CN204850516U - A horizontal lifeline system for steel construction factory building - Google Patents
A horizontal lifeline system for steel construction factory building Download PDFInfo
- Publication number
- CN204850516U CN204850516U CN201520588240.8U CN201520588240U CN204850516U CN 204850516 U CN204850516 U CN 204850516U CN 201520588240 U CN201520588240 U CN 201520588240U CN 204850516 U CN204850516 U CN 204850516U
- Authority
- CN
- China
- Prior art keywords
- steel
- lifeline
- factory building
- line system
- girder steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 53
- 239000010959 steel Substances 0.000 title claims abstract description 53
- 238000010276 construction Methods 0.000 title abstract description 7
- 230000001105 regulatory effect Effects 0.000 claims description 5
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 238000000034 method Methods 0.000 abstract description 6
- 210000001364 upper extremity Anatomy 0.000 abstract 2
- 238000009434 installation Methods 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 241000269799 Perca fluviatilis Species 0.000 description 1
- 230000001276 controlling effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model discloses a horizontal lifeline system for steel construction factory building, including lifeline, bracing piece and with the upper limb listrium complex mounting of girder steel, the top of bracing piece be equipped with with lifeline complex lifeline mounting hole, its bottom with mounting fixed connection, the mounting has a centre gripping mouth, is equipped with 2 at least screws on the bottom plate of centre gripping mouth, is equipped with complex fastening bolt in the screw, makes on the mounting centre gripping is fixed in the upper limb listrium of girder steel through adjusting fastening bolt, the top flange plate thickness more than or equal to 14mm of girder steel. The utility model discloses an on horizontal lifeline system only can use the steel construction factory building of constituteing with simple steel, the technique of having filled this field was blank, obviously has positive realistic meaning.
Description
Technical field
The utility model relates to a kind of horizontal life line system for steel-structure factory building, is specifically related to a kind of horizontal life line system moving horizontally operation fall arrest, belongs to fall arrest field.
Background technology
In recent years, because the output of steel of China increases, a lot of place all starts to adopt steel-structure factory building, specifically can also divide light-duty and Heavy Type Steel Structure factory building.The industry that this steel are built and civilian construction facility are called as steel-structure factory building.Steel-structure factory building tool has the following advantages: (1) construction quality is light, and intensity is high, and span is large; (2) the building operations duration is short, corresponding reduction cost of investment; (3) building is moved conveniently, reclaims pollution-free.Therefore, steel-structure factory building obtains and develops fast.
In prior art, steel-structure factory building refers to that main supporting member is made up of steel, the wingceltis bar comprising built-in fitting, steel column, girder steel and be provided with between girder steel; Girder steel and wingceltis bar constitute the roof structure of factory building, and roof structure is also equipped with color steel watt.
But, in the building course of steel-structure factory building, need to adopt loop wheel machine lifting girder steel, specifically: with slip rope controlling party to, arm pendulum is to design elevation and installation site, and put in place by the rope traction of girder steel one end, worker stands is on scaffold, hand steered girder steel enters beam column/connection operation area, there is contraposition junction plate at beam-to-column joint place, and the workman of girder steel one end carries out the contraposition of bolt hole, wears high-strength bolt, the workman of the girder steel other end following closely, adopt same operation, after girder steel is calibrated, just can bolt on, after bolt tightening, i.e. detachable hook; Finally carry out electric welding, with electric welding do finally weld time, the same side welding simultaneously at girder steel two ends should be avoided, in order to avoid make girder steel tilt because weld seam shrinks.In addition, after girder perch, workman needs to go to hoist cable place and unties lifting rope.After steel girder erection completes, also need wingceltis bar is installed.In above-mentioned work progress and untie in lifting rope operation, there is great potential safety hazard in work high above the ground in workman, all needs to arrange safety prevention measure.
In prior art, for work high above the ground, there is the horizontal life line system of fall arrest, as Chinese invention patent application CN103949023A discloses a kind of horizontal life line system, it comprises fixed bearing, regulate tensioning apparatus, lifeline, support is held up in centre, outer corner holds up support, inside lock holds up support, snubber, fixed bearing one end is fixed on standing part, the other end connects snubber, the snubber other end connects lifeline, support is held up in lifeline centre, outer corner holds up support, inside lock holds up support fixing, the lifeline other end connects adjustment tensioning apparatus, the tensioning apparatus other end is regulated to be connected and fixed bearing, the fixed bearing other end is fixed on standing part.But the complicated structure of above-mentioned horizontal life line system, is only applicable to high-rise civil construction thing, cannot be applied on the steel-structure factory building that only forms with simple steel, this is because girder steel is in I-shaped, be made up of top flange plate, web, bottom wing listrium; Therefore it does not have installation or the permanent position of similar civil construction thing, therefore above-mentioned horizontal life line system cannot be suitable for.
Therefore, develop a kind of horizontal life line system that can be applied on steel-structure factory building, to ensure the life security of workman, obviously there is positive realistic meaning.
Summary of the invention
Goal of the invention of the present utility model is to provide a kind of horizontal life line system for steel-structure factory building.
To achieve the above object of the invention, the technical solution adopted in the utility model is: a kind of horizontal life line system for steel-structure factory building, the fixture comprising lifeline, support bar and coordinate with the top flange plate of girder steel;
The top of described support bar is provided with the lifeline installing hole coordinated with lifeline, and its bottom is fixedly connected with described fixture;
Described fixture has a clamp port, and the base plate of clamp port is provided with at least 2 screws, is provided with the fastening bolt of cooperation in screw, makes fixture be clamped and fastened on the top flange plate of girder steel by regulating fastening bolt;
The thickness of the top flange plate of described girder steel is more than or equal to 14mm.
Above, described lifeline is prior art, is generally to adopt wire rope.
Described girder steel is prior art, is made up of, in I-shaped top flange plate, web, bottom wing listrium.
In technique scheme, the position that the top of described support bar corresponds to lifeline installing hole is also provided with jackscrew.Jackscrew is used for withstanding lifeline, makes it be fixed in lifeline installing hole.
In technique scheme, described fixture comprises an angle steel, and a limit of angle steel is installed with cover plate, and another limit of cover plate and angle steel forms described clamp port; Another limit of angle steel is provided with at least 2 screws.
In technique scheme, described cover plate is also provided with reinforcing rib.This is the intensity in order to increase cover plate.
In technique scheme, the base plate of described clamp port is just installed with nut to the position of described screw.Thus screw can be made together with the screwed hole of nut to form the duct be threaded, gain in strength.
Because technique scheme is used, the utility model compared with prior art has following advantages:
1. the utility model design obtains a kind of horizontal life line system for steel-structure factory building, practical application proves: horizontal life line system of the present utility model can be applied on the steel-structure factory building that only forms with simple steel, fill up the technological gap in this field, obviously there is positive realistic meaning;
2. the utility model adopts fixture to be clamped and fastened on the top flange plate of girder steel, by regulating fastening bolt to regulate, not only easy for installation, and can disassemble and carry out Reusability, reduces costs;
3. structure of the present utility model is simple, is easy to realize, and is suitable for applying.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model embodiment one.
Fig. 2 is the lateral view of fixture in the utility model embodiment one.
Fig. 3 is the front view of fixture in the utility model embodiment one.
Wherein: 1, support bar; 2, top flange plate; 3, lifeline installing hole; 4, clamp port; 5, fastening bolt; 6, angle steel; 7, cover plate; 8, reinforcing rib; 9, nut.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further described:
Embodiment one
Shown in Fig. 1 ~ 3, a kind of horizontal life line system for steel-structure factory building, the fixture comprising lifeline, support bar 1 and coordinate with the top flange plate 2 of girder steel;
The top of described support bar is provided with the lifeline installing hole 3 coordinated with lifeline, and its bottom is fixedly connected with described fixture;
Described fixture has a clamp port 4, and the base plate of clamp port is provided with 2 screws, is provided with the fastening bolt 5 of cooperation in screw, makes fixture be clamped and fastened on the top flange plate of girder steel by regulating fastening bolt;
The thickness of the top flange plate of described girder steel is 14mm.
The position that the top of described support bar corresponds to lifeline installing hole is also provided with jackscrew.
Described fixture comprises an angle steel 6, and a limit of angle steel is installed with cover plate 7, and another limit of cover plate and angle steel forms described clamp port; Another limit of angle steel is provided with 2 screws.
Described cover plate is also provided with reinforcing rib 8.
The base plate of described clamp port is just installed with nut 9 to the position of described screw.Thus make screw form the duct be threaded together with the screwed hole of nut, gain in strength.
Above, described lifeline is prior art, is generally to adopt wire rope.Described girder steel is prior art, is made up of, in I-shaped top flange plate, web, bottom wing listrium.Shown in Figure 1.
Claims (5)
1. for a horizontal life line system for steel-structure factory building, it is characterized in that: the fixture comprising lifeline, support bar (1) and coordinate with the top flange plate (2) of girder steel;
The top of described support bar is provided with the lifeline installing hole (3) coordinated with lifeline, and its bottom is fixedly connected with described fixture;
Described fixture has a clamp port (4), and the base plate of clamp port is provided with at least 2 screws, is provided with the fastening bolt (5) of cooperation in screw, makes fixture be clamped and fastened on the top flange plate of girder steel by regulating fastening bolt;
The thickness of the top flange plate of described girder steel is more than or equal to 14mm.
2. the horizontal life line system for steel-structure factory building according to claim 1, is characterized in that: the position that the top of described support bar corresponds to lifeline installing hole is also provided with jackscrew.
3. the horizontal life line system for steel-structure factory building according to claim 1, it is characterized in that: described fixture comprises an angle steel (6), a limit of angle steel is installed with cover plate (7), and another limit of cover plate and angle steel forms described clamp port; Another limit of angle steel is provided with at least 2 screws.
4. the horizontal life line system for steel-structure factory building according to claim 3, is characterized in that: described cover plate is also provided with reinforcing rib (8).
5. the horizontal life line system for steel-structure factory building according to claim 1, is characterized in that: the base plate of described clamp port is just installed with nut (9) to the position of described screw.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520588240.8U CN204850516U (en) | 2015-08-07 | 2015-08-07 | A horizontal lifeline system for steel construction factory building |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520588240.8U CN204850516U (en) | 2015-08-07 | 2015-08-07 | A horizontal lifeline system for steel construction factory building |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204850516U true CN204850516U (en) | 2015-12-09 |
Family
ID=54741081
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520588240.8U Expired - Fee Related CN204850516U (en) | 2015-08-07 | 2015-08-07 | A horizontal lifeline system for steel construction factory building |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204850516U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106050879A (en) * | 2016-07-22 | 2016-10-26 | 中国建筑第八工程局有限公司 | Nut installation device and installation method thereof |
| CN106760581A (en) * | 2016-12-23 | 2017-05-31 | 美联钢结构建筑系统(上海)股份有限公司 | A kind of steel structure member and preparation method thereof |
| CN108677740A (en) * | 2018-07-27 | 2018-10-19 | 中国铁建大桥工程局集团有限公司 | A kind of device and method for ensureing steel girder member bar consolidation service personnel safety |
-
2015
- 2015-08-07 CN CN201520588240.8U patent/CN204850516U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106050879A (en) * | 2016-07-22 | 2016-10-26 | 中国建筑第八工程局有限公司 | Nut installation device and installation method thereof |
| CN106760581A (en) * | 2016-12-23 | 2017-05-31 | 美联钢结构建筑系统(上海)股份有限公司 | A kind of steel structure member and preparation method thereof |
| CN108677740A (en) * | 2018-07-27 | 2018-10-19 | 中国铁建大桥工程局集团有限公司 | A kind of device and method for ensureing steel girder member bar consolidation service personnel safety |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202299464U (en) | Steel column rapid hoisting and in-position correcting device | |
| CN113323365B (en) | Elevator shaft protection platform and construction method | |
| CN207294093U (en) | A kind of large span steel truss integral lifting apparatus | |
| CN102275829A (en) | Frame high-altitude piece mounting method of dry quenching lifter device | |
| CN204826704U (en) | A horizontal lifeline system for steel construction factory building | |
| CN103628692B (en) | A kind of floor beam mounting bracket and use it to install the method for floor beam | |
| CN104836161A (en) | Hanger frame of fixed-steering pulley | |
| CN204753397U (en) | Temporary installation of hangers for steel box bridges | |
| CN103835516B (en) | A kind of H profile steel beam installs gap adjusting device and using method thereof | |
| CN203347024U (en) | Continuous purline installation connecting structure in steel structure integral hoisting method | |
| CN202787991U (en) | Overhanging passageway for tower crane | |
| CN201321723Y (en) | Steel column none-cable wind rope correcting structure | |
| CN204737704U (en) | Be used for special hanging flower basket of wiping line installation | |
| CN217398221U (en) | Auxiliary tool for hoisting large flue in limited space | |
| CN102733612B (en) | Mounting method of electric hoist orbit | |
| CN203821865U (en) | Adjusting device for installing gap of H-shaped steel beam | |
| CN205855702U (en) | A kind of Elevator weight sensor block assembly | |
| CN214899827U (en) | High-altitude outdoor cable terminal work platform | |
| CN204676756U (en) | The fastener of top board furred ceiling | |
| CN204980842U (en) | Crane girder hoist and mount special lifting device | |
| CN207863502U (en) | A kind of Construction of Steel Structure life line bracket | |
| CN218879137U (en) | Special hoisting tool for installing corner connecting device of steel structure horizontal supporting beam | |
| CN206809562U (en) | A kind of repeatable life line bracket utilized | |
| CN202214972U (en) | Frame body of attached lifting scaffold | |
| CN205709520U (en) | A kind of bridge crane diving platform structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151209 Termination date: 20160807 |