CN106869032B - A kind of bridge bearing platform constructing tie beam method - Google Patents

A kind of bridge bearing platform constructing tie beam method Download PDF

Info

Publication number
CN106869032B
CN106869032B CN201710108953.3A CN201710108953A CN106869032B CN 106869032 B CN106869032 B CN 106869032B CN 201710108953 A CN201710108953 A CN 201710108953A CN 106869032 B CN106869032 B CN 106869032B
Authority
CN
China
Prior art keywords
steel
lifted trunk
bearing platform
pipe pile
binder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710108953.3A
Other languages
Chinese (zh)
Other versions
CN106869032A (en
Inventor
寇海军
邹振中
杨永明
侯利宗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 19th Bureau Group Co Ltd
Original Assignee
China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 19th Bureau Group Co Ltd filed Critical China Railway 19th Bureau Group Co Ltd
Priority to CN201710108953.3A priority Critical patent/CN106869032B/en
Publication of CN106869032A publication Critical patent/CN106869032A/en
Application granted granted Critical
Publication of CN106869032B publication Critical patent/CN106869032B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure

Abstract

The present invention relates to bridge construction technology field more particularly to a kind of bridge bearing platform constructing tie beam method, by binder bottom and around set auxiliary steel-pipe pile, after steel lifted trunk bottom plate and side plate are installed, steel lifted trunk carries out cast-in-place construction directly below.The present invention is for marine ultra-large type pier body, it especially proves effective especially by the cushion cap of the dumbbell shaped of binder connection, the overall stability of steel lifted trunk is greatly improved, reinforced concrete drilling pile foundation is saved simultaneously, investment reduction, it uses steel lifted trunk side plate as cushion cap template, can reduce the size of steel lifted trunk, saves construction cost.

Description

A kind of bridge bearing platform constructing tie beam method
Technical field
The present invention relates to bridge construction technology field more particularly to a kind of bridge bearing platform constructing tie beam methods.
Background technique
In water in the construction of bridge, there are have the case where relatively large cushion cap binder between large-scale cushion cap.Dalian south shore Bridge spanning the sea route design in extra large main road engineering star bay is sufficiently complex, westerly square into main spanning all the way in eastern section access bridge part It marches forward, route undergoes doubling three times altogether, and four A, B ring road, S line and x-ray one-way roads are finally merged into pair current up and down Layer bridge.S25 pier and No. S26 are just on multi-thread combined node, and three piers are existed side by side, the row of main line (S, X) and ring road (A, B) Lane center spacing infinite tendency, and bridge pier is laterally on same mileage section, is analyzed from amechanical angle, at this Bridge pier will bear greatly to shear and power of toppling.In order to solve this problem, it is ensured that the stability of bridge structure, designing unit pass through Multi-argument, final to use the scheme that two neighbouring cushion caps are consolidated into an entirety by binder, which is responsible for rigid Property two cushion caps of connection be an entirety, bottom does not have pile foundation support, is completely in suspended state, and weigh 120t, and binder is high Degree is the 1/2 of cushion cap, this brings great difficulty to practice of construction all from technological layer.The marine binder of conventional is applied Work method is prefabricated installation, also needs to be equipped with reinforced concrete drilling pile foundation in work progress, time-consuming.
In order to solve the constructing technology problem of the cushion cap, and is ensuring cushion cap and constructing tie beam quality and reducing security risk While, steel lifted trunk construction cost is compressed to greatest extent, and providing the completely new cushion cap constructing tie beam method of one kind is particularly important.
Summary of the invention
(1) technical problems to be solved
The present invention provides a kind of bridge bearing platform constructing tie beam method, time-consuming and laborious for solving existing cushion cap constructing tie beam, The problem that quality, safety be not high and construction cost is high.
(2) technical solution
In order to solve the above technical problem, the present invention provides a kind of bridge bearing platform constructing tie beam methods, comprising the following steps:
S1, pile foundation of bearing platform construction is carried out in the corresponding position of cushion cap;
After the completion of S2, pile foundation of bearing platform construction, the binder corresponding position inserting piling between cushion cap and cushion cap assists steel Tubular pole system, the auxiliary steel-pipe pile system include being located in the middle inside steel-pipe pile and being symmetrically positioned in the outer of the binder two sides Side steel-pipe pile, the outside steel-pipe pile are higher than the inside steel-pipe pile, the inside steel-pipe pile, for consolidating the binder, institute Outside steel-pipe pile is stated, for assisting load-bearing in the construction process;
S3, steel lifted trunk bottom board fixer is installed at the correspondence elevation location on the pile foundation of bearing platform;
S4, steel lifted trunk bottom plate is installed on the board fixer of the steel lifted trunk bottom;In the periphery peace of the steel lifted trunk bottom plate Steel loading suspension box side sheet, and the box system surrounded to the steel lifted trunk bottom plate and the steel lifted trunk side plate gives inside and outside reinforcing;
After S5, the inside and outside reinforcing of the box system, steel lifted trunk is controlled in the effect of self weight by hydraulic jack or jack It is lowered into water;
S6, it after the steel lifted trunk is transferred to designed elevation, carries out last positioning and reinforces;
S7, cushion cap and binder bottom concrete are poured;
S8, cushion cap and binder concrete are poured;
S9, the outside steel-pipe pile for removing the steel lifted trunk side plate and binder two sides.
Wherein, in step S2, after the inside steel-pipe pile and the contour installation of outside steel-pipe pile, the inside steel is cut off Tubular pole is to designed elevation, so that the outside steel-pipe pile is higher than the inside steel-pipe pile.
Wherein, in step S3, the perforation installation positioning joist at the correspondence elevation location on the pile foundation of bearing platform, described Position installation platform part steel lifted trunk bottom joist on joist;Installation is fixed respectively on the outside steel-pipe pile of the binder two sides Position beam, the axis of the positioning beam is vertical with the axis of the outside steel-pipe pile, installs binder between the positioning beam of two sides Part bottom joist.
Wherein, the top of the pile foundation of bearing platform and the top of the inside steel-pipe pile are pierced by the steel lifted trunk bottom plate, institute The hole between steel lifted trunk bottom plate and the pile foundation of bearing platform and between the steel lifted trunk bottom plate and the inside steel-pipe pile is stated to adopt Watertight closure is carried out with sheet rubber and keeper plate of steel.
Wherein, the outer wall of the pile foundation of bearing platform is wrapped up in the upper end of the rubber skin, and the lower end of the rubber skin is fitted in institute It states on steel lifted trunk bottom plate, and is fixed between the steel lifted trunk bottom plate and the keeper plate of steel by the keeper plate of steel.
Wherein, in step S4, the prefabricated completion of steel lifted trunk side plate, then monolith lifting is directly installed on the steel lifted trunk On bottom plate, the steel lifted trunk bottom plate and the steel lifted trunk side plate are bolted using angle steel flange.
Wherein, permeable hole is opened up on the steel lifted trunk side plate, to reduce water-head inside and outside the steel lifted trunk.
Wherein, the steel lifted trunk side plate, which opens up, is equipped with folding valve at the permeable hole.
Wherein, the auxiliary steel-pipe pile system includes multiple inside steel-pipe piles and multiple outside steel-pipe piles, more A inside steel-pipe pile is arranged at a column, and multiple outside steel-pipe piles of every side are arranged at a column.
Wherein, it is 72cm that the inside steel-pipe pile and the outside steel-pipe pile, which are all made of diameter, and wall thickness is the spiral of 8mm Steel pipe column.
(3) beneficial effect
A kind of bridge bearing platform constructing tie beam method provided by the invention, has the following characteristics that compared with the prior art
1, bridge bearing platform construction method of the invention, lead to binder bottom and around set auxiliary steel-pipe pile system, directly Lower section steel lifted trunk carries out cast-in-place molding, greatly improves the overall stability of steel lifted trunk, while eliminating reinforced concrete drilling Pile foundation has saved investment;
2, bridge bearing platform construction method of the invention doubles as cushion cap template using steel lifted trunk side plate, reduces steel lifted trunk Size has saved construction cost, is suitable for on-water bridge bearing platform construction, is particularly suitable for connecting in profundal zone by floated binder The cushion cap connect.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of existing binder cushion cap;
Fig. 2 is the structure chart after the completion of pile foundation of bearing platform provided by the invention construction;
Fig. 3~4 are the structure chart after the completion of auxiliary steel-pipe pile system construction provided by the invention;
Fig. 5 is the structure chart after the completion of cushion cap part provided by the invention and the construction of binder part steel lifted trunk bottom joist;
Fig. 6 is the structure chart after the completion of steel lifted trunk construction of bottom plates provided by the invention;
Fig. 7 is the structure chart of implementation side plate installation provided by the invention;
Fig. 8 is the binder suspended deck structure figure after the completion of bridge bearing platform constructing tie beam provided by the invention;
In figure, 1: cushion cap;2: pile foundation of bearing platform;3: inside steel-pipe pile;4: outside steel-pipe pile;5: binder;6: positioning joist;7: Cushion cap part bottom joist;8: positioning beam;9: binder part bottom joist;10: steel lifted trunk bottom plate;11: steel lifted trunk side plate.
Specific embodiment
To facilitate the understanding of the present invention, a more comprehensive description of the invention is given in the following sections with reference to the relevant attached drawings.In attached drawing Give better embodiment of the invention.The above is only a preferred embodiment of the present invention, is not intended to limit of the invention special Sharp range, it is all using equivalent structure or equivalent flow shift made by description of the invention and accompanying drawing content, directly or It connects and is used in other related technical areas, be included within the scope of the present invention.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term " and or " used herein includes one or more Any and all combinations of relevant listed item.
In deep-sea when the substructure of construction bridges, it can often be related to size greatly and need to be connected by suspension binder The more pier shaft cushion caps connect, i.e., the structure of binder cushion cap as shown in Figure 1.
The present invention provides a kind of bridge bearing platform constructing tie beam method, time-consuming and laborious for solving existing cushion cap constructing tie beam, The problem that quality, safety be not high and construction cost is high.
To overcome the shortcomings of existing constructing tie beam, a kind of bridge bearing platform constructing tie beam method is provided in the embodiment of the present invention, The following steps are included:
S1, the construction of pile foundation of bearing platform 2 is carried out in the corresponding position of cushion cap 1;Wherein, the knot after the completion of pile foundation of bearing platform 2 is constructed Composition is as shown in Figure 2;
After the completion of S2, pile foundation of bearing platform 2 are constructed, the 5 corresponding position inserting piling of binder between cushion cap 1 and cushion cap 1 assists steel Tubular pole system, auxiliary steel-pipe pile system include the outside steel pipe for being located in the middle inside steel-pipe pile 3 and being symmetrically positioned in 5 two sides of binder Stake 4, inside steel-pipe pile 3, for consolidating the binder 5 between cushion cap 1 and cushion cap 1, outside steel-pipe pile 4, in the construction process Assist load-bearing;Wherein, assist the arrangement position of steel-pipe pile system as shown in Figure 3;
Specifically, during the installation process, after inside steel-pipe pile 3 and the contour installation of outside steel-pipe pile 4, cutting off inside steel-pipe pile 3 to designed elevation, so that outside steel-pipe pile 4 is higher than inside steel-pipe pile;Since inside steel-pipe pile 3 is to support binder 5, outside Steel-pipe pile 4 is to carry out auxiliary load-bearing when lifting to subsequent steel lifted trunk, and outside steel-pipe pile 4 need to be higher than inside steel-pipe pile 3, therefore, when it is implemented, the steel pipe absolute altitude that need to will be located at the centre of 5 bottom of binder truncates;Wherein, by 3 He of inside steel-pipe pile Structure chart after the completion of the auxiliary steel-pipe pile system construction that outside steel-pipe pile 4 forms is as shown in Figure 4;
S3, steel lifted trunk bottom board fixer is installed at the correspondence elevation location on pile foundation of bearing platform 2;Specifically, in cushion cap Perforation installation positioning joist 6 at correspondence elevation location in pile foundation 2, the installation platform part bottom joist 7 on positioning joist 6;? Positioning beam 8 is installed respectively on the outside steel-pipe pile 5 of 5 two sides of binder, the axis of positioning beam 8 is vertical with the axis of outside steel-pipe pile 4, Binder part bottom joist 9 is installed between the positioning beam 8 of two sides;Wherein, cushion cap part bottom joist 7 and binder part bottom joist 9 are applied Structure chart after the completion of work is as shown in Figure 5;
S4, steel lifted trunk bottom plate 10 is installed on cushion cap part bottom joist 7 and binder part bottom joist 9;In steel lifted trunk bottom plate 10 periphery installation steel lifted trunk side plate 11, and to the box system that steel lifted trunk bottom plate 10 and steel lifted trunk side plate 11 surround give in, External reinforcement;Wherein, the structure chart that steel lifted trunk bottom plate 10 is completed after construction is as shown in Figure 6;The structure chart that steel lifted trunk side plate 11 is installed As shown in Figure 7;
After steel lifted trunk bottom plate 10 is installed, hangar system is installed at the top of pile foundation of bearing platform 2, hangar system is by steel hanger It is formed with fining twisted steel sunpender;The top of steel-pipe pile 4 is also equipped with hangar system on the outside, and being set to for the hangar system is held The hangar system set-up mode at 2 top of platform pile foundation is identical;By setting hangar system at pile foundation of bearing platform 2, it can carry and steel is hung The lifting equipment or platform as other operations that case carries out hanging operation, at outside steel-pipe pile 4 at the top of hangar system, rise Heavy equipment can carry certain weight here, so that hydraulic jack or jack are to the control in steel lifted trunk operation;
After the inside and outside reinforcing of S5, box system, cushion cap part bottom joist 10 is extracted, is controlled by hydraulic jack or jack Steel lifted trunk submerged under the action of self-weight;
S6, it after steel lifted trunk is transferred to designed elevation, carries out last positioning and reinforces;
S7, cushion cap and binder bottom concrete are poured;
S8, cushion cap and binder concrete are poured, realizes pouring for cushion cap 1 and binder 5;
S9, steel lifted trunk side plate 11 and the outside steel-pipe pile 5 positioned at 5 two sides of binder are removed, to complete applying for binder cushion cap Work;Wherein, cushion cap-binder-cushion cap dumbbell structure figure is as shown in Figure 8 after the completion of construction;
Bridge bearing platform constructing tie beam method provided by the invention is greatly improved by being located at the auxiliary steel-pipe pile below binder The overall stability of steel lifted trunk, while reinforced concrete drilling pile foundation is eliminated, save investment.In addition, this bridge is held Platform constructing tie beam method doubles as cushion cap template using steel lifted trunk side plate, reduces the size of steel lifted trunk, has saved construction cost.Cause This, which is suitable for on-water bridge bearing platform construction, is particularly suitable for connecting in profundal zone by floated binder Cushion cap.
Bridge bearing platform constructing tie beam method of the invention, by binder bottom and around set auxiliary steel-pipe pile, directly The cast-in-place molding of steel lifted trunk is transferred, the cushion cap connected for marine ultra-large type pier body, especially dumbbell shaped by binder is especially played Effect.
Support the technology single-wall steel suspended box cofferdam of the invention bridge bearing platform constructing tie beam method.Core of the invention technology is It is combined by single-wall steel suspended box cofferdam and in the method that auxiliary steel-pipe pile is set up in binder lower part, is ultra-large type suspension binder waterborne Formula cushion cap provides a kind of completely new construction method.
In the present embodiment, in step S3 further include:
After cushion cap part hanging box bottom joist 7 is installed, repetition measurement is carried out to its plan-position and absolute altitude, it is subsequent to guarantee The precision of construction.
In the present embodiment, steel lifted trunk bottom plate is the stringer that the piecemeal assembly of I10 I-shaped steel mesh is welded, and installs steel lifted trunk bottom Before plate 10, aperture at pile foundation of bearing platform hole location is corresponded on steel lifted trunk bottom plate 10, so that pile foundation of bearing platform 2 is pierced by steel lifted trunk bottom plate 10;Aperture at 3 hole location of steel-pipe pile on the inside of being corresponded on steel lifted trunk bottom plate 10, so that inside steel-pipe pile 3 is pierced by steel lifted trunk bottom plate 10。
In the present embodiment, between steel lifted trunk bottom plate 10 and pile foundation of bearing platform 2 and steel lifted trunk bottom plate 10 and inside steel-pipe pile 3 it Between hole watertight closure is carried out using sheet rubber and keeper plate of steel.
In the present embodiment, the outer wall of pile foundation of bearing platform is tightly wrapped up in the upper end of rubber skin, and the lower end of rubber skin is fitted in steel and hangs It on bottom plate, and is fixed between steel lifted trunk bottom plate and keeper plate of steel by keeper plate of steel, realizes water proof and prevents back cover coagulation Soil leakage.
In the present embodiment, in step S4, steel lifted trunk side plate 11 first according to the size of corresponding cushion cap on job platform group I.e. prefabricated completion is installed into, then monolith lifting is directly installed on steel lifted trunk bottom plate 10, steel lifted trunk bottom plate 10 and steel lifted trunk side Plate 11 is bolted using angle steel flange.
In the present embodiment, permeable hole is opened up on steel lifted trunk side plate 11, to reduce water-head inside and outside steel lifted trunk.
In the present embodiment, steel lifted trunk side plate 11, which opens up, is equipped with folding valve at the permeable hole, is switched with facilitating.
In the present embodiment, auxiliary steel-pipe pile system includes multiple inside steel-pipe piles 3 and multiple outside steel-pipe piles 4, it is multiple in Side steel-pipe pile 3 is arranged at a column, and multiple outside steel-pipe piles 4 of the every side of binder 5 are arranged at a column.Specifically, in 5 bottom of binder Inside steel-pipe pile 3 is set as 5, is respectively provided with 4 outside steel-pipe piles in every side in 5 outside of binder.
In the present embodiment, inside steel-pipe pile 3 and outside steel-pipe pile 4 are all made of diameter as 72cm, and wall thickness is the spiral of 8mm Steel pipe column.
In the present embodiment, since 5 top mark height of binder is than 1 top mark height 1.5m of cushion cap, need to height difference part be arranged every From steel form, by the control slump when casting concrete, to realize that the concrete not channelling of 1 top half of cushion cap is arrived At binder 5.
It is flat to remove steel construction drilling to bridge bearing platform constructing tie beam method of the invention after pile foundation of bearing platform construction is completed Platform.For cushion cap part, perforation installation positioning joist and cushion cap part bottom joist, using positioning joist and are held on pile foundation of bearing platform Steel lifted trunk bottom plate and side plate are installed in the bottom joist load-bearing of platform part, while hangar system is installed at the top of pile foundation of bearing platform, hangar system It is made of 4 groups of fashioned iron hangers and 16 fining twisted steel sunpenders.For the binder part of suspension, auxiliary steel-pipe pile is beaten in seabed, Each column in left and right on the outside of one column of binder bottom arrangement, binder.The steel-pipe pile of binder bottom plays firm effect, left and right on the outside of binder Steel-pipe pile is mainly used for load-bearing.For being also equipped with hangar system at the top of the auxiliary steel-pipe pile of load-bearing, set-up mode is same for two sides Hangar system on pile foundation of bearing platform.
Then steel lifted trunk bottom plate, steel lifted trunk side plate are successively installed on cushion cap part bottom joist and binder part bottom joist, And various ways is taken to reinforce entire box system, after being installed, extracts the positioning joist being mounted on pile foundation of bearing platform out, determines Position beam and bottom joist are slowly lowered under the action of self-weight using the lifting equipment control steel lifted trunk of jack or jack etc. Water.After transferring to designed elevation, jack or jack are removed, the fashioned iron hanger at top is passed in the self weight of steel lifted trunk by sunpender On, complete first time stress check calculation.Then underwater bottom concrete is poured, bottom concrete reaches 80% or more design strength Afterwards, hanging box internal water accumulation can be extracted out, remove joist under hanger and bottom plate, complete second of conversion of stress system.Cut off top The pile foundation of bearing platform and steel-pipe pile of superelevation part chisel out pile crown, carry out bearing platform construction.Cushion cap concreting is completed and the head that constructed After saving pier shaft, steel lifted trunk side plate is removed.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of bridge bearing platform constructing tie beam method, which comprises the following steps:
S1, pile foundation of bearing platform construction is carried out in the corresponding position of cushion cap;
After the completion of S2, pile foundation of bearing platform construction, the binder corresponding position inserting piling between cushion cap and cushion cap assists steel-pipe pile System, the auxiliary steel-pipe pile system includes the outside steel for being located in the middle inside steel-pipe pile and being symmetrically positioned in the binder two sides Tubular pole, the outside steel-pipe pile are higher than the inside steel-pipe pile, and the inside steel-pipe pile is described outer for consolidating the binder Side steel-pipe pile, for assisting load-bearing in the construction process;
S3, steel lifted trunk bottom is respectively mounted at the correspondence elevation location on the pile foundation of bearing platform and between two outside steel-pipe piles Board fixer;
S4, steel lifted trunk bottom plate is installed on the board fixer of the steel lifted trunk bottom;In the periphery installation steel of the steel lifted trunk bottom plate Suspension box side sheet, and the box system surrounded to the steel lifted trunk bottom plate and the steel lifted trunk side plate gives inside and outside reinforcing;
After S5, the inside and outside reinforcing of the box system, steel lifted trunk is controlled by hydraulic jack or jack and is sunk under the action of self-weight Enter in water;
S6, it after the steel lifted trunk is transferred to designed elevation, carries out last positioning and reinforces;
S7, cushion cap and binder bottom concrete are poured;
S8, cushion cap and binder concrete are poured;
S9, the outside steel-pipe pile for removing the steel lifted trunk side plate and binder two sides.
2. bridge bearing platform constructing tie beam method according to claim 1, which is characterized in that in step S2, the inside steel After tubular pole and the contour installation of outside steel-pipe pile, the inside steel-pipe pile is cut off to designed elevation, so that the outside steel pipe Stake is higher than the inside steel-pipe pile.
3. bridge bearing platform constructing tie beam method according to claim 1, which is characterized in that in step S3, in the cushion cap Perforation installation positioning joist, the installation platform part steel lifted trunk collet on the positioning joist at correspondence elevation location in pile foundation Beam;Positioning beam, the axis of the positioning beam and the outside are installed respectively on the outside steel-pipe pile of the binder two sides The axis of steel-pipe pile is vertical, and binder part bottom joist is installed between the positioning beam of two sides.
4. bridge bearing platform constructing tie beam method according to claim 3, which is characterized in that the top of the pile foundation of bearing platform and The top of the inside steel-pipe pile is pierced by the steel lifted trunk bottom plate, between the steel lifted trunk bottom plate and the pile foundation of bearing platform and Hole between the steel lifted trunk bottom plate and the inside steel-pipe pile carries out watertight closure using sheet rubber and keeper plate of steel.
5. bridge bearing platform constructing tie beam method according to claim 4, which is characterized in that wrap up the upper end of the rubber skin The outer wall of the pile foundation of bearing platform, the lower end of the rubber skin are fitted on the steel lifted trunk bottom plate, and passing through the keeper plate of steel will It is fixed between the steel lifted trunk bottom plate and the keeper plate of steel.
6. bridge bearing platform constructing tie beam method according to claim 1, which is characterized in that in step S4, the steel lifted trunk The prefabricated completion of side plate, then monolith lifting are directly installed on the steel lifted trunk bottom plate, and the steel lifted trunk bottom plate is hung with the steel Case side plate is bolted using angle steel flange.
7. bridge bearing platform constructing tie beam method according to claim 6, which is characterized in that opened up on the steel lifted trunk side plate Permeable hole, to reduce water-head inside and outside the steel lifted trunk.
8. bridge bearing platform constructing tie beam method according to claim 7, which is characterized in that the steel lifted trunk side plate opens up institute It states and is equipped with folding valve at permeable hole.
9. bridge bearing platform constructing tie beam method according to claim 1, which is characterized in that the auxiliary steel-pipe pile system packet Multiple inside steel-pipe piles and multiple outside steel-pipe piles are included, multiple inside steel-pipe piles are arranged at a column, every side Multiple outside steel-pipe piles are arranged at a column.
10. bridge bearing platform constructing tie beam method according to claim 1, which is characterized in that the inside steel-pipe pile and institute Stating outside steel-pipe pile and being all made of diameter is 72cm, and wall thickness is the spiral steel pipe column of 8mm.
CN201710108953.3A 2017-02-27 2017-02-27 A kind of bridge bearing platform constructing tie beam method Active CN106869032B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710108953.3A CN106869032B (en) 2017-02-27 2017-02-27 A kind of bridge bearing platform constructing tie beam method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710108953.3A CN106869032B (en) 2017-02-27 2017-02-27 A kind of bridge bearing platform constructing tie beam method

Publications (2)

Publication Number Publication Date
CN106869032A CN106869032A (en) 2017-06-20
CN106869032B true CN106869032B (en) 2018-12-07

Family

ID=59167989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710108953.3A Active CN106869032B (en) 2017-02-27 2017-02-27 A kind of bridge bearing platform constructing tie beam method

Country Status (1)

Country Link
CN (1) CN106869032B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108999206B (en) * 2018-07-02 2020-07-21 中铁大桥勘测设计院集团有限公司 Construction method of bridge bearing platform
CN112030754A (en) * 2020-08-19 2020-12-04 中交路桥建设有限公司 Construction method of steel structure bridge and steel structure bridge
CN113123233B (en) * 2021-03-03 2022-11-25 中交二航局第二工程有限公司 Anchorage design and construction method
CN113202026A (en) * 2021-04-01 2021-08-03 中铁六局集团有限公司 Construction method for tie beam between pier columns

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09221717A (en) * 1996-02-20 1997-08-26 Kawasaki Steel Corp Steel-concrete composite floor-slab bridge and construction method thereof
CN202577325U (en) * 2012-05-16 2012-12-05 科达集团股份有限公司 Cofferdam collaborative operation device of steel pipe pile platform and steel board pile
CN105155406A (en) * 2015-08-27 2015-12-16 中铁大桥局集团有限公司 Hollow thin-wall pier frame bearing platform and bridge
CN105442623A (en) * 2015-12-17 2016-03-30 中交二航局第四工程有限公司 No-trestle water bridge pile foundation and bearing platform construction method and cofferdam thereof
CN106193084A (en) * 2016-08-31 2016-12-07 中交公局第三工程有限公司 The pouring structure of concrete bearing platform and casting method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09221717A (en) * 1996-02-20 1997-08-26 Kawasaki Steel Corp Steel-concrete composite floor-slab bridge and construction method thereof
CN202577325U (en) * 2012-05-16 2012-12-05 科达集团股份有限公司 Cofferdam collaborative operation device of steel pipe pile platform and steel board pile
CN105155406A (en) * 2015-08-27 2015-12-16 中铁大桥局集团有限公司 Hollow thin-wall pier frame bearing platform and bridge
CN105442623A (en) * 2015-12-17 2016-03-30 中交二航局第四工程有限公司 No-trestle water bridge pile foundation and bearing platform construction method and cofferdam thereof
CN106193084A (en) * 2016-08-31 2016-12-07 中交公局第三工程有限公司 The pouring structure of concrete bearing platform and casting method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
"恶劣海况下大型钢吊箱围堰施工关键技术";苗博宇;《铁道建筑技术》;20140721(第6期);第18页第1节-第38页第6节,图1-6 *
"江顺大桥Z3号主墩承台施工关键技术";周文;《中外公路》;20131204;第3卷(第5期);第165页第1节-第169页第7节,图1-2 *

Also Published As

Publication number Publication date
CN106869032A (en) 2017-06-20

Similar Documents

Publication Publication Date Title
CN106869032B (en) A kind of bridge bearing platform constructing tie beam method
CN106638640B (en) Construction method without bottom concrete combined type cofferdam under the conditions of formation geology
CN208996025U (en) A kind of double casing pile foundation construction structures of thick silt layer
CN106012960B (en) A kind of assembled long piled wharf superstructure system and its construction method
CN101476327B (en) Subaqueous bearing platform construction method
CN106120839A (en) A kind of construction technology of off-lying sea blower foundation embedded rock pile
CN105350526B (en) Method for setting up steel platform
CN108179735A (en) A kind of boulder bed large-sized deep water foundation construction platform and method
CN111119059A (en) Ultrahigh composite support system for high-pier cast-in-place box girder and construction method
CN104563119A (en) Rotating type floating pile driving guide frame
CN104805857B (en) One detachably recycles bottomless steel jacket box and construction method thereof
CN102359110A (en) Modular cast-in-place construction method for large-diameter root foundation
CN114457668B (en) Large-span space special-shaped arch rib delphinium type basket steel box arch bridge and rapid construction method
CN106223355A (en) A kind of high bearing platform supported on piles in deep water Hold Hoop method has device and the construction method of end steel jacket box
CN206512730U (en) It is a kind of to realize the box that box wall body is used in turn
CN113136853A (en) Assembly type drilling platform and process for reservoir bare rock group pile foundation
CN108179758A (en) A kind of construction technology of novel quick-assembling self-floating prestressing force steel reinforced concrete combination precast-boxed cofferdam
CN102691267A (en) High pier construction method for external whole operation platform
CN102587377B (en) Drop hammer type pile sinking device and pile sinking method thereof
CN204608812U (en) One detachably recycles bottomless steel jacket box
EP3904674B1 (en) Floating platform for high-power wind turbines
CN204510221U (en) Rotary marine piling saddle
CN108425374B (en) Integral construction method of steel suspension box cofferdam with tie beam dumbbell-shaped bearing platform under complex sea condition
CN202767095U (en) Set pile cap foundation
CN202969333U (en) Steel truss rock-socketed wharf structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant