CN209907926U - Pouring template system capable of realizing subsection vibrating of secondary structure wall constructional column - Google Patents

Pouring template system capable of realizing subsection vibrating of secondary structure wall constructional column Download PDF

Info

Publication number
CN209907926U
CN209907926U CN201920178494.0U CN201920178494U CN209907926U CN 209907926 U CN209907926 U CN 209907926U CN 201920178494 U CN201920178494 U CN 201920178494U CN 209907926 U CN209907926 U CN 209907926U
Authority
CN
China
Prior art keywords
secondary structure
side template
front side
square timber
constructional column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920178494.0U
Other languages
Chinese (zh)
Inventor
蔡志文
申彦萍
靳俊杰
田海军
平衡
米云娇
何振华
苟家鑫
元燕丽
和玉东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Sanjian Group Co Ltd
Original Assignee
Shanxi Sanjian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Sanjian Group Co Ltd filed Critical Shanxi Sanjian Group Co Ltd
Priority to CN201920178494.0U priority Critical patent/CN209907926U/en
Application granted granted Critical
Publication of CN209907926U publication Critical patent/CN209907926U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a can realize secondary structure wall body constructional column's that segmentation vibrates pouring template system has solved secondary structure wall body constructional column and can't realize the segmentation vibration and lead to the uncompacted problem of constructional column lower part concrete vibration in pouring. A front side template (5) and a rear side template of a pre-poured secondary structure wall constructional column are arranged between a secondary structure left side wall body (3) and a secondary structure right side wall body (4), a split bolt (8) is arranged between a rear side template clamping transverse square timber and a front side template clamping transverse square timber (7), a vibrator insertion hole (9) is arranged in the middle of the front side template (5), and a plugging plate (10) is arranged on the vibrator insertion hole (9). The construction column is convenient to vibrate and compact, and the construction quality and the impression effect of the construction column are improved.

Description

Pouring template system capable of realizing subsection vibrating of secondary structure wall constructional column
Technical Field
The utility model relates to a template system is pour to the constructional column, in particular to can realize secondary structure wall body constructional column's that the segmentation vibrates template system of pouring.
Background
And after the primary structure pouring construction of the high-rise building is finished, performing secondary structure construction, wherein the building specification requires that a constructional column is required to be arranged in a secondary structure wall body so as to ensure the overall stability of the wall body. The traditional construction method of the constructional column in the secondary structure wall body is as follows: building walls on two sides of a constructional column, forming serrated racking on the inner sides of the walls on the two sides, arranging constructional column reinforcing steel bars between the serrated racking, then respectively placing inner and outer side templates on the inner and outer surfaces of the walls on the two sides, arranging square timber outside the inner and outer templates, fixing the inner and outer templates through tie bolts, arranging a secondary constructional column pouring opening at the joint of the top end of the template and an upper concrete floor, pouring concrete of the secondary constructional column through the opening, and putting a vibrating rod through the opening for vibrating the concrete in the concrete pouring process; when the constructional column is higher, because the inside reinforcing bar of constructional column is intensive, the vibrating rod can't stretch into the cylinder lower part, causes the concrete of constructional column lower part to vibrate not closely, appears defects such as the rotten root of constructional column, honeycomb, pitted face easily.
Disclosure of Invention
The utility model provides a can realize secondary structure wall body constructional column's that segmentation vibrated pouring template system has solved secondary structure wall body constructional column and can't realize the segmentation and vibrate and lead to the uncompacted technical problem of constructional column lower part concrete vibration in pouring.
The utility model discloses a solve above technical problem through following technical scheme:
a pouring template system of a secondary structure wall constructional column capable of realizing sectional vibration comprises a primary structure primary floor and a primary structure upper floor, wherein a secondary structure left side wall and a secondary structure right side wall are respectively arranged between the primary structure primary floor and the primary structure upper floor, a front side template and a rear side template for pre-pouring the secondary structure wall constructional column are arranged between the secondary structure left side wall and the secondary structure right side wall, the front side template is provided with a front side template clamping vertical square timber, the front side template is provided with a front side template clamping horizontal square timber, the rear side template is provided with a rear side template clamping vertical square timber, the rear side template is provided with a rear side template clamping horizontal square timber, and a split bolt is arranged between the rear side template clamping horizontal square timber and the front side template clamping horizontal square timber, the middle part of the front side template is provided with a vibrator inserting hole, and the vibrator inserting hole is provided with a plugging plate.
The front side template above the vibrator inserting hole is provided with a rotating shaft bolt through hole, a rotating shaft bolt is inserted in the rotating shaft bolt through hole, the inner side end of the rotating shaft bolt is fixedly connected with a plugging plate, and the outer side end of the rotating shaft bolt is provided with a tightening nut.
The utility model discloses having divided into two sections with the constructional column and having pour, the vibration of being convenient for is closely knit, has improved the construction quality and the impression effect of constructional column.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
fig. 2 is a schematic structural diagram of the plugging plate 10 of the present invention.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings:
a pouring template system of a secondary structure wall constructional column capable of realizing sectional vibration comprises a primary structure primary floor slab 1 and a primary structure upper floor slab 2, a secondary structure left side wall body 3 and a secondary structure right side wall body 4 are respectively arranged between the primary structure primary floor slab 1 and the primary structure upper floor slab 2, a front side template 5 and a rear side template of a pre-poured secondary structure wall constructional column are arranged between the secondary structure left side wall body 3 and the secondary structure right side wall body 4, a front side template clamping vertical square timber 6 is arranged on the front side template 5, a front side template clamping horizontal square timber 7 is arranged on the front side template clamping vertical square timber 6, a rear side template clamping vertical square timber is arranged on the rear side template clamping vertical square timber, a rear side template clamping horizontal square timber is arranged on the rear side template clamping vertical timber, a counter bolt 8 is arranged between the rear side template clamping horizontal square timber and the front side template clamping horizontal square timber 7, a vibrator insertion hole 9 is provided in the middle of the front side mold plate 5, and a plugging plate 10 is provided on the vibrator insertion hole 9.
A rotating shaft bolt through hole 11 is formed in the front side die plate 5 above the vibrator insertion hole 9, a rotating shaft bolt 12 is inserted into the rotating shaft bolt through hole 11, a plugging plate 10 is fixedly connected to the inner side end of the rotating shaft bolt 12, and a locking nut 13 is arranged on the outer side end of the rotating shaft bolt 12.
This use the utility model discloses carry out the concrete implementation process that the constructional column was pour and do:
firstly, building a secondary structure left wall 3 and a secondary structure right wall 4 between a primary structure floor 1 and a primary structure upper floor 2;
secondly, manufacturing a front side template 5 of the constructional column, forming a vibrator insertion hole 9 with the diameter of 8 centimeters in the middle of the front side template 5, and processing a rotating shaft bolt through hole 11 on the front side template 5 above the vibrator insertion hole 9;
thirdly, manufacturing a plugging plate 10 with the diameter of 10 cm and the thickness of 2 mm, and welding the plugging plate 10 with the inner side end of the rotating shaft bolt 12;
fourthly, a rotating shaft bolt 12 is inserted into a rotating shaft bolt through hole 11 on the inner side of the front side template 5, a locking nut 13 is screwed on the outer side end of the rotating shaft bolt 5 which penetrates out of the outer side of the front side template 5, so that the sealing plate 10 covers the vibrator insertion hole 9 on the inner side surface of the front side template 5, and the locking nut 13 is screwed tightly;
fifthly, mounting the rear side template and clamping the square timber to complete the integral mounting of the constructional column;
sixthly, after the locking nut 13 is loosened, the plugging plate 10 on the vibrator insertion hole 9 is suspended by rotating the rotating shaft bolt 12, the loudspeaker cover 14 is inserted into the vibrator insertion hole 9, and the vibrator 15 is placed between the front side template 5 and the rear side template through the loudspeaker cover 14;
seventhly, pouring constructional column concrete through the upper pouring opening 16 of the front side template 5, starting the vibrator 15, gradually vibrating and slowly lifting the vibrator 15 along with the increase of the pouring height of the concrete, and stopping pouring the constructional column concrete when the concrete is poured into the vibrator insertion hole 9;
eighthly, taking out the vibrator 15, and rotating the plugging plate 10 on the vibrator insertion hole 9 to a position for covering the vibrator insertion hole 9 by rotating the rotating shaft bolt 12;
and ninthly, inserting the vibrator 15 into the lower-section concrete poured by the constructional column through the upper pouring opening 16, pouring the upper-section concrete of the constructional column through the upper pouring opening 16, and vibrating while pouring until the pouring of the whole constructional column is finished.

Claims (2)

1. A pouring template system of a secondary structure wall constructional column capable of realizing sectional vibration comprises a primary structure primary floor (1) and a primary structure upper floor (2), a secondary structure left side wall (3) and a secondary structure right side wall (4) are respectively arranged between the primary structure primary floor (1) and the primary structure upper floor (2), a front side template (5) and a rear side template of a pre-poured secondary structure wall constructional column are arranged between the secondary structure left side wall (3) and the secondary structure right side wall (4), a front side template clamping vertical square timber (6) is arranged on the front side template (5), a front side template clamping horizontal square timber (7) is arranged on the front side template clamping vertical square timber (6), a rear side template clamping vertical square timber is arranged on the rear side template clamping vertical square timber, a rear side template clamping horizontal square timber is arranged on the rear side template clamping vertical square timber, a split bolt (8) is arranged between the rear side die plate clamping transverse square timber and the front side die plate clamping transverse square timber (7), and the split type square timber vibration tamping machine is characterized in that a vibrator inserting hole (9) is arranged in the middle of the front side die plate (5), and a plugging plate (10) is arranged on the vibrator inserting hole (9).
2. The pouring formwork system for the secondary structure wall constructional column capable of realizing sectional vibration according to claim 1, characterized in that a rotating shaft bolt through hole (11) is formed in the front side formwork (5) above the vibrator insertion hole (9), a rotating shaft bolt (12) is inserted into the rotating shaft bolt through hole (11), a plugging plate (10) is fixedly connected to the inner side end of the rotating shaft bolt (12), and a tightening nut (13) is arranged on the outer side end of the rotating shaft bolt (12).
CN201920178494.0U 2019-02-01 2019-02-01 Pouring template system capable of realizing subsection vibrating of secondary structure wall constructional column Active CN209907926U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920178494.0U CN209907926U (en) 2019-02-01 2019-02-01 Pouring template system capable of realizing subsection vibrating of secondary structure wall constructional column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920178494.0U CN209907926U (en) 2019-02-01 2019-02-01 Pouring template system capable of realizing subsection vibrating of secondary structure wall constructional column

Publications (1)

Publication Number Publication Date
CN209907926U true CN209907926U (en) 2020-01-07

Family

ID=69030646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920178494.0U Active CN209907926U (en) 2019-02-01 2019-02-01 Pouring template system capable of realizing subsection vibrating of secondary structure wall constructional column

Country Status (1)

Country Link
CN (1) CN209907926U (en)

Similar Documents

Publication Publication Date Title
CN102561681B (en) Casting molding template and casting molding process for constructional columns of infilled walls
CN104989102B (en) A kind of improved concrete walls, column construction method
CN102121310B (en) Double column constructional template for large-section ultrahigh steel reinforced clear water concrete and construction method thereof
CN104594500B (en) Integrated slab column formwork structure system and construction method
CN203712840U (en) Small box girder concrete pouring mold
CN106863552B (en) Integral forming die for cement prefabricated member by direct extrusion vibration method and processing method thereof
CN105696790B (en) Double-layer connecting beam opening formwork system and construction method thereof applied to double-layer connecting beam
CN206220489U (en) Concrete post formwork for placing tightening device
CN109797969B (en) Construction method of post-cast strip tool type advanced formwork lifting system
CN208343121U (en) Prefabricated assembled steel structure concrete wallboard mould
CN207177286U (en) Add region mould after fabricated shear wall is reserved
CN209907926U (en) Pouring template system capable of realizing subsection vibrating of secondary structure wall constructional column
CN204983661U (en) Light steel is framed greatly, integrative -in -place mould support system is decorated in protection that keeps warm
CN107214819B (en) Building constructional column shaping moulding box
CN206448272U (en) Roadbed side slope arched framework one-time-shaped mould
CN202000661U (en) Large-section super-high steel-rib bare-concrete double-column construction mould plate
CN201835524U (en) Pouring device for concrete beam with top embedded part
CN204983647U (en) Design instrument formula aluminum alloy template
CN104975715A (en) Formwork sealing method for walls or columns
CN210011144U (en) Construction site fence prefabricated foundation
CN208563755U (en) A kind of precast hollow constructional column for wall connecting
CN209369324U (en) Side form reinforcing apparatus of shear force wall
CN206016254U (en) Building precast constructional column exempts from the U-shaped shell of formwork
CN112878462A (en) Construction method of circular inspection well template
CN219952689U (en) Wall box device is worn to lateral wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant