CN208534002U - A kind of high-altitude constructing structure that can partially store - Google Patents
A kind of high-altitude constructing structure that can partially store Download PDFInfo
- Publication number
- CN208534002U CN208534002U CN201820869412.2U CN201820869412U CN208534002U CN 208534002 U CN208534002 U CN 208534002U CN 201820869412 U CN201820869412 U CN 201820869412U CN 208534002 U CN208534002 U CN 208534002U
- Authority
- CN
- China
- Prior art keywords
- wirerope
- hanging basket
- steel
- steelframe
- constructing structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The utility model discloses the high-altitude constructing structures that one kind can be stored partially, include: the steelframe being fixedly connected with floor, is spaced the hanging basket hanging point being uniformly arranged on steelframe, the wirerope connecting with hanging basket hanging point, the hanging basket connecting with wirerope controls the motor of cage lifting.The utility model is lower to construction requirement, and structure is firm safely, and can partially store and stash, convenient for later period vestibule contour level and the construction maintenance of super high-rise building.
Description
Technical field
The utility model relates to the maintenances of Super High vestibule or the bottom curtain wall that cornices, more particularly to one kind is in vestibule furred ceiling aluminium
Convenient for the structure of construction in plate maintenance process, and the constructing structure can be promoted and applied to the maintenance of large stadium cornice.
Background technique
High-rise and super high-rise building vestibule bottom aluminum plate construction and maintenance usually all use and set up scaffold auxiliary work
Industry, and it is long, costly to set up the time required for scaffold, and influences on bottom section big;If using high-altitude operation vehicle, again
It can be influenced by construction operation height, and bottom must set lane;If hanging ship using large span, support construction must be set up on roof and matched
Weight, ground assembling large size hang ship, more demanding to operation side, and are unable to satisfy the construction of arcuate structure.
Utility model content
The utility model proposes a kind of height that can partially store to solve above-mentioned the technical problems existing in the prior art
Empty constructing structure, comprising: the steelframe being fixedly connected with floor is spaced the hanging basket hanging point being uniformly arranged on steelframe, hangs with hanging basket
The wirerope of point connection, the hanging basket connecting with wirerope control the motor of cage lifting.
In one embodiment, the steelframe is in lattice-shaped.The welding of the steel construction or structure built-in fitting of the steelframe and floor
It is integrated.
Specifically, the hanging basket hanging point includes the steel plate being fixedly connected with steelframe, the openable and closable snap ring being connect with steel plate,
The end of the wirerope is connect by the clamping lantern ring that is shaped as of wirerope with the snap ring.The hanging basket hanging point is equipped with two blocks of steel
Plate, the snap ring being connect respectively with two blocks of steel plates, the wirerope being connect respectively with two snap rings, the limit being connect with two wirerope
Steel is logical, and the limit steel is logical to be connect with part or all of steel wire rope clamp.
In a concrete application, furred ceiling is equipped with below the floor, the wirerope, limit steel are logical and limit steel passes to
On part be accommodated in furred ceiling.The floor is vestibule bottom or bottom of cornicing.
The utility model facilitates vestibule bottom furred ceiling and two wing flats by increasing hanging basket hanging point on vestibule bottom structure
The upkeep operation of wall;And the constructing structure can be arranged in the curtain wall construction stage, can also pass through maintenance after the completion of curtain wall construction
Channel enters internal setting, is hidden in inside furred ceiling, does not influence appearance and use, and to architecture indoor use almost without shadow
It rings.In use, each hanging point spacing is 6 meters, and it is consistent with currently used hanging basket, it is easy to use, and each hanging point is respectively provided with steel
It is logical to be limited, it ensure that the safety used.It can also be selected according to the demand of construction by the hanging point of suitable position, by steel
Cord is put down, and is connect, is constructed with ground hanging basket.
Detailed description of the invention
Fig. 1 is the details enlarged drawing one of the hanging basket hanging point of the utility model.
Fig. 2 is the details enlarged drawing two of the hanging basket hanging point of the utility model.
Specific embodiment
With reference to the accompanying drawing and the principles of the present invention and structure are described in detail in embodiment.
As shown in Figure 1 and Figure 2, an embodiment of the present invention propose can high-altitude constructing structure, including steelframe 1, hanging basket hang
Point, wirerope 2, hanging basket and motor, wherein hanging basket and motor are being not shown in the figure.
In the present embodiment, steelframe is in lattice-shaped, is fixedly connected with floor.In other embodiments, steelframe 1 can be in item
Shape, interval are uniformly arranged, and can be welded together with structure built-in fitting, can also be together with the welding for steel structure of floor.
Hanging basket hanging point interval is uniformly arranged on steelframe 1, and hanging basket hanging point can be set identical as the construction point spacing of the prior art, is pressed
It is arranged on steelframe according to 6 meters × 6 meters of lattice, one end of wirerope is connect with hanging basket hanging point, and the other end is connect with hanging basket, then
Pass through the lifting of Motor Control hanging basket.
Hanging basket hanging point includes the steel plate 5 being fixedly connected with steelframe, the openable and closable snap ring 3 connecting with steel plate, wirerope
End forms lantern ring 8 by the fixation of steel wire rope clamp 4 and connect with snap ring 3.In specific embodiment shown in figure, the hanging basket hanging point
Equipped with two blocks of steel plates, two snap rings, two wirerope, two wirerope lead to 6 by a limit steel and are limited, and prevent steel wire
Rope lower slide, limit steel is logical to be connect with part or all of steel wire rope clamp.When not in use, wirerope can be accommodated in below floor, be made
Used time, wirerope is put down, the disassembly and displacement of hanging basket are intended to be down to ground.
In a concrete application example, furred ceiling 7, each hanging basket hanging point are mounted with below vestibule or the floor that cornices
Openable aperture is set on the furred ceiling aluminium sheet of bottom, for steel wire penetrating.When carrying out upkeep operation, according to operating area, palpus
Suitable hanging basket hanging point is selected, puts down from furred ceiling internal overhaul channel by wirerope, connect wirerope with hanging basket on ground, is made
Industry personnel are promoted to furred ceiling operating area together in hanging basket and construct;After the completion of operation, hanging basket is down to ground, and personnel remove
From hanging basket being removed, wirerope is received to furred ceiling, and covers furred ceiling port lid.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
Made any modifications, equivalent replacements, and improvements etc., should be included in the utility model within the spirit and principle of utility model
Protection scope within.
Claims (7)
1. the high-altitude constructing structure that one kind can be stored partially characterized by comprising the steelframe being fixedly connected with floor, interval
The hanging basket hanging point being uniformly arranged on steelframe, the wirerope connecting with hanging basket hanging point, the hanging basket connecting with wirerope control hanging basket
The motor of lifting.
2. high-altitude constructing structure as described in claim 1, which is characterized in that the steelframe is in lattice-shaped.
3. high-altitude constructing structure as described in claim 1, which is characterized in that the steel construction or structure of the steelframe and floor are pre-
Slugging is integrated.
4. high-altitude constructing structure as described in claim 1, which is characterized in that the hanging basket hanging point includes being fixedly connected with steelframe
Steel plate, the openable and closable snap ring connecting with steel plate, the end of the wirerope is shaped as lantern ring and institute by the way that wirerope is clamping
State snap ring connection.
5. high-altitude constructing structure as claimed in claim 4, which is characterized in that the hanging basket hanging point is equipped with two blocks of steel plates, respectively
The snap ring connecting with two blocks of steel plates, the wirerope connecting respectively with two snap rings, the limit steel connecting with two wirerope is logical, institute
State that limit steel is logical to be connect with part or all of steel wire rope clamp.
6. high-altitude constructing structure as claimed in claim 4, which is characterized in that be equipped with furred ceiling, the steel wire below the floor
Rope, the part that limit steel leads to and limit steel passes to are accommodated in furred ceiling.
7. high-altitude constructing structure as described in claim 1, which is characterized in that the floor is vestibule bottom or bottom of cornicing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820869412.2U CN208534002U (en) | 2018-06-06 | 2018-06-06 | A kind of high-altitude constructing structure that can partially store |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820869412.2U CN208534002U (en) | 2018-06-06 | 2018-06-06 | A kind of high-altitude constructing structure that can partially store |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208534002U true CN208534002U (en) | 2019-02-22 |
Family
ID=65381423
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820869412.2U Expired - Fee Related CN208534002U (en) | 2018-06-06 | 2018-06-06 | A kind of high-altitude constructing structure that can partially store |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208534002U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111980393A (en) * | 2020-08-31 | 2020-11-24 | 中国二十二冶集团有限公司 | Construction method for mounting high-altitude special-shaped cornice structure suspended ceiling |
-
2018
- 2018-06-06 CN CN201820869412.2U patent/CN208534002U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111980393A (en) * | 2020-08-31 | 2020-11-24 | 中国二十二冶集团有限公司 | Construction method for mounting high-altitude special-shaped cornice structure suspended ceiling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201221193Y (en) | High altitude packway ceiling construction operating platform | |
CN103603504B (en) | The dynamo-electric heavy caliber standpipe of super highrise building is with the method for main body progress lifting construction | |
CN202324571U (en) | Overhanging type double-row scaffold | |
CN201228207Y (en) | Portable window hoister | |
CN102864936A (en) | Combination lifting construction method for large-scale high hollow building roof of steel structure | |
CN201040922Y (en) | Anti-slip hook for fixing and suspending scaffold | |
CN208534002U (en) | A kind of high-altitude constructing structure that can partially store | |
CN115538792A (en) | Residential building machine installation construction method and structure | |
CN206753012U (en) | A kind of attachment type raise scaffold just hangs hanging apparatus | |
CN104153586A (en) | Construction method for installing purline through suspension cable cranes | |
CN202441045U (en) | Rail-type electric attached lifting scaffold | |
CN113062584A (en) | Multipoint elevator shaft construction lifting platform and construction method | |
CN209011528U (en) | A kind of all steel attachment type raise scaffold | |
CN206487129U (en) | Safety hanging cradle for industrial premises Construction of Steel Structure | |
CN202000647U (en) | Base device for lifting scaffold in elevator shaft | |
CN217028004U (en) | Annular hanging basket suspension device for curtain wall construction of super high-rise building | |
CN216766397U (en) | Building curtain wall mounting structure | |
CN202731270U (en) | Movable platform for high-altitude installation operation of space steel structure | |
CN206158146U (en) | Novel building section of thick bamboo well construction operation platform | |
CN213141328U (en) | Hanging basket for mounting safety type outdoor high-rise building electrical appliances | |
CN212249126U (en) | Sliding platform for large-size cornice aluminum plate construction | |
CN209760761U (en) | Construction platform and elevator core section of thick bamboo construction structures in a core section of thick bamboo | |
CN204081433U (en) | Steel structural roof liner profiled sheet construction Special-purpose hanger basket support | |
CN209494204U (en) | Suspension type steel ladder | |
CN209556401U (en) | A kind of super high-rise building super large curtain wall unit hydraulic synchronizing lifting system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 518000 1701, Fangda building, No. 011, Keji South 12th Road, high tech Zone, Yuehai street, Nanshan District, Shenzhen, Guangdong Patentee after: Shenzhen fangdayunzhu Technology Co.,Ltd. Address before: 518000 room 1902, Shuguang building, Keji South 12th Road, Yuehai street, Nanshan District, Shenzhen, Guangdong Province Patentee before: SHENZHEN YUNZHU INDUSTRIAL Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190222 |