CN209556323U - A kind of wellbore operations platform and template integrated construction system - Google Patents

A kind of wellbore operations platform and template integrated construction system Download PDF

Info

Publication number
CN209556323U
CN209556323U CN201821305917.2U CN201821305917U CN209556323U CN 209556323 U CN209556323 U CN 209556323U CN 201821305917 U CN201821305917 U CN 201821305917U CN 209556323 U CN209556323 U CN 209556323U
Authority
CN
China
Prior art keywords
wellbore operations
template
platform
idler wheel
operations platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821305917.2U
Other languages
Chinese (zh)
Inventor
高扬
罗金龙
庄寿松
刘垒垒
郑文凯
吴兵兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201821305917.2U priority Critical patent/CN209556323U/en
Application granted granted Critical
Publication of CN209556323U publication Critical patent/CN209556323U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A kind of wellbore operations platform and template integrated construction system, including wellbore operations platform and it is fixed on the vertical steel frame plywood template system of wellbore operations platform surrounding, wellbore operations mesa base is uniformly provided at least four wheeled fixtures, wheeled fixture includes the idler wheel being arranged towards on the outside of wellbore operations platform and the idler wheel rotary connector for idler wheel to be fixed on to operating platform bottom, vertical steel frame plywood template system bottom is fixed by clamping piece with the connector flange plate for being set to wellbore operations surrounding edge position, vertical steel frame plywood template system is equipped with and the one-to-one bolt groove template of reserved groove location, bolt groove shape of template and reserved groove shapes are adapted.The utility model is able to satisfy the demand for security of construction, reduces worker and faces side operating risk, while can integrally be promoted in place, and vertical construction overall process is taken without repeating to tear open, provides convenience for worker's construction.The wellbore operations platform is easy to process, convenient to assemble and disassemble, quick, and floor transhipment convenience, cost is relatively low.

Description

A kind of wellbore operations platform and template integrated construction system
Technical field
The utility model belongs to shaft construction field more particularly to a kind of wellbore operations platform and template integrated construction system System.
Background technique
At present in construction of elevator shaft operation, mostly use steel wellbore operations platform, steel pipe scaffold wellbore operations flat Platform.When conventional steel wellbore operations platform construction, it need to be reserved in every layer of pit shaft side wall and wear I-steel hole, lead to subsequent closure Wall hole workload increases;When conventional steel wellbore operations platform construction, scaffold takes that tear project amount open larger, construction cost compared with It is high.
Utility model content
The purpose of the utility model is to provide a kind of wellbore operations platform and template integrated construction systems, to solve existing Technology construction is complicated, the high technical problem of construction cost;And solve and to solve prior art construction efficiency low, the duration is longer to ask Topic.
To achieve the above objectives, the present invention adopts the following technical solutions:
A kind of wellbore operations platform and template integrated construction system, it is characterised in that: including wellbore operations platform and solid It is scheduled on the vertical steel frame plywood template system of wellbore operations platform surrounding, the wellbore operations mesa base is uniformly provided at least Four wheeled fixtures, the wheeled fixture include towards the idler wheel of setting on the outside of wellbore operations platform and for idler wheel to be fixed on The idler wheel rotary connector of operating platform bottom, the idler wheel fix in the reserved groove of well bore wall, the reserved groove For notch towards wellbore operations platform, bottom surface is plane, and top surface is towards the acclivitous inclined-plane of wellbore operations platform, the idler wheel Rotary connector is fixed by rotary shaft and the fixing piece of operating platform bottom, the idler wheel can by idler wheel rotary connector around Rotary shaft rotates down 0 ~ 45 °;
The vertical steel frame plywood template system bottom is by clamping piece and is set to wellbore operations surrounding edge position Connector flange plate is fixed, and vertical steel frame plywood template system is spliced by several pieces of steel frame plywood formworks, described perpendicular It is equipped with and the one-to-one bolt groove template of reserved groove location, the bolt chase form to steel frame plywood formwork system Plate shape and reserved groove shapes are adapted, and bolt groove template, which passes through, is set to reserving on vertical steel frame plywood template system Hole is simultaneously fixed by fixation kit and vertical steel frame plywood template system, and the fixation kit includes being stuck in outside hole to be provided Level is fixed keel and is rotated for the bolt of regulating pin groove template and vertical steel frame plywood template system relative distance Axis, the bolt rotary shaft passes perpendicularly through horizontal fixed keel, and is fixed by mountain type card and the fixed keel of level.
It is further preferred that the idler wheel rotary connector includes that two block structures are identical and connecting plate disposed in parallel, institute Roller portion exposing is stated, is partially built between two pieces of connecting plate ends, two pieces of connecting plate bottoms, idler wheel are arranged right below gear Plate, the baffle make idler wheel be only capable of rolling along well bore wall upwards.
Further, the wellbore operations platform includes the platform main joist set gradually from bottom to top, platform secondary joist Peaceful deck plate.
Further, the platform main joist includes the channel steel of longitudinal uniform intervals setting, and the platform secondary joist includes Laterally homogeneous spaced square steel, the platform panel are formed on square steel by checkered steel plate paving.
Further, the platform main joist is equipped with the hanging ring for promoting pit shaft operating platform.
Further, the fixing piece is laterally disposed channel steel, and channel steel top flange plate is fixed with platform main joist bolt, The idler wheel rotary connector is fixed by rotary shaft and channel steel back cord.
Further, the connector section is L-type, and side flange plate is fixed with wellbore operations platform, another side wing edge Plate is fixed with by clamping piece and vertical steel frame plywood template system bottom end;The clamping piece include snap-ring groove with for screwing Snap-ring groove screws end.
Further, the steel frame plywood formwork of hole to be provided hole surrounding, which is equipped with, reinforces keel.
Further, it is erected with scaffold on the wellbore operations platform, when the high 3m of pit shaft layer, crosshead is higher by this layer of knot Structure 1.8m completely spreads scaffold board on crosshead.
Compared with prior art the utility model have the characteristics that and the utility model has the advantages that
The steel frame plywood formwork of the utility model is equipped with bolt groove template, can make to form fixing idler wheel on well bore wall Reserved groove, reserve groove not through pit shaft wall, avoid the subsequent trouble for blocking wall hole, the utility model construction Under the premise of constructing worker without influencing, using specification, the simple component of negligible amounts, wellbore operations platform passes through method Clamping piece and vertical steel frame plywood template system are fixed into an entirety, and the two can carry out whole promotion, reduce pit shaft behaviour Make tower crane occupancy when platform promotion, improves construction efficiency.
The utility model is able to satisfy the demand for security of construction, reduces worker and faces side operating risk, while can integrally be promoted just Position, vertical construction overall process are taken without repeating to tear open, provide convenience for worker's construction.The wellbore operations platform is easy to process, peace is torn open Convenient, fast, floor transhipment convenience, cost is relatively low.
The utility model has the characteristics that safety, is applicable in, and has good promotion and practical value, after extensive popularization and application Good economic benefit can be generated.
Detailed description of the invention
Fig. 1 be the utility model relates to wellbore operations platform and idler wheel position relationship structural diagram;
The cross-sectional view in the portion Fig. 2 Figure 1A-A;
Fig. 3 is the enlarged structure schematic diagram in the portion Fig. 2 C;
Fig. 4 the utility model relates to idler wheel and idler wheel rotary connector attachment structure schematic diagram;
Fig. 5 is that the utility model relates to the attachment structure schematic diagrams of baffle and connecting plate;
Fig. 6 be the utility model relates to idler wheel be in the structural schematic diagram of propradation;
Fig. 7 be the utility model relates to bolt groove template and steel frame plywood formwork positional relationship structural representation Figure;
Fig. 8 be the utility model relates to the fixed keel of level and bolt rotary shaft and the connection structure of pin groove template show It is intended to;
Fig. 9 is the cross-sectional view in the portion Fig. 8 B-B.
Appended drawing reference: 1- idler wheel;2- reserves groove;3- idler wheel rotary connector;31- connecting plate;32- baffle;4- rotation Axis;5- clamping piece;51- snap-ring groove;52- screws end;6- steel frame plywood formwork;7- bolt groove template;The fixed dragon of 8- level Bone;9- bolt rotary shaft;10- platform main joist;11- platform secondary joist;12- platform panel;13- fixing piece;14- well bore wall; 15- hanging ring;16- connector;17- reinforces keel;The mountain 18- type card.
Specific embodiment
To make technological means of the utility model, character of innovation, reaching purpose and effect is easy to understand, below The present invention will be further described.
The embodiment recorded herein is the specific specific embodiment of the utility model, for illustrating the utility model Design, be it is explanatory and illustrative, should not be construed as the limit to the utility model embodiment and the scope of the utility model System.In addition to the embodiment recorded herein, those skilled in the art can also be public based on the claim of this application book and specification institute For the content opened using obvious other technical solutions, these technical solutions include using doing to the embodiment recorded herein The technical solution of any obvious substitutions and modifications out.
A kind of wellbore operations platform and template integrated construction system, including wellbore operations platform and it is fixed on wellbore operations The vertical steel frame plywood template system of platform surrounding, as illustrated in fig. 1 and 2, wellbore operations platform include successively setting from bottom to top The peaceful deck plate 12 of platform main joist 10, platform secondary joist 11 set, platform main joist 10 include longitudinal uniform intervals setting Channel steel, platform secondary joist 11 include laterally homogeneous spaced square steel, square steel 20 × 40 × 1.5mm of model, platform panel 12 are formed on square steel by checkered steel plate paving, and platform main joist 10 is equipped with the hanging ring 15 for promoting pit shaft operating platform, Hanging ring 15 is made of 10mm thick steel plate, and wellbore operations mesa base is uniformly provided at least four wheeled fixtures, as shown in figure 4, wheel Formula fixture includes the idler wheel 1 being arranged towards on the outside of wellbore operations platform and the rolling for idler wheel 1 to be fixed on to operating platform bottom Rotary connector 3 is taken turns, idler wheel 1 is A80 pulley, and idler wheel 1 fixes in the reserved groove 2 of well bore wall 14, reserves the notch of groove 2 Towards wellbore operations platform, bottom surface is plane, and top surface is towards the acclivitous inclined-plane of wellbore operations platform, idler wheel rotation connection Part 3 is fixed by the fixing piece 13 of rotary shaft 4 and operating platform bottom, and fixing piece 13 is laterally disposed channel steel, channel steel upper limb Listrium is fixed with 10 bolt of platform main joist, and idler wheel rotary connector 3 is fixed by rotary shaft 4 and channel steel back cord, and rotary shaft 4 is M20 high-strength bolt rotary shaft, idler wheel 1 can rotate down 0 ~ 45 ° around rotary shaft 4 by idler wheel rotary connector 3, as shown in figure 5, Idler wheel rotary connector 3 including two block structures, expose, be partially built in by connecting plate 31 identical and disposed in parallel, 1 part of idler wheel Between two pieces of connecting plate ends, two pieces of connecting plate bottoms, idler wheel 1 are arranged right below baffle 32, and baffle 32 is only capable of idler wheel upwards It is rolled along well bore wall 14;
Vertical steel frame plywood template system bottom passes through clamping piece 5 and the connection for being set to wellbore operations surrounding edge position 16 flange plate of part is fixed, as shown in figure 3,16 section of connector is L-type, side flange plate is fixed with wellbore operations platform, another Flank listrium is fixed with by clamping piece 5 and vertical steel frame plywood template system bottom end;Clamping piece 5 includes snap-ring groove 51 and uses Screw end 52 in screw snap-ring groove 51, vertical steel frame plywood template system spliced by several pieces of steel frame plywood formworks 6 and At as shown in fig. 7, vertical steel frame plywood template system is equipped with and the reserved one-to-one bolt chase form in 2 position of groove Plate 7,7 shape of bolt groove template and reserved 2 shape of groove are adapted, and bolt groove template 7, which passes through, is set to the conjunction of vertical steel frame glue Hole to be provided on plate formwork system is simultaneously fixed by fixation kit and vertical steel frame plywood template system, as shown in figure 8, in advance The steel frame plywood formwork 6 of box out hole surrounding, which is equipped with, reinforces keel 17, and fixation kit includes that the level being stuck in outside hole to be provided is consolidated Determine keel 8 and the bolt rotary shaft 9 for regulating pin groove template 7 and vertical steel frame plywood template system relative distance, As shown in figure 9, bolt rotary shaft 9 passes perpendicularly through horizontal fixed keel 8, bolt rotary shaft 9 is M16 bolt rotary shaft, and is passed through Mountain type card 18 and horizontal fixed keel 8 are fixed, and end and bolt groove template 7 are fixed.
It is erected with scaffold on wellbore operations platform, when the high 3m of pit shaft layer, crosshead is higher by this layer of structure 1.8m, crosshead On completely spread scaffold board.
The method for carrying out shaft construction using wellbore operations platform and template integrated construction system, which is characterized in that packet Include following steps:
Step 1: this layer of shaft construction: wellbore operations platform and vertical steel frame plywood template system are promoted in place, rotation 7 after-pouring concrete of bolt groove template on vertical steel frame plywood template system out finishes precession to concrete coagulation and inserts Groove template 7 is sold, reserved groove 2 is formed on well bore wall 14, wellbore operations platform and vertical steel frame plywood template system is mentioned Next construction part is risen, as shown in fig. 6, idler wheel 1 scrolls up along well bore wall 14, until idler wheel 1 fixes in reserved groove 2, The idler wheel end of idler wheel rotary connector 3 is lighter, and with wellbore operations platform fixing end than heavier, idler wheel 1 leans on wellbore operations platform Downward gravity fixes in reserved groove 2, and the fixing state of idler wheel 1 is as shown in Fig. 2, screw out 7 after-pouring of bolt groove template Concrete finishes precession bolt groove template 7 to concrete coagulation, forms reserved groove 2 on well bore wall 14, repeat the above steps Until this layer of shaft construction finishes;
Step 2: conversion wellbore operations platform and template integrated construction system: removing vertical steel frame plywood formwork system System, and wellbore operations platform and vertical steel frame plywood template system are converted by tower crane to upper layer pit shaft;
Step 3: construction upper layer pit shaft: after the floor slab construction of upper layer, upper layer pit shaft wall steel bar is bound, according to step A pair of of upper layer pit shaft is constructed, until upper layer shaft construction finishes, repeats step 1 to step 3 until shaft construction finishes, So far, it is finished using the utility model wellbore operations platform and template integrated construction system construction pit shaft.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all practical at this Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model Within the scope of shield.

Claims (9)

1. a kind of wellbore operations platform and template integrated construction system, it is characterised in that: including wellbore operations platform and fixation In the vertical steel frame plywood template system of wellbore operations platform surrounding, the wellbore operations mesa base is uniformly provided at least four A wheeled fixture, the wheeled fixture include the idler wheel (1) being arranged towards on the outside of wellbore operations platform and are used for idler wheel (1) is solid It is scheduled on the idler wheel rotary connector (3) of operating platform bottom, the idler wheel (1) fixes the reserved groove (2) in well bore wall (14) Interior, for the notch of the reserved groove (2) towards wellbore operations platform, bottom surface is plane, top surface be towards wellbore operations platform to Upper inclined inclined-plane, the idler wheel rotary connector (3) are solid by the fixing piece (13) of rotary shaft (4) and operating platform bottom Fixed, the idler wheel (1) can rotate down 0 ~ 45 ° around rotary shaft (4) by idler wheel rotary connector (3);
The vertical steel frame plywood template system bottom passes through clamping piece (5) and the company for being set to wellbore operations surrounding edge position Fitting (16) flange plate is fixed, and vertical steel frame plywood template system is spliced by several pieces of steel frame plywood formworks (6), institute State vertical steel frame plywood template system be equipped with the one-to-one bolt groove template (7) in reserved groove (2) position, it is described Bolt groove template (7) shape and reserved groove (2) shape are adapted, and bolt groove template (7), which passes through, is set to vertical steel frame glue Hole to be provided on plywood template system is simultaneously fixed, described fixed group by fixation kit and vertical steel frame plywood template system Part includes the level fixed keel (8) being stuck in outside hole to be provided and is used for regulating pin groove template (7) and vertical steel frame plywood The bolt rotary shaft (9) of template system relative distance, the bolt rotary shaft (9) passes perpendicularly through horizontal fixed keel (8), and leads to It crosses mountain type card (18) and horizontal fixed keel (8) is fixed, and end and bolt groove template (7) are fixed.
2. a kind of wellbore operations platform as described in claim 1 and template integrated construction system, it is characterised in that: the rolling Taking turns rotary connector (3), connecting plate (31) identical and disposed in parallel, idler wheel (1) part are exposed including two block structures, portion It is divided to and is built between two pieces of connecting plate ends, two pieces of connecting plate bottoms, idler wheel (1) is arranged right below baffle (32), the baffle (32) idler wheel is made to be only capable of rolling along well bore wall (14) upwards.
3. a kind of wellbore operations platform as described in claim 1 and template integrated construction system, it is characterised in that: the well Cylinder operating platform includes the platform main joist (10) set gradually from bottom to top, the peaceful deck plate (12) of platform secondary joist (11).
4. a kind of wellbore operations platform as claimed in claim 3 and template integrated construction system, it is characterised in that: described flat Platform main joist (10) includes the channel steel of longitudinal uniform intervals setting, and the platform secondary joist (11) includes laterally homogeneous interval setting Square steel, the platform panel (12) formed on square steel by checkered steel plate paving.
5. a kind of wellbore operations platform as claimed in claim 3 and template integrated construction system, it is characterised in that: described flat Platform main joist (10) is equipped with the hanging ring (15) for promoting pit shaft operating platform.
6. a kind of wellbore operations platform as claimed in claim 4 and template integrated construction system, it is characterised in that: described solid Determining part (13) is laterally disposed channel steel, and channel steel top flange plate is fixed with platform main joist (10) bolt, and the idler wheel rotation connects Fitting (3) is fixed by rotary shaft (4) with channel steel back cord.
7. a kind of wellbore operations platform as described in claim 1 and template integrated construction system, it is characterised in that: the company Fitting (16) section is L-type, and side flange plate fixes with wellbore operations platform, other side flange plate with by clamping piece (5) and Vertical steel frame plywood template system bottom end is fixed;The clamping piece (5) includes snap-ring groove (51) and is used to screw snap-ring groove (51) screw end (52).
8. a kind of wellbore operations platform as described in claim 1 and template integrated construction system, it is characterised in that: described pre- The steel frame plywood formwork (6) of box out hole surrounding, which is equipped with, reinforces keel (17).
9. a kind of wellbore operations platform and template integrated construction system as described in claim 1~8 any one, feature It is: is erected with scaffold on the wellbore operations platform, when the high 3m of pit shaft layer, crosshead is higher by this layer of structure 1.8m, operation Scaffold board is completely spread on frame.
CN201821305917.2U 2018-08-14 2018-08-14 A kind of wellbore operations platform and template integrated construction system Expired - Fee Related CN209556323U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821305917.2U CN209556323U (en) 2018-08-14 2018-08-14 A kind of wellbore operations platform and template integrated construction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821305917.2U CN209556323U (en) 2018-08-14 2018-08-14 A kind of wellbore operations platform and template integrated construction system

Publications (1)

Publication Number Publication Date
CN209556323U true CN209556323U (en) 2019-10-29

Family

ID=68297267

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821305917.2U Expired - Fee Related CN209556323U (en) 2018-08-14 2018-08-14 A kind of wellbore operations platform and template integrated construction system

Country Status (1)

Country Link
CN (1) CN209556323U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025235A (en) * 2018-08-14 2018-12-18 中建局集团建设发展有限公司 Wellbore operations platform and template integrated construction system and the method constructed using it

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025235A (en) * 2018-08-14 2018-12-18 中建局集团建设发展有限公司 Wellbore operations platform and template integrated construction system and the method constructed using it

Similar Documents

Publication Publication Date Title
CN109518605A (en) The telescopic overhanging support of one kind and its installation method
CN202509754U (en) High-altitude steel structure node construction working platform
CN110318490B (en) Construction method for connecting laminated slab and secondary beam and node connecting structure
CN206616862U (en) Formwork root bracing means
CN209556323U (en) A kind of wellbore operations platform and template integrated construction system
CN109025235A (en) Wellbore operations platform and template integrated construction system and the method constructed using it
CN106988529A (en) A kind of stair template structure and the stair construction method using the formwork structure
CN201567787U (en) Form-traveler steel formwork
CN204754226U (en) Detachable construction platform of unloading
CN103104090A (en) Silo house concrete whole sliding and ascending module
CN202831621U (en) Integrated slipform for silo concrete
CN205134966U (en) Superaltitude conversion truss hoisting device
CN212376268U (en) Three-step bottom die reinforcing device and reinforcing and supporting system on stairs
CN204753374U (en) Equipment bridge railing
CN2656540Y (en) Telescopic elevator shaft formwork
CN108193874A (en) A kind of stairway steel formwork for building
CN102767280A (en) Quick-dismounting system and installation method for top plate
CN203113752U (en) Construction platform of elevator shaft
CN106522531A (en) Ring lock scaffold opening portion bracket supporting system
CN215519955U (en) Dog teeth for aluminum alloy stair template
CN111173263A (en) Integral aluminum die body based on narrow expansion joint
CN203213566U (en) Scaffold cantilever device
CN203795681U (en) Opening type 914 floor bearing plate
CN205955195U (en) Section steel stair template and construction system
CN213449189U (en) Parapet construction tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191029

CF01 Termination of patent right due to non-payment of annual fee