A kind of Construction of Steel Structure life line bracket Download PDFInfo
- Publication number
- CN207863502U CN207863502U CN201721702808.XU CN201721702808U CN207863502U CN 207863502 U CN207863502 U CN 207863502U CN 201721702808 U CN201721702808 U CN 201721702808U CN 207863502 U CN207863502 U CN 207863502U
- Authority
- CN
- China
- Prior art keywords
- connecting plate
- plate
- steel structure
- steel
- nut
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Emergency Lowering Means (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及建筑工程钢结构辅助器械技术领域,尤其是涉及一种钢结构施工生命线支架。The utility model relates to the technical field of steel structure auxiliary equipment for construction engineering, in particular to a steel structure construction lifeline support.
背景技术Background technique
目前我国钢结构行业发展迅速,尤其在高层建筑、大跨度空间结构应用广泛。钢结构施工作业人员在钢梁上行走或操作时面临很大的风险,其中发生人身坠落是其中最大的风险。如何在钢结构施工过程中更好的保证人身安全,是一个急需解决的问题。At present, my country's steel structure industry is developing rapidly, especially in high-rise buildings and large-span space structures. Steel structure construction workers face great risks when walking or operating on steel beams, among which personal fall is the biggest risk. How to better ensure personal safety in the process of steel structure construction is an urgent problem to be solved.
实用新型内容Utility model content
本实用新型的目的旨在克服现有技术存在的不足,提供了一种装拆方便,可靠性强,安全性的钢结构施工生命线支架。The purpose of the utility model is to overcome the deficiencies in the prior art, and provide a lifeline support for steel structure construction that is easy to assemble and disassemble, highly reliable and safe.
为了解决上述技术问题,本实用新型是通过以下技术方案实现的:In order to solve the above technical problems, the utility model is achieved through the following technical solutions:
一种钢结构施工生命线支架,其使用状态时朝上的一端称为上端,另一端称为下端;包括立杆,固定设置于立杆下端的连接板,设置于连接板上的螺母,旋拧于螺母上的螺杆,以及设置于连接板上的垫板;所述连接板其中一个边侧设置开口槽,所述垫板固定设置于开口槽开口端的下侧处,所述螺母固定设置于开口槽开口端的上侧处、且与垫板相对,通过旋拧螺杆可使螺杆的下端与垫板间的距离发生变化;所述立杆的上端设置供钢丝绳穿过的上部通孔,所述连接板的上部设置供钢丝绳穿过的下部通孔。A lifeline support for steel structure construction, the upward end of which is called the upper end when in use, and the other end is called the lower end; it includes a vertical rod, a connecting plate fixed at the lower end of the vertical rod, and a nut set on the connecting plate, which is screwed The screw rod on the nut, and the backing plate arranged on the connecting plate; one side of the connecting plate is provided with an open groove, the backing plate is fixedly arranged at the lower side of the opening end of the open groove, and the nut is fixedly arranged in the opening At the upper side of the opening end of the groove, and opposite to the backing plate, the distance between the lower end of the screw rod and the backing plate can be changed by screwing the screw; the upper end of the vertical rod is provided with an upper through hole for the wire rope to pass through, and the connecting The upper part of the plate is provided with a lower through hole for the wire rope to pass through.
优选的是,所述立杆采用长度为480mm的DN36mm钢管制成。Preferably, the pole is made of DN36mm steel pipe with a length of 480mm.
优选的是,所述连接板采用5mm的钢板制成。Preferably, the connecting plate is made of 5mm steel plate.
优选的是,所述螺杆采用M16螺杆。Preferably, the screw adopts M16 screw.
优选的是,所述垫板采用长×宽×厚为35×35×5mm的钢板。Preferably, the backing plate is a steel plate with a length×width×thickness of 35×35×5 mm.
优选的是,所述钢管与连接板采用焊接连接。Preferably, the steel pipe and the connecting plate are connected by welding.
优选的是,所述连接板与螺母采用焊接连接。Preferably, the connecting plate and the nut are connected by welding.
优选的是,所述连接板与垫板采用焊接连接。Preferably, the connecting plate and the backing plate are connected by welding.
与现有技术相比,本实用新型具有如下优点:Compared with the prior art, the utility model has the following advantages:
本实用新型的生命绳支架安装施工相比传统焊接支架更加方便快捷,而且安全、可靠,有效提高了工作效率,并由于可拆卸周转使用,可有效的降低施工成本。Compared with the traditional welding bracket, the installation and construction of the life rope bracket of the utility model is more convenient and quicker, and it is also safe and reliable, effectively improves the work efficiency, and can effectively reduce the construction cost because it can be disassembled and used for turnover.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其它的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are only some embodiments of the present utility model, and those skilled in the art can also obtain other drawings according to these drawings without creative work.
图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.
图2为图1的俯视放大图。FIG. 2 is an enlarged top view of FIG. 1 .
图3为本实用新型安装状态的示意图。Fig. 3 is a schematic diagram of the installation state of the utility model.
图4为本实用新型施工使用时的示意图。Fig. 4 is the schematic diagram when the utility model is constructed and used.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有付出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
图1-4所示的钢结构施工生命线支架,其使用状态时朝上的一端称为上端,另一端称为下端;包括立杆1,固定设置于立杆1下端的连接板3,设置于连接板3上的螺母5,旋拧于螺母5上的螺杆2,以及设置于连接板3上的垫板4;所述连接板3其中一个边侧设置开口槽,所述垫板4固定设置于开口槽开口端的下侧处,所述螺母5固定设置于开口槽开口端的上侧处、且与垫板4相对,通过旋拧螺杆2可使螺杆2的下端与垫板4间的距离发生变化;所述立杆1的上端设置供钢丝绳穿过的上部通孔7,所述连接板3的上部设置供钢丝绳穿过的下部通孔6。The steel structure construction lifeline bracket shown in Fig. 1-4, when it is in use, the upward end is called the upper end, and the other end is called the lower end; it includes the vertical pole 1, and the connecting plate 3 fixedly arranged at the lower end of the vertical pole 1 is arranged on the The nut 5 on the connecting plate 3, the screw rod 2 screwed on the nut 5, and the backing plate 4 arranged on the connecting plate 3; one side of the connecting plate 3 is provided with an open groove, and the backing plate 4 is fixedly arranged At the lower side of the opening end of the opening slot, the nut 5 is fixedly arranged on the upper side of the opening end of the opening slot and is opposite to the backing plate 4, and the distance between the lower end of the screw rod 2 and the backing plate 4 can be adjusted by screwing the screw rod 2. Variation: the upper end of the vertical rod 1 is provided with an upper through hole 7 for the wire rope to pass through, and the upper part of the connecting plate 3 is provided with a lower through hole 6 for the wire rope to pass through.
作为具体的技术方案,所述立杆1采用长度为480mm的DN36mm钢管制成,在保证强度的前提下,具有更轻的重量。所述连接板3采用5mm的钢板制成。所述螺杆2采用M16螺杆。所述垫板4采用长×宽×厚为35×35×5mm的钢板。所述钢管与连接板3采用焊接连接。所述连接板3与螺母5采用焊接连接。所述连接板3与垫板4采用焊接连接。As a specific technical solution, the pole 1 is made of DN36mm steel pipe with a length of 480mm, which has a lighter weight under the premise of ensuring strength. The connecting plate 3 is made of 5mm steel plate. The screw 2 adopts M16 screw. The backing plate 4 adopts a steel plate whose length×width×thickness is 35×35×5 mm. The steel pipe and the connecting plate 3 are connected by welding. The connecting plate 3 and the nut 5 are connected by welding. The connecting plate 3 and the backing plate 4 are connected by welding.
钢梁10吊装前,提前在钢梁10上安装好支架,并在支架的上部通孔7及下部通孔6上安装钢丝绳20,支架间距不大于3m。安装时首先调节螺杆锚入螺母长度,使支架能顺利穿入钢梁10上翼板,然后紧固螺杆,使螺杆、上翼板、垫板连接紧密,固定牢固。接着穿好两道钢丝绳20,随钢梁10一起吊装。钢梁10吊装及紧固完成后,支架与钢梁10连接牢固,所以操作工人在钢梁10上部行走及操作时,可直接将安全带固定在支架上的钢丝绳上,避免了工人在梁顶施工时无法进行防护而造成的危险。钢梁10焊接完成后,压型钢板铺设施工中,随压型钢板铺设的同时拆除支架。通过调节螺杆,使支架能顺利从钢梁10取出,取出后利用连接板的下部通孔穿钢丝绳20,顺利吊运支架下楼,方便又快捷。Before the hoisting of the steel beam 10, a support is installed on the steel beam 10 in advance, and a steel wire rope 20 is installed on the upper through hole 7 and the lower through hole 6 of the support, and the distance between the supports is not more than 3m. During installation, first adjust the length of the screw rod anchored into the nut so that the support can smoothly penetrate into the upper wing plate of the steel beam 10, and then tighten the screw rod so that the screw rod, the upper wing plate and the backing plate are tightly connected and fixed firmly. Then put on two steel wire ropes 20, and hoist together with the steel beam 10. After the steel girder 10 is hoisted and fastened, the bracket and the steel girder 10 are firmly connected, so when the operator walks and operates on the upper part of the steel girder 10, he can directly fix the safety belt on the wire rope on the bracket, which avoids the worker from being on the top of the beam. The danger caused by the inability to protect during construction. After the welding of the steel beam 10 is completed, during the construction of the profiled steel plate laying, the support is removed while the profiled steel plate is laid. By adjusting the screw rod, the support can be taken out from the steel beam 10 smoothly, and after taking out, the bottom through hole of the connecting plate is utilized to wear the steel wire rope 20, and the support is smoothly lifted downstairs, which is convenient and fast.
以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included in the Within the protection scope of the present utility model.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721702808.XU CN207863502U (en) | 2017-12-10 | 2017-12-10 | A kind of Construction of Steel Structure life line bracket |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721702808.XU CN207863502U (en) | 2017-12-10 | 2017-12-10 | A kind of Construction of Steel Structure life line bracket |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207863502U true CN207863502U (en) | 2018-09-14 |
Family
ID=63468450
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721702808.XU Expired - Fee Related CN207863502U (en) | 2017-12-10 | 2017-12-10 | A kind of Construction of Steel Structure life line bracket |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207863502U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109381831A (en) * | 2018-11-21 | 2019-02-26 | 中建二局第建筑工程有限公司 | A kind of safety device |
-
2017
- 2017-12-10 CN CN201721702808.XU patent/CN207863502U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109381831A (en) * | 2018-11-21 | 2019-02-26 | 中建二局第建筑工程有限公司 | A kind of safety device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205777425U (en) | A kind of scalable hanging basket support means | |
| CN211846850U (en) | Hoisting device for prefabricated building installation | |
| CN113152873A (en) | Heightening hanging basket system | |
| CN205527400U (en) | Lifting mechanism | |
| WO2022111218A1 (en) | Pile casing hoisting arm | |
| CN205114902U (en) | Device of demolising that attaches wall pull rod of high void tower formula hoist | |
| CN209568685U (en) | A kind of overhanging frame support structure | |
| CN204626930U (en) | Integrated lifting frame operating platform | |
| CN207536992U (en) | A kind of cross combined type superimposed sheet suspender | |
| CN202658867U (en) | Overhanging construction platform | |
| CN203174507U (en) | Steel pipe arch suspender installation device | |
| CN216042530U (en) | Heightening hanging basket system | |
| CN205688778U (en) | A kind of elevating scaffold special over sling structure | |
| CN206487129U (en) | Safety hanging cradle for industrial premises Construction of Steel Structure | |
| CN205892589U (en) | Light gauge steel component hoist device | |
| CN201105957Y (en) | Tower crane engineering special-purpose gin pole hoist | |
| CN205617772U (en) | Gallows structure under lifting foot hand rack special use | |
| CN205116854U (en) | Coal scuttle is portable platform for aggregate erection | |
| CN209210183U (en) | fixed system | |
| CN116335410A (en) | A construction method for truss diagonal members on the refuge floor of a super high-rise building | |
| CN203333224U (en) | Steel structural beam upward lifting tool | |
| CN207265540U (en) | A kind of tangent tower overhead line lifter | |
| CN209322324U (en) | A kind of large form handling apparatus | |
| CN206707321U (en) | A kind of anti-fall climbing frame of high-building construction | |
| CN205577386U (en) | Inserted lift scaffold movable pulley hoist and mount system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180914 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |