CN209651568U - A kind of gantry dislocation pile counting apparatus - Google Patents

A kind of gantry dislocation pile counting apparatus Download PDF

Info

Publication number
CN209651568U
CN209651568U CN201822073886.9U CN201822073886U CN209651568U CN 209651568 U CN209651568 U CN 209651568U CN 201822073886 U CN201822073886 U CN 201822073886U CN 209651568 U CN209651568 U CN 209651568U
Authority
CN
China
Prior art keywords
frame
driving
pile
gear
driving mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822073886.9U
Other languages
Chinese (zh)
Inventor
唐艺
李代军
李荣镇
张江波
肖圣涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Yongchuang Packaging Machinery Co Ltd
Original Assignee
Dongguan Yongchuang Packaging Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Yongchuang Packaging Machinery Co Ltd filed Critical Dongguan Yongchuang Packaging Machinery Co Ltd
Priority to CN201822073886.9U priority Critical patent/CN209651568U/en
Application granted granted Critical
Publication of CN209651568U publication Critical patent/CN209651568U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of gantry dislocation pile counting apparatus, including sequentially connected front end conveying device, middle-end conveying device, rear end conveying device, pile platform and control device from left to right, including portal frame, rear end conveying device, which slides up and down, is installed on portal frame, rear end conveying device includes delivery section and lifting unit, the input terminal of lifting unit is connect with delivery section, and the output end of lifting unit is towards pile platform;Pile platform includes frame body, one end at the top of frame body is connect with portal frame, the bottom of frame body is provided with splicing frame, splicing frame is equipped with pile transfer device, for conveying pile backward, erection of frames has backgauge frame and driving device, and driving device includes the first driving mechanism, the second driving mechanism and third driving mechanism, and backgauge frame is equipped with striker plate;The utility model structure is simple, high in machining efficiency, shortens the time of switching pile, reduces the production cost of enterprise.

Description

A kind of gantry dislocation pile counting apparatus
Technical field
The utility model relates to cardboards to collect technical field, more particularly, to a kind of gantry dislocation pile counting apparatus.
Background technique
The production of cardboard needs to be processed by multiple processes, and wherein pile points are one of production processes of cardboard, Pile counting apparatus smoothly conveys cardboard, is then counted and neat pile, the paper that will be folded after the completion of pile Plate is sent into subsequent processing.
When pile counting apparatus carries out pile to cardboard at present, pallet is driven to go upward to slightly less than cardboard by lifting device Cardboard is delivered on pallet by exit by conveying device, and one cardboard of every stacking, lifting device just drive pallet to decline on pallet A distance, with the progress of pile, lifting device drives pallet to gradually decrease down bottom and completes entire pile.Conveying dress at this time It sets and stops working, pile is transferred to the front of pile station by grass-hopper from pile station, and lifting device drives on pallet again To the exit of slightly less than cardboard, conveying device starts again at work and continues to complete next pile row.
For pile counting apparatus after the completion of by cardboard pile, the height of stacking is higher, gravity center instability, is easy to collapse, it has not been convenient to The transfer of cardboard;
Need to expend longer time in the pile to cardboard, and the time for completing entire pile is very short.Complete In total time at a pile, switching the time shared by pile and completing the ratio of time shared by pile is 1:2~5, is cut It changes pile to take a substantial amount of time, when working especially for large batch of pile, processing efficiency is extremely low, increases the life of enterprise Produce cost, it is therefore necessary to be improved.
Utility model content
In view of the deficienciess of the prior art, the purpose of the utility model is to provide a kind of gantry dislocation pile counting apparatus, Structure is simple, high in machining efficiency, reduces the production cost of enterprise.
To achieve the goals above, technical solution used by the utility model is a kind of gantry dislocation pile counting apparatus, Including sequentially connected front end conveying device from left to right, middle-end conveying device, rear end conveying device, pile platform and control dress It sets, including portal frame, rear end conveying device, which slides up and down, is installed on portal frame, and rear end conveying device includes delivery section and lifting The input terminal in portion, lifting unit is connect with delivery section, and the output end of lifting unit is towards pile platform;
Pile platform includes frame body, and one end at the top of frame body is connect with portal frame, and the bottom of frame body is provided with splicing frame, is connect Material frame is equipped with pile transfer device, and for conveying pile backward, erection of frames has backgauge frame and driving device, driving device packet The first driving mechanism, the second driving mechanism and third driving mechanism are included, backgauge frame is equipped with striker plate;
First driving mechanism is installed on the top of backgauge frame, for driving backgauge frame to horizontally slip at the top of frame body, first The both ends of driving mechanism are connect with frame body respectively;
Second driving mechanism is installed on backgauge frame, for driving striker plate to slide up and down in backgauge frame;
Third driving mechanism is installed on splicing frame, for driving splicing frame to horizontally slip in frame body.
In further technical solution, first driving mechanism includes the first driving motor, the first connecting shaft, the second company The input terminal of spindle, first gear, second gear and the first steering box, the output end of the first driving motor and the first steering box connects Connect, the first end of the first connecting shaft is connect with the first output end of the first steering box, the first end of the second connecting shaft with first turn It is connected to the second output terminal of case, the second end of the first connecting shaft connect with first gear, the second end of the second connecting shaft and the The connection of two gears, the two sides at the top of the frame body are respectively arranged with the first track and the second track, and the is provided in the first track One rack gear is provided with the second rack gear in the second track, and first gear is engaged with the first rack gear, and second gear is nibbled with the second rack gear It closes.
In further technical solution, second driving mechanism includes the second driving motor, the second steering box, third company Spindle, the first driving chain and the second driving chain, the output end of the second driving motor are connect with the input terminal of the second steering box, Second steering box connect axis connection with third, and the first end of third connecting shaft is equipped with the first ratchet, backgauge frame bottom Front end is equipped with the second ratchet, and the first driving chain is placed on the first ratchet and the second ratchet, the second end peace of third connecting shaft Equipped with third ratchet, the rear end of backgauge frame bottom is equipped with the 4th ratchet, and the second driving chain is placed on third ratchet and the 4th Ratchet, backgauge frame are equipped with striker plate, and the rear and front end of striker plate is respectively arranged with the first mounting base and the second mounting base, and first Mounting base is installed on the first driving chain, and the second mounting base is installed on the second driving chain, for driving striker plate to move up and down In backgauge frame.
In further technical solution, the bottom of the splicing frame is provided with mounting rack and mounting base, the bottom of splicing frame It is provided with pulley, pulley horizontally slips in mounting rack, and third driving mechanism includes third driving motor, third gear and third tooth Item, third driving motor are installed on splicing frame, and third rack gear is installed on mounting rack, and third gear is placed on the defeated of third driving motor Outlet, third gear are engaged with third rack gear.
In further technical solution, the pile transfer device includes conveyer belt, transmission roller group and driving motor, transmission Roller group is installed on the two sides of splicing frame, and conveyer belt is placed on transmission roller group and is covered in the upper surface of splicing frame, driving motor it is defeated Outlet is connect with transmission roller group.
In further technical solution, the lifting unit is provided with hairbrush and rotating electric machine, and the output end of rotating electric machine connects It is connected to the first driving wheel, one end of hairbrush is connected with the second driving wheel, transmission is cased between the first driving wheel and the second driving wheel Belt.
After adopting the above structure, the utility model is compared to the prior art advantageously: the utility model is a kind of Gantry dislocation pile counting apparatus, structure is simple, high in machining efficiency, shortens the time of switching pile, reduces the production of enterprise Cost.
Detailed description of the invention
The present invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is a kind of structural schematic diagram of gantry dislocation pile counting apparatus of the utility model.
Fig. 2 is that the structural schematic diagram after front end conveying device and middle-end conveying device is omitted in Fig. 1.
Fig. 3 is the structural schematic diagram of splicing frame.
Fig. 4 is the structural schematic diagram of frame body and backgauge frame
In figure:
The front end 1- conveying device;
2- middle-end conveying device;
The rear end 3- conveying device, 31- delivery section, 32- lifting unit, 321- hairbrush;
4- pile platform, 41- frame body, 42- splicing frame, 421- mounting rack, 422- mounting base, 423- pulley, 43- backgauge Frame, 431- striker plate;
5- portal frame;
6- driving device, the first driving mechanism of 61-, the first driving motor of 611-, the first rack gear of 612-, 62- second drive Mechanism, the second driving motor of 621-, 622- third connecting shaft, 63- third driving mechanism, 631- third driving motor, 632- Three gears, 633- third rack gear;
7- pile transfer device, 71- conveyer belt, 72- are driven roller group, 73- driving motor.
Specific embodiment
As described below is only the preferred embodiment of the utility model, does not therefore limit the protection model of the utility model It encloses.
Embodiment, as shown in Fig. 1~4, a kind of gantry dislocation pile counting apparatus, including sequentially connected front end from left to right Conveying device 1, middle-end conveying device 2, rear end conveying device 3, pile platform 4 and control device, including portal frame 5, rear end is defeated Send device 3 to slide up and down and be installed on portal frame 5, rear end conveying device 3 include delivery section 31 and lifting unit 32, lifting unit 32 it is defeated Enter end to connect with delivery section 31, the output end of lifting unit 32 is towards pile platform 4;Pile platform 4 includes frame body 41, and frame body 41 pushes up The one end in portion is connect with portal frame 5, and the bottom of frame body 41 is provided with splicing frame 42, and splicing frame 42 is equipped with pile transfer device 7, For conveying pile backward, frame body 41 is equipped with backgauge frame 43 and driving device 6, driving device 6 include the first driving mechanism 61, Second driving mechanism 62 and third driving mechanism 63, backgauge frame 43 are equipped with striker plate 431;First driving mechanism 61 is installed on gear The top for expecting frame 43, for driving backgauge frame 43 to horizontally slip in the top of frame body 41, the both ends of the first driving mechanism 61 respectively with Frame body 41 connects;Second driving mechanism 62 is installed on backgauge frame 43, for driving striker plate 431 to slide up and down in backgauge frame 43; Third driving mechanism 63 is installed on splicing frame 42, for driving splicing frame 42 to horizontally slip in frame body 41.The setting structure is simple, It is high in machining efficiency, the time of switching pile is shortened, the production cost of enterprise is reduced.
First driving mechanism 61 includes the first driving motor 611, the first connecting shaft, the second connecting shaft, first gear, second The output end of gear and the first steering box, the first driving motor 611 is connect with the input terminal of the first steering box, the first connecting shaft First end is connect with the first output end of the first steering box, the second output terminal of the first end of the second connecting shaft and the first steering box Connection, the second end of the first connecting shaft are connect with first gear, and the second end of the second connecting shaft is connect with second gear, the frame The two sides at 41 top of body are respectively arranged with the first track and the second track, and the first rack gear 612, the second rail are provided in the first track The second rack gear is provided in road, first gear is engaged with the first rack gear 612, and second gear is engaged with the second rack gear.Pass through first Driving mechanism 61 drives backgauge frame 43 to be moved left and right, and backgauge frame 43 is adjusted according to the length of cardboard, and structure is simple, It is practical.
Second driving mechanism 62 includes the second driving motor 621, the second steering box, third connecting shaft 622, the first transmission chain The output end of item and the second driving chain, the second driving motor 621 is connect with the input terminal of the second steering box, the second steering box with Third connecting shaft 622 connects, and the first end of third connecting shaft 622 is equipped with the first ratchet, the front end of 43 bottom of backgauge frame Portion is equipped with the second ratchet, and the first driving chain is placed on the first ratchet and the second ratchet, the second end installation of third connecting shaft 622 There is third ratchet, the rear end of 43 bottom of backgauge frame is equipped with the 4th ratchet, and the second driving chain is placed on third ratchet and the 4th Ratchet, backgauge frame 43 are equipped with striker plate 431, and the rear and front end of striker plate 431 is respectively arranged with the first mounting base 422 and second Mounting base 422, the first mounting base 422 are installed on the first driving chain, and the second mounting base 422 is installed on the second driving chain, use It moves up and down in drive striker plate 431 in backgauge frame 43.The left and right ends of striker plate 431 are driven by the second driving motor 621 It moves up and down respectively, guarantees that striker plate 431 can timely block the cardboard just in pile.
The bottom of splicing frame 42 is provided with mounting rack 421 and mounting base 422, and the bottom of splicing frame 42 is provided with pulley 423, Pulley 423 horizontally slips in mounting rack 421, and third driving mechanism 63 includes third driving motor 631, third gear 632 and the Three rack gears 633, third driving motor 631 are installed on splicing frame 42, and third rack gear 633 is installed on mounting rack 421, third gear 632 are placed on the output end of third driving motor 631, and third gear 632 is engaged with third rack gear 633.When carrying out pile, pass through Third driving mechanism 63 drives entire splicing frame 42 to be moved left and right, and enables the dislocation on each adjacent one the first from left of cardboard right side It stacks, guarantees that the center of gravity of entire pile is placed on centre, avoid collapsing when shifting pile, facilitate the transfer of cardboard.
Pile transfer device 7 includes conveyer belt 71, transmission roller group 72 and driving motor 73, and transmission roller group 72 is installed on splicing The two sides of frame 42, conveyer belt 71 are placed on transmission roller group 72 and are covered in the upper surface of splicing frame 42, the output end of driving motor 73 It is connect with transmission roller group 72.Lifting unit 32 is provided with hairbrush 321 and rotating electric machine, and the output end of rotating electric machine is connected with the first biography Driving wheel, one end of hairbrush 321 are connected with the second driving wheel, are cased with driving belt between the first driving wheel and the second driving wheel.Subtract The time that switching pile expends less, of simple structure and strong practicability.
When carrying out pile, rear end conveying device 3 declines the utility model, and cardboard enters splicing frame 42 from lifting unit 32 On, the first driving mechanism 61 drives backgauge frame 43 to move left and right the neat of guarantee cardboard.When first block of cardboard falls into splicing frame 42 Afterwards, third driving mechanism 63 drives splicing frame 42 to move right, and is covered on first piece of paper when second block of cardboard falls into splicing frame 42 After on plate, third driving mechanism 63, which drives splicing frame 42 to be moved to the left, keeps two blocks of adjacent cardboards interleaved next.When stacking one When determining height, the second driving mechanism 62 drives striker plate 431 to move up, and rear end conveying device 3 also moves up, and is carrying out heap When stacker plate, the lower pressboard of hairbrush 321 guarantees the neat of cardboard.
When completing pile, third driving mechanism 63 drives splicing frame 42 to move right a certain distance, driving motor 73 Transmission belt is driven to be moved backward by transmission roller group 72, so that the pile being located on transmission belt be driven to exit back splicing frame 42, for rear end conveying device 3 from highest point continuous decrease to origin, the second driving mechanism 62 drives striker plate 431 to be moved down into Origin, after rear end conveying device 3 and striker plate 431 return to origin, which is transferred out of splicing frame 42 again, subtracts significantly The time for having lacked switching pile, processing efficiency is improved, the production cost of enterprise is reduced.
The above content is only the preferred embodiment of the utility model, for those of ordinary skill in the art, according to this reality With novel thought, there will be changes in the specific implementation manner and application range, and the content of the present specification should not be construed as Limitations of the present invention.

Claims (6)

  1. The pile counting apparatus 1. a kind of gantry misplaces, including sequentially connected front end conveying device (1), middle-end conveying dress from left to right Set (2), rear end conveying device (3), pile platform (4) and control device, it is characterised in that: including portal frame (5), rear end conveying Device (3), which slides up and down, to be installed on portal frame (5), and rear end conveying device (3) includes delivery section (31) and lifting unit (32), lifting The input terminal in portion (32) is connect with delivery section (31), and the output end of lifting unit (32) is towards pile platform (4);
    Pile platform (4) includes frame body (41), and one end at the top of frame body (41) is connect with portal frame (5), the bottom of frame body (41) It is provided with splicing frame (42), splicing frame (42) is equipped with pile transfer device (7), for conveying pile, frame body (41) peace backward Equipped with backgauge frame (43) and driving device (6), driving device (6) includes the first driving mechanism (61), the second driving mechanism (62) With third driving mechanism (63), backgauge frame (43) is equipped with striker plate (431);
    First driving mechanism (61) is installed on the top of backgauge frame (43), for driving backgauge frame (43) to horizontally slip in frame body (41) top, the both ends of the first driving mechanism (61) are connect with frame body (41) respectively;
    Second driving mechanism (62) is installed on backgauge frame (43), for driving striker plate (431) to slide up and down in backgauge frame (43);
    Third driving mechanism (63) is installed on splicing frame (42), for driving splicing frame (42) to horizontally slip in frame body (41).
  2. The pile counting apparatus 2. a kind of gantry according to claim 1 misplaces, it is characterised in that: first driving mechanism It (61) include the first driving motor (611), the first connecting shaft, the second connecting shaft, first gear, second gear and the first steering The output end of case, the first driving motor (611) is connect with the input terminal of the first steering box, the first end of the first connecting shaft and first First output end of steering box connects, and the first end of the second connecting shaft is connect with the second output terminal of the first steering box, and first connects The second end of spindle is connect with first gear, and the second end of the second connecting shaft is connect with second gear, at the top of the frame body (41) Two sides be respectively arranged with the first track and the second track, be provided in the first track the first rack gear (612), set in the second track It is equipped with the second rack gear, first gear is engaged with the first rack gear (612), and second gear is engaged with the second rack gear.
  3. The pile counting apparatus 3. a kind of gantry according to claim 2 misplaces, it is characterised in that: second driving mechanism It (62) include the second driving motor (621), the second steering box, third connecting shaft (622), the first driving chain and the second transmission chain The output end of item, the second driving motor (621) is connect with the input terminal of the second steering box, the second steering box and third connecting shaft (622) it connects, the first end of third connecting shaft (622) is equipped with the first ratchet, the front end peace of backgauge frame (43) bottom Equipped with the second ratchet, the first driving chain is placed on the first ratchet and the second ratchet, and the second end of third connecting shaft (622) is equipped with The rear end of third ratchet, backgauge frame (43) bottom is equipped with the 4th ratchet, and the second driving chain is placed on third ratchet and the 4th Ratchet, backgauge frame (43) are equipped with striker plate (431), and the rear and front end of striker plate (431) is respectively arranged with the first mounting base (422) and the second mounting base (422), the first mounting base (422) are installed on the first driving chain, the second mounting base (422) installation In the second driving chain, for driving striker plate (431) to move up and down in backgauge frame (43).
  4. The pile counting apparatus 4. a kind of gantry according to claim 3 misplaces, it is characterised in that: the bottom of the splicing frame (42) Portion is provided with mounting rack (421) and mounting base (422), and the bottom of splicing frame (42) is provided with pulley (423), and pulley (423) is left The right side slides on mounting rack (421), and third driving mechanism (63) includes third driving motor (631), third gear (632) and third Rack gear (633), third driving motor (631) are installed on splicing frame (42), and third rack gear (633) is installed on mounting rack (421), the Three gears (632) are placed on the output end of third driving motor (631), and third gear (632) is engaged with third rack gear (633).
  5. The pile counting apparatus 5. a kind of gantry according to claim 4 misplaces, it is characterised in that: the pile transfer device It (7) include conveyer belt (71), transmission roller group (72) and driving motor (73), transmission roller group (72) is installed on the two of splicing frame (42) Side, conveyer belt (71) are placed on transmission roller group (72) and are covered in the upper surface of splicing frame (42), the output end of driving motor (73) It is connect with transmission roller group (72).
  6. The pile counting apparatus 6. a kind of gantry according to claim 5 misplaces, it is characterised in that: lifting unit (32) setting There are hairbrush (321) and rotating electric machine, the output end of rotating electric machine is connected with the first driving wheel, and one end of hairbrush (321) is connected with Second driving wheel is cased with driving belt between the first driving wheel and the second driving wheel.
CN201822073886.9U 2018-12-11 2018-12-11 A kind of gantry dislocation pile counting apparatus Active CN209651568U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822073886.9U CN209651568U (en) 2018-12-11 2018-12-11 A kind of gantry dislocation pile counting apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822073886.9U CN209651568U (en) 2018-12-11 2018-12-11 A kind of gantry dislocation pile counting apparatus

Publications (1)

Publication Number Publication Date
CN209651568U true CN209651568U (en) 2019-11-19

Family

ID=68518043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822073886.9U Active CN209651568U (en) 2018-12-11 2018-12-11 A kind of gantry dislocation pile counting apparatus

Country Status (1)

Country Link
CN (1) CN209651568U (en)

Similar Documents

Publication Publication Date Title
CN107697624A (en) A kind of pcb board conveyer for stencil printer
CN102674014A (en) Stacking machine
CN203652796U (en) Material bag tray unstacker
CN210763087U (en) Feeding and discharging conveying device for high and low positions of plate
CN205240760U (en) High -speed automatic loading hacking machine
CN102976139A (en) Automatic paper collecting stacker
CN208961110U (en) A kind of full-automatic pipe machine
CN204624708U (en) A kind of stacker
CN209651568U (en) A kind of gantry dislocation pile counting apparatus
CN207224131U (en) One kind cuts roller shear sawing sheet system automatically
CN209698377U (en) A kind of automatic loading tool machine
CN208712709U (en) A kind of sheeting feed device
CN210260341U (en) Automatic stacking device
CN110642065A (en) High-efficient pile device
CN108927465A (en) A kind of sheeting feed device
CN210083661U (en) Cigarette carton pushing and stacking device
CN210558018U (en) Fruit cup stacking machine
CN203173584U (en) Paperboard stagger stacking machine
CN114524302A (en) Batch carton board feed divider
CN209192957U (en) Turnover box supplies machine automatically
CN209755398U (en) automatic lamination machine for rubber and plastic sheet materials
CN217198854U (en) Shower cap stacking and conveying mechanism
CN215243215U (en) Automatic unstacking device
CN116767781B (en) Fixed tray circulation line
CN208994818U (en) A kind of automation paper counting hay stacker

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant