CN206428687U CN201621273847.8U CN201621273847U CN206428687U CN 206428687 U CN206428687 U CN 206428687U CN 201621273847 U CN201621273847 U CN 201621273847U CN 206428687 U CN206428687 U CN 206428687U
Authority
CN
China
Prior art keywords
pile
steel
positioning tube
installation sleeve
truss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621273847.8U
Other languages
Chinese (zh)
Inventor
廖卫勇
仝洪昌
李泽
张乐平
王海波
王徽华
冯小星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU LONGYUAN ZHENHUA MARINE ENGINEERING CO LTD
Pingmei Construction Engineering Group Special Drilling Engineering Co Ltd
Original Assignee
JIANGSU LONGYUAN ZHENHUA MARINE ENGINEERING CO LTD
Pingmei Construction Engineering Group Special Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU LONGYUAN ZHENHUA MARINE ENGINEERING CO LTD, Pingmei Construction Engineering Group Special Drilling Engineering Co Ltd filed Critical JIANGSU LONGYUAN ZHENHUA MARINE ENGINEERING CO LTD
Priority to CN201621273847.8U priority Critical patent/CN206428687U/en
Application granted granted Critical
Publication of CN206428687U publication Critical patent/CN206428687U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a kind of pin-connected panel marine single-pile foundation construction platform, the operation platform is that can be used as large-scale single-pile foundation drilling platform and also be used as large-scale single pile squeezing into steady stake platform, including steady pile frame, steel pile casting and steel-pipe pile, the center of the steady pile frame is provided with positioning tube, the upper end and/or lower end of the positioning tube are along the circumferential direction symmetrically embedded some locking cylinders, the steel pile casting is inserted in positioning tube and carries out radial positioning by the locking cylinder, the outside uniform ring of positioning tube sets some installation sleeves, the installation sleeve is fixedly connected with positioning tube by radial direction truss, and be fixedly connected between adjacent installation sleeve by circumferential truss, the steel-pipe pile is inserted in installation sleeve and is connected with installation sleeve card key.By steady pile frame, steel pile casting and steel-pipe pile, removably quick-assembling constitutes operation platform to the utility model, without marine welding job, it can reuse, what is more important, the unique structure design of the utility model, can make operation platform have the high stationarity for bearing seaway load.

Description

A kind of marine single-pile foundation construction platform of pin-connected panel
Technical field
The utility model belongs to offshore construction equipment technical field, and in particular to a kind of marine single-pile foundation construction of pin-connected panel Platform.
Background technology
Marine large-scale structures are often supported with the various pile foundations for stretching into underground, and the structure of pile foundation is required to sea and applied Work platform.Marine large-scale single-pile foundation construction platform has constructed following difficulty:
(1)When seabed unconsolidated formation is excessively thin, the steel-pipe pile of operation platform is squeezed into after sea bed, shallow because burying, and can not be protected marine Standing is held, existing single-pile foundation construction equipment is difficult to construction platform in the case;
(2)Existing single-pile foundation construction equipment constructs the long in time limit of offshore construction platform, loss greatly, and reason is:It is existing Some single-pile foundation construction equipment always first squeezes into some steel-pipe piles after sea bed, then is formed by welding and applies with steel-pipe pile with landing beam The bearing structure of work platform, one side weld interval is long, and working strength is big, when on the other hand removing, it is necessary to cut welding structure Open, cause huge spillage of material;
(3)The offshore construction platform that existing single-pile foundation construction equipment is constructed can be only positioned at water because of the welding of its landing beam On face, the support stiffness of operation platform can only largely be determined by the rigidity for stretching into the steel-pipe pile under sea, to horizontal force Repellence it is poor, operation platform is rocked greatly, it is difficult to meet some specific requirement of engineering, for example Large Steel pile tube drive piles when will Pile frame of seeking to stable has enough horizontal support rigidity causes the load of large-scale steel pipe pile deflection to act on to resist, also therefore, marine Large Steel pile tube still relies on special supporting leg ship to construct at present, but using supporting leg ship it is with high costs, and supporting leg ship it is in place with The duration of withdrawal of vessel is also longer;
(4)The offshore construction platform that existing single-pile foundation construction equipment is constructed is disposable welding structure, is not adjusted Space, when some components need very accurately levelness or during verticality, it is difficult to meet and require.
Utility model content
The utility model is put down for problems of the prior art there is provided a kind of marine single-pile foundation construction of pin-connected panel Platform, by steady pile frame, steel pile casting and steel-pipe pile, removably assembly constitutes operation platform, it is entirely avoided marine Welder Make, can reuse, it is even more important that the unique structure design of the utility model, can have operation platform and bear The high stability of seaway load.
The utility model is adopted the following technical scheme that:
A kind of marine single-pile foundation construction platform of pin-connected panel, including steady pile frame, steel pile casting and steel-pipe pile, the steady pile frame Center is provided with positioning tube, and the upper end and/or lower end of the positioning tube are along the circumferential direction symmetrically embedded some locking cylinders, institute State steel pile casting to be inserted in positioning tube and carry out radial positioning by the locking cylinder, the outside uniform ring of positioning tube sets some peaces Sleeved, the installation sleeve is fixedly connected with positioning tube by radial direction truss, and passes through circumferential truss between adjacent installation sleeve It is fixedly connected with, the steel-pipe pile is inserted in installation sleeve and is connected with installation sleeve card key.
Further, the locking cylinder includes the executive component for making stretching motion, and the executive component extend out to default During stroke, the end of executive component is with the outer wall phase apical grafting of the steel pile casting to realize the locking positioning of steel pile casting.
Further, the top of the steel-pipe pile is uniformly provided with some annular grooves vertically, close to the installation sleeve Common cover is along the circumferential direction connected with outside some card keys, all card keys in the annular groove at top and sets a card key outer cover, the card The top of key outer cover, which corresponds at the position of card key, is respectively connected with the regulating bolt being vertically arranged, the bottom of the regulating bolt with The top phase apical grafting of card key, the bottom of card key outer cover at the top of installation sleeve with being connected.
Further, the radial direction truss and circumferential truss are in perpendicular, and radial direction truss and circumferential truss It is two sprit hack levers of X-shaped girder truss to be constituted by intersecting and respectively positioned at the X-shaped girder truss top and bottom Two horizontal girder hack levers constitute, the end of the sprit hack lever and horizontal girder hack lever is both secured to installation sleeve or positioning tube On.
Further, the top of the steel pile casting is provided with first annular flange, the top of the positioning tube along cylindrical circumferential direction Hold along the uniform some support members being vertically arranged of cylindrical circumferential direction, the top of the support member and the bottom of the first annular flange Hold phase apical grafting.
Further, the support member includes leading screw and adjusting nut, and the top of the positioning tube is equal along cylindrical circumferential direction Some leading screw guide sleeves being vertically arranged of cloth, the leading screw is inserted in the leading screw guide sleeve, the adjusting nut and leading screw It is threadedly coupled and adjusting nut seating is in the top of leading screw guide sleeve.
Further, the support member also includes ball pivot pad, and the top of the leading screw is connected with the ball pivot pad, and ball Cut with scissors top and the bottom phase apical grafting of the first annular flange of pad.
Further, the first annular flange is provided with rig fixed pedestal, and the top of the steel pile casting is provided with hold-carrying It is blue.
The construction technology of the marine single-pile foundation construction platform of above-mentioned pin-connected panel,
(1)Enter water:Steel-pipe pile is connected to after steady pile frame, integral hoisting enters water to steel-pipe pile and sea bed;
(2)Point shakes:Apply point to steel-pipe pile to shake so that steel-pipe pile is squeezed into ID, make platform have initial support steady Qualitative, initial support platform is formed;
(3)Leveling:Microspur slings the lowest part of the initial support platform and releases the card key connection of steel-pipe pile at this, adjusts After flat initial support platform, the steel-pipe pile of releasing is connected into reconnect by card key and is fixed on steady pile frame;
(4)Piling:All steel-pipe piles carry out following piling process successively:The card key connection of a steel-pipe pile is released first, Then the steel-pipe pile of releasing is squeezed into required depth using vibration hammer, finally connected the steel-pipe pile of releasing again by card key It is connected and fixed on steady pile frame;
(5)Gu cylinder:Steel pile casting is inserted in positioning tube, the locking cylinder on positioning tube is positioned to steel pile casting, Then steel pile casting is squeezed into required depth, last locking cylinder locks steel pile casting, so far, and platform construction is completed.
The beneficial effects of the utility model are as follows:
(1)Eliminate marine welding job:Positioning tube, radial direction truss, circumferential truss, installation sleeve are fixedly connected with composition surely Pile frame, steel-pipe pile and installation sleeve are detachably connected mode using what such as card key was connected, overall structure can with underwater, and Fixation is adjusted under water, but constructing for existing offshore construction platform is limited by marine welding, the utility model Above-mentioned design not only altogether dispensed with the work of marine welding, and be advantageously implemented the big intensity of operation platform, big rigidity Design;
(2)Card key connection can easily be accommodated to be fixed conveniently under the driving depth of steel-pipe pile and sea:The top of steel-pipe pile is vertically Provided with some annular grooves opened up along steel-pipe pile circumferencial direction, thus in certain scope no matter steel-pipe pile to squeeze into sea bed more It is deep, always there is some annular slot to be connected with installation sleeve card key on steel-pipe pile, realize the fixation of steel-pipe pile and steady pile frame Connection, and can easily be accommodated the driving depth of steel-pipe pile, at the same each steel-pipe pile by installation sleeve endoporus precision limit and The double constraints of card key connection, stability is high, and this card key is connected as detachable connection, compared to welding, can connect under sea Fixation is connect, it is simple and efficient;
(3)Positioning tube can realize the radial positioning of steel pile casting:Steel pile casting is inserted in positioning tube and steel pile casting and positioning Gap is left between cylinder, the upper end and/or lower end of positioning tube are along the circumferential direction symmetrically embedded some locking cylinders, the locking oil Cylinder includes making the executive component of stretching motion, when the executive component extend out to preset strokes, the end of executive component with it is described During the outer wall phase apical grafting of steel pile casting is to realize that the locking positioning of steel pile casting, steel pile casting insert positioning tube and squeeze into sea bed, It can be realized by adjusting the stroke that stretches out of each locking cylinder executive component to the gesture stability of steel pile casting;
Above-mentioned card key connection and the setting of locking cylinder cause the verticality and steady pile frame of steel-pipe pile and steel pile casting Levelness all possesses appropriate adjustment space, and when needing very accurately levelness or during verticality, the utility model can expire Foot is required;
(4)It is effective against horizontal force impact:After the completion of operation platform is assembled, burying for steel pile casting bottom is held by sea bed about Beam, steel pile casting top be locked oil cylinder constraint, then the horizontal force that operation platform is born mainly is born by steel pile casting, and steel pile casting Huge rigidity then determine extra stabilization of the whole operation platform when bearing horizontal force, usual large-scale steel pile casting need only enter Sea bed number meter, its bearing strength and the rigidity of structure just can meet the impact of the significant horizontal power that wave is produced when typhoon passes through;
(5)The upper end of steel pile casting is provided with first annular flange to facilitate bayonet socket plate, the rig fixed pedestal of arrangement vibration hammer Etc. structure, if setting up dry support arm between the bottom of first annular flange and the top of positioning tube, the effect of support member be by The axial load that steel pile casting is born(Pressure)Steady pile frame is passed to, and then steel-pipe pile is passed to by regulating bolt, card key, point Carry on a shoulder pole the load of steel pile casting;Support member includes leading screw and adjusting nut, makes the top of leading screw against first by turning adjusting nut The bottom of annular flange, and then seating is in the top of leading screw guide sleeve for adjusting nut, the bottom of leading screw is smooth, cylindrical peripheral surface, all the time In leading screw guide sleeve, it play the guiding role while can prevent leading screw from toppling;
(6)The top of steel pile casting is disposed with end flanges, the bayonet socket plate and the fixed pedestal of rig of vibration hammer, it is adaptable to different Construction demand, when this operation platform be used for large-scale driving into type steel-pipe pile when, then need only be by special pile gripper and steel pile casting End flanges couple;When this operation platform is used for large-scale single pile drilling platforms, then rig need only be connected with rig fixed pedestal;
(7)Rig(Or pile gripper), steel pile casting and steady pile frame three total force put on each steel-pipe pile, when this is applied Work platform bear to topple caused by wave power when, exactly resist the power of toppling by the support force of each steel-pipe pile, therefore require each Steel-pipe pile bears enough gravity, so as to during to anchorage, be not subject to the effect of pile pulling power, it is ensured that operation platform In stability, the utility model, the gross weight of both steel pile casting and steady pile frame can meet above-mentioned gravity requirement.
(8)From construction technology of the present utility model can be seen that steady pile frame and steel-pipe pile can pre-install it is integral enter water, with gram The sea bed of thin cover layer is taken because single steel pipe stake can not stand, conventional construction method is difficult to the difficulty for constructing offshore platform, so that The scope of application of marine large-scale single pile operation platform is extended to the waters of thin cover layer sea bed;And the utility model is assembled fast It is fast, adjustable(Vertical posture, the driving depth of steel-pipe pile that positioning tube can adjust steel pile casting are easily adjusted), result in more Accurately levelness and verticality, therefore the marine large-scale single-pile foundation construction platform of pin-connected panel described in the utility model is to sea bed The strong adaptability of matter, it is widely used, can quick-assembling, anti-wave it is stable, precisely adjustable.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is Fig. 1 A-A sectional views;
Fig. 3 is Fig. 1 B-B sectional views;
Fig. 4 is Fig. 2 C-C sectional views;
Fig. 5 is Fig. 3 D-D sectional views;
The partial enlarged drawing that Fig. 6 is K in Fig. 1;
1st, steel pile casting;100th, first annular flange;101st, rig fixed pedestal;102nd, vibration hammer bayonet socket plate;103rd, hold-carrying It is blue;
2nd, positioning tube;200th, the second annular flange;201st, fixed cover;202nd, locking cylinder;
3rd, support member;300th, leading screw;301st, adjusting nut;302nd, ball pivot pad;303rd, leading screw guide sleeve;
4th, radial direction truss;5th, circumferential truss;
6th, steel-pipe pile;600;Annular groove;601st, regulating bolt;602nd, clamp nut;603rd, card key;604th, outside card key Cover;605th, adpting flange;
7th, sprit hack lever;8th, installation sleeve;9th, horizontal girder hack lever;10th, sea bed;11st, deep floor.
Embodiment
In order that technical purpose of the present utility model, technical scheme and beneficial effect are clearer, below in conjunction with the accompanying drawings and Specific embodiment is further illustrated to the technical solution of the utility model.
As shown in Figures 1 to 6, the marine single-pile foundation construction platform of a kind of pin-connected panel, including steady pile frame, steel pile casting 1 and steel pipe Stake 6, the center of the steady pile frame is provided with positioning tube 2, and the outside uniform ring of positioning tube 2 sets six installation sleeves 8, the peace Sleeved 8 are fixedly connected with positioning tube 2 by radial direction truss 4, and are fixedly connected between adjacent installation sleeve 8 by circumferential truss 5, on State positioning tube 2, installation sleeve 8, radial direction truss 4 and circumferential truss 5 and collectively form steady pile frame.The upper end of installation sleeve 8 is with End sets some deep floors 11 along cylindrical circumferential direction, and the radial direction truss 4 and circumferential truss 5 are located in perpendicular, And radial direction truss 4 and circumferential truss 5 are that two sprit hack levers 7 of X-shaped girder truss are constituted by intersecting and are located at respectively Two horizontal girder hack levers 9 on the X-shaped girder truss top and bottom are constituted, the end of the sprit hack lever 7 and horizontal girder hack lever 9 It is both secured on installation sleeve 8 or positioning tube 2, welding may be selected in fixed form;
The steel-pipe pile 6 is inserted in installation sleeve 8 and is detachably connected with installation sleeve 8, the fixed length of 6 top of steel-pipe pile one The gap that the inner peripheral surface of outer circumference surface and installation sleeve 8 in the range of degree has precision coordinates, can only edge so as to constrain steel-pipe pile 6 The inwall of installation sleeve 8 is moved axially.Herein be detachably connected using card key connection, specifically, the steel-pipe pile 6 it is upper Portion is uniformly provided with some annular grooves 600 opened up along the circumferencial direction of steel-pipe pile 6 vertically, close to the top of installation sleeve 8 Annular groove 600 in be along the circumferential direction connected with some card keys 603, the cross section of the card key 603 is in I-shaped, positioned at interior I-shaped two flange of side is embedded in adjacent two annular groove 600 at the top of installation sleeve 8, around same steel All card keys 603 of pile tube 6 collectively form an annular card key and the annular card key outer cover sets a card key outer cover 604, the card key The main body of outer cover 604 is a cylindrical drum, and the inside circumferentially extending formation inward flange in top of the cylindrical drum, the bottom of cylindrical drum is outside Circumferentially extending formation outward flange, the inward flange, which corresponds at the position of card key 603, is respectively connected with the regulating bolt being vertically arranged 601, the bottom of the regulating bolt 601 and the top phase apical grafting of card key 603, and it is connected with clamp nut in regulating bolt 601 602, the outward flange is connected with being fixed on the flange 605 at the top of installation sleeve 8;Steel is realized by above-mentioned card key connection Pile tube 6 is connected with steady pile frame, and can dismount under water, practical;
The top and bottom of the positioning tube 2 are provided with the second annular flange 200, second annular along cylindrical circumferential direction Flange 200, which is along the circumferential direction uniformly offered, is provided with locking cylinder 202 in 12 fixed covers 201, the fixed cover 201, often Adjacent two oil circuits of locking cylinder 202 parallel connection constitutes one group of locking cylinder, and every group of locking cylinder can not only be locked individually, and And stroke is controllable, while provided with safeguard protection;The steel pile casting 1 is inserted in positioning tube 2, and the top and bottom of positioning tube 2 are total to 24 locking cylinders 202, both squeeze into guiding during sea bed as steel pile casting 1, also serve as steel pile casting 1 and positioning tube 2 is radially fixed Retaining mechanism, for the benefit of carrying be connected with oil pipe, locking cylinder 202 is piston rod oil-feed and piston rod(Relative to steady stake Frame)Fix and the arrangement form of movement of cylinder block, the locking cylinder 202 makees the executive component as cylinder body of stretching motion, described When cylinder body extend out to preset strokes(Preset strokes are set according to the gap of steel pile casting 1 and positioning tube 2), the end of cylinder body with it is described The outer wall phase apical grafting of steel pile casting 1 is to realize locking and the radial positioning of steel pile casting 1;
The top of the steel pile casting 1 is provided with first annular flange 100, the top edge of the positioning tube 2 along cylindrical circumferential direction The uniform some support members 3 being vertically arranged of cylindrical circumferential direction, the top of the support member 3 and the first annular flange 100 Bottom phase apical grafting.The support member 3 includes leading screw 300, adjusting nut 301 and ball pivot pad 302, and the positioned at the upper end of positioning tube 2 Uniform some leading screw guide sleeves 303 being vertically arranged in second ring flange 200, the lower end of the leading screw 300 is inserted in the silk In thick stick guide sleeve 303, and the top of leading screw 300 is connected with the ball pivot pad 302, and the top of ball pivot pad 302 and described the The bottom phase apical grafting of one annular flange 100, specifically, ball pivot pad 302 includes positioned at bottom and the top with leading screw 300 is mutually solid The ball pad of metal semi-spherical portion even and superposed indent, the semi-spherical portion is adapted with ball pad, and semi-spherical portion is stretched Enter into ball pad and be fixedly connected with ball pad, the setting of ball pivot pad 302 causes the top of leading screw 300 and first annular flange More closely fit 100 bottom;The adjusting nut 301 is threadedly coupled with leading screw 300 and the seating of adjusting nut 301 is in leading screw The top of guide sleeve 303, adjusting nut 301 can adjusting screw 300 stretch out or stretch into the depth of leading screw guide sleeve 303.Enter one Step ground, the first annular flange 100 is provided with vibration hammer bayonet socket plate 102, the edge of vibration hammer bayonet socket plate 102 along cylindrical circumferential direction Some rig fixed pedestals 101 of circumferential directions, the top of steel pile casting 1 is provided with end flanges 103, the vibration hammer bayonet socket plate 102nd, the setting of rig fixed pedestal 101 and end flanges 103, is easy to steel pile casting 1 to install different construction equipments so that this reality It is more extensive with new applicable surface.
Next the construction technology to the marine single-pile foundation construction platform of pin-connected panel described in the utility model is explained, main Comprise the following steps:
(1)Enter water:Positioning tube 2, radial direction truss 4, circumferential truss 5 and safety sleeve 8 in steady pile frame are welded on land Connect and be fixed as one, then steel-pipe pile 6 is connected on steady pile frame by above-mentioned card key, then by steady pile frame and steel-pipe pile 6 integral hoistings being assembled into enter water, transfer to steel-pipe pile 6 sea bed, remove suspension hook;
(2)Point shakes:Apply point to steel-pipe pile 6 using vibration hammer to shake(Low-intensity vibration i.e. in short-term)So that steel-pipe pile 6 dozens Enter to ID, to improve the initial support stability of steel-pipe pile 6, form initial support platform;
(3)Leveling:The lowest part of the initial support platform is sling using floating derrick microspur and releases steel-pipe pile 6 at this With the connection of steady pile frame(The card key connection of steel-pipe pile 6 it will remove at this), then put down using floating derrick leveling initial support After platform, then the steel-pipe pile 6 of releasing and steady pile frame again card key be connected;
(4)Piling:All steel-pipe piles 6 carry out following piling process successively:The card key of steel-pipe pile 6 and steady pile frame is released first Connection, is then squeezed into the steel-pipe pile 6 of releasing to required depth, finally by the steel-pipe pile 6 of releasing and steady pile frame using vibration hammer Again card key is connected, and is completed until all steel-pipe piles 6 are driven piles;
(5)Gu cylinder:Steel pile casting 1 is inserted in positioning tube 2 using floating derrick, the stretching of each locking cylinder 202 is adjusted Stroke relies on locking cylinder 202 to be oriented to, steel pile casting 1 is squeezed into required depth to control the plummet posture of steel pile casting 1;
(6)Support:Rotate the height of the adjusting screw 300 of adjusting nut 301 so that the top of ball pivot pad 302 and the first ring The bottom phase apical grafting of shape flange 100;All support members 3 carry out above-mentioned adjustment process successively, complete the support operation of support member 3;
Assembly is completed.
, it is necessary to be torn open to it after the marine single-pile foundation construction platform of pin-connected panel described in the utility model is using end Remove, the method for dismounting is as follows:
(1)Locking cylinder 202 is unclamped first, then extracts steel pile casting 1 using vibration hammer;
(2)When the sea bed coating that steel-pipe pile 6 is squeezed into is shallower, pile extraction resistance less, then can be by steady pile frame and steel-pipe pile 6 It is overall to be extracted from water;When steel-pipe pile 6, to squeeze into sea bed coating deeper, when pile extraction resistance is big, then can it is micro- sling steady pile frame with In the case of the entirety of steel-pipe pile 6, manually(Can be by chain block handling card key outer cover)All card key connections are released, then will be steady Pile frame is extracted, and finally extracts steel-pipe pile 6 from sea bed one by one(Vibration hammer is used if necessary);
Thus dismantling operation is completed, it can be seen that steel pile casting 1, steady pile frame and steel-pipe pile 6 in the utility model are being removed Still remain intact, assembled again when next time uses afterwards, no spillage of material, recycling degree is high.
It should be noted last that:Above-described embodiment is merely to illustrate and unrestricted the technical solution of the utility model, is appointed Equivalent substitution and do not depart from the modification of the utility model spirit and scope or locally replace that what is carried out to the utility model, its is equal It should cover within the utility model protective scope of the claims.

Claims (8)

1. a kind of marine single-pile foundation construction platform of pin-connected panel, including steady pile frame, steel pile casting and steel-pipe pile, it is characterised in that:Institute The center for stating steady pile frame is provided with positioning tube, and the upper end and/or lower end of the positioning tube are along the circumferential direction symmetrically embedded some Locking cylinder, the steel pile casting is inserted in positioning tube and carries out radial positioning by the locking cylinder, and the outside of positioning tube is equal Even ring sets some installation sleeves, and the installation sleeve is fixedly connected with positioning tube by radial direction truss, and between adjacent installation sleeve It is fixedly connected with by circumferential truss, the steel-pipe pile is inserted in installation sleeve and is connected with installation sleeve card key.
2. the marine single-pile foundation construction platform of pin-connected panel according to claim 1, it is characterised in that:The locking cylinder bag The executive component for making stretching motion is included, when the executive component extend out to preset strokes, the end of executive component is protected with the steel The outer wall phase apical grafting of cylinder is to realize the locking positioning of steel pile casting.
3. the marine single-pile foundation construction platform of pin-connected panel according to claim 1, it is characterised in that:The steel-pipe pile it is upper Portion is uniformly provided with some annular grooves vertically, is along the circumferential direction connected with the annular groove at the top of the installation sleeve Common cover sets a card key outer cover outside some card keys, all card keys, and the top of the card key outer cover is corresponding to equal at the position of card key It is connected with the regulating bolt being vertically arranged, the bottom of the regulating bolt and the top phase apical grafting of card key, the bottom of card key outer cover With being connected at the top of installation sleeve.
4. the marine single-pile foundation construction platform of pin-connected panel according to claim 1, it is characterised in that:The radial direction truss and Circumferential truss is in perpendicular, and radial direction truss and circumferential truss are two that X-shaped girder truss is constituted by intersecting Individual sprit hack lever and the two horizontal girder hack levers composition for being located at the X-shaped girder truss top and bottom respectively, the sprit frame The end of bar and horizontal girder hack lever is both secured on installation sleeve or positioning tube.
5. the marine single-pile foundation construction platform of pin-connected panel according to claim 1, it is characterised in that:The top of the steel pile casting End is provided with first annular flange along cylindrical circumferential direction, and the top of the positioning tube some is vertically arranged along cylindrical circumferential direction is uniform Support member, the top of the support member and the bottom phase apical grafting of the first annular flange.
6. the marine single-pile foundation construction platform of pin-connected panel according to claim 5, it is characterised in that:The support member includes Leading screw and adjusting nut, the top of the positioning tube are described along the uniform some leading screw guide sleeves being vertically arranged of cylindrical circumferential direction Leading screw is inserted in the leading screw guide sleeve, and the adjusting nut is connected with threads of lead screw and adjusting nut seating is oriented in leading screw The top of set.
7. the marine single-pile foundation construction platform of pin-connected panel according to claim 6, it is characterised in that:The support member is also wrapped Ball pivot pad is included, the top of the leading screw is connected with the ball pivot pad, and the top of ball pivot pad and the first annular flange Bottom phase apical grafting.
8. the marine single-pile foundation construction platform of pin-connected panel according to claim 5, it is characterised in that:It is described first annular convex Edge is provided with rig fixed pedestal, and the top of the steel pile casting is provided with end flanges.
CN201621273847.8U 2016-11-25 2016-11-25 A kind of marine single-pile foundation construction platform of pin-connected panel Withdrawn - After Issue CN206428687U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621273847.8U CN206428687U (en) 2016-11-25 2016-11-25 A kind of marine single-pile foundation construction platform of pin-connected panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621273847.8U CN206428687U (en) 2016-11-25 2016-11-25 A kind of marine single-pile foundation construction platform of pin-connected panel

Publications (1)

Publication Number Publication Date
CN206428687U true CN206428687U (en) 2017-08-22

Family

ID=59589102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621273847.8U Withdrawn - After Issue CN206428687U (en) 2016-11-25 2016-11-25 A kind of marine single-pile foundation construction platform of pin-connected panel

Country Status (1)

Country Link
CN (1) CN206428687U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400764A (en) * 2016-11-25 2017-02-15 平煤建工集团特殊凿井工程有限公司 Assembled offshore single-pile foundation construction platform and construction process thereof
CN108301409A (en) * 2018-03-07 2018-07-20 江苏龙源振华海洋工程有限公司 A kind of interior casing mounting process
CN108532604A (en) * 2018-03-07 2018-09-14 江苏龙源振华海洋工程有限公司 A kind of steady stake platform construction technique
CN110644487A (en) * 2019-09-17 2020-01-03 天津港航工程有限公司 Construction method based on box-cylinder type pile stabilizing platform

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400764A (en) * 2016-11-25 2017-02-15 平煤建工集团特殊凿井工程有限公司 Assembled offshore single-pile foundation construction platform and construction process thereof
CN106400764B (en) * 2016-11-25 2018-07-17 平煤建工集团特殊凿井工程有限公司 A kind of pin-connected panel sea single-pile foundation construction platform and its construction technology
CN108301409A (en) * 2018-03-07 2018-07-20 江苏龙源振华海洋工程有限公司 A kind of interior casing mounting process
CN108532604A (en) * 2018-03-07 2018-09-14 江苏龙源振华海洋工程有限公司 A kind of steady stake platform construction technique
CN110644487A (en) * 2019-09-17 2020-01-03 天津港航工程有限公司 Construction method based on box-cylinder type pile stabilizing platform

Similar Documents

Publication Publication Date Title
CN106400764B (en) A kind of pin-connected panel sea single-pile foundation construction platform and its construction technology
CN206428687U (en) A kind of marine single-pile foundation construction platform of pin-connected panel
CN107299643B (en) Steel lattice column combined type tower crane foundation structure in foundation pit and construction method
CN105464117B (en) Rotary marine piling saddle and multi-column pier foundation piling technique waterborne
CN201649072U (en) Pile foundation reinforcement cage hoisting device
CN102701083B (en) Method for replacing wind driven generator component by using special equipment
CN108265708B (en) Piling equipment
CN102328732A (en) Offshore pile driving, pile pressing and installing united engineering ship
CN105951832A (en) Diesel hammer deviation piling rectification construction process and equipment
CN106869032B (en) Bridge bearing platform beam tying construction method
CN202557745U (en) Multifunctional wind power engineering catamaran for offshore high-altitude heavy-load hoisting and installation operation
CN108330972A (en) A kind of stirring piling all-in-one machine
CN105804077B (en) A kind of pile extracting method of jack-up unit
CN102644290A (en) Steel cofferdam construction method suitable for construction of deep silt layer bridge in shallow sea area
CN102514690B (en) Multifunctional twin-hull wind power engineering ship for offshore high-altitude heavy-duty lifting installation operation
CN101962946A (en) Method for arranging hoisting points and floating-supported conduit frame with skirt pile sleeves
CN209989815U (en) Hoop mechanism of pile driving and stabilizing platform device
CN104652424A (en) Movable lifting hook for lifting reinforcing cage
CN104499706A (en) Elevator well template platform and construction method thereof
CN204510221U (en) Rotary marine piling saddle
CN208701509U (en) Universal telescopic support frame suitable for V-shaped bridge pier
CN113086868B (en) Method for cutting off ultrahigh part of offshore wind power large-diameter single pile foundation
CN213204094U (en) Simple to operate's steel reinforcement cage
CN209163731U (en) The pore-forming equipment of a variety of diameters can be fast implemented in loess geology
CN203891023U (en) Pile driving platform device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170822

Effective date of abandoning: 20180717