CN214995799U - Tool type wall hanging cantilever frame - Google Patents

Tool type wall hanging cantilever frame Download PDF

Info

Publication number
CN214995799U
CN214995799U CN202120217024.8U CN202120217024U CN214995799U CN 214995799 U CN214995799 U CN 214995799U CN 202120217024 U CN202120217024 U CN 202120217024U CN 214995799 U CN214995799 U CN 214995799U
Authority
CN
China
Prior art keywords
pull rod
wall
girder steel
wall body
encorbelmenting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120217024.8U
Other languages
Chinese (zh)
Inventor
翟然然
段振
梁孟孟
闫斌
赵雪琼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Bureau Group South China Co Ltd
Original Assignee
China Construction Third Bureau Group South China Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Bureau Group South China Co Ltd filed Critical China Construction Third Bureau Group South China Co Ltd
Priority to CN202120217024.8U priority Critical patent/CN214995799U/en
Application granted granted Critical
Publication of CN214995799U publication Critical patent/CN214995799U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides an instrument formula hanging cantilever frame, relates to cantilever frame technical field, and the cantilever frame is used for setting up the external construction of conveniently carrying out the wall outside the house wall, including pre-buried sleeve pipe in the wall body, the wall body outside be provided with pre-buried sleeve pipe cooperation forms the fixed girder steel of encorbelmenting, pre-buried sleeve pipe will with the mounting encorbelmenting the girder steel level and fixing outside the wall body, still including the slope setting the pull rod assembly of the adjustable elasticity at the girder steel top of encorbelmenting, pull rod assembly's bottom mounting is in one side of wall body is kept away from to the girder steel of encorbelmenting, pull rod assembly's top is fixed on the wall body of encorbelmenting girder steel top, the utility model discloses shorten girder steel length, reduced the work load in outer wall stifled hole, installation and dismantlement convenience can have enough to meet the need the use, and are with low costs, have improved the efficiency of construction greatly.

Description

Tool type wall hanging cantilever frame
Technical Field
The utility model relates to an overhanging frame technical field, concretely relates to instrument formula hanging overhanging frame.
Background
With the continuous development of economic society of China, the living standard of people is continuously improved, and all parts are in the high tide of building construction. The high-rise building not only can meet the building requirements of some places, but also can effectively solve the problem of land resource shortage in China, thereby being widely concerned. The outer cantilever frame is widely applied to high-rise building construction due to the characteristics of quick turnover, low investment, construction period saving and the like, and the construction of the outer cantilever frame is reliable and reasonable, so that the outer cantilever frame is one of important factors for ensuring the construction safety of buildings.
At present, the outer scaffold frame form of most building construction engineering all adopts the outer scaffold frame of overhanging type, and the outer scaffold frame of overhanging type of tradition girder steel all need pass through the outer wall, and the anchor is on structural floor, and the steel use amount is big, and outer wall hole blocking work load is big, and seepage risk and construction cost are higher.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the formula of encorbelmenting external scaffolding among the prior art and encorbelment the girder steel and all need pass through the outer wall, the anchor is on structural floor, and the steel use amount is big, and outer wall stifled hole work load is big, the higher technical defect of seepage risk and construction cost.
For solving the technical problem, the utility model discloses the technical scheme who adopts does:
the utility model provides an instrument formula hanging cantilever frame, the cantilever frame is used for setting up and conveniently carries out the construction outside the wall outside the house wall is external, including pre-buried sleeve in the wall body, the wall body outside be provided with pre-buried sleeve cooperation forms the fixed girder steel of encorbelmenting, pre-buried sleeve will through with the mounting encorbelment the girder steel level and fix outside the wall body, still set up including the slope the pull rod assembly of the adjustable elasticity at encorbelment girder steel top, pull rod assembly's bottom mounting is in one side of encorbelmenting the girder steel and keeping away from the wall body, pull rod assembly's top is fixed on the wall body of encorbelmenting the girder steel top.
Further, the girder steel of encorbelmenting keep away from one side of wall body be provided with tie-lug plate of pull rod assembly articulated, the girder steel of encorbelmenting is provided with the end plate near one side of wall body, the end plate with the wall body is contradicted.
Furthermore, the top of the cantilever steel beam is provided with a steel pipe limiting reinforcing bar head for erecting a scaffold.
Furthermore, the pull rod assembly comprises an upper pull rod, a lower pull rod and a turnbuckle for connecting the upper pull rod and the lower pull rod, a thread section is arranged at one end of the upper pull rod, the lower pull rod and the turnbuckle, the thread direction of the thread section arranged on the upper pull rod and the lower pull rod is opposite, a first connecting steel plate which is hinged with the connecting lug plate in a matched mode is arranged at the bottom end of the lower pull rod, and a second connecting steel plate which is fixed with the wall in a matched mode is arranged at the top end of the upper pull rod.
Furthermore, a bending section matched with the wall body is arranged on the second connecting steel plate, and the second connecting steel plate is fixed on the wall body through a bolt.
Furthermore, the turn buckle comprises a plurality of vertical steel arranged at intervals in a surrounding manner, and round steel arranged at two ends of the vertical steel, wherein the round steel is provided with threaded holes in threaded connection with the upper pull rod and the lower pull rod.
Further, the fixing piece is a high-strength bolt, and a steel gasket is arranged on the high-strength bolt in a padded mode.
Compared with the prior art, the utility model discloses following beneficial effect has:
the utility model provides an instrument formula hanging cantilever frame, it is through having buried the pre-buried sleeve pipe in advance outside the house wall body, through pre-buried sleeve pipe department level sets up the girder steel of encorbelmenting, adopts pull rod assembly will girder steel 1's the outside and wall body fixed connection encorbelment utilize mounting and pull rod assembly will encorbelment the girder steel and fix at the outer wall, through adjusting pull rod assembly's elasticity, it is taut the girder steel of encorbelmenting, the utility model discloses shortened girder steel length, reduced the work load in outer wall stifled hole, the installation and dismantle conveniently, can have enough to meet the need the use, with low costs has improved the efficiency of construction greatly.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the cantilever steel beam of the present invention;
fig. 3 is a schematic structural view of the tie rod assembly of the present invention;
fig. 4 is a schematic structural view of the lower pull rod of the present invention;
fig. 5 is a schematic structural view of the upper pull rod of the present invention;
fig. 6 is a schematic structural view of the turn buckle of the present invention.
In the figure: 1. the steel plate comprises a cantilever steel beam, 2 parts of embedded sleeves, 3 parts of fixing pieces, 4 parts of steel gaskets, 5 parts of pull rod assemblies, 6 parts of turn-buckle bolts, 7 parts of end plates, 8 parts of connecting lug plates, 9 parts of steel pipe limiting steel bar heads, 10 parts of upper pull rods, 11 parts of lower pull rods, 12 parts of first connecting steel plates, 13 parts of thread sections, 14 parts of vertical steel, 15 parts of round steel and 16 parts of second connecting steel plates.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely below, and it should be apparent that the described embodiments are only some embodiments of the present invention, but not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
As shown in fig. 1-6, an instrument formula hanging cantilever frame, the frame of encorbelmenting is used for setting up and conveniently carries out the construction outside the wall outside the house wall is external, including pre-buried embedded pipe 2 in the wall body, the wall body outside be provided with pre-buried embedded pipe 2 cooperates and forms fixed girder steel 1 that encorbelments, pre-buried embedded pipe 2 will through with mounting 3 encorbelment girder steel 1 level and fix outside the wall body, still including the slope setting and be in the pull rod assembly 5 of the adjustable elasticity at 1 top of girder steel encorbelmenting, the bottom mounting of pull rod assembly 5 is in one side of encorbelment girder steel 1 and keeping away from the wall body, pull rod assembly 5's top is fixed on the wall body of encorbelmenting girder steel 1 top.
The utility model provides an instrument formula hanging cantilever frame, it is through buried embedded sleeve 2 underground outside the house wall in advance, through embedded sleeve 2 level sets up girder steel 1 of encorbelmenting, adopts pull rod assembly will girder steel 1's the outside and wall body fixed connection of encorbelmenting utilize mounting 3 and pull rod assembly will encorbelment the girder steel and fix at the outer wall, through adjusting pull rod assembly's elasticity is taut the girder steel of encorbelmenting, the utility model discloses shortened girder steel length, reduced the work load in outer wall stifled hole, the installation and dismantle conveniently, can have enough to meet the need the use, with low costs has improved the efficiency of construction greatly.
Specifically, as shown in the figure, the girder steel 1 of encorbelmenting keep away from one side of wall body be provided with 5 articulated engaging lug boards 8 of pull rod assembly, girder steel 1 of encorbelmenting is provided with end plate 7 near one side of wall body, end plate 7 with the wall body is contradicted.
Specifically, as shown in the figure, the top of the cantilever steel beam 1 is provided with a steel pipe limiting reinforcing bar head 9 for erecting a scaffold.
Specifically, as shown in the figure, the pull rod assembly 5 includes upper pull rod 10, lower link 11 and is used for connecting the turn buckle 6 of upper pull rod 10, lower link 11, the one end that upper pull rod 10, lower link 11 and turn buckle 6 are connected is provided with screw thread section 13, the screw thread opposite direction who sets up screw thread section 13 on upper pull rod 10, the lower link 11, the bottom of lower link 11 be provided with connect 8 cooperation of otic placode to form articulated first connecting steel sheet 12, the top of upper pull rod 10 is provided with forms fixed second connecting steel sheet 16 with the wall body cooperation. The distance between the upper pull rod 10 and the lower pull rod 11 is adjusted by rotating the turn buckle 6, so that the cantilever steel beam 1 is tensioned.
Specifically, as shown in the figure, a bent section matched with the wall body is arranged on the second connecting steel plate 16, and the second connecting steel plate 16 is fixed on the wall body through a bolt.
Specifically, as shown in the figure, the turn buckle 6 includes that a plurality of vertical intervals enclose and close perpendicular steel 15 that sets up to and fixed the setting is in the round steel 14 at perpendicular steel 15 both ends, two be provided with on the round steel 14 with go up pull rod 10, 11 threaded connection's of pull rod screw hole.
Specifically, as shown in the figure, the fixing member 3 is a high-strength bolt, and a steel gasket 4 is padded on the high-strength bolt.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (7)

1. The utility model provides an instrument formula hanging cantilever frame, the cantilever frame be used for setting up at the external convenient construction of wall of house wall, its characterized in that, including pre-buried sleeve (2) in the wall, the wall body outside be provided with pre-buried sleeve (2) cooperation forms fixed girder steel (1) of encorbelmenting, pre-buried sleeve (2) through with mounting (3) will girder steel (1) level of encorbelmenting is fixed outside the wall, still sets up including the slope draw bar assembly (5) of the adjustable elasticity at girder steel (1) top encorbelmenting, the bottom mounting of draw bar assembly (5) is in one side of encorbelment girder steel (1) far away from the wall body, the top of draw bar assembly (5) is fixed on the wall body of encorbelmenting girder steel (1) top.
2. An instrument type wall hanging cantilever according to claim 1, wherein, the side of the cantilever steel beam (1) far away from the wall body is provided with a connecting ear plate (8) hinged with the pull rod assembly (5), the side of the cantilever steel beam (1) near the wall body is provided with an end plate (7), and the end plate (7) is in collision with the wall body.
3. A tool type wall hanging cantilever according to claim 2, wherein the top of the cantilever steel beam (1) is provided with steel tube spacing rebar heads (9) for scaffolding.
4. The tool type wall hanging cantilever frame according to claim 2, wherein the pull rod assembly (5) comprises an upper pull rod (10), a lower pull rod (11) and a turn buckle (6) for connecting the upper pull rod (10) and the lower pull rod (11), a threaded section (13) is arranged at one end of the upper pull rod (10) and the lower pull rod (11) connected with the turn buckle (6), the threaded direction of the threaded section (13) arranged on the upper pull rod (10) and the lower pull rod (11) is opposite, a first connecting steel plate (12) which is hinged with the connecting lug plate (8) in a matched mode is arranged at the bottom end of the lower pull rod (11), and a second connecting steel plate (16) which is fixed with a wall in a matched mode is arranged at the top end of the upper pull rod (10).
5. A tool type wall hanging cantilever according to claim 4, wherein, the second connecting steel plate (16) is provided with a bending section matched with the wall, and the second connecting steel plate (16) is fixed on the wall through bolts.
6. A tool type wall hanging cantilever frame according to claim 4, wherein, the turn buckle (6) comprises a plurality of vertical steels (15) which are arranged in a surrounding manner at vertical intervals, and round steels (14) which are fixedly arranged at two ends of the vertical steels (15), and threaded holes which are in threaded connection with the upper pull rod (10) and the lower pull rod (11) are arranged on the two round steels (14).
7. A tool type wall hanging cantilever according to claim 1, wherein, the fixing member (3) is a high strength bolt, and the high strength bolt is padded with a steel gasket (4).
CN202120217024.8U 2021-01-27 2021-01-27 Tool type wall hanging cantilever frame Active CN214995799U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120217024.8U CN214995799U (en) 2021-01-27 2021-01-27 Tool type wall hanging cantilever frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120217024.8U CN214995799U (en) 2021-01-27 2021-01-27 Tool type wall hanging cantilever frame

Publications (1)

Publication Number Publication Date
CN214995799U true CN214995799U (en) 2021-12-03

Family

ID=79144064

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120217024.8U Active CN214995799U (en) 2021-01-27 2021-01-27 Tool type wall hanging cantilever frame

Country Status (1)

Country Link
CN (1) CN214995799U (en)

Similar Documents

Publication Publication Date Title
CN201826525U (en) Climbing shuttering system device for buildings
CN211037272U (en) Connecting joint of oblique-pulling concrete beam column
CN214995799U (en) Tool type wall hanging cantilever frame
CN213268820U (en) Pull rod type I-steel cantilever beam
CN210888133U (en) Pipe truss installation string-up safety channel device
CN210031492U (en) Vertical stop device of carbon fiber rope of middle and small span girder bridge
CN208733881U (en) A kind of setting multiple tracks is kept out the wind the Super High super-span single layer cable curtain wall of steel truss
CN207597580U (en) A kind of Steel corridor
CN211949546U (en) Detachable U-shaped anchor ring of section steel cantilever scaffold
CN212406082U (en) Overhanging type attached climbing frame wall-attached adjustable steel beam support structure
CN215368613U (en) Shaped steel hangs outrigger external corner construction structures
CN217000814U (en) Adjustable pull rod type cantilever beam
CN217025115U (en) Attached supporting structure for super high-rise externally hung tower crane
CN203499259U (en) Tool type cantilevered unloading platform
CN209114976U (en) A kind of dismountable environment protection fence
CN210029824U (en) Novel tower crane is adhered to device
CN215364389U (en) Overhanging type steel overlength wall-attached device
CN214074771U (en) Safety rope suspension device
CN213296411U (en) Precast pile foundation for building engineering
CN216516786U (en) Flexible structure of encorbelmenting of dismantling of peripheral protection circulation of superelevation layer
CN212533728U (en) Protector for construction
CN210798994U (en) Concrete structure wall body unilateral template structure
CN210713196U (en) Supporting and connecting structure of assembled concrete precast beam
CN216766947U (en) Assembled inequilateral trompil bucking restraint steel sheet energy consumer
CN210013444U (en) Closed cantilever scaffold system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant