CN109025235A - Wellbore operations platform and template integrated construction system and the method constructed using it - Google Patents

Wellbore operations platform and template integrated construction system and the method constructed using it Download PDF

Info

Publication number
CN109025235A
CN109025235A CN201810921708.9A CN201810921708A CN109025235A CN 109025235 A CN109025235 A CN 109025235A CN 201810921708 A CN201810921708 A CN 201810921708A CN 109025235 A CN109025235 A CN 109025235A
Authority
CN
China
Prior art keywords
template
wellbore operations
platform
operations platform
idler wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810921708.9A
Other languages
Chinese (zh)
Other versions
CN109025235B (en
Inventor
高扬
罗金龙
庄寿松
刘垒垒
郑文凯
吴兵兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201810921708.9A priority Critical patent/CN109025235B/en
Publication of CN109025235A publication Critical patent/CN109025235A/en
Application granted granted Critical
Publication of CN109025235B publication Critical patent/CN109025235B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/28Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Abstract

Wellbore operations platform and template integrated construction system and the method constructed using it, including wellbore operations platform and it is fixed on the vertical steel frame plywood template system of wellbore operations platform surrounding, wellbore operations mesa base is uniformly provided at least four wheeled fixtures, wheeled fixture includes the idler wheel being arranged towards on the outside of wellbore operations platform and the idler wheel rotary connector for idler wheel to be fixed on to operating platform bottom, vertical steel frame plywood template system bottom is fixed by clamping piece with the connector flange plate for being set to wellbore operations surrounding edge position, vertical steel frame plywood template system is equipped with and the one-to-one bolt groove template of reserved groove location, bolt groove shape of template and reserved groove shapes are adapted.The present invention is able to satisfy the demand for security of construction, reduces worker and faces side operating risk, while can integrally be promoted in place, and vertical construction overall process is taken without repeating to tear open, provides convenience for worker's construction.The wellbore operations platform is easy to process, convenient to assemble and disassemble, quick, and floor transhipment convenience, cost is relatively low.

Description

Wellbore operations platform and template integrated construction system and the method constructed using it
Technical field
The invention belongs to shaft construction field more particularly to wellbore operations platform and template integrated construction system and utilizations Its method constructed.
Background technique
At present in construction of elevator shaft operation, mostly use steel wellbore operations platform, steel pipe scaffold wellbore operations flat Platform.When conventional steel wellbore operations platform construction, it need to be reserved in every layer of pit shaft side wall and wear I-steel hole, lead to subsequent closure Wall hole workload increases;When conventional steel wellbore operations platform construction, scaffold takes that tear project amount open larger, construction cost compared with It is high.
Summary of the invention
The object of the present invention is to provide wellbore operations platform and template integrated construction system and using its construction method, It is complicated to solve prior art construction, the high technical problem of construction cost;And it solves and low, the work that solves prior art construction efficiency Phase longer problem.
To achieve the above object, the present invention adopts the following technical scheme:
A kind of wellbore operations platform and template integrated construction system, it is characterised in that: including wellbore operations platform and be fixed on The vertical steel frame plywood template system of wellbore operations platform surrounding, the wellbore operations mesa base are uniformly provided at least four Wheeled fixture, the wheeled fixture include towards the idler wheel of setting on the outside of wellbore operations platform and for idler wheel to be fixed on operation The idler wheel rotary connector of mesa base, the idler wheel fix the notch of the reserved groove in the reserved groove of well bore wall Towards wellbore operations platform, bottom surface is plane, and top surface is towards the acclivitous inclined-plane of wellbore operations platform, the idler wheel rotation Connector is fixed by rotary shaft and the fixing piece of operating platform bottom, and the idler wheel can be by idler wheel rotary connector around rotation Axis rotates down 0 ~ 45 °;
The vertical steel frame plywood template system bottom passes through clamping piece and the connection for being set to wellbore operations surrounding edge position Part flange plate is fixed, and vertical steel frame plywood template system is spliced by several pieces of steel frame plywood formworks, the vertical steel Frame glue plywood template system is equipped with and the one-to-one bolt groove template of reserved groove location, the bolt groove template shape Shape and reserved groove shapes are adapted, bolt groove template pass through the hole to be provided being set on vertical steel frame plywood template system, And fixed by fixation kit and vertical steel frame plywood template system, the fixation kit includes the level being stuck in outside hole to be provided Fixed keel and the bolt rotary shaft for regulating pin groove template and vertical steel frame plywood template system relative distance, institute It states bolt rotary shaft and passes perpendicularly through horizontal fixed keel, and fixed by mountain type card and the fixed keel of level.
It is further preferred that the idler wheel rotary connector includes that two block structures are identical and connecting plate disposed in parallel, institute Roller portion exposing is stated, is partially built between two pieces of connecting plate ends, two pieces of connecting plate bottoms, idler wheel are arranged right below gear Plate, the baffle make idler wheel be only capable of rolling along well bore wall upwards.
Further, the wellbore operations platform includes the platform main joist set gradually from bottom to top, platform secondary joist Peaceful deck plate.
Further, the platform main joist includes the channel steel of longitudinal uniform intervals setting, and the platform secondary joist includes Laterally homogeneous spaced square steel, the platform panel are formed on square steel by checkered steel plate paving.
Further, the platform main joist is equipped with the hanging ring for promoting pit shaft operating platform.
Further, the fixing piece is laterally disposed channel steel, and channel steel top flange plate is fixed with platform main joist bolt, The idler wheel rotary connector is fixed by rotary shaft and channel steel back cord.
Further, the connector section is L-type, and side flange plate is fixed with wellbore operations platform, another side wing edge Plate is fixed with by clamping piece and vertical steel frame plywood template system bottom end;The clamping piece include snap-ring groove with for screwing Snap-ring groove screws end.
Further, the steel frame plywood formwork of hole to be provided hole surrounding, which is equipped with, reinforces keel.
Further, it is erected with scaffold on the wellbore operations platform, when the high 3m of pit shaft layer, crosshead is higher by this layer of knot Structure 1.8m completely spreads scaffold board on crosshead.
The method constructed using wellbore operations platform and template integrated construction system, which is characterized in that including with Lower step:
Step 1: this layer of shaft construction: wellbore operations platform and vertical steel frame plywood template system being promoted in place, screwed out perpendicular Bolt groove template after-pouring concrete in steel frame plywood formwork system, finishes precession bolt groove to concrete coagulation Template, forms reserved groove on well bore wall, and wellbore operations platform and vertical steel frame plywood template system are promoted next construction Position, idler wheel scroll up along well bore wall, until idler wheel fixes in reserved groove, screw out bolt groove template after-pouring coagulation Soil finishes precession bolt groove template to concrete coagulation, forms reserved groove on well bore wall, repeat the above steps until this layer Shaft construction finishes;
Step 2: conversion wellbore operations platform and template integrated construction system: vertical steel frame plywood template system is removed, and Wellbore operations platform and vertical steel frame plywood template system are converted by tower crane to upper layer pit shaft;
Step 3: construction upper layer pit shaft: after the floor slab construction of upper layer, upper layer pit shaft wall steel bar is bound, according to step 1 pair Upper layer pit shaft is constructed, until upper layer shaft construction finishes, repeats step 1 to step 3 until shaft construction finishes, until This, is finished using wellbore operations platform of the present invention and template integrated construction system construction pit shaft.
Compared with prior art the invention has the characteristics that and the utility model has the advantages that
Steel frame plywood formwork of the invention be equipped with bolt groove template, can make on well bore wall formed fix idler wheel reserve it is recessed Slot reserves groove not through pit shaft wall, avoids the subsequent trouble for blocking wall hole, construction method of the present invention is to worker Under the premise of constructing without influencing, using specification, the simple component of negligible amounts, wellbore operations platform is by clamping piece and vertically Steel frame plywood formwork system is fixed into an entirety, and the two can carry out whole promotion, when reducing the promotion of wellbore operations platform Tower crane occupancy improves construction efficiency.
The present invention is able to satisfy the demand for security of construction, reduces worker and faces side operating risk, while can integrally be promoted in place, erects It is taken to construction overall process without repeating to tear open, provides convenience for worker's construction.The wellbore operations platform is easy to process, it is convenient to assemble and disassemble, Fast, floor transhipment convenience, cost is relatively low.
The present invention has the characteristics that safety, is applicable in, and has good promotion and practical value, and can produce after extensive popularization and application Raw good economic benefit.
Detailed description of the invention
Fig. 1 is the position relationship structural diagram of wellbore operations platform and idler wheel of the present invention;
The cross-sectional view in the portion Fig. 2 Figure 1A-A;
Fig. 3 is the enlarged structure schematic diagram in the portion Fig. 2 C;
The attachment structure schematic diagram of Fig. 4 idler wheel of the present invention and idler wheel rotary connector;
Fig. 5 is that the present invention relates to the attachment structure schematic diagrams of baffle and connecting plate;
Fig. 6 is the structural schematic diagram that idler wheel of the present invention is in propradation;
Fig. 7 is the position relationship structural diagram of bolt groove template and steel frame plywood formwork of the present invention;
Fig. 8 is the attachment structure schematic diagram of horizontal fixed keel and bolt rotary shaft and pin groove template of the present invention;
Fig. 9 is the cross-sectional view in the portion Fig. 8 B-B.
Appended drawing reference: 1- idler wheel;2- reserves groove;3- idler wheel rotary connector;31- connecting plate;32- baffle;4- rotation Axis;5- clamping piece;51- snap-ring groove;52- screws end;6- steel frame plywood formwork;7- bolt groove template;The fixed dragon of 8- level Bone;9- bolt rotary shaft;10- platform main joist;11- platform secondary joist;12- platform panel;13- fixing piece;14- well bore wall; 15- hanging ring;16- connector;17- reinforces keel;The mountain 18- type card.
Specific embodiment
For realize the present invention technological means, character of innovation, reach purpose and effect is easy to understand, below to Invention further illustrates.
The embodiment recorded herein is specific specific embodiment of the invention, for illustrating design of the invention, Be it is explanatory and illustrative, should not be construed as the limitation to embodiment of the present invention and the scope of the invention.Except what is recorded herein Outside embodiment, those skilled in the art can also based on the claim of this application book and specification disclosure of that using aobvious and The other technical solutions being clear to, these technical solutions include using any obvious to making for the embodiment recorded herein The technical solution of substitutions and modifications.
A kind of wellbore operations platform and template integrated construction system, including wellbore operations platform and it is fixed on wellbore operations The vertical steel frame plywood template system of platform surrounding, as illustrated in fig. 1 and 2, wellbore operations platform include successively setting from bottom to top The peaceful deck plate 12 of platform main joist 10, platform secondary joist 11 set, platform main joist 10 include longitudinal uniform intervals setting Channel steel, platform secondary joist 11 include laterally homogeneous spaced square steel, square steel 20 × 40 × 1.5mm of model, platform panel 12 are formed on square steel by checkered steel plate paving, and platform main joist 10 is equipped with the hanging ring 15 for promoting pit shaft operating platform, Hanging ring 15 is made of 10mm thick steel plate, and wellbore operations mesa base is uniformly provided at least four wheeled fixtures, as shown in figure 4, wheel Formula fixture includes the idler wheel 1 being arranged towards on the outside of wellbore operations platform and the rolling for idler wheel 1 to be fixed on to operating platform bottom Rotary connector 3 is taken turns, idler wheel 1 is A80 pulley, and idler wheel 1 fixes in the reserved groove 2 of well bore wall 14, reserves the notch of groove 2 Towards wellbore operations platform, bottom surface is plane, and top surface is towards the acclivitous inclined-plane of wellbore operations platform, idler wheel rotation connection Part 3 is fixed by the fixing piece 13 of rotary shaft 4 and operating platform bottom, and fixing piece 13 is laterally disposed channel steel, channel steel upper limb Listrium is fixed with 10 bolt of platform main joist, and idler wheel rotary connector 3 is fixed by rotary shaft 4 and channel steel back cord, and rotary shaft 4 is M20 high-strength bolt rotary shaft, idler wheel 1 can rotate down 0 ~ 45 ° around rotary shaft 4 by idler wheel rotary connector 3, as shown in figure 5, Idler wheel rotary connector 3 including two block structures, expose, be partially built in by connecting plate 31 identical and disposed in parallel, 1 part of idler wheel Between two pieces of connecting plate ends, two pieces of connecting plate bottoms, idler wheel 1 are arranged right below baffle 32, and baffle 32 is only capable of idler wheel upwards It is rolled along well bore wall 14;
Vertical steel frame plywood template system bottom passes through clamping piece 5 and the connector 16 for being set to wellbore operations surrounding edge position Flange plate is fixed, as shown in figure 3,16 section of connector is L-type, side flange plate is fixed with wellbore operations platform, another flank Listrium is fixed with by clamping piece 5 and vertical steel frame plywood template system bottom end;Clamping piece 5 include snap-ring groove 51 be used for revolve Tight snap-ring groove 51 screws end 52, and vertical steel frame plywood template system is spliced by several pieces of steel frame plywood formworks 6, such as Shown in Fig. 7, vertical steel frame plywood template system be equipped with the reserved one-to-one bolt groove template 7 in 2 position of groove, insert It sells 7 shape of groove template and reserved 2 shape of groove is adapted, bolt groove template 7, which passes through, is set to vertical steel frame plywood formwork Hole to be provided in system is simultaneously fixed by fixation kit and vertical steel frame plywood template system, as shown in figure 8, hole to be provided hole The steel frame plywood formwork 6 of mouth surrounding, which is equipped with, reinforces keel 17, and fixation kit includes the fixed keel 8 of level being stuck in outside hole to be provided With the bolt rotary shaft 9 for regulating pin groove template 7 and vertical steel frame plywood template system relative distance, such as Fig. 9 institute Show, bolt rotary shaft 9 passes perpendicularly through horizontal fixed keel 8, and bolt rotary shaft 9 is M16 bolt rotary shaft, and passes through mountain type card 18 It is fixed with the fixed keel 8 of level, and end and bolt groove template 7 are fixed.
It is erected with scaffold on wellbore operations platform, when the high 3m of pit shaft layer, crosshead is higher by this layer of structure 1.8m, crosshead On completely spread scaffold board.
The method for carrying out shaft construction using wellbore operations platform and template integrated construction system, which is characterized in that packet Include following steps:
Step 1: this layer of shaft construction: wellbore operations platform and vertical steel frame plywood template system being promoted in place, screwed out perpendicular 7 after-pouring concrete of bolt groove template in steel frame plywood formwork system, it is recessed to finish precession bolt to concrete coagulation Slot template 7 forms reserved groove 2 on well bore wall 14, will be under wellbore operations platform and vertical steel frame plywood template system promote One construction part, as shown in fig. 6, idler wheel 1 scrolls up along well bore wall 14, until idler wheel 1 fixes the idler wheel in reserved groove 2 The idler wheel end of rotary connector 3 is lighter, and with wellbore operations platform fixing end than heavier, idler wheel 1 is downward by wellbore operations platform Gravity fix in reserved groove 2, the fixing state of idler wheel 1 is as shown in Fig. 2, back-out 7 after-pouring coagulation of bolt groove template Soil, finishes precession bolt groove template 7 to concrete coagulation, and reserved groove 2 is formed on well bore wall 14, repeat the above steps until This layer of shaft construction finishes;
Step 2: conversion wellbore operations platform and template integrated construction system: vertical steel frame plywood template system is removed, and Wellbore operations platform and vertical steel frame plywood template system are converted by tower crane to upper layer pit shaft;
Step 3: construction upper layer pit shaft: after the floor slab construction of upper layer, upper layer pit shaft wall steel bar is bound, according to step 1 pair Upper layer pit shaft is constructed, until upper layer shaft construction finishes, repeats step 1 to step 3 until shaft construction finishes, until This, is finished using wellbore operations platform of the present invention and template integrated construction system construction pit shaft.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of wellbore operations platform and template integrated construction system, it is characterised in that: including wellbore operations platform and fixation In the vertical steel frame plywood template system of wellbore operations platform surrounding, the wellbore operations mesa base is uniformly provided at least four A wheeled fixture, the wheeled fixture include the idler wheel (1) being arranged towards on the outside of wellbore operations platform and are used for idler wheel (1) is solid It is scheduled on the idler wheel rotary connector (3) of operating platform bottom, the idler wheel (1) fixes the reserved groove (2) in well bore wall (14) Interior, for the notch of the reserved groove (2) towards wellbore operations platform, bottom surface is plane, top surface be towards wellbore operations platform to Upper inclined inclined-plane, the idler wheel rotary connector (3) are solid by the fixing piece (13) of rotary shaft (4) and operating platform bottom Fixed, the idler wheel (1) can rotate down 0 ~ 45 ° around rotary shaft (4) by idler wheel rotary connector (3);
The vertical steel frame plywood template system bottom passes through clamping piece (5) and the company for being set to wellbore operations surrounding edge position Fitting (16) flange plate is fixed, and vertical steel frame plywood template system is spliced by several pieces of steel frame plywood formworks (6), institute State vertical steel frame plywood template system be equipped with the one-to-one bolt groove template (7) in reserved groove (2) position, it is described Bolt groove template (7) shape and reserved groove (2) shape are adapted, and bolt groove template (7), which passes through, is set to vertical steel frame glue Hole to be provided on plywood template system is simultaneously fixed, described fixed group by fixation kit and vertical steel frame plywood template system Part includes the level fixed keel (8) being stuck in outside hole to be provided and is used for regulating pin groove template (7) and vertical steel frame plywood The bolt rotary shaft (9) of template system relative distance, the bolt rotary shaft (9) passes perpendicularly through horizontal fixed keel (8), and leads to It crosses mountain type card (18) and horizontal fixed keel (8) is fixed, and end and bolt groove template (7) are fixed.
2. a kind of wellbore operations platform as described in claim 1 and template integrated construction system, it is characterised in that: the rolling Taking turns rotary connector (3), connecting plate (31) identical and disposed in parallel, idler wheel (1) part are exposed including two block structures, portion It is divided to and is built between two pieces of connecting plate ends, two pieces of connecting plate bottoms, idler wheel (1) is arranged right below baffle (32), the baffle (32) idler wheel is made to be only capable of rolling along well bore wall (14) upwards.
3. a kind of wellbore operations platform as described in claim 1 and template integrated construction system, it is characterised in that: the well Cylinder operating platform includes the platform main joist (10) set gradually from bottom to top, the peaceful deck plate (12) of platform secondary joist (11).
4. a kind of wellbore operations platform as claimed in claim 3 and template integrated construction system, it is characterised in that: described flat Platform main joist (10) includes the channel steel of longitudinal uniform intervals setting, and the platform secondary joist (11) includes laterally homogeneous interval setting Square steel, the platform panel (12) formed on square steel by checkered steel plate paving.
5. a kind of wellbore operations platform as claimed in claim 3 and template integrated construction system, it is characterised in that: the platform Main joist (10) is equipped with the hanging ring (15) for promoting pit shaft operating platform.
6. a kind of wellbore operations platform as claimed in claim 4 and template integrated construction system, it is characterised in that: described solid Determining part (13) is laterally disposed channel steel, and channel steel top flange plate is fixed with platform main joist (10) bolt, and the idler wheel rotation connects Fitting (3) is fixed by rotary shaft (4) with channel steel back cord.
7. a kind of wellbore operations platform as described in claim 1 and template integrated construction system, it is characterised in that: the company Fitting (16) section is L-type, and side flange plate fixes with wellbore operations platform, other side flange plate with by clamping piece (5) and Vertical steel frame plywood template system bottom end is fixed;The clamping piece (5) includes snap-ring groove (51) and is used to screw snap-ring groove (51) screw end (52).
8. a kind of wellbore operations platform as described in claim 1 and template integrated construction system, it is characterised in that: described pre- The steel frame plywood formwork (6) of box out hole surrounding, which is equipped with, reinforces keel (17).
9. a kind of wellbore operations platform as described in claim 1 and template integrated construction system, it is characterised in that: the well Scaffold is erected on cylinder operating platform, and when the high 3m of pit shaft layer, crosshead is higher by this layer of structure 1.8m, completely spreads foot hand on crosshead Plate.
10. utilizing the side that a kind of wellbore operations platform and template integrated construction system are constructed as described in claim 1 Method, which comprises the following steps:
Step 1: this layer of shaft construction: wellbore operations platform and vertical steel frame plywood template system being promoted in place, screwed out perpendicular Bolt groove template (7) after-pouring concrete in steel frame plywood formwork system, finishes precession bolt to concrete coagulation Groove template (7) is formed on well bore wall (14) reserved groove (2), by wellbore operations platform and vertical steel frame plywood formwork system System promotes next construction part, and idler wheel (1) scrolls up along well bore wall (14), until idler wheel (1) is fixed in reserved groove (2) It is interior, bolt groove template (7) after-pouring concrete is screwed out, finishes precession bolt groove template (7), well bore wall to concrete coagulation (14) it is formed reserved groove (2), is repeated the above steps until this layer of shaft construction finishes on;
Step 2: conversion wellbore operations platform and template integrated construction system: vertical steel frame plywood template system is removed, and Wellbore operations platform and vertical steel frame plywood template system are converted by tower crane to upper layer pit shaft;
Step 3: construction upper layer pit shaft: after the floor slab construction of upper layer, upper layer pit shaft wall steel bar is bound, according to step 1 pair Upper layer pit shaft is constructed, until upper layer shaft construction finishes, repeats step 1 to step 3 until shaft construction finishes, until This, is finished using wellbore operations platform of the present invention and template integrated construction system construction pit shaft.
CN201810921708.9A 2018-08-14 2018-08-14 Shaft operation platform and template integrated construction system and construction method using same Active CN109025235B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810921708.9A CN109025235B (en) 2018-08-14 2018-08-14 Shaft operation platform and template integrated construction system and construction method using same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810921708.9A CN109025235B (en) 2018-08-14 2018-08-14 Shaft operation platform and template integrated construction system and construction method using same

Publications (2)

Publication Number Publication Date
CN109025235A true CN109025235A (en) 2018-12-18
CN109025235B CN109025235B (en) 2023-10-24

Family

ID=64634013

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810921708.9A Active CN109025235B (en) 2018-08-14 2018-08-14 Shaft operation platform and template integrated construction system and construction method using same

Country Status (1)

Country Link
CN (1) CN109025235B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113914598A (en) * 2021-11-08 2022-01-11 中国能源建设集团山西电力建设有限公司 Liftable connection method of construction platform cantilever beam based on I-steel stand column

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT7927220A0 (en) * 1978-11-14 1979-11-12 Ivan Roque Gonzales Grazia LIFTING PLATFORM FOR USE IN METAL STRUCTURES, WELLS, TOWERS AND SIMILAR STRUCTURES.
CN103711490A (en) * 2014-01-10 2014-04-09 李明 Deviated well bore site cast concrete well wall self-moving type sliding mould
CN103806654A (en) * 2012-11-06 2014-05-21 中国五冶集团有限公司 Hydraulic support system for elevator shaft mold and operating method thereof
CN205314547U (en) * 2015-11-30 2016-06-15 中建海峡建设发展有限公司 It is electronic from climbing formula elevator shaft template
CN107543690A (en) * 2017-09-09 2018-01-05 东北石油大学 Suspension tubing string sine and Helical Buckling analogue experiment installation and experimental method in pit shaft
CN207228618U (en) * 2017-09-18 2018-04-13 湖北仁泰恒昌科技发展有限公司 Electrical lift shaft form
CN209556323U (en) * 2018-08-14 2019-10-29 中建一局集团建设发展有限公司 A kind of wellbore operations platform and template integrated construction system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT7927220A0 (en) * 1978-11-14 1979-11-12 Ivan Roque Gonzales Grazia LIFTING PLATFORM FOR USE IN METAL STRUCTURES, WELLS, TOWERS AND SIMILAR STRUCTURES.
CN103806654A (en) * 2012-11-06 2014-05-21 中国五冶集团有限公司 Hydraulic support system for elevator shaft mold and operating method thereof
CN103711490A (en) * 2014-01-10 2014-04-09 李明 Deviated well bore site cast concrete well wall self-moving type sliding mould
CN205314547U (en) * 2015-11-30 2016-06-15 中建海峡建设发展有限公司 It is electronic from climbing formula elevator shaft template
CN107543690A (en) * 2017-09-09 2018-01-05 东北石油大学 Suspension tubing string sine and Helical Buckling analogue experiment installation and experimental method in pit shaft
CN207228618U (en) * 2017-09-18 2018-04-13 湖北仁泰恒昌科技发展有限公司 Electrical lift shaft form
CN209556323U (en) * 2018-08-14 2019-10-29 中建一局集团建设发展有限公司 A kind of wellbore operations platform and template integrated construction system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王胜;朱绚丽;赵中南;: "新型钢框胶合板模板在高层住宅中的应用", 施工技术, no. 08, pages 53 - 56 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113914598A (en) * 2021-11-08 2022-01-11 中国能源建设集团山西电力建设有限公司 Liftable connection method of construction platform cantilever beam based on I-steel stand column

Also Published As

Publication number Publication date
CN109025235B (en) 2023-10-24

Similar Documents

Publication Publication Date Title
CN103206089A (en) Fabricated aluminum alloy formwork system construction method
CN109518605A (en) The telescopic overhanging support of one kind and its installation method
CN202509754U (en) High-altitude steel structure node construction working platform
CN207526100U (en) Wall is poured with aluminum alloy pattern plate leveling and ruggedized construction
CN209556323U (en) A kind of wellbore operations platform and template integrated construction system
CN109025235A (en) Wellbore operations platform and template integrated construction system and the method constructed using it
CN208668817U (en) A kind of light-duty armored concrete formula precast stair
CN204754226U (en) Detachable construction platform of unloading
CN110185247A (en) Mobile outrigger platform
CN201567787U (en) Form-traveler steel formwork
CN102661035A (en) Tool type wall connecting piece for exterior wall scaffold
CN209338999U (en) A kind of telescopic overhanging support
CN107605165A (en) A kind of prefabricated post construction method for hanging
CN205134966U (en) Superaltitude conversion truss hoisting device
CN205314539U (en) Large -scale cantilever type combination steel form
CN204456813U (en) A kind of single support operation platform for elevator hoistways
CN111173263A (en) Integral aluminum die body based on narrow expansion joint
CN201826546U (en) Tower-type ladder stand for construction
CN206000167U (en) Adjustable Alminum Project slab form support meanss
CN205955195U (en) Shaped steel stair template and construction system
CN109057329A (en) A kind of template promotes positioning apparatus and its construction method
CN202248888U (en) Hoop with lifting type supporting roller
CN216810965U (en) Adjustable top support for formwork
CN213449189U (en) Parapet construction tool
CN212027094U (en) Integral aluminum die body based on narrow expansion joint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant