CN209676091U CN201920886704.1U CN201920886704U CN209676091U CN 209676091 U CN209676091 U CN 209676091U CN 201920886704 U CN201920886704 U CN 201920886704U CN 209676091 U CN209676091 U CN 209676091U
Authority
CN
China
Prior art keywords
iron core
carrier
rubber shell
manipulator
bottom case
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920886704.1U
Other languages
Chinese (zh)
Inventor
李秋寒
蔡勇前
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Yong Qian Intelligent Precision Technology Co Ltd
Original Assignee
Guangdong Yong Qian Intelligent Precision Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Yong Qian Intelligent Precision Technology Co Ltd filed Critical Guangdong Yong Qian Intelligent Precision Technology Co Ltd
Priority to CN201920886704.1U priority Critical patent/CN209676091U/en
Application granted granted Critical
Publication of CN209676091U publication Critical patent/CN209676091U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Brushes (AREA)

Abstract

A kind of electric toothbrush motor full-automatic assembly line, it include: that iron core and rubber shell assembling equipment, spooling equipment, the group of magnets standby, bottom case of installing and bearing group install the assembling of standby and shell and dotting equipment, iron core and rubber shell assembling equipment, spooling equipment, group of magnets install standby, bottom case and bearing group installing is standby and shell assembles and dotting equipment is arranged successively, and is designed with semi-finished product loading and unloading manipulator between two adjacent equipment.Above-mentioned electric toothbrush motor full-automatic assembly line can complete the independent assembly of motor, and be automatically finished each process, substantially increase the motor packaging efficiency of electric toothbrush.

Description

Electric toothbrush motor full-automatic assembly line
Technical field
The utility model relates to assembly lines, more particularly, to a kind of electric toothbrush motor full-automatic assembly line.
Background technique
Electric toothbrush is the quick rotation or vibration by motor, so that brush head is generated high-frequency vibration, moment decomposes toothpaste At subtle foam, a kind of toothbrush of teeth space is deeply cleaned.In order to improve the production efficiency of electric toothbrush, some manufacturers are using automatic Assembly line assembles electric toothbrush.
Existing assembly line is not arranged for the motor of electric toothbrush dedicated just for the assembling of electric toothbrush entirety Assembly line.However, due to needing individually to be assembled between the electrical machinery and brushing head cylinder of electric toothbrush, and current manufacturer Or it is assembled by artificial mode, efficiency is lower, therefore, a for the complete of electric toothbrush motor it is necessory to design Automatic assembly line.
Utility model content
Technical solutions of the utility model provide a kind of electric toothbrush for above situation to solve the above-mentioned problems Motor full-automatic assembly line, the full-automatic assembly line include: iron core and rubber shell assembling equipment, spooling equipment, group of magnets installing Standby, bottom case and bearing group install the assembling of standby and shell and dotting equipment, and the iron core and rubber shell assembling equipment, the coiling are set Standby, the described group of magnets installs standby, the described bottom case and bearing group installs standby and described shell assembling and dotting equipment is arranged successively, and Semi-finished product loading and unloading manipulator is designed between two adjacent equipment.
Further, the iron core and rubber shell assembling equipment include: brush head cylinder feed mechanism, iron core assembly mechanism, first Rubber shell assemble mechanism, the second rubber shell assemble mechanism, the first carrier transport mechanism and multiple first carriers, the iron core assembly mechanism It is extended between the first rubber shell assemble mechanism and the second rubber shell assemble mechanism from the brush head cylinder feed mechanism, institute The first rubber shell assemble mechanism and the second rubber shell assemble mechanism is stated to be arranged successively in the side of the first carrier transport mechanism, Multiple first carriers are located in the first carrier transport mechanism.
Further, the brush head cylinder feed mechanism includes: brush head cylinder vibrating disk, brush head cylinder manipulator, brush head circle Column loader and recovery approach, the brush head cylinder manipulator is located at the brush head cylinder vibrating disk and the brush head cylinder is packed into Between device, the brush head cylinder loader is arranged towards the iron core assembly mechanism, and the recovery approach is located at brush head circle The lower section of column manipulator, the brush head cylinder loader are driven using oil cylinder.
Further, the iron core assembly mechanism includes: iron core cartridge clip, iron core binding clasp, iron core conveyer belt, iron core transfer Tool hand and iron core export manipulator, and the iron core cartridge clip, the iron core binding clasp and the iron core conveyer belt are arranged successively, described Iron core transfer robot arm extends to the iron core conveyer belt from the iron core cartridge clip, and the iron core output manipulator is located at the iron Between core conveyer belt and the first carrier transport mechanism, the brush head cylinder loader is arranged towards the iron core binding clasp.
Further, the first rubber shell assemble mechanism includes: the first rubber shell vibrating disk and the first rubber shell manipulator, and described One rubber shell manipulator is between the first rubber shell vibrating disk and the first carrier transport mechanism;The second rubber shell assembly Mechanism includes: the second rubber shell vibrating disk and the second rubber shell manipulator, and the second rubber shell manipulator is located at second rubber shell vibration Between Moving plate and the first carrier transport mechanism.
Further, the first carrier transport mechanism include: the first carrier belt, upper layer carrier driver, drop device, Lower layer's carrier driver and lifting device, first carrier belt form the closed loop of vertical direction, the upper layer carrier driving Device is located at the top of first carrier belt, and lower layer's carrier driver is located at the bottom of first carrier belt Portion, the drop device and the lifting device all extend to bottom, and the drop device at the top of first carrier belt The both ends of first carrier belt are located at the lifting device.
Further, it includes: feeding belt, charging manipulator, the second carrier belt, multiple second that the group of magnets installing is standby Carrier, four magnet cartridge clips, four magnet manipulators, rotator, unloading manipulator and discharge channel, it is the feeding belt, described Second carrier belt and the discharge channel are arranged successively, and the charging manipulator is located at the feeding belt and described second and carries Have between conveyer belt, second carrier belt forms the closed loop of horizontal direction, and multiple second carriers are located at described second and carry Have on conveyer belt, four magnet cartridge clips are all located at the side of second carrier belt and arrange in a manner of a row, two A magnet cartridge clip is located at close to the position of second carrier belt one end, other two magnet cartridge clip is located at close to described the The position of the two carrier belt other ends, the rotator are located at the position in the middle part of second carrier belt, four magnet Manipulator is aligned with four magnet manipulators respectively, and the magnet manipulator be located at second carrier belt with it is described Between magnet manipulator, the unloading manipulator is between second carrier belt and the discharge channel.
Further, second carrier includes: that pedestal, swing collet and swinging axle, the pedestal are opened for top and bottom The box shape of mouth, the bottom for swinging collet are located at the inside of the pedestal, and the top extends to the outer of the pedestal Portion, the swinging axle run through the pedestal and the swing collet;The group of magnets installing is standby further include: two oscillating cylinders, The oscillating cylinder is located at the lower section of second carrier belt, and two oscillating cylinders respectively with second and the 4th magnetic The alignment of iron cartridge clip, the piston rod of the oscillating cylinder are arranged upward.
Further, it includes: bottom case vibrating disk, bear vibration disk, bottom case and bearing dress that the bottom case and bearing group, which are installed standby, Fitting mechanism and stripper, the bottom case vibrating disk and the bear vibration disk extend respectively to the bottom case and bearing assembly machine Structure, the bottom case and bearing assembly machine structure are aligned with the stripper.
Further, the bottom case and bearing assembly machine structure include: bottom case manipulator, bearing mechanical hand, bottom case loader, axis Loader and compactor are held, the bottom case manipulator is between the bottom case vibrating disk and the bottom case loader, the axis Manipulator is held between the bear vibration disk and the bearing loader, the bottom case loader and the bearing loader It is respectively facing the compactor setting.
After adopting the above technical scheme, the effect of the utility model is: the electric toothbrush motor with above structure is complete certainly Dynamic assembly line, can complete the independent assembly between electrical machinery and brushing head cylinder, and be automatically finished each process, greatly improve The motor packaging efficiency of electric toothbrush.
Detailed description of the invention
Fig. 1 be the utility model relates to iron core and rubber shell assemble equipment schematic diagram;
Fig. 2 be the utility model relates to brush head cylinder feed mechanism schematic diagram;
Fig. 3 be the utility model relates to iron core assembly mechanism schematic diagram;
Fig. 4 be the utility model relates to the first rubber shell assemble mechanism schematic diagram;
Fig. 5 be the utility model relates to the second rubber shell assemble mechanism schematic diagram;
Fig. 6 be the utility model relates to the first carrier transport mechanism schematic diagram;
Fig. 7 be the utility model relates to group of magnets install standby schematic diagram;
Fig. 8 be the utility model relates to the second carrier schematic diagram;
Fig. 9 be the utility model relates to bottom case and bearing group install standby schematic diagram;
Figure 10 be the utility model relates to bottom case and bearing assembly machine structure schematic diagram.
Specific embodiment
It is emphasized that term " first ", " second ", " third " in the utility model are used for description purposes only, and It cannot be understood as indicating or implying relative importance or implicitly indicate the quantity of indicated technical characteristic.It defines as a result, " first ", " second ", " third " feature can explicitly or implicitly include at least one of the features.Description of the invention In, the meaning of " plurality " is at least two, such as two, three etc., unless otherwise specifically defined.The utility model is real The directional instruction (such as up, down, left, right, before and after ...) of institute in example is applied to be only used for explaining each portion under a certain particular pose Relative positional relationship, motion conditions between part etc., if the particular pose changes, directionality instruction is also corresponding Ground changes correspondingly.
Technical solutions of the utility model are further described below by embodiment:
The utility model provides a kind of electric toothbrush motor full-automatic assembly line, and full-automatic assembly line includes: iron core and glue Shell assembles equipment, spooling equipment, the group of magnets standby, bottom case of installing and bearing group installing is standby and shell assembles and dotting equipment.Iron core And rubber shell assembling equipment, spooling equipment, group of magnets install standby, bottom case and the assembling of bearing group installing standby and shell and dotting equipment according to Secondary arrangement, and semi-finished product loading and unloading manipulator is designed between two adjacent equipment.Above equipment belongs to fully-automatic production Equipment, wherein iron core and rubber shell assembling equipment are used to iron core and the first rubber shell, the second rubber shell being assembled to brush head cylinder, around Line equipment is ready for use on four magnetic of assembly in the first rubber shell and the second rubber shell for carrying out coiling, group of magnets installing on iron core Iron, bottom case and bearing group installing are ready for use on by bottom case and bearing assembly in the first rubber shell and the second rubber shell, and shell is assembled and beaten Point device is used to assemble shell on bottom case and completes to get operation ready.
In the present invention, spooling equipment is two, and two spooling equipments work at the same time, to improve full-automatic assembly line Whole efficiency.In addition, the assembling of spooling equipment, shell and dotting equipment and the structure of semi-finished product loading and unloading manipulator belong to now There is technology, repeat no more in the present invention, standby 2 and bottom will be installed for iron core and rubber shell assembling equipment 1, group of magnets below Shell and bearing group installing standby 3 are for a more detailed description.
As shown in Figure 1, iron core and rubber shell assembling equipment 1 include: brush head cylinder feed mechanism 11, iron core assembly mechanism 12, First rubber shell assemble mechanism 13, the second rubber shell assemble mechanism 14, the first carrier transport mechanism 15 and multiple first carriers 16.Iron core Assemble mechanism 12 from brush head cylinder feed mechanism 11 extend to the first rubber shell assemble mechanism 13 and the second rubber shell assemble mechanism 14 it Between, the first rubber shell assemble mechanism 13 and the second rubber shell assemble mechanism 14 are arranged successively in the side of the first carrier transport mechanism 15, Multiple first carriers 16 are located in the first carrier transport mechanism 15.Brush head cylinder feed mechanism 11 is for brush head cylinder to be sent to Iron core assembly mechanism 12, iron core assembly mechanism 12 is used for iron core assembly in brush head cylinder, and is sent to the first load On tool 16, the first rubber shell assemble mechanism 13 is used to the first rubber shell being sent to the first carrier 16, the second rubber shell assemble mechanism 14 For the second rubber shell to be sent to the first carrier 16, i.e. the first carrier 16 successively receives the brush after the first rubber shell, assembly iron core Head cylinder and the second rubber shell, and the assembly of above-mentioned part is completed, the first carrier transport mechanism 15 exists for realizing the first carrier 16 Transmission between first rubber shell assemble mechanism 13, iron core assembly mechanism 12 and the second rubber shell assemble mechanism 14, and for exporting warp Semi-finished product after iron core and the rubber shell assembling assembly of equipment 1.
As shown in Fig. 2, brush head cylinder feed mechanism 11 include: brush head cylinder vibrating disk 111, brush head cylinder manipulator 112, Brush head cylinder loader 113 and recovery approach 114, brush head cylinder manipulator 112 are located at brush head cylinder vibrating disk 111 and brush head circle Between column loader 113, brush head cylinder loader 113 is arranged towards iron core assembly mechanism 12, and recovery approach 114 is located at brush head circle The lower section of column manipulator 112.Brush head cylinder vibrating disk 111 is for exporting brush head cylinder, and brush head cylinder manipulator 112 will be for that will close The brush head cylinder of lattice is placed on brush head cylinder loader 113, and underproof brush head cylinder is placed on recovery approach 114 It is recycled, brush head cylinder loader 113 is for brush head cylinder to be fitted into the iron core in iron core assembly mechanism 12.
As a preferred solution, brush head cylinder loader 113 is driven using oil cylinder, and compared with cylinder, oil cylinder resists Fatigue strength is high, can guarantee the stability of brush head cylinder and iron core assembly.
As shown in figure 3, iron core assembly mechanism 12 include: iron core cartridge clip 121, iron core binding clasp 122, iron core conveyer belt 123, Iron core transfer robot arm 124 and iron core export manipulator 125, iron core cartridge clip 121, iron core binding clasp 122 and iron core conveyer belt 123 It is arranged successively, iron core transfer robot arm 124 extends to iron core conveyer belt 123 from iron core cartridge clip 121, and iron core exports manipulator 125 Between iron core conveyer belt 123 and the first carrier transport mechanism 15, brush head cylinder loader 113 is towards iron core binding clasp 122 Setting.Iron core cartridge clip 121 is used for output iron core, iron core binding clasp 122 for clamping iron core, and with brush head cylinder loader 113 cooperations, complete the assembling between brush head cylinder and iron core, and iron core conveyer belt 123 will be with will assemble the brush head cylinder biography after iron core It send between the first rubber shell assemble mechanism 13 and the second rubber shell assemble mechanism 14, iron core transfer robot arm 124 is for realizing iron core Transmission between iron core cartridge clip 121 and iron core binding clasp 122, and realize that the brush head cylinder after assembly iron core is clamped in iron core Transmission between device 122 and iron core conveyer belt 123, iron core export manipulator 125 and are used for the assembly iron on iron core conveyer belt 123 Brush head cylinder after core is sent on the first carrier 16.
In conjunction with shown in Fig. 4 and Fig. 5, the first rubber shell assemble mechanism 13 includes: the first rubber shell vibrating disk 131 and the first rubber shell machine Tool hand 132, the first rubber shell manipulator 132 is between the first rubber shell vibrating disk 131 and the first carrier transport mechanism 15.First glue Shell vibrating disk 131 is used to the first rubber shell being sent to the first carrier 16 for exporting the first rubber shell, the first rubber shell manipulator 132 On, and complete the assembly of the first rubber shell.Second rubber shell assemble mechanism 14 includes: the second rubber shell vibrating disk 141 and the second rubber shell Manipulator 142, the second rubber shell manipulator 142 is between the second rubber shell vibrating disk 141 and the first carrier transport mechanism 15.Second Rubber shell vibrating disk 141 is used to the second rubber shell being sent to the first carrier 16 for exporting the second rubber shell, the second rubber shell manipulator 142 On, and complete the assembly of the second rubber shell.
As shown in fig. 6, the first carrier transport mechanism 15 include: the first carrier belt 151, upper layer carrier driver 152, Drop device 153, lower layer's carrier driver 154 and lifting device 155, the first carrier belt 151 form vertical direction (i.e. upper and lower level Reflux) closed loop, upper layer carrier driver 152 is located at the top of the first carrier belt 151, lower layer's carrier driver 154 In the bottom of the first carrier belt 151, drop device 153 and lifting device 155 all extend from the top of the first carrier belt 151 To bottom, and drop device 153 and lifting device 155 are located at the both ends of the first carrier belt 151.First carrier belt 151 for accepting the first carrier 16, and upper layer carrier driver 152 is used to drive the be located at the top of the first carrier belt 151 One carrier 16 is mobile, and drop device 153 is sent to bottom for that will be located at first carrier 16 at 151 top of the first carrier belt, Lower layer's carrier driver 154 is used to drive the first carrier 16 positioned at 151 bottom of the first carrier belt mobile, lifting device 155 The first carrier 16 for that will be located at 151 bottom of the first carrier belt is sent to top.
When the work of the first carrier transport mechanism 15, the first rubber shell is sent to first by the first rubber shell assemble mechanism 13 first On one first carrier 16 at 15 top of carrier transport mechanism, then the first carrier transport mechanism 15 passes above-mentioned first carrier 16 Transport to next position;Then the brush head cylinder after assembling iron core is sent on above-mentioned first carrier 16 by iron core assembly mechanism 12 And the assembly of the first rubber shell and brush head cylinder is completed, then above-mentioned first carrier 16 is transmitted to down by the first carrier transport mechanism 15 One position;Then the second rubber shell is sent on above-mentioned first carrier 16 and completes the first rubber shell by the second rubber shell assemble mechanism 14 With the assembly of the second rubber shell, above-mentioned first carrier 16 is transmitted to output position by last first carrier transport mechanism 15.As one The preferred scheme of kind, the first carrier 16 are six station carriers, can carry six semi-finished product simultaneously, carry out the assembly of six products, To improve assembly efficiency.
As shown in fig. 7, group of magnets installing standby 2 include: feeding belt 21, it is charging manipulator 22, the second carrier belt 23, more The magnet cartridge clip 25, four of a second carrier 24, four magnet manipulator 26, rotator 27, unloading manipulator 28 and discharge channel 29.Feeding belt 21, the second carrier belt 23 and discharge channel 29 are arranged successively, and charging manipulator 22 is located at feeding belt 21 and the Between two carrier belts 23, the second carrier belt 23 forms the closed loop of horizontal direction, and multiple second carriers 24 are located at second In carrier belt 23, four magnet cartridge clips 25 are all located at the side of the second carrier belt 23 and arrange in a manner of a row Column, two magnet cartridge clips 25 are located at close to the position of 23 one end of the second carrier belt, other two magnet cartridge clip 25, which is located at, to be leaned on The position of nearly second carrier belt, 23 other end, rotator 27 are located at the position at 23 middle part of the second carrier belt, four magnetic Iron manipulator 26 is aligned with four magnet manipulators 26 respectively, and magnet manipulator 26 is located at the second carrier belt 23 and magnetic Between iron manipulator 26, unloading manipulator 28 is between the second carrier belt 23 and discharge channel 29.It is installed in group of magnets When standby 2 work, semi-finished product are entered by feeding belt 21, are fed manipulator 22 for semi-finished product and are sent to the second carrier from feeding belt 21 On second carrier 24 of conveyer belt 23, during the second carrier 24 transmits in the second carrier belt 23, two magnet Cartridge clip 25 exports magnet first, and two magnet manipulators 26 assemble magnet on semi-finished product, then will be partly by rotator 27 Finished product rotates 180 °, other two magnet cartridge clip 25 then exports magnet, other two magnet manipulator 26 again matches magnet cartridge On semi-finished product, semi-finished product are sent on discharge channel 29 by last unloading manipulator 28 carries out discharging.
As a preferred solution, as shown in figure 8, the second carrier 24 includes: pedestal 241, swings collet 242 and swing Axis 243, pedestal 241 are the box shape of top and bottom opening, and the bottom for swinging collet 242 is located at the inside of pedestal 241, top Portion extends to the outside of pedestal 241, and swinging axle 243 is through pedestal 241 and swings collet 242.Semi-finished product are placed on swing collet On 242, swinging collet 242 can swing in pedestal 241 around swinging axle 243.In addition, group of magnets installing standby 2 further include: two Oscillating cylinder (not shown), oscillating cylinder are located at the lower section of the second carrier belt 23, and two oscillating cylinder difference It is aligned with second and the 4th magnet cartridge clip 25, the piston rod of oscillating cylinder is arranged upward.When the second carrier 24 is sent to and the When the position of one magnet cartridge clip 25 alignment, first magnet manipulator 26 assembles magnet in a corner of semi-finished product;When When second carrier 24 is sent to the position being aligned with the second magnet cartridge clip 25, oscillating cylinder, which up pushes, swings collet 242, makes it It swings, to change the angle of semi-finished product, second magnet manipulator 26 is facilitated to assemble magnet in the another of semi-finished product In a corner.Similarly, after being rotated semi-finished product by rotator 26, magnet is mounted on by third and fourth manipulator 26 respectively Other two corner of semi-finished product.Due to swinging the swingable setting of collet 242, magnet manipulator 26 does not need to carry out angle The magnet cartridge that semi-finished product four corners can be completed in adjustment is matched, and is greatly reduced the structural complexity of magnet manipulator 26, is also dropped The operation difficulty of low assembly.
As shown in figure 9, bottom case and bearing group installing standby 3 include: bottom case vibrating disk 31, bear vibration disk 32, bottom case and axis It installs fitting mechanism 33 and stripper 34, bottom case vibrating disk 31 and bear vibration disk 32 extends respectively to bottom case and bearing assembly machine structure 33, bottom case and bearing assembly machine structure 33 are aligned with stripper 34.Bottom case vibrating disk 31 and bear vibration disk 32 are respectively used to export Bottom case and bearing, bottom case and bearing assembly machine structure 33 are used for bottom case and bearing assembly in semi-finished product, and stripper 34 is for connecing Receive the semi-finished product completed by bottom case and the assembly of bearing assembly machine structure 33.The bottom case and bearing group of the utility model install standby 3 energy It is completed at the same time the assembly of bottom case and bearing, substantially increases the efficiency of motor assembling.
Specifically, as shown in Figure 10, bottom case and bearing assembly machine structure 33 include: bottom case manipulator 331, bearing mechanical hand 332, bottom case loader 333, bearing loader 334 and compactor 335, bottom case manipulator 331 are located at bottom case vibrating disk 31 and bottom Between shell loader 333, bearing mechanical hand 332 is between bear vibration disk 32 and bearing loader 334, bottom case loader 333 and bearing loader 334 be respectively facing compactor 335 setting.Bottom case manipulator 331 is used for the bottom on bottom case vibrating disk 31 Shell is sent on bottom case loader 333, and bearing mechanical hand 332 is used to for the bearing on bear vibration disk 32 to be sent to bearing and be packed into On device 334, for bottom case to be assembled in semi-finished product, bearing loader 334 is used to for bearing to be assembled to half bottom case loader 333 In finished product, compactor 335 is for compressing bottom case and bearing.More specifically, what compactor 335 was cooperated using upper cylinder and lower cylinder Mode carries out compressing above-mentioned part.
As it can be seen that with above structure electric toothbrush motor full-automatic assembly line, can complete electrical machinery and brushing head cylinder it Between installation, and be automatically finished each process, substantially increase the motor packaging efficiency of electric toothbrush.
Embodiment described above, only the preferred embodiments of the utility model, are not the implementation model to limit the utility model It encloses, therefore all equivalent change or modifications done according to structure, feature and principle described in present utility model application the scope of the patents, it should all It is included in the scope of the utility model patent application.

Claims (10)

1. a kind of electric toothbrush motor full-automatic assembly line, it is characterised in that: the full-automatic assembly line includes: iron core and rubber shell It assembles equipment, spooling equipment, the group of magnets standby, bottom case of installing and bearing group installing is standby and shell assembles and dotting equipment, the iron Core and rubber shell assembling equipment, the spooling equipment, the group of magnets install standby, the described bottom case and bearing group installing is standby and described outer Shell assembling and dotting equipment are arranged successively, and are designed with semi-finished product loading and unloading manipulator between two adjacent equipment.
2. electric toothbrush motor full-automatic assembly line according to claim 1, it is characterised in that: the iron core and rubber shell group It includes: brush head cylinder feed mechanism, iron core assembly mechanism, the first rubber shell assemble mechanism, the second rubber shell assemble mechanism, that installing is standby One carrier transport mechanism and multiple first carriers, the iron core assembly mechanism extend to described from the brush head cylinder feed mechanism Between first rubber shell assemble mechanism and the second rubber shell assemble mechanism, the first rubber shell assemble mechanism and second rubber shell Assemble mechanism is arranged successively in the side of the first carrier transport mechanism, and multiple first carriers are located at first carrier transmission In mechanism.
3. electric toothbrush motor full-automatic assembly line according to claim 2, it is characterised in that: the brush head cylinder feeding Mechanism includes: brush head cylinder vibrating disk, brush head cylinder manipulator, brush head cylinder loader and recovery approach, the brush head cylinder Manipulator is between the brush head cylinder vibrating disk and the brush head cylinder loader, and the brush head cylinder loader is towards institute The setting of iron core assembly mechanism is stated, the recovery approach is located at the lower section of the brush head cylinder manipulator, and the brush head cylinder is packed into Device is driven using oil cylinder.
4. electric toothbrush motor full-automatic assembly line according to claim 3, it is characterised in that: the iron core assembly mechanism It include: iron core cartridge clip, iron core binding clasp, iron core conveyer belt, iron core transfer robot arm and iron core output manipulator, the iron core bullet Folder, the iron core binding clasp and the iron core conveyer belt are arranged successively, and the iron core transfer robot arm is prolonged from the iron core cartridge clip The iron core conveyer belt is extended to, the iron core output manipulator is located at the iron core conveyer belt and the first carrier transport mechanism Between, the brush head cylinder loader is arranged towards the iron core binding clasp.
5. electric toothbrush motor full-automatic assembly line according to claim 4, it is characterised in that: the first rubber shell assembly Mechanism includes: the first rubber shell vibrating disk and the first rubber shell manipulator, and the first rubber shell manipulator is located at first rubber shell vibration Between Moving plate and the first carrier transport mechanism;The second rubber shell assemble mechanism includes: the second rubber shell vibrating disk and second Rubber shell manipulator, the second rubber shell manipulator be located at the second rubber shell vibrating disk and the first carrier transport mechanism it Between.
6. electric toothbrush motor full-automatic assembly line according to claim 2, it is characterised in that: the first carrier transmission Mechanism includes: the first carrier belt, upper layer carrier driver, drop device, lower layer's carrier driver and lifting device, and described first Carrier belt forms the closed loop of vertical direction, and the upper layer carrier driver is located at the top of first carrier belt, Lower layer's carrier driver is located at the bottom of first carrier belt, and the drop device and the lifting device are all from described Bottom is extended at the top of first carrier belt, and the drop device and the lifting device are located at first carrier and pass Send the both ends of band.
7. electric toothbrush motor full-automatic assembly line according to claim 1, it is characterised in that: the group of magnets installing is standby It include: feeding belt, charging manipulator, the second carrier belt, multiple second carriers, four magnet cartridge clips, four magnet machinery Hand, rotator, unloading manipulator and discharge channel, the feeding belt, second carrier belt and the discharge channel according to Secondary arrangement, the charging manipulator is between the feeding belt and second carrier belt, the second carrier transmission With the closed loop for forming horizontal direction, multiple second carriers are located in second carrier belt, and four magnet cartridge clips are all located at It the side of second carrier belt and is arranged in a manner of a row, two magnet cartridge clips are located at close to second carrier The position of conveyer belt one end, other two magnet cartridge clip is located at close to the position of the second carrier belt other end, described Rotator is located at the position in the middle part of second carrier belt, four magnet manipulators respectively with four magnet manipulators pair Together, and the magnet manipulator is between second carrier belt and the magnet manipulator, and the discharging is mechanical Hand is between second carrier belt and the discharge channel.
8. electric toothbrush motor full-automatic assembly line according to claim 7, it is characterised in that: the second carrier packet Include: pedestal swings collet and swinging axle, and the pedestal is the box shape of top and bottom opening, the bottom for swinging collet Portion is located at the inside of the pedestal, and the top extends to the outside of the pedestal, and the swinging axle runs through the pedestal and institute State swing collet;The group of magnets installing is standby further include: two oscillating cylinders, the oscillating cylinder are located at second carrier biography The lower section of band is sent, and two oscillating cylinders are aligned with second and the 4th magnet cartridge clip respectively, the piston of the oscillating cylinder Bar is arranged upward.
9. electric toothbrush motor full-automatic assembly line according to claim 1, it is characterised in that: the bottom case and bearing group It includes: bottom case vibrating disk, bear vibration disk, bottom case and bearing assembly machine structure and stripper that installing is standby, the bottom case vibrating disk and The bear vibration disk extends respectively to the bottom case and bearing assembly machine structure, and the bottom case and bearing assembly machine structure are unloaded with described Flitch alignment.
10. electric toothbrush motor full-automatic assembly line according to claim 9, it is characterised in that: the bottom case and bearing Assemble mechanism includes: bottom case manipulator, bearing mechanical hand, bottom case loader, bearing loader and compactor, and the bottom case is mechanical For hand between the bottom case vibrating disk and the bottom case loader, the bearing mechanical hand is located at the bear vibration disk and institute It states between bearing loader, the bottom case loader and the bearing loader are respectively facing the compactor setting.
CN201920886704.1U 2019-06-13 2019-06-13 Electric toothbrush motor full-automatic assembly line Active CN209676091U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920886704.1U CN209676091U (en) 2019-06-13 2019-06-13 Electric toothbrush motor full-automatic assembly line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920886704.1U CN209676091U (en) 2019-06-13 2019-06-13 Electric toothbrush motor full-automatic assembly line

Publications (1)

Publication Number Publication Date
CN209676091U true CN209676091U (en) 2019-11-22

Family

ID=68575779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920886704.1U Active CN209676091U (en) 2019-06-13 2019-06-13 Electric toothbrush motor full-automatic assembly line

Country Status (1)

Country Link
CN (1) CN209676091U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111037284A (en) * 2019-12-30 2020-04-21 东莞市沃德精密机械有限公司 Charging module assembly line
CN111331338A (en) * 2020-04-14 2020-06-26 青岛双瑞海洋环境工程股份有限公司 Tubular electrolytic cell assembly device and method
CN113732649A (en) * 2021-09-16 2021-12-03 广东勇前智能精密科技有限公司 Automatic equipment for toothbrush movement
CN113732698A (en) * 2021-09-30 2021-12-03 广东勇前智能精密科技有限公司 Automatic assembly equipment of electric toothbrush with simple and easy electric core
CN113852253A (en) * 2021-09-16 2021-12-28 广东勇前智能精密科技有限公司 Second-generation automatic line equipment for toothbrush sound wave motor

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111037284A (en) * 2019-12-30 2020-04-21 东莞市沃德精密机械有限公司 Charging module assembly line
CN111331338A (en) * 2020-04-14 2020-06-26 青岛双瑞海洋环境工程股份有限公司 Tubular electrolytic cell assembly device and method
CN113732649A (en) * 2021-09-16 2021-12-03 广东勇前智能精密科技有限公司 Automatic equipment for toothbrush movement
CN113852253A (en) * 2021-09-16 2021-12-28 广东勇前智能精密科技有限公司 Second-generation automatic line equipment for toothbrush sound wave motor
CN113732698A (en) * 2021-09-30 2021-12-03 广东勇前智能精密科技有限公司 Automatic assembly equipment of electric toothbrush with simple and easy electric core

Similar Documents

Publication Publication Date Title
CN209676091U (en) Electric toothbrush motor full-automatic assembly line
CN106787494B (en) A kind of full-automatic assembling manufacturing machine of motor stator
CN101837845B (en) Full-automatic bag-feeding type packaging machine
CN204558241U (en) For the fully automatic feeding device of coil winding machine
CN107813137A (en) A kind of process equipment for being used to assemble bearing
CN200988308Y (en) Full automatic rubber air valve assembling machine
CN202130868U (en) Automatic feeding device of cap sealing machine
CN109474147A (en) A kind of production equipment and method for assembling motor case
CN110466814A (en) A kind of box packing machine
CN114147484A (en) Automatic assembling machine for paper folding filter element
CN110282206A (en) A kind of pipe fitting labeling packaging facilities of robot control
CN106271546A (en) A kind of automation equipment for flange with steel ring riveting assembling
CN201673808U (en) Automatic feeding and discharging mechanism of transformer coiler
CN111404336B (en) Motor magnetic shoe assembly system
CN106112510B (en) Cosmetic brush assemble method
CN208278883U (en) A kind of novel dual output band depiler
CN111942667A (en) Inner bag bundling assembly of packing machine adapting to inner and outer separation of packing bag
CN206955185U (en) A kind of pin cup automatic assembly equipment
CN207155219U (en) A kind of automated exchanged cutter equipment
CN206767018U (en) A kind of manufacturing and processing equipment based on Internet of Things
CN213800499U (en) Automatic boxing machine for wireless digital electronic detonators
CN214296699U (en) Full-automatic packaging machine for diamond tool bits
CN110057250A (en) The spherical automatic package system of fireworks
CN206586002U (en) A kind of Edible Fungi sack-filling device
CN106003817A (en) Full-automatic assembly line of packaging carton for electrical product

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: Room 201, building 4, No. 4, Xingye Road, Songshanhu Park, Dongguan City, Guangdong Province 523000

Patentee after: GUANGDONG YONGQIAN INTELLIGENT PRECISION TECHNOLOGY Co.,Ltd.

Address before: Building 16, Dakeng North 11 lane, Datang Lang village, Dalingshan Town, Dongguan City, Guangdong Province 523000

Patentee before: GUANGDONG YONGQIAN INTELLIGENT PRECISION TECHNOLOGY Co.,Ltd.

CP02 Change in the address of a patent holder