CN209828015U - Super high-rise emergency escape channel - Google Patents
Super high-rise emergency escape channel Download PDFInfo
- Publication number
- CN209828015U CN209828015U CN201920052949.4U CN201920052949U CN209828015U CN 209828015 U CN209828015 U CN 209828015U CN 201920052949 U CN201920052949 U CN 201920052949U CN 209828015 U CN209828015 U CN 209828015U
- Authority
- CN
- China
- Prior art keywords
- slideway
- fixedly connected
- spiral slideway
- arc
- spiral
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005192 partition Methods 0.000 claims description 20
- 239000004698 Polyethylene Substances 0.000 claims description 3
- -1 polyethylene Polymers 0.000 claims description 3
- 229920000573 polyethylene Polymers 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 2
- 239000000428 dust Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000779 smoke Substances 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model discloses an emergent passway for escaping of superelevation layer, including first support column and first backup pad, the first support column base of bottom fixedly connected with of first support column, and one side of first support column is provided with the second support column, the first spiral slideway of outside fixedly connected with of first support column, the first backup pad of outside fixedly connected with of second support column, a lateral wall fixedly connected with fourth spiral slideway of first backup pad, fourth spiral slideway's below is provided with the fourth backup pad, the lateral wall fixedly connected with third spiral slideway of fourth backup pad, the below fixedly connected with third backup pad of third spiral slideway. The utility model discloses in shift to safe region through first spiral slideway and second spiral slideway cunning down, can effectually save personnel evacuation time under proruption emergency, ensured resident's personal safety.
Description
Technical Field
The utility model relates to a building technical field especially relates to an emergent passway for escaping of superelevation layer.
Background
People live and work in high buildings in cities, certainly, the land is saved, and the space in high altitude is fully utilized to bring a lot of benefits, but people who live and work in high buildings in high floors have no safety facilities to keep up with, and high building designers build multi-storey houses in high altitude, the safety facilities of the high buildings are basically not matched and are unreasonable, the news that people can not escape when a lot of high buildings are in fire is reported all the time, if the elevators and pedestrian passages of the high buildings are blocked by fire and dense smoke in the case of the fire, people can escape from the high buildings only without good ways! Although a fire fighting truck sprays water to fight a fire, the too high floor is also covered with dust, and people also design a movable crane using the high floor to rescue lives, but the too high floor is also covered with dust! Meanwhile, the fire engine of the high-rise building and the movable crane of the high-rise building need a certain time to arrive.
The conventional safety passage is generally built by adopting stairs, and when a fire disaster occurs, a great deal of time is needed for the evacuation from the stairs, so that the personal safety of residents is difficult to guarantee.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the existing safe passage in the prior art is generally built by adopting the stairs, when a fire disaster occurs, the escape from the stairs needs to spend a large amount of time, and the shortcoming that the personal safety of residents is difficult to guarantee is avoided, thereby providing an emergency escape passage for the super high-rise.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
an emergency escape passage for a super high-rise building comprises a first supporting column and a first supporting plate, wherein the bottom end of the first supporting column is fixedly connected with a first supporting column base, one side of the first supporting column is provided with a second supporting column, the outer part of the first supporting column is fixedly connected with a first spiral slideway, the outer part of the second supporting column is fixedly connected with the first supporting plate, one side wall of the first supporting plate is fixedly connected with a fourth spiral slideway, the fourth spiral slideway is arranged below the fourth spiral slideway, the side wall of the fourth supporting plate is fixedly connected with a third spiral slideway, the lower part of the third spiral slideway is fixedly connected with a third supporting plate, one side of the upper end of the third supporting plate is fixedly connected with a second spiral slideway, the side wall of the third supporting plate is fixedly connected with an arc slideway, and one end of the second spiral slideway is fixedly connected to the side wall of the second supporting plate, the second backup pad is located first spiral slideway under, and second backup pad fixed connection is on the second support column, the arc slide includes first arc slide baffle, first division board, second division board, third division board and second arc slide baffle, first arc slide baffle is located the lateral wall of arc slide, and one side of first arc slide baffle is provided with first division board, one side of first division board is provided with the second division board, one side of second division board is provided with the third division board, one side of third division board is provided with second arc slide baffle, the equal fixed mounting of first division board, second division board and third division board is in the upper end of arc slide.
Preferably, the included angle between the arc-shaped slide way and the ground is 45-60 degrees.
Preferably, the first spiral slideway and the fourth spiral slideway are mirror symmetry.
Preferably, the first partition plate, the second partition plate and the third partition plate are linearly and equidistantly arranged at the upper end of the arc-shaped slide way.
Preferably, the first supporting plate is fixedly connected with the second supporting column through welding.
Preferably, the first spiral slideway, the second spiral slideway, the arc slideway, the second support column base and the fourth spiral slideway are all members made of polyethylene.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses in shunt super high-rise personnel through utilizing first spiral slideway and fourth spiral slideway, make personnel shift to safe region through first spiral slideway and second spiral slideway from super high-rise cunning, can effectually save personnel evacuation time under proruption emergency, ensured resident's personal safety.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is the schematic diagram of the arc-shaped slideway structure of the present invention.
In the figure: 1. a first support column; 2. a first support plate; 3. a second support column; 4. a first spiral slideway; 5. a second support plate; 6. a second spiral slideway; 7. a third support plate; 8. an arc-shaped slideway; 9. a second support column base; 10. a first support column base; 11. a third spiral slideway; 12. a fourth support plate; 13. a fourth spiral slideway; 14. a first arcuate chute partition; 15. a first partition plate; 16. a second partition plate; 17. a third partition plate; 18. a second arcuate chute baffle.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-2, an emergency escape passage for a super high-rise building comprises a first supporting column 1 and a first supporting plate 2, wherein the bottom end of the first supporting column 1 is fixedly connected with a first supporting column base 10, one side of the first supporting column 1 is provided with a second supporting column 3, the exterior of the first supporting column 1 is fixedly connected with a first spiral slideway 4, the exterior of the second supporting column 3 is fixedly connected with the first supporting plate 2, one side wall of the first supporting plate 2 is fixedly connected with a fourth spiral slideway 13, the fourth spiral slideway 13, a fourth supporting plate 12 is arranged below the fourth spiral slideway 13, the side wall of the fourth supporting plate 12 is fixedly connected with a third spiral slideway 11, the lower part of the third spiral slideway 11 is fixedly connected with a third supporting plate 7, one side of the upper end of the third supporting plate 7 is fixedly connected with a second spiral slideway 6, and the side wall of the third supporting plate 7 is fixedly connected with an arc slideway 8, one end fixed connection of second spiral slideway 6 is on the lateral wall of second backup pad 5, second backup pad 5 is located first spiral slideway 4 under, and second backup pad 5 fixed connection is on second support column 3, arc slide 8 includes first arc slide baffle 14, first division board 15, second division board 16, third division board 17 and second arc slide baffle 18, first arc slide baffle 14 is located arc slide 8's lateral wall, and one side of first arc slide baffle 14 is provided with first division board 15, one side of first division board 15 is provided with second division board 16, one side of second division board 16 is provided with third division board 17, one side of third division board 17 is provided with second arc slide baffle 18, first division board 15, second division board 16 and third division board 17 are all fixed mounting in arc slide 8's upper end.
The contained angle is between 45 degrees to 60 degrees between arc slide 8 and the ground, first spiral slide 4 and fourth spiral slide 13 mirror symmetry, first division board 15, second division board 16 and third division board 17 are linear equidistance's range in the upper end of arc slide 8, first backup pad 2 passes through welded fastening with second support column 3 and is connected, first spiral slide 4, second spiral slide 6, arc slide 8, second support column base 9 and fourth spiral slide 13 all are the component of a polyethylene material.
The working principle is as follows: the first spiral slideway 4 and the fourth spiral slideway 13 are used for shunting personnel at the super high rise, so that the personnel slide down through the first spiral slideway 4 and the second spiral slideway 14 from the super high rise to be transferred to a safe area, personnel evacuation time can be effectively saved under emergency, and personal safety of residents is guaranteed.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. An emergency escape passage for a super high-rise building comprises a first supporting column (1) and a first supporting plate (2), and is characterized in that the bottom end of the first supporting column (1) is fixedly connected with a first supporting column base (10), one side of the first supporting column (1) is provided with a second supporting column (3), the outer part of the first supporting column (1) is fixedly connected with a first spiral slideway (4), the outer part of the second supporting column (3) is fixedly connected with the first supporting plate (2), one side wall of the first supporting plate (2) is fixedly connected with a fourth spiral slideway (13), the fourth spiral slideway (13) is arranged below the fourth spiral slideway (13), a fourth supporting plate (12) is arranged below the fourth spiral slideway (13), the side wall of the fourth supporting plate (12) is fixedly connected with a third spiral slideway (11), and a third supporting plate (7) is fixedly connected below the third spiral slideway (11), a second spiral slideway (6) is fixedly connected to one side of the upper end of the third supporting plate (7), an arc-shaped slideway (8) is fixedly connected to the side wall of the third supporting plate (7), one end of the second spiral slideway (6) is fixedly connected to the side wall of the second supporting plate (5), the second supporting plate (5) is positioned under the first spiral slideway (4), the second supporting plate (5) is fixedly connected to the second supporting column (3), the arc-shaped slideway (8) comprises a first arc-shaped slideway partition plate (14), a first partition plate (15), a second partition plate (16), a third partition plate (17) and a second arc-shaped slideway partition plate (18), the first arc-shaped slideway partition plate (14) is positioned on the side wall of the arc-shaped slideway (8), the first partition plate (15) is arranged on one side of the first arc-shaped slideway partition plate (14), the second partition plate (16) is arranged on one side of the first partition plate (15), one side of second division board (16) is provided with third division board (17), one side of third division board (17) is provided with second arc slide baffle (18), equal fixed mounting in the upper end of arc slide (8) of first division board (15), second division board (16) and third division board (17).
2. The superelevation emergency escape route of claim 1, wherein the angle between the arc-shaped chute (8) and the ground is 45 to 60 degrees.
3. The very high-rise emergency escape route of claim 1, wherein the first spiral slideway (4) and the fourth spiral slideway (13) are mirror-symmetrical.
4. The super high-rise emergency escape route according to claim 1, wherein the first partition plate (15), the second partition plate (16) and the third partition plate (17) are linearly and equidistantly arranged at the upper end of the arc-shaped slide way (8).
5. The superelevation layer emergency escape passage according to claim 1, wherein the first support plate (2) and the second support plate (3) are fixedly connected by welding.
6. The ultra-high-rise emergency escape route according to claim 1, wherein the first spiral slideway (4), the second spiral slideway (6), the arc slideway (8), the second support column base (9) and the fourth spiral slideway (13) are all members made of polyethylene.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920052949.4U CN209828015U (en) | 2019-01-14 | 2019-01-14 | Super high-rise emergency escape channel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920052949.4U CN209828015U (en) | 2019-01-14 | 2019-01-14 | Super high-rise emergency escape channel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209828015U true CN209828015U (en) | 2019-12-24 |
Family
ID=68901603
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920052949.4U Expired - Fee Related CN209828015U (en) | 2019-01-14 | 2019-01-14 | Super high-rise emergency escape channel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209828015U (en) |
-
2019
- 2019-01-14 CN CN201920052949.4U patent/CN209828015U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5377778A (en) | Emergency fire escape for multi-storied building | |
CN103691072B (en) | rescue system for high-rise building | |
CN102381317A (en) | Escape way for emergency evacuation | |
CN203201233U (en) | Building with passive self-rescue escape and evacuation system | |
CN208017947U (en) | Chute type rescues safety ladder for evacuating | |
CN209828015U (en) | Super high-rise emergency escape channel | |
CN203291405U (en) | Rescuing system for high-rise building | |
JP3791730B2 (en) | Stair-climbing lift for evacuating vulnerable people | |
Kuligowski et al. | Design of occupant egress systems for tall buildings | |
RU2381982C2 (en) | Device to evacuate people from high blocks in fire | |
CN103556843B (en) | Outdoor platform evacuation system for vertical transportation trunk and branch conversion of high-rise building | |
CN214531089U (en) | Building with spiral vertical refuge facility | |
CN101126281A (en) | Building with fire-proof type structure | |
CN203594244U (en) | Outdoor platform evacuation system for switching of vertical transportation trunk road and branch roads of high-rise building | |
CN101555724A (en) | Method for improving high-rise building safe evacuation scissors staircase and structure thereof | |
CN207739675U (en) | A kind of three-dimensional cabin with outdoor maintenance platform | |
CN112832369A (en) | Building with three-dimensional refuge facility | |
CN201305962Y (en) | Improved structure of a high building safe evacuation scissors staircase | |
TWI681904B (en) | Floating tilting refuge capsule | |
CN109132965B (en) | Multifunctional working bucket in aerial ladder fire-fighting equipment | |
CN112096166B (en) | Design method for improving fireproof safety performance of underground commercial facility matched with traffic building | |
JP3213457U (en) | Dormitory building | |
CN219509075U (en) | Independent peripheral house building safety channel facility | |
CN213898310U (en) | Fire-proof structure of underground commercial facility of traffic building | |
CN204447064U (en) | A kind of high-rise building housing-group public safety support facility |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191224 |
|
CF01 | Termination of patent right due to non-payment of annual fee |