CN204754226U - Detachable construction platform of unloading - Google Patents

Detachable construction platform of unloading Download PDF

Info

Publication number
CN204754226U
CN204754226U CN201520388891.2U CN201520388891U CN204754226U CN 204754226 U CN204754226 U CN 204754226U CN 201520388891 U CN201520388891 U CN 201520388891U CN 204754226 U CN204754226 U CN 204754226U
Authority
CN
China
Prior art keywords
steel pipe
discharging platform
body transom
building operations
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520388891.2U
Other languages
Chinese (zh)
Inventor
陈辉
吴其民
张剑锋
李臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Branch Office Of Guangsha Construction Group Co Ltd
Original Assignee
Guizhou Branch Office Of Guangsha Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Branch Office Of Guangsha Construction Group Co Ltd filed Critical Guizhou Branch Office Of Guangsha Construction Group Co Ltd
Priority to CN201520388891.2U priority Critical patent/CN204754226U/en
Application granted granted Critical
Publication of CN204754226U publication Critical patent/CN204754226U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a detachable construction platform of unloading, include the chassis and install the girder in the chassis both sides respectively, be provided with guardrail installation base on the girder, install the guardrail on guardrail installation base, the chassis comprises body transom A and body transom B, the last sliding block that is fixed with of body transom A, sliding block inserts in the body transom B to lock through the fixed pin, the girder outside still is provided with cable wire anchoring device, cable wire anchoring device comprises forked tail bottom plate, accommodate the lead screw and the dovetail block that sets up on accommodate the lead screw, and wherein, accommodate the lead screw passes through at both ends cable wire anchoring device to be fixed at the forked tail bottom plate, and the dovetail block suit is on accommodate the lead screw to be connected with the cooperation of forked tail bottom plate. The utility model discloses a be provided with the cable wire anchor outside the girder to can adjust two contained angles between the cable wire wantonly, make things convenient for the cable wire installation, be convenient for adjust the installation stationarity of the platform of unloading.

Description

A kind of detachable building operations discharging platform
Technical field
The utility model relates to a kind of detachable building operations discharging platform, belongs to technical field of building construction.
Background technology
Along with the high speed development of urban construction, urban land resource is fewer and feweri, thereby produce a large amount of highrise building, highrise building is increasing to the difficulty of the material transport such as detachable building operations discharging platform a kind of in work progress, steel pipe or door subrack, therefore traditional steel pipe console mode discharging platform can not meet its transhipment requirement, often affects the duration.In order to ensure construction safety, shorten the construction period, reduce difficulty of construction, occurred various Construction Unloading Platform at construction field at present.Such as, the Chinese patent of publication number position CN202209051U discloses a kind of discharging platform for high-rise building construction, and this discharging platform comprises two girders, two secondary beams and discharging platform; Two parallel secondary beams are vertically connected on two parallel girders respectively, the rectangle underframe of composition one end open, the framework side on underframe is utilized to be designed to a basket formula discharging platform, overhanging by establishing wire-rope sling rear end to do in the front end of two girders, be connected and fixed can Fast Installation use respectively at the round steel suspension ring in the round steel garter spring be embedded on flooring and upper strata concrete beam plate.Although this discharging platform can self manufacture use, be applicable to the transhipment of the above constructional materials of multilayer.But the width of this discharging platform and length are all unadjustable, therefore the building operations for different in width needs to make corresponding discharging platform, construction cost is caused greatly to increase, simultaneously this discharging platform framework and beam welding as a whole, more difficult for larger stage+module, need its corresponding crane gear of adapted to install, add equipment investment; Because wire-rope sling is fixed on girder, therefore two wire rope installation angles of the same side not easily regulate, when needs adjust its angle to ensure that stage+module stationarity requires, need again to look for position welding wire rope suspension ring, thus affect construction speed, and be difficult to the installation stationarity adjusting platform.
For another example, publication number is that the Chinese patent of CN204238556U discloses a kind of adjustable overhanging type discharging platform, comprise girder, secondary beam, landing slab and the fixture of floor plates concrete structure is fixed in girder activity, girder one end is provided with the clamping block with fixture clamping, the other end is outwards encorbelmented, its end is equipped with drag-line, and this drag-line other end is connected to fixture through suspension ring.This discharging platform can to skid off and sliding into towards floor plates concrete structure direction without during scaffold to the rightabout of floor plates concrete structure when there being scaffold, realize regulating rapidly to switch under two kinds of operating modes using, can not building and building operations impacted discharging platform; Drag-line is fixed to and this discharging platform same level face place, is more convenient for regulating.But this discharging platform is the installation site being regulated platform by the length of erection of main beam, and platform itself can not regulate, the fixed range simultaneously between two drag-lines is unadjustable, can not meet the instructions for use of same drag-line setting angle.Therefore existing Construction Unloading Platform is desirable not enough, awaits perfect further.
Utility model content
For solving the problems of the technologies described above, the utility model provides a kind of detachable building operations discharging platform, and this kind of detachable building operations discharging platform passes through
The utility model is achieved by the following technical programs.
The detachable building operations discharging platform of the one that the utility model provides; Comprise underframe and be arranged on the girder of underframe both sides respectively, described girder is provided with guardrail mounting seat, guardrail mounting seat is provided with guardrail, described underframe is made up of body transom A and body transom B, described body transom A is fixed with slipping block, and described slipping block inserts in body transom B, and is locked by steady pin, also be provided with cable wire anchoring device outside described girder, described underframe is provided with panel.
Described cable wire anchoring device is made up of dovetail base plate, adjustment screw mandrel and the dovetails be arranged on adjustment screw mandrel, wherein, regulate screw mandrel two ends to be fixed on dovetail base plate by cable wire anchoring device, dovetails is sleeved on and regulates on screw mandrel, and is provided with retainer ring in dovetails.
Described guardrail is made up of some vertical steel pipes and the lateral connection steel pipe be arranged at above vertical steel pipe, is provided with and laterally strengthens steel pipe between described every root vertical steel pipe.
Described guardrail mounting seat is made up of the some base plates on steel pipe post and setting and steel pipe post, and steel pipe post is provided with some through holes.
The quantity of described vertical steel pipe and arrangement pitch and base plate match.
The external diameter of described vertical steel pipe and the internal diameter of base plate match.
Described girder adopts i iron to make.
Described panel adopts checkered steel plate to make.
Described body transom A and body transom B is box-structure, and the external dimensions of the inner cavity size of box-structure and slipping block matches.
Described body transom A and body transom B all adopts square steel to make, and square steel inner cavity size and the external dimensions of slipping block match.
The beneficial effects of the utility model are:
Compared with prior art, the utility model underframe can carry out telescopic adjustment, to meet the instructions for use of different in width, overcome existing discharging platform can not regulate in the direction of the width existing for deficiency; Owing to having cable wire anchor device in girder arranged outside, thus the angle between two cable wires can be regulated arbitrarily, facilitate cable wire to install, be convenient to the installation stationarity regulating discharging platform.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation after Fig. 1 increases regulating block;
Fig. 3 is that in Fig. 2, panel is separated from the structural representation after underframe;
Fig. 4 is the structural representation of cable wire anchor device in the utility model;
Fig. 5 is the exploded perspective view of Fig. 4;
Fig. 6 is the structural representation of guardrail in the utility model;
Fig. 7 is guardrail mounting seat structural representation in the utility model;
Fig. 8 is the structural representation after the utility model fixing tightwire;
Fig. 9 is exploded perspective view of the present utility model.
In figure: 1-girder, 2-panel, 3-guardrail, 4-guardrail mounting seat, 5-cable wire anchoring device, 6-regulating block, 7-underframe, 8-cable wire, 31-vertical steel pipe, 32-lateral connection steel pipe, 33-laterally strengthens steel pipe, 41-steel pipe post, 42-base plate, 51-dovetail base plate, 52-regulates screw mandrel, 53-dovetails, 54-fixed block, 55-retainer ring, 56-locking nut, 57-bolt, 71-body transom A, 72-slipping block, 73-body transom B, 74-steady pin.
Detailed description of the invention
Further describe the technical solution of the utility model below, but described in claimed scope is not limited to.
A kind of detachable building operations discharging platform; Comprise underframe 7 and be arranged on the girder 1 of underframe 7 both sides respectively, described girder 1 is provided with guardrail mounting seat 4, guardrail mounting seat 4 is provided with guardrail 3, described underframe 7 is made up of body transom A71 and body transom B73, described body transom A71 is fixed with slipping block 72, and described slipping block 72 inserts in body transom B73, and is locked by steady pin 74, also be provided with cable wire anchoring device 5 outside described girder 1, described underframe 7 is provided with panel 2.In the technical program, guardrail mounting seat 4 is fixed on girder 1 by bolt, guardrail 3 directly and guardrail mounting seat 4 Moveable assembled, underframe 7 is two parts, and connected by slipping block 72, in the technical program, each parts of composition discharging platform are detachablely to be assembled at the construction field (site), quick and easy for installation, a people gets final product on-site consolidation, avoids the input of crane gear, greatly reduces construction cost.
Described cable wire anchoring device 5 is made up of dovetail base plate 51, adjustment screw mandrel 52 and the dovetails 53 be arranged on adjustment screw mandrel 52, wherein, screw mandrel 52 two ends are regulated to be fixed on dovetail base plate 51 by fixed block 54, dovetails 53 is sleeved on and regulates on screw mandrel 52, and is provided with retainer ring 55 in dovetails 53.Adopt the technical program, dovetail base plate 51 and dovetails 53 are connected, and adjustment screw mandrel 52 is fixed on dovetail base plate 51 by bolt 57 by fixed block 54, thus dovetails 53 can be made to regulate at adjustment screw mandrel 52, after regulating, locked by the locking nut 56 being arranged on dovetails 53 both sides.
Described guardrail 3 is made up of some vertical steel pipes 31 and the lateral connection steel pipe 32 be arranged at above vertical steel pipe 31, is provided with and laterally strengthens steel pipe 33 between described every root vertical steel pipe 31.
Described guardrail mounting seat 4 is made up of the some base plates 42 on steel pipe post 41 and setting and steel pipe post 41, and steel pipe post 41 is provided with some through holes.
The quantity of described vertical steel pipe 31 and arrangement pitch and base plate 42 match.
The external diameter of described vertical steel pipe 31 and the internal diameter of base plate 42 match.
Adopt technique scheme, vertical steel pipe 31 when mounted, directly inserts in corresponding steel pipe post 41, forms convenient and swift, ask a people to complete assembling by guardrail, time saving and energy saving.
Described girder 1 adopts i iron to make.
Described panel 2 adopts checkered steel plate to make.
Described body transom A71 and body transom B73 is box-structure, and the external dimensions of the inner cavity size of box-structure and slipping block 72 matches.
Body transom A71 described in 1 and body transom B73 all adopts square steel to make, and square steel inner cavity size and the external dimensions of slipping block 72 match.

Claims (10)

1. a detachable building operations discharging platform, it is characterized in that: comprise underframe (7) and be arranged on the girder (1) of underframe (7) both sides respectively, described girder (1) is provided with guardrail mounting seat (4), guardrail mounting seat (4) is provided with guardrail (3), described underframe (7) is made up of body transom A (71) and body transom B (73), described body transom A (71) is fixed with slipping block (72), described slipping block (72) inserts in body transom B (73), and by steady pin (74) locking, described girder (1) outside is also provided with cable wire anchoring device (5), described underframe (7) is provided with panel (2).
2. a kind of detachable building operations discharging platform as claimed in claim 1, it is characterized in that: described cable wire anchoring device (5) is made up of dovetail base plate (51), adjustment screw mandrel (52) and the dovetails (53) be arranged in adjustment screw mandrel (52), wherein, screw mandrel (52) two ends are regulated to be fixed on dovetail base plate (51) by cable wire anchoring device (5), dovetails (53) is sleeved on and regulates on screw mandrel (52), and is provided with retainer ring (55) in dovetails (53).
3. a kind of detachable building operations discharging platform as claimed in claim 1, it is characterized in that: described guardrail (3) is made up of some vertical steel pipes (31) and the lateral connection steel pipe (32) be arranged at above vertical steel pipe (31), is provided with and laterally strengthens steel pipe (33) between described every root vertical steel pipe (31).
4. a kind of detachable building operations discharging platform as claimed in claim 1, it is characterized in that: described guardrail mounting seat (4) is made up of the some base plates (42) on steel pipe post (41) and setting and steel pipe post (41), and steel pipe post (41) is provided with some through holes.
5. a kind of detachable building operations discharging platform as claimed in claim 3, is characterized in that: the quantity of described vertical steel pipe (31) and arrangement pitch and base plate (42) match.
6. a kind of detachable building operations discharging platform as claimed in claim 3, is characterized in that: the external diameter of described vertical steel pipe (31) and the internal diameter of base plate (42) match.
7. a kind of detachable building operations discharging platform as claimed in claim 1, is characterized in that: described girder (1) adopts i iron to make.
8. a kind of detachable building operations discharging platform as claimed in claim 1, is characterized in that: described panel (2) adopts checkered steel plate to make.
9. a kind of detachable building operations discharging platform as claimed in claim 1, it is characterized in that: described body transom A (71) and body transom B (73) are box-structure, and the external dimensions of the inner cavity size of box-structure and slipping block (72) matches.
10. a kind of detachable building operations discharging platform as claimed in claim 1, it is characterized in that: described body transom A (71) and body transom B (73) all adopt square steel to make, and square steel inner cavity size and the external dimensions of slipping block (72) match.
CN201520388891.2U 2015-06-08 2015-06-08 Detachable construction platform of unloading Expired - Fee Related CN204754226U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520388891.2U CN204754226U (en) 2015-06-08 2015-06-08 Detachable construction platform of unloading

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520388891.2U CN204754226U (en) 2015-06-08 2015-06-08 Detachable construction platform of unloading

Publications (1)

Publication Number Publication Date
CN204754226U true CN204754226U (en) 2015-11-11

Family

ID=54468949

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520388891.2U Expired - Fee Related CN204754226U (en) 2015-06-08 2015-06-08 Detachable construction platform of unloading

Country Status (1)

Country Link
CN (1) CN204754226U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106906756A (en) * 2017-04-26 2017-06-30 武汉二航路桥特种工程有限责任公司 Can Fast Installation remove maintenance operation platform and its construction method
CN107165425A (en) * 2017-05-25 2017-09-15 张志通 A kind of discharging platform for building
CN109056521A (en) * 2018-09-11 2018-12-21 华东交通大学 A kind of maintenance platform and maintenance activity method for high-speed rail bridge steel member
CN111852048A (en) * 2020-08-11 2020-10-30 中发腾龙建设有限公司 High-rise building construction discharge apparatus

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106906756A (en) * 2017-04-26 2017-06-30 武汉二航路桥特种工程有限责任公司 Can Fast Installation remove maintenance operation platform and its construction method
CN107165425A (en) * 2017-05-25 2017-09-15 张志通 A kind of discharging platform for building
CN109056521A (en) * 2018-09-11 2018-12-21 华东交通大学 A kind of maintenance platform and maintenance activity method for high-speed rail bridge steel member
CN111852048A (en) * 2020-08-11 2020-10-30 中发腾龙建设有限公司 High-rise building construction discharge apparatus

Similar Documents

Publication Publication Date Title
CN204754226U (en) Detachable construction platform of unloading
CN201826525U (en) Climbing shuttering system device for buildings
CN101672102B (en) Steel structural overhead ceiling construction platform
CN202787991U (en) Overhanging passageway for tower crane
CN102953344B (en) Climbing cone type triangular cantilever bracket
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN204850516U (en) A horizontal lifeline system for steel construction factory building
AU2014224104B2 (en) Construction Site Safety Screen System
CN203867198U (en) Slip equipment for high-rise steel structure transfer layer truss
CN203383516U (en) Construction device for installing connecting beam on frame type steel structure
CN103015693A (en) Three-dimensional construction device for super high-rise core tube beam-slab structure
CN206636168U (en) A kind of overhanging scaffold system
CN108331335A (en) A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support
CN203257080U (en) Adjustable overhang supporting device for building construction
CN107313597A (en) Modularization ready-package discharging platform for assembled architecture
CN204326490U (en) A kind of construction of lift well operating platform
CN202745354U (en) Toolized discharging steel platform
CN208456133U (en) Overhanging slab form installs device on the outside of a kind of shear wall
CN208152356U (en) A kind of rack smallpox cell cube system
CN206873303U (en) A pin-connected panel high position falls boom support
CN205063310U (en) Multi -functional operation platform of liftable formula in elevartor shaft
CN215717458U (en) Device for hanging safety belt of high-altitude operation platform constructor
CN204609291U (en) Formwork system
CN214144122U (en) Easily install C shaped steel bearing frame structure
CN204826704U (en) A horizontal lifeline system for steel construction factory building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151111

Termination date: 20210608