CN209651703U - A kind of three section masts of sail handling bounding system simultaneously - Google Patents

A kind of three section masts of sail handling bounding system simultaneously Download PDF

Info

Publication number
CN209651703U
CN209651703U CN201822059835.0U CN201822059835U CN209651703U CN 209651703 U CN209651703 U CN 209651703U CN 201822059835 U CN201822059835 U CN 201822059835U CN 209651703 U CN209651703 U CN 209651703U
Authority
CN
China
Prior art keywords
section
mast
handling
sail
suspender belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822059835.0U
Other languages
Chinese (zh)
Inventor
马庆英
刘庆国
常睿
李韬
于子淇
刘昕瑶
吉航
潘新伟
王广夫
杨建明
张欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Shipbuilding Industry Co Ltd
Original Assignee
Dalian Shipbuilding Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Shipbuilding Industry Co Ltd filed Critical Dalian Shipbuilding Industry Co Ltd
Priority to CN201822059835.0U priority Critical patent/CN209651703U/en
Application granted granted Critical
Publication of CN209651703U publication Critical patent/CN209651703U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a kind of three section masts of sail while handling bounding systems, including crane (17) and handling apparatus, it is characterized in that, the handling apparatus includes laterally being threaded through the pin shaft (8) on third section mast (3) top, the lifting suspender belt (15) being connected between pin shaft (8) and the crane (17), and length suspender belt group (18) for tying up three section mast of sail and the wedge-caulking device (7) in first first segment mast (1) lower part is arranged.The utility model breaks through the barrier of traditional handling mode, and the mast that three sections are socketed is bundled, and realizes while allocating and transporting turn, saves a large amount of manpower and material resources, and the efficiency of handling work greatly improved.

Description

A kind of three section masts of sail handling bounding system simultaneously
Technical field
The present invention relates to sail mast handling appliance facility fields, more specifically to a kind of three section masts of sail Handling bounding system simultaneously.
Background technique
The mast of liftable sail is hollow tubular structure, as shown in Figure 1, the diameter of first segment mast 1 is greater than the second section The diameter of mast 2, the diameter of the second section mast 2 are greater than the diameter of third section mast 3.First segment mast 1, the second section mast 2, Three section masts 3 in open-door test ground are set in together in advance, 1 set of first segment mast outside the second section mast 2, the second section mast Bar 2 is covered again outside third section mast 3.Because first segment mast 1 and the second section mast 2 are by being mounted in first segment mast 1 Hydraulic cylinder push the second section mast 2 to move up and down, third section mast 3 and the second section mast 2 are to lean on pulley wire wire saws It moves up and down.In the state that hydraulic cylinder does not start, hydraulic oil cylinder rod can still be pulled out, therefore first segment mast 1, the second section It can mutually be slided between mast 2, third section mast 3.Therefore, during handling, if the only third section in furred ceiling portion Mast 3, two section masts will slip below that.In traditional means of transportation, during handling, the fractionation of three section masts is holded funeral rites Dress three times, when assembling, then is set with three times, needs a large amount of manpower and material resources, working efficiency is low and wastes time.
Summary of the invention
It can be by the tooling of three section masts handling simultaneously to solve traditional approach handling the purpose of the present invention is designing one kind Time-consuming and laborious, ineffective problem.
In order to achieve the above object, the present invention designs the three section masts while handling bounding system of a kind of sail, including hangs Vehicle and handling apparatus, the handling apparatus include laterally being threaded through the pin shaft on third section mast top, being connected to pin shaft and described Lifting suspender belt between crane, and length suspender belt group for tying up three section mast of sail and be arranged in the first first segment mast The wedge-caulking device of lower part;Casing is cased with outside the pin shaft.The wedge-caulking device includes being stuck under arc transition plate side End and spaced two U-shaped baffles, the inclined-plane that arc transition plate upper end is set, and match jib and cotter with the inclined-plane Tight triangle voussoir;Wherein, the other side of the arc transition plate is symmetrical set;The length suspender belt group includes long suspender belt With drop shot band, the middle part of the middle part of the long suspender belt and the drop shot band is crossed on the both ends of the pin shaft, the drop shot respectively The both ends of band are pierced by after extending downwardly into the third section mast inside, and the both ends of the long suspender belt extend around first separately down Divide again with the both ends of the drop shot band after saving the interval on the arc transition plate of mast lower part between two U-shaped baffles Fixation is not connected by buckle it.
Preferably, the arc transition plate includes curved slab, covers the support panel on the curved slab, and vertical Support webs between the curved slab and the support panel are set.Preferably, three section masts of the sail are simultaneously Handling bounding system further includes the shoe that the third section mast top suspender belt is arranged in and passes through position.Preferably, institute Shoe to be stated to be made of cricoid half arc of concave and fastening screw, half arc of concave is covered in the third section mast top, The fastening screw passes through half arc of concave, and half arc of concave is fixed with the third section mast top.
Preferably, one end outside described sleeve pipe is vertical and interval is set there are two ring baffle, outside described sleeve pipe The other end be symmetrical set.
Preferably, middle part is equipped with four pieces of support plates outside described sleeve pipe.
Preferably, the interval between described two ring baffles accommodates the lifting suspender belt.The present invention is broken through
The barrier of traditional handling mode bundles the mast that three sections are socketed, and realizes while allocating and transporting turn, saves The efficiency of handling work greatly improved in a large amount of manpower and material resources.
Detailed description of the invention
Front view structure signal when Fig. 1 is the three section masts while handling bounding system handling mast of sail of the present invention Figure.
Fig. 2 be in Fig. 1 A to structural schematic diagram.
Fig. 3 is that the turn of the three section masts handling bounding system simultaneously of sail of the present invention was fallen schematic diagram.
Fig. 4 is the structural representation of pin shaft and casing installation in three section masts of sail of the present invention while handling bounding system Figure.
Fig. 5 is the planar structure schematic diagram of crane in three section masts of sail of the present invention while handling bounding system.
Fig. 6 is three section masts of sail of the present invention while the schematic view of the front view of handling bounding system middle sleeve.
Fig. 7 is the signal of three section masts of sail of the present invention while casing Section A-A in Fig. 6 of handling bounding system Figure.
Fig. 8 is the main view floor map of three section masts of sail of the present invention while the wedge-caulking device of handling bounding system.
Fig. 9 is B- B in fig. 8 sections of three section masts of sail of the present invention while the wedge-caulking device of handling bounding system The floor map in face.
Figure 10 is that the plane of the U-shaped baffle of wedge-caulking device in three section masts of sail of the present invention while handling bounding system is shown It is intended to.
Figure 11 is the main view floor map of shoe in three section masts of sail of the present invention while handling bounding system.
Figure 12 is three section masts of sail of the present invention while handling bounding system integrally turns over the main view fallen in handling Floor map.
Wherein, 1- first segment mast, 2- the second section mast, 3- third section mast, 4- long suspender belt, 5- drop shot band, 6- are unloaded Button, 7- wedge-caulking device, 8- pin shaft, 9- casing, 10- shoe, half arc of 101- concave, 102- positioning bolt, 11- arc transition Plate, 111- curved slab, 112- support panel, 113- support webs, 12- triangle voussoir, 13- ring baffle, 14- support plate, 15- mast lifts suspender belt, 16-U shape baffle, the inclined-plane 161-, 17- crane, 18- length suspender belt group, 19- round nut.
Specific embodiment
As shown in Figure 1, the present invention includes crane 17 and handling apparatus, it further include setting at 3 top of third section mast Suspender belt passes through the shoe 10 at position.The handling apparatus includes the pin shaft 8 for being laterally threaded through 3 top of third section mast, connects Connect the lifting suspender belt 15 between pin shaft 8 and the crane 17, and the length suspender belt group 18 for tying up three section mast of sail With the wedge-caulking device 7 that 1 lower part of the first first segment mast is arranged in;Casing 9 is cased with outside the pin shaft 8.The pin shaft 8 penetrates In the third section mast 3, the peripheral edge of the third section mast 3 is fixed on by round nut 19, the round nut 19 is Commonly used equipment is that nut is tightened with hole herein, is inserted when tightening nut with round steel rod and move power-saving function.Such as the institute of Fig. 6~7 Show, one end outside described sleeve pipe 9 is vertical and interval is set there are two ring baffle 13, and the other end outside described sleeve pipe 9 is in It is symmetrical arranged;9 outside middle part of described sleeve pipe is additionally provided with four pieces of support plates 14, the interval accommodating between described two ring baffles 13 The lifting suspender belt 15.The wedge-caulking device 7 includes being stuck in the 11 side lower end of arc transition plate and spaced two U Shape baffle 16, the inclined-plane 161 that 11 upper end of arc transition plate is set, and the triangle with the inclined-plane 161 cooperation wedging Shape voussoir 12.Wherein, the other side of the arc transition plate 11 is symmetrical set.
As shown in Fig. 1~2, the length suspender belt group 18 includes long suspender belt 4 and drop shot band 5, the middle part of the long suspender belt 4 It is crossed on the both ends of the pin shaft 8 respectively with the middle part of the drop shot band 5, the both ends of the drop shot band 5 extend downwardly into described Three section masts is pierced by behind 3 inside, and the both ends of the long suspender belt 4 extend around the circle of 1 lower part of first segment mast separately down Pass through shackle 6 behind interval in arc transition plates 11 between two U-shaped baffles 16 respectively with the both ends of the drop shot band 5 again to connect admittedly It is fixed.
As shown in Fig. 9~10, the arc transition plate 11 includes curved slab 111, covers the branch on the curved slab 111 Panel 112 is supportted, and the support webs 113 being vertically set between the curved slab 111 and the support panel 112.
As shown in figure 11, the shoe 10 is made of cricoid half arc 101 of concave and fastening screw, the concave half 101 sets of arc passes through half arc of concave in the third section mast top, the fastening screw, by half arc of concave with it is described It is fixed at the top of third section mast 3.
Embodiment:
As shown in Fig. 1~5, on first segment mast 1, third section mast 3 covers again in the second section mast the second 2 sets of section mast On 2, three section masts are set in together.Pin shaft 8,8 housing tubing 9 of pin shaft are housed in third section mast top hole for hoist;Length is hung Band 4 and drop shot band 5 bypass 8 both ends of pin shaft respectively, and long suspender belt 4 hangs down inside third section mast, fixes around first segment mast Pedestal upwardly extends, and drop shot band 5 hangs down inside third section mast, the both ends of drop shot band 5 inside first segment mast respectively with The both ends of long suspender belt 4 are connected by shackle 6.
The pin shaft 8 at 3 top of third section mast is across 3 top side plate of third section mast, and suspender belt, which is equivalent to, rides over pin shaft It goes up and hangs down, long suspender belt is connected by buckle with drop shot band upwards again around first segment bottom;In this way, making by suspender belt Three section masts are fixed together with first segment mast;Because the second section mast coat is outside the third section mast and in first segment mast The middle position in portion, so the second section mast can not also move naturally;So far, three section masts are just firmly banded together ;Pin shaft 8 is lateral pin.
As shown in fig. 7, not tight to prevent suspender belt from tying up, when lifting, is slipped, and wedge-caulking device is arranged under mast firm banking 7;As shown in figure 8, wedge-caulking device 7 is made of arc transition plate 11 and triangle voussoir 12, the both ends of long suspender belt 4 are from third section mast Bar hangs down, and upwardly extends around arc transition plate 11, and wedge-caulking device is continuously welded and fixed with bracket after voussoir is urgent, it is ensured that Voussoir does not exit.
Shoe 10 is arranged by position in third section mast top suspender belt, as shown in Figure 4;Shoe is by concave half Arc and fastening screw composition, half arc of concave are covered in the concave upright side in third section mast top sail face, with fastening screw by concave It is fixed at the top of half arc and sail leaf, passed through when suspender belt tightens lifting by semi-circular tube circular arc, avoids corner angle steel plate side at the top of page turning Edge scratches suspender belt.
Operating method of the invention:
1, by 2 sets of the second section mast in first segment mast 1, third section mast 3 is covered again in the second section mast 2, is formed The entirety that three section masts are set in together.
2, by long suspender belt 4 and drop shot band 5 around behind 9 both ends of third section mast top pin shaft casing, then long suspender belt 4 and short The both ends of suspender belt 5 are hung down, and then long suspender belt 4 is from arc transition plate below first segment mast foot hydraulic oil cylinder seat around upper Come, connector uses shackle 6 to connect to upward two connectors two-by-two downwards with drop shot band, is in this way packed together three section masts.
3, not tight to prevent length suspender belt group 18 from tying up, when lifting, slips, we design wedge-caulking device 7, wedge-caulking device by Arc transition plate 11 is formed plus triangle voussoir 12.Triangle voussoir 12 is urgent, drop shot long in this way after suspender belt connection Band group 18 would not loosen sliding.
4, for during preventing handling, mast lifting suspender belt 15 is cut bad by the corner angle of third section mast 3, we are in third section The position setting shoe 10 that 3 upper mast of mast lifting suspender belt 15 passes through.Shoe 10 is stuck on third section mast 3 and uses At the flange of installation sail leaf, flange is the structure of mast itself, is the pressure plate after the installation of sail leaf, rises and compress sail Ye Zuoyong.
5, it is designed using suspender belt, shackle, wedging, anti-skidding, abrasionproof etc., three sections is nested in mast and are securely bundled, Become an entirety, realizes the mast handling simultaneously of three sections socket, turn over transport etc..
Pin shaft and casing installation instructions:
1, casing is put into third section mast top installation site using crane cooperation in advance.Casing tube internal hole and mast two sides The alignment of hole for hoist center.
2, pin shaft is fitted inside from side alignment mast two sides hole for hoist.
3, pin shaft again tightens round nut after going through from side alignment mast two sides hole for hoist.
4, suspender belt is bypassed from casing, and because casing is equipped with baffle, suspender belt cannot be slided, it is ensured that handling is steady.
The present invention breaks through the barrier of traditional handling mode, and the mast that three sections are socketed is bundled, and realizes while allocating and transporting It turns over, saves a large amount of manpower and material resources, the efficiency of handling work greatly improved.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art within the technical scope of the present disclosure, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (7)

1. a kind of three section masts of sail handling bounding system, including crane (17) and handling apparatus simultaneously, which is characterized in that institute Stating handling apparatus includes laterally being threaded through the pin shaft (8) on third section mast (3) top, being connected to pin shaft (8) and the crane (17) the lifting suspender belt (15) between, and length suspender belt group (18) for tying up three section mast of sail and be arranged in first segment The wedge-caulking device (7) of mast (1) lower part;
Casing (9) are cased with outside the pin shaft (8);The wedge-caulking device (7) includes being stuck in arc transition plate (11) side lower end And spaced two U-shaped baffles (16), be arranged on the inclined-plane (161) of arc transition plate (11) upper end, and with institute State the triangle voussoir (12) of inclined-plane (161) cooperation wedging;Wherein, the other side of the arc transition plate (11) is in and symmetrically sets It sets;The length suspender belt group (18) includes long suspender belt (4) and drop shot band (5), the middle part of the long suspender belt (4) and the drop shot band (5) middle part is crossed on the both ends of the pin shaft (8) respectively, and the both ends of the drop shot band (5) extend downwardly into the third section mast It is pierced by behind bar (3) inside, the both ends of the long suspender belt (4) extend around the circle of first segment mast (1) lower part separately down Both ends behind interval between the upper two U-shaped baffles (16) of arc transition plates (11) again with the drop shot band (5) pass through shackle respectively (6) it is connected and fixed.
2. three section masts of sail while handling bounding system according to claim 1, which is characterized in that the arc transition Plate (11) includes curved slab (111), covers the support panel (112) on the curved slab (111), and is vertically set on described Support webs (113) between curved slab (111) and support panel (112).
3. three section masts of sail while handling bounding system according to claim 1, which is characterized in that the three of the sail Handling bounding system further includes the setting shoe that suspender belt passes through position at the top of the third section mast (3) to section mast simultaneously (10)。
4. three section masts of sail while handling bounding system according to claim 3, which is characterized in that the shoe (10) it is made of cricoid half arc of concave (101) and fastening screw, half arc of concave (101) covers on the third section mast top Portion, the fastening screw pass through half arc of concave, will be fixed at the top of half arc of concave and the third section mast (3).
5. three section masts of sail while handling bounding system according to claim 1, which is characterized in that described sleeve pipe (9) External one end is vertical and what is be spaced sets there are two ring baffle (13), and the external other end of described sleeve pipe (9) is symmetrical set.
6. three section masts of sail while handling bounding system according to claim 5, which is characterized in that described sleeve pipe (9) External middle part is equipped with four pieces of support plates (14).
7. three section masts of sail while handling bounding system according to claim 5, which is characterized in that described two annulars Interval between baffle (13) accommodates the lifting suspender belt (15).
CN201822059835.0U 2018-12-07 2018-12-07 A kind of three section masts of sail handling bounding system simultaneously Active CN209651703U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822059835.0U CN209651703U (en) 2018-12-07 2018-12-07 A kind of three section masts of sail handling bounding system simultaneously

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822059835.0U CN209651703U (en) 2018-12-07 2018-12-07 A kind of three section masts of sail handling bounding system simultaneously

Publications (1)

Publication Number Publication Date
CN209651703U true CN209651703U (en) 2019-11-19

Family

ID=68517902

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822059835.0U Active CN209651703U (en) 2018-12-07 2018-12-07 A kind of three section masts of sail handling bounding system simultaneously

Country Status (1)

Country Link
CN (1) CN209651703U (en)

Similar Documents

Publication Publication Date Title
CN205955358U (en) Group's tower device of interior floated armful of pole of acting as go -between
CN103470093B (en) Concrete chimney dismantling method
CN104631810B (en) High altitude moving hanging basket system and construction method
CN206857993U (en) Material lifts antichattering system outside a kind of high-rise building room
CN201703776U (en) Inverted lifting device of storage tank
CN204139609U (en) A kind of mounting structure of overhanging unloading platform
CN209651703U (en) A kind of three section masts of sail handling bounding system simultaneously
CN207566717U (en) A kind of I-shaped floor steel beam lifting structure
CN212054063U (en) Novel high-voltage line protection device
CN108385524A (en) The method of revolution steel strand wires bivector traction in the same direction
CN211594766U (en) Hoisting device
CN208321400U (en) Foreign matter removing device for power distribution network emergency repair
CN109083395A (en) A kind of Excitations for Long Span Suspension operating platform and its erection method
CN205472340U (en) People's passageway on instrument formula tower crane
CN209507403U (en) A kind of fixture of large diameter pipeline vertical transport
CN109132842B (en) Pipe fitting hoisting structure
CN203174507U (en) Steel pipe arch suspender installation device
CN208748524U (en) The dismounting tooling of cat road mesh sheet
CN208534002U (en) A kind of high-altitude constructing structure that can partially store
CN207863502U (en) A kind of Construction of Steel Structure life line bracket
CN217582171U (en) Small-section tunnel steel grating mounting tool
CN207566736U (en) Transport device is fixed convenient for the building steel tube of assembling
CN206693730U (en) Composite construction formula power transmission tower
CN217886832U (en) Device for preventing high falling
CN205892550U (en) Flexible hoist and mount system of suspension bridge stiffening beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant