CN209923717U - Environmental protection barrier that porous ecological concrete afforestation was planted for town road - Google Patents

Environmental protection barrier that porous ecological concrete afforestation was planted for town road Download PDF

Info

Publication number
CN209923717U
CN209923717U CN201920504747.9U CN201920504747U CN209923717U CN 209923717 U CN209923717 U CN 209923717U CN 201920504747 U CN201920504747 U CN 201920504747U CN 209923717 U CN209923717 U CN 209923717U
Authority
CN
China
Prior art keywords
hole
concrete
bulge
concrete main
protruding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920504747.9U
Other languages
Chinese (zh)
Inventor
鲁旭荣
汪洋
王兴华
任贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kaili University
Original Assignee
Kaili University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kaili University filed Critical Kaili University
Priority to CN201920504747.9U priority Critical patent/CN209923717U/en
Application granted granted Critical
Publication of CN209923717U publication Critical patent/CN209923717U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an environment-friendly barrier for porous ecological concrete greening planting for municipal roads, which belongs to the technical field of urban greening and comprises a concrete main body and air holes, wherein a device is firstly paved on the ground, then the second block is rotated by 180 degrees to align the hole five of the second block device with the hole eight of the first block device, then a third device is laid, the hole four of the third device is aligned with the hole nine of the first device, the steps are repeated until the ground is laid in a covering manner, the utility model can be used for laying the surface of the sidewalk on the municipal road, the urban greening area can be effectively increased, can effectively prevent simultaneously that the plant from being trampled and lethal, the utility model discloses can change into rattan plant with planting the plant, lay on the enclosure surface, be favorable to increasing the urban afforestation area, further improve urban air quality, can increase the probability of surviving of plant simultaneously.

Description

Environmental protection barrier that porous ecological concrete afforestation was planted for town road
Technical Field
The utility model belongs to the technical field of the urban afforestation, concretely relates to town road is with environmental protection protective screen that porous ecological concrete afforestation was planted.
Background
The construction process, functional requirements and operational purposes of urban afforestation are different from forestry, but are all components of production construction, one is mainly made of materials, and the other is mainly made of environmental protection. Urban landscaping is an investment in the capital of the social environment, and the economic return is multifaceted and quite abundant. The demand of cities for gardens is divided into two aspects: firstly, as an infrastructure; and the other is used as leisure facilities. The former should be given to all citizens by municipalities as a public product, and the latter may be provided to some citizens by legal entities as legal products.
Present pavement all adopts the ceramic tile to lay, but the ceramic tile is laid and is needed periodic maintenance, the ceramic tile simple structure uses for a long time and can cause not hard uply, the gomphosis is inseparable enough between ceramic tile and the ceramic tile, cause ceramic tile below ponding in rainy day, the pedestrian steps on and easily causes ponding to sputter, lay the ceramic tile completely and do not have the environmental protection effect moreover, long-term trampling of planting the lawn to the people's road can lead to the plant dead, consequently need a protection protective screen can play the effect of protection vegetation, can avoid negative effects such as traditional ceramic tile insecure again when playing the ceramic tile effect.
SUMMERY OF THE UTILITY MODEL
To above technical problem, the utility model provides an environmental protection protective screen that porous ecological concrete afforestation was planted is used to town road.
An environment-friendly barrier for greening and planting porous ecological concrete for a municipal road comprises a concrete main body and air holes, wherein a cavity is formed inside the concrete, a first protrusion is arranged on the left side of the concrete main body, a first groove and a second groove are respectively arranged on the front side and the rear side of the first protrusion, the right side of the first protrusion is communicated with the inside of the concrete, a grid support is fixed on the upper surface of the concrete main body, a third groove with the same length and width as the first protrusion is formed in the upper half part of the middle part of the right side of the concrete main body, a second protrusion is arranged above the right rear side of the concrete main body, the left side of the second protrusion is communicated with the inside of the concrete main body, a fourth groove with the same length as the fourth protrusion is formed below the second protrusion, a third protrusion is arranged on the right front side of the concrete main body, the left side of the third protrusion is communicated with the inside of the concrete main body, a fifth groove with the same, the air holes comprise a first hole, a second hole, a third hole, a fourth hole, a fifth hole, a sixth hole, a seventh hole, an eighth hole and a ninth hole, the first hole is fixed at the bottom of the concrete body, the second hole and the third hole are located on the front side and the rear side of the left side face of the first protrusion side face side by side, the fourth hole is located on the right side face of the second protrusion side face, the fifth hole is located on the right side face of the third protrusion side face, the sixth hole is located on the right side face of the first groove, the seventh hole is located on the right side face of the second groove, the eighth hole and the ninth hole are located on the front side and the rear side of the left side face of the third groove side face by side.
Further, the internal surface of concrete body covers there is one deck lock water layer, the lock water layer comprises a plurality of rectangle units, and every rectangle unit all is equipped with the aperture, and the lock water layer can effectively delay the evaporation of water.
Furthermore, the plants are selected from turfgrass, the height of the turfgrass is low, and even if the turfgrass is stepped on, part of the plants in the concrete body can be still stored, so that the death of the plants caused by stepping on can be effectively reduced.
Furthermore, the concrete main body is made of water-permeable concrete, so that rainwater infiltration and daily irrigation in rainy days are facilitated.
Furthermore, the soil is organic soil which can provide more nutrients required by plants and improve the survival rate of the plants.
The novel laying construction method comprises the following steps:
s1: after leveling treatment is carried out on the paved ground, the device is directly paved;
s2: firstly, paving a device on the ground, then rotating the second block by 180 degrees to align the hole five of the second block device with the hole eight of the first block device, then paving the third block to align the hole four of the third block device with the hole nine of the first block device, and repeating the steps until the paved ground is covered.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the utility model can be used for paving the surface of the sidewalk on the municipal road, can effectively increase the urban greening area, and can effectively prevent the plants from being trampled to die;
(2) the utility model can replace the planting plants into the vine-shaped plants and lay the vine-shaped plants on the surface of the enclosing wall, which is beneficial to increasing the urban greening area, further improving the urban air quality and increasing the survival probability of the plants;
(3) the utility model can be used for river bank protection, not only can purify the water surface, but also can effectively prevent soil erosion;
(4) the utility model discloses a lock water layer can carry out the secondary condensation with steam, stores inside the device, has improved the survival rate of plant greatly.
(5) The utility model discloses the hole that the bottom was equipped with makes this device under the condition of long-term heavy burden, lay inside ground soil can a clearing hole embedding device, can effectively prevent device horizontal displacement, also can effectively avoid conventional ceramic tile to lay and to produce the phenomenon on bottom ponding splash ceramic tile surface because of the atress is uneven in the rainy day.
(6) The utility model discloses the gomphosis is inseparable, can effectively disperse the pressure that single device bore, and more effectual single device of avoiding sinks to arouse the phenomenon of laying the face unevenness.
(7) The utility model discloses a plurality of holes ventilate mutually after laying, can each device inside unnecessary moisture of fast dispersion and do not arouse local soil erosion and water loss, effectively avoid the water impact hole that arouses because of irrigating.
Drawings
Fig. 1 is a perspective view of the present invention;
fig. 2 is a top view of the present invention;
FIG. 3 is a structure diagram of the water-locking layer of the present invention;
fig. 4 is a left side view of the present invention;
fig. 5 is a schematic diagram of the splicing of the present invention;
wherein, 1-concrete main body, 2-air holes, 11-first bulge, 12-first groove, 13-second groove, 14-grid support, 15-third groove, 16-second bulge, 17-fourth groove, 18-third bulge, 19-fifth groove, 21-first hole, 22-second hole, 23-third hole, 24-fourth hole, 25-fifth hole, 26-sixth hole, 27-seventh hole, 28-eighth hole, 29-ninth hole, 3-soil, 4-plant, 5-water locking layer and 51-small hole.
Detailed Description
For the convenience of understanding the embodiments of the present invention, the following description is further explained with reference to fig. 1 to 5, which are not intended to limit the embodiments of the present invention.
As shown in figure 1, the environmental protection barrier for greening and planting porous ecological concrete for the municipal road comprises a concrete main body 1 and air holes 2, wherein a cavity is formed in the concrete, the concrete main body 1 is made of water-permeable concrete and is beneficial to rainwater permeation and daily irrigation in rainy days, a first bulge 11 is arranged on the left side of the concrete main body 1, a first groove 12 and a second groove 13 are respectively arranged on the front side and the rear side of the first bulge 11, the right side of the first bulge 11 is communicated with the interior of the concrete, a water locking layer 5 is covered on the inner surface of the concrete main body 1, as shown in figure 3, the water locking layer 5 is composed of a plurality of rectangular units, each rectangular unit is provided with a small hole 51, the water locking layer 5 can effectively delay water evaporation, a grid support 14 is fixed on the upper surface of the concrete main body 1, as shown in figure 2, a third groove 15 with the same length and width as the first bulge 11 is arranged on the upper half, a second bulge 16 is arranged above the right rear side of the concrete main body 1, the left side surface of the second bulge 16 is communicated with the interior of the concrete main body 1, a fourth groove 17 with the same length as the second bulge 16 is arranged below the second bulge 16, a third bulge 18 is arranged on the right front side of the concrete main body 1, the left side surface of the third bulge 18 is communicated with the interior of the concrete main body 1, a fifth groove 19 with the same length as the third bulge 18 is arranged below the third bulge 18, the length of the first bulge 11 is equal to the sum of the length of the second bulge 16 and the length of the third bulge 18, the vent holes 2 comprise a first hole 21, a second hole 22, a third hole 23, a fourth hole 24, a fifth hole 25, a sixth hole 26, a seventh hole 27, an eighth hole 28 and a ninth hole 29, the first hole 21 is fixed at the bottom of the concrete main body 1, the second hole 22 and the third hole 23 are arranged on the front side and the rear side of the left side surface of the first bulge 11 in parallel, the fourth hole, the seventh hole 27 is located on the right side face of the second groove 13, the eighth hole 28 and the ninth hole 29 are located on the front side face and the rear side face of the left side face of the third groove 15 in parallel, as shown in fig. 4, soil 3 is filled in the lower layer of the concrete body 1, the soil 3 is organic soil, the organic soil can provide more nutrition required by plants, the survival rate of the plants is improved, the plants 4 are planted in the soil 3, the plants 4 are selected from lawn grass, the height of the lawn grass is low, even if the plants are stepped on, part of the plants 4 in the concrete body can be still stored, and the death of the plants due to the stepping on.
The paving construction method of the embodiment comprises the following steps:
s1: after leveling treatment is carried out on the paved ground, the device is directly paved;
s2: as shown in fig. 5, the installation is first carried out on the ground, the second block is rotated by 180 ° so that the fifth hole 25 of the second block is aligned with the eighth hole 28 of the first block, then the third block is laid so that the fourth hole 24 of the third block is aligned with the ninth hole 29 of the first block, and the above steps are repeated until the ground is covered.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the embodiments of the present invention.

Claims (5)

1. The utility model provides an environmental protection barrier that porous ecological concrete afforestation was planted for town road, its characterized in that, including concrete main part (1), bleeder vent (2), the inside cavity that is of concrete, the left side of concrete main part (1) is equipped with protruding one (11), both sides are equipped with recess one (12) and recess two (13) respectively around protruding one (11), and the right side of protruding one (11) communicates with each other with the concrete is inside, and surface mounting has net support (14) on concrete main part (1), and the first half at concrete main part (1) right side middle part is equipped with recess three (15) that equals with protruding one (11) length and width, and the right rear side top of concrete main part (1) is equipped with protruding two (16), protruding two (16) left surface communicates with each other with concrete main part (1) is inside, and protruding two (16) below is equipped with recess four (17) that its length equals, the right front side of the concrete main body (1) is provided with a third bulge (18), the left side surface of the third bulge (18) is communicated with the inside of the concrete main body (1), a fifth groove (19) with the same length as the third bulge (18) is arranged below the third bulge (18), the length of the first bulge (11) is equal to the sum of the length of the second bulge (16) and the length of the third bulge (18), the air vent (2) comprises a first hole (21), a second hole (22), a third hole (23), a fourth hole (24), a fifth hole (25), a sixth hole (26), a seventh hole (27), an eighth hole (28) and a ninth hole (29), the first hole (21) is fixed at the bottom of the concrete main body (1), the second hole (22) and the third hole (23) are arranged on the left side surface of the first bulge (11) in parallel, the fourth hole (24) is arranged on the right side surface of the second bulge (16), and the fifth hole (25) is arranged on the right, the hole six (26) is located on the right side face of the groove I (12), the hole seven (27) is located on the right side face of the groove II (13), the hole eight (28) and the hole nine (29) are located on the left side face of the groove III (15) in parallel, the lower layer of the concrete main body (1) is filled with soil (3), and plants (4) are planted in the soil (3).
2. An environmental barrier for porous ecological concrete greening cultivation for town roads according to claim 1, characterized in that the inner surface of the concrete body (1) is covered with a water-locking layer (5), and the water-locking layer (5) is composed of a plurality of rectangular units, each of which is provided with small holes (51).
3. An environmental barrier for porous eco-concrete greening cultivation of municipal roads according to claim 1, wherein said plants (4) are selected from turfgrass.
4. An environmental protection barrier for porous ecological concrete greening cultivation for municipal roads according to claim 1, characterized in that the concrete body (1) is made of water permeable concrete.
5. An environmental protection barrier for porous ecological concrete greening cultivation for municipal roads according to claim 1, characterized in that the soil (3) is organic soil.
CN201920504747.9U 2019-04-15 2019-04-15 Environmental protection barrier that porous ecological concrete afforestation was planted for town road Expired - Fee Related CN209923717U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920504747.9U CN209923717U (en) 2019-04-15 2019-04-15 Environmental protection barrier that porous ecological concrete afforestation was planted for town road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920504747.9U CN209923717U (en) 2019-04-15 2019-04-15 Environmental protection barrier that porous ecological concrete afforestation was planted for town road

Publications (1)

Publication Number Publication Date
CN209923717U true CN209923717U (en) 2020-01-10

Family

ID=69073494

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920504747.9U Expired - Fee Related CN209923717U (en) 2019-04-15 2019-04-15 Environmental protection barrier that porous ecological concrete afforestation was planted for town road

Country Status (1)

Country Link
CN (1) CN209923717U (en)

Similar Documents

Publication Publication Date Title
Klaus et al. A conceptual framework for urban ecological restoration and rehabilitation
Zhang et al. Integrating biodiversity conservation into land consolidation in hilly areas–A case study in southwest China
CN101690457A (en) Stepped versant framed flower bed
CN102392453A (en) Terrace bank construction method for changing slope farmland into level terrace in reservoir area of Three Gorges
CN103283521A (en) Self-circulation green plant container series
CN209923717U (en) Environmental protection barrier that porous ecological concrete afforestation was planted for town road
CN202489024U (en) Cement pillar type greening shed
CN207739092U (en) Landscape ecology Pavement Construction
CN201585288U (en) Stepped side slope flower pond
CN108385702B (en) Highway two-edge ecological slope protection structure and construction method thereof
CN106284587A (en) Urban road is with oozing water tank and construction method thereof
CN113374026A (en) Southwest hilly area sloping field area ditch rainwater is collected and is recycled system
CN110959328B (en) Plant sand storage and fixation system for hilly valley land in hilly area
CN102630455A (en) Sowing and grass-planting method for terrene road surface
KR101057646B1 (en) Natural grass packaging material using artificial structure
CN203087114U (en) City street tree well protection brick
CN202347392U (en) Pedestrian tree pit pavement structure
KR200430137Y1 (en) Grass sidewalk block
CN206260377U (en) A kind of landscape tree pond with horizontal Ecological regulation services
CN105133456B (en) Greenery landscape road
CN215302011U (en) Planting layout of suitable-for-growth Chinese roses on road
CN204940048U (en) A kind of Afforestation Landscape road
CN213806812U (en) Landscape ecological corridor frame capable of storing water
CN1520708A (en) Naked rock fast afforestation method
CN202073103U (en) Grass-planting brick

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200110

CF01 Termination of patent right due to non-payment of annual fee