematic structural diagram of a box-cylinder type pile stabilizing platform in a pile feeding state in the construction method based on the box-cylinder type pile stabilizing platform of the invention;
FIG. 4 is a top view of the box-cylinder type pile stabilizing platform of the construction method based on the box-cylinder type pile stabilizing platform of the present invention;
fig. 5 is a side view of the box-barrel type pile stabilizing platform based on the construction method of the box-barrel type pile stabilizing platform.
Detailed Description
The invention will be further described with reference to the following figures and specific examples, which are not intended to limit the invention in any way.
Example 1
As shown in fig. 1 to 5, a box-tube pile-stabilizing platform suitable for large-diameter steel piles comprises four box tubes 1, four steel tubes 3, a fixed truss 4, a movable truss 6, a pile driving frame 7 and a pile embracing device 8; wherein the content of the first and second substances,
the four steel pipes 3 are respectively vertically arranged and fixed at the centers of the top surfaces of the four box cylinders 1, and meanwhile, eight reinforcing rib plates are uniformly distributed on the side wall of the bottom end of each steel pipe along the circumferential direction, so that the bottom ends of the steel pipes 3 are fixedly reinforced on the top surfaces of the box cylinders 1; specifically, the bottom end of the steel tube 3 is welded and fixed on the top surface of the box barrel 1, each reinforcing rib plate uniformly distributed along the circumferential direction of the steel tube is vertically arranged, the inner side of the reinforcing rib plate is prevented from being welded and fixed on the side wall of the steel tube 3, and the bottom side of the reinforcing rib plate is welded and fixed on the top surface of the box barrel 1;
the fixed truss 4 is of a cubic structure with an opening part on one side, and four top corners are respectively welded and fixed on the side walls of the bottom ends of the four steel pipes 3, so that the four box barrels 1 are simultaneously supported at the four top corners of the fixed truss 4; specifically, the size of the fixed truss 4 is adapted to the diameter of the large-diameter steel pile to be constructed, so that the large-diameter steel pile can be arranged inside the opening parts of the fixed truss 4 and the movable truss 6; in addition, the radial section of the opening part of the fixed truss 4 is an isosceles triangle, and the radial section area of the opening part is 1/4 of the radial section area of the fixed truss, so that the structure with the opening ensures that the fixed truss 4 still has good stability and strength;
the size and the structure of the movable truss 6 are completely the same as those of the fixed truss 4, and the difference is that the four top corners of the movable truss are respectively provided with a sleeve 6; the sleeves 6 are cylindrical barrel structures with the inner diameter slightly larger than the outer diameter of the steel pipes 3, the four sleeves 6 are respectively sleeved on the outer sides of the four steel pipes 3, so that the movable truss 6 moves up and down along the axial direction of the steel pipes, the distance between the movable truss 6 and the fixed truss 4 is adjusted, and the pile stabilizing platform is suitable for different water depth conditions; in addition, the opening part of the movable truss 6 and the opening part of the fixed truss 4 are positioned at the same side;
the pile driving frame 7 and the pile embracing device are arranged on the movable truss 6 after the pile stabilizing platform moves to a construction site, and specifically, the pile driving frame 7 is fixedly welded at the center of the top surface of the movable truss 6; the pile embracing device is welded and fixed on the side wall of one side of the pile driving frame 7 and is positioned above the opening part of the movable truss 6, the pile embracing device specifically comprises two annular embracing arms 8 positioned on the same axis, and 4 pushers 9 are uniformly distributed on each annular embracing arm 8 along the circumferential direction, so that a large-diameter steel pile 10 arranged in each annular embracing arm 8 is always kept in a completely vertical state before pile sinking and in the pile sinking process.
In the embodiment, the box barrel, the pile driving frame, the pile embracing device and the ejector are all of structures conventionally used in the field of steel pipe pile construction, wherein two embracing arms of the pile embracing device are annular embracing arms capable of being opened and closed, so that the steel pile can be conveniently translated into the embracing arms; the specific internal space structures of the fixed truss and the movable truss also adopt the structures with good stability and high strength which are common in the existing truss; in addition, the type of the box barrel is selected according to the geological conditions of the pile sinking position, specifically, when a sludge layer under the sludge surface at the sinking position of the pile stabilizing platform is deep enough, the box barrel adopts the box barrel with at least one gas compartment arranged therein, the box barrel is guaranteed to sink to a preset position stably, and sludge in the sludge layer is carried out from the bottom side of the box barrel until the inner cavity of the box barrel is filled with sludge, so that the box barrel is in a stable state in the sludge; when the mud layer under the mud surface at the sinking position of the pile stabilizing platform is shallow or is difficult to sink under vacuum negative pressure, the box barrel adopts the box barrel which is internally provided with at least one gas bulkhead and at least one water bag, and after the box barrel is ensured to sink to a preset position stably, the space of the inner cavity of the box barrel which is not filled with the mud can fill the space which is not filled with the mud by a water filling water bag in a manner of pouring water into the water bag, so that the box barrel reaches a stable state in the mud.
Example 2
The construction method of the box-tube pile-stabilizing platform based on the embodiment 1 comprises the following specific steps:
s1, putting the pile stabilizing platform formed by assembling the four box barrels 1, the four steel pipes 3, the fixed truss 4 and the movable truss 6 into water through a slide way or land hoisting equipment, and dragging the pile stabilizing platform in a floating state to a construction site by using a tugboat;
s2, connecting the air pumping holes 11 of the four box cylinders 1 with an air pump through pipelines respectively, and pumping air in each box cylinder at the same speed simultaneously to enable the four box cylinders 1 to sink to preset positions synchronously under the action of negative pressure and be in a stable state;
s3, lifting the movable truss 6 upwards to a position above the water surface, fixing four sleeves of the movable truss on corresponding positions of four steel pipes in a welding mode, installing a fixed pile driving frame 7 at the center of the top surface of the movable truss 6, and installing a fixed pile embracing device on the pile driving frame 7 to enable an annular embracing arm 8 on the pile driving frame to be coaxially arranged and located above the opening parts of the fixed truss 4 and the movable truss 6;
in the step, when the sludge layer under the sludge surface at the sinking position of the pile stabilizing platform is deep enough or can sink to a preset position under vacuum negative pressure, the box barrel 1 adopts a box barrel with at least one gas compartment arranged therein; when the sinking position of the pile stabilizing platform is a condition that a sludge layer under a sludge surface is shallow or the pile stabilizing platform is difficult to sink under vacuum negative pressure, the box barrel 1 adopts a box barrel which is internally provided with at least one gas bulkhead and at least one water bag, so that when the pile stabilizing platform is difficult to sink, water is filled into the water bag through a water conveying pipeline connected with a water inlet of the water bag until the water bag fills a space which is not filled with sludge in the box barrel, and the structure is kept stable;
s4, opening a plurality of annular embracing arms 8 of the pile embracing device, closing the embracing arms after the large-diameter steel pipe pile 10 is hung into the pile embracing device, and adjusting the verticality of the large-diameter steel pipe pile through a plurality of pushing devices arranged on the annular embracing arms 8;
s5, hoisting a pile driving hammer for pile sinking construction after the large-diameter steel pipe pile is self-sunk into mud to a stable state until the large-diameter steel pipe pile is sunk to a designed elevation position;
s6, opening an arm of the pile embracing device, moving the pile driving frame and the pile embracing device down to the bottom of the steel pipe again along with the movable truss 6 and fixing, then inflating the box cylinder through an air pump, pulling up the box cylinder pile stabilizing platform under the action of buoyancy to recover to a floating state, and dragging the box cylinder pile stabilizing platform to the next construction site by using a tugboat;
and S7, repeating the steps S2-S6 until the large-diameter steel pipe piles 10 of the rest machine positions are completely sunk.
The above-mentioned embodiments are only specific embodiments of the present invention, and are not intended to limit the technical solutions of the present invention, and any person skilled in the art can modify or easily conceive of the technical solutions described in the above-mentioned embodiments or make equivalent substitutions on some technical features within the technical scope of the present invention; such modifications, changes or substitutions do not depart from the spirit and scope of the embodiments of the present invention, and they should be construed as being included therein.

Claims (4)

1. A construction method based on a box-tube type pile stabilizing platform is characterized in that the box-tube type pile stabilizing platform adopted by the method comprises four box tubes (1), four steel tubes (3), a fixed truss (4), a movable truss (6), a pile driving frame (7) and a pile embracing device (8); wherein, the four steel pipes (3) are respectively vertically arranged and fixed at the centers of the top surfaces of the four box cylinders (1); the fixed truss (4) is of a cubic structure with an opening part on one side, and four top corners of the fixed truss are respectively fixed on the side walls of the bottom ends of the four steel pipes (3), so that the four box barrels (1) are simultaneously supported at the four top corners of the fixed truss (4); the size and the structure of the movable truss (6) and the fixed truss (4) are the same, four vertex angles of the movable truss are respectively provided with a sleeve (6), each sleeve (6) is vertically arranged, the inner diameter of each sleeve is matched with the outer diameter of the steel pipe (3), and the movable truss (6) is enabled to be capable of adjusting the distance in the axial direction of the steel pipe relative to the fixed truss (4) by respectively sleeving the four sleeves (6) on the four steel pipes (3); the opening part of the movable truss (6) and the opening part of the fixed truss (4) are positioned at the same side; the pile driving frame (7) is fixed at the center of the top surface of the movable truss (6); the pile embracing device is fixed on the side wall of one side of the pile driving frame (7), is positioned above the opening part of the movable truss (6), and comprises at least two annular embracing arms (8) positioned on the same axis, and a plurality of pushing devices are uniformly distributed on each annular embracing arm (8) along the circumferential direction;
the specific construction method based on the box-cylinder type pile stabilizing platform comprises the following steps:
s1, putting the pile stabilizing platform formed by assembling the four box barrels (1), the four steel pipes (3), the fixed truss (4) and the movable truss (6) into water through a slide way or land hoisting equipment, and dragging the pile stabilizing platform in a floating state to a construction site by using a tugboat;
s2, connecting the air pumping holes of the four tanks (1) with an air pump through pipelines respectively, and pumping the air in each tank at the same speed simultaneously to ensure that the four tanks (1) sink to preset positions synchronously under the action of negative pressure and are in a stable state;
s3, lifting the movable truss (6) upwards to a position above the water surface, fixing four sleeves of the movable truss on corresponding positions of four steel pipes, installing a pile driving frame (7) at the center of the top surface of the movable truss (6), installing a pile embracing device on the pile driving frame (7), and enabling an annular embracing arm (8) on the pile driving frame to be coaxially arranged and located above the opening parts of the fixed truss (4) and the movable truss (6);
s4, opening a plurality of annular embracing arms (8) of the pile embracing device, closing the embracing arms after the large-diameter steel pipe piles (10) are hung into the pile embracing device, and adjusting the verticality of the large-diameter steel pipe piles through a plurality of pushing devices arranged on the annular embracing arms (8);
s5, hoisting a pile driving hammer for pile sinking construction after the large-diameter steel pipe pile is self-sunk into mud to a stable state until the large-diameter steel pipe pile is sunk to a designed elevation position;
s6, opening an arm of the pile embracing device, moving the pile driving frame and the pile embracing device down to the bottom of the steel pipe again along with the movable truss (6) and fixing, then inflating the box cylinder through an air pump, pulling up the box cylinder pile stabilizing platform under the action of buoyancy to recover to a floating state, and dragging the box cylinder pile stabilizing platform to the next construction site by using a tug boat;
and S7, repeating the steps S2-S6 until the large-diameter steel pipe piles of the rest machine positions are completely sunk.
2. The construction method of a box-and-tube-based pile stabilization platform according to claim 1, wherein the size of the opening portions of the fixed truss (4) and the movable truss (6) is adapted to the diameter of the large-diameter steel pile so that the large-diameter steel pile can be disposed inside the opening portions of the fixed truss (4) and the movable truss (6).
3. The construction method of the box-tube-based pile stabilizing platform according to claim 1, wherein a plurality of reinforcing ribs are uniformly distributed on the bottom end side wall of each steel tube (3) along the circumferential direction, each reinforcing rib is vertically arranged, the inner side of each reinforcing rib is fixed on the side wall of the steel tube (3), and the bottom side of each reinforcing rib is fixed on the top surface of the box tube (1).
4. The box-and-tube-based pile stabilization platform construction method according to claim 1, characterized in that in step S3, when the mud layer under the mud surface at the sinking position of the pile stabilization platform is deep enough, the box (1) is a box with at least one gas compartment inside; when the sludge layer under the sludge surface at the sinking position of the pile stabilizing platform is shallow or is difficult to sink under vacuum negative pressure, the box barrel (1) adopts a box internally provided with at least one gas compartment and at least one water bag.
CN201910875520.XA 2019-09-17 2019-09-17 Construction method based on box-cylinder type pile stabilizing platform Withdrawn CN110644487A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910875520.XA CN110644487A (en) 2019-09-17 2019-09-17 Construction method based on box-cylinder type pile stabilizing platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910875520.XA CN110644487A (en) 2019-09-17 2019-09-17 Construction method based on box-cylinder type pile stabilizing platform

Publications (1)

Publication Number Publication Date
CN110644487A true CN110644487A (en) 2020-01-03

Family

ID=68991939

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910875520.XA Withdrawn CN110644487A (en) 2019-09-17 2019-09-17 Construction method based on box-cylinder type pile stabilizing platform

Country Status (1)

Country Link
CN (1) CN110644487A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111364456A (en) * 2020-03-28 2020-07-03 江苏龙源振华海洋工程有限公司 Offshore generator pile and construction platform thereof
CN115897575A (en) * 2023-02-21 2023-04-04 中天科技集团海洋工程有限公司 Underwater pile sinking device and process based on suction cylinder type pile stabilizing platform

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106320309A (en) * 2016-08-23 2017-01-11 天津港航工程有限公司 Suction anchor type overwater piling platform and overwater pile group foundation piling technology
CN206428687U (en) * 2016-11-25 2017-08-22 平煤建工集团特殊凿井工程有限公司 A kind of marine single-pile foundation construction platform of pin-connected panel
CN207484441U (en) * 2017-10-25 2018-06-12 海洋石油工程股份有限公司 Movable type piling assistance platform
CN108505522A (en) * 2018-05-21 2018-09-07 中天科技集团海洋工程有限公司 A kind of steady stake platform

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106320309A (en) * 2016-08-23 2017-01-11 天津港航工程有限公司 Suction anchor type overwater piling platform and overwater pile group foundation piling technology
CN206428687U (en) * 2016-11-25 2017-08-22 平煤建工集团特殊凿井工程有限公司 A kind of marine single-pile foundation construction platform of pin-connected panel
CN207484441U (en) * 2017-10-25 2018-06-12 海洋石油工程股份有限公司 Movable type piling assistance platform
CN108505522A (en) * 2018-05-21 2018-09-07 中天科技集团海洋工程有限公司 A kind of steady stake platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111364456A (en) * 2020-03-28 2020-07-03 江苏龙源振华海洋工程有限公司 Offshore generator pile and construction platform thereof
CN111364456B (en) * 2020-03-28 2021-10-15 江苏龙源振华海洋工程有限公司 Construction platform of offshore generator pile
CN115897575A (en) * 2023-02-21 2023-04-04 中天科技集团海洋工程有限公司 Underwater pile sinking device and process based on suction cylinder type pile stabilizing platform

Similar Documents

Publication Publication Date Title
CN107542101B (en) Construction method of offshore four-buoy-buoyancy tank combined foundation structure
CN102312435B (en) Template and the method for multiple basic component are installed in stratum under water
US20130183101A1 (en) Method for Providing a Foundation for a Mass Located at Height, and a Positioning Frame for Performing the Method
CN107653895B (en) Combined offshore six-buoy buoyancy tank foundation structure and construction method thereof
CN108316338B (en) Suction injection type arc-shaped steel anchor
CN107630461B (en) Combined offshore four-buoy buoyancy tank foundation structure and construction method thereof
CN109680702A (en) Suction cartridge type single-pile foundation structure and its construction method
CN110644487A (en) Construction method based on box-cylinder type pile stabilizing platform
CN108374430A (en) A kind of marine submersible basis and auxiliary floating apparatus and construction method entirely
CN106930291B (en) Marine multi-pile limiting frame and construction method thereof
CN110374820B (en) Combined type ring cylinder buoyancy tank foundation structure and construction method thereof
CN211143066U (en) Box-cylinder type pile stabilizing platform
CN107792306B (en) Buoyancy tower platform
CN103119222A (en) Surface-breaking re-usable submergeable template for installing one or more submerged columns/piles
CN219490990U (en) Convenient underwater leveling guide frame
NO772969L (en) EQUIPMENT FOR EXTRACTION OF OIL OR GAS FROM UNDER THE SEABROUND AND PROCEDURE FOR INSTALLATION OF SUCH EQUIPMENT
CN116927236A (en) Integrated sleeve cage structure of single pile foundation of fan
CN111155520A (en) Offshore large-diameter steel pipe pile erecting method and pile erecting device thereof
CN111101496A (en) Construction process for installing deepwater jacket based on attached pile stabilizing device
CN209798803U (en) suction cylinder type single pile foundation structure
CN210343603U (en) Modular ring section of thick bamboo flotation tank foundation structure
CN105401564A (en) Construction method for fixing tidal current energy power generation device to water bottom and tidal current energy power generation device
CN112095606A (en) Float bowl leveling pile gripper
CN210066693U (en) Offshore geological exploration platform structure with assembled barrel-shaped foundation
CN111962543A (en) Rapid connection and separation process of pile stabilizing platform and mother ship

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20200103