CN209509003U - A kind of high cushion cap foundation pile stabilising arrangement of Construction of Civil Engineering - Google Patents

A kind of high cushion cap foundation pile stabilising arrangement of Construction of Civil Engineering Download PDF

Info

Publication number
CN209509003U
CN209509003U CN201822237941.3U CN201822237941U CN209509003U CN 209509003 U CN209509003 U CN 209509003U CN 201822237941 U CN201822237941 U CN 201822237941U CN 209509003 U CN209509003 U CN 209509003U
Authority
CN
China
Prior art keywords
construction
foundation pile
support pillar
civil engineering
cushion cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822237941.3U
Other languages
Chinese (zh)
Inventor
李利峰
邓慧琳
张晓虎
韩六平
李密
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou University of Engineering Science
Original Assignee
Guizhou University of Engineering Science
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou University of Engineering Science filed Critical Guizhou University of Engineering Science
Priority to CN201822237941.3U priority Critical patent/CN209509003U/en
Application granted granted Critical
Publication of CN209509003U publication Critical patent/CN209509003U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of high cushion cap foundation pile stabilising arrangements of Construction of Civil Engineering, including foundation pile body, concrete baffle and three stable units, the stable unit of described three is distributed around concrete baffle in equilateral triangle, each stable unit includes pedestal, connecting column and expanding support pillar, below the connecting column and side difference firm banking and expanding support pillar, the expanding support pillar side is equipped with several spacer pin post holes, spacing pin is inserted into inside the spacer pin post holes, top plate is fixedly connected on the outside of the expanding support pillar, poly- power band is respectively fixed with above and below on the outside of the top plate, stiffener plate is additionally provided between the expanding support pillar and top plate, the pedestal and connecting column rear is additionally provided with reinforcing rib column.The device improves the stability of concrete baffle in concreting process, avoids the phenomenon of high cushion cap skew, guarantees the quality for pouring effect and subsequent construction.

Description

A kind of high cushion cap foundation pile stabilising arrangement of Construction of Civil Engineering
Technical field
The utility model relates to Construction of Civil Engineering equipment technical fields, apply more specifically, being related to a kind of civil engineering The high cushion cap foundation pile stabilising arrangement of work.
Background technique
Civil engineering is to build the general designation of the science and technology of all kinds of job facilities, it both referred to applied material, equipment and The technical activities such as the exploration, design, construction, maintenance, the maintenance that are carried out also refer to the object of engineering construction, that is, build on the ground or In underground, land or water, be directly or indirectly human lives, production, military affairs, Scientific Research Service various job facilities, such as room Room, road, railway, pipeline, tunnel, bridge, canal, dykes and dams, harbour, power station, airport, ocean platform, water supply and drainage and Protection works etc., civil engineering refer in addition to building construction, to create, reconstructing or extending the building of all kinds of engineerings, construct Every technical work such as the prospecting, planning, design, construction, installation and the maintenance that are carried out such as object and related auxiliary facility and its complete At engineering entity.Wherein foundation pile is by stake and to be connected to the basis that the cushion cap of stake top collectively constitutes, if ground is exposed in pile body top Face and cushion cap bottom is located at ground or more, then referred to as elevated footing on piles, and elevated footing on piles is usually sent out during molding pours Growing concrete baffle and foundation pile frame rely on built on the sand, during casting concrete, due to by concrete gravity Effect, concrete baffle are easy to easily lead to that foundation pile molding effect after pouring is bad, and the quality of engineering cannot get to two sides skew Guarantee.
Utility model content
The purpose of the utility model is to provide a kind of high cushion cap foundation pile stabilising arrangement of Construction of Civil Engineering, which is mentioned The stability of concrete baffle in high concrete casting process, avoids the phenomenon of high cushion cap skew, and guarantee pours effect and subsequent The quality of construction.
To achieve the goals above, the technical solution adopted in the utility model is as follows:
A kind of high cushion cap foundation pile stabilising arrangement of Construction of Civil Engineering, including foundation pile body, concrete baffle and three stabilizations Unit, described three stable units around concrete baffle in equilateral triangle be distributed, each stable unit include pedestal, Connecting column and expanding support pillar, the connecting column lower section and side difference firm banking and expanding support pillar, the expanding support pillar Side is equipped with several spacer pin post holes, and spacing pin, the expanding support pillar outside are inserted into inside the spacer pin post holes It is fixedly connected with top plate, is respectively fixed with poly- power band, the expanding support pillar and top above and below the top plate outside Stiffener plate is additionally provided between plate, the pedestal and connecting column rear are additionally provided with reinforcing rib column.
Further, the poly- power band above and below described respectively corresponds position above and below concrete baffle periphery Place, the poly- power beam shapes are matched with concrete baffle peripheral shape.
Further, the top plate working face is arcwall face, the arcwall face shape and concrete baffle peripheral shape It matches.
Further, the pedestal is embedded in Construction of Civil Engineering below ground.
Compared with the prior art, the beneficial effects of the utility model are as follows:
By being realized when being poured to high cushion cap foundation pile in three stable units of equilateral triangle distribution in the utility model Steady operation solves during casting concrete, and concrete baffle and foundation pile frame rely on built on the sand, concrete gear The problem that plate skew causes foundation pile molding effect after pouring bad;Using expanding support pillar and spacing pin structure, facilitate fixation While also easy disassembly, save stabilising arrangement arrangement construction time, improve working efficiency;Using poly- power item arranged up and down Band, the pressure that top plate can be concentrated to apply, acts on and is easiest to inclined concrete baffle upper and lower, and then improves stablizing effect And safety.
Detailed description of the invention
Fig. 1 is that the utility model stablizes cellular construction schematic diagram;
Fig. 2 is the utility model integral arrangement scheme of installation;
In figure: 1, pedestal;2, reinforcing rib column;3, connecting column;4, expanding support pillar;5, spacing pin;6, top plate;7, reinforcing rib Plate;8, poly- power band;9, concrete baffle;10, foundation pile body.
Specific embodiment
In order to which the technical means, creative features, achievable purpose and effectiveness for realizing utility model are easy to understand, below In conjunction with being specifically illustrating, the utility model is further described.
As depicted in figs. 1 and 2, a kind of Construction of Civil Engineering high cushion cap foundation pile stabilising arrangement, including foundation pile body 10, coagulation Native baffle 9 and three stable units, three stable units are distributed around concrete baffle 10 in equilateral triangle, each stable single Member includes pedestal 1, connecting column 3 and expanding support pillar 4, and 3 lower section of connecting column and side are distinguished firm banking 1 and expanding support pillar 4, stretched 4 side of contracting top pillar is equipped with several spacer pin post holes, and spacing pin 5 is inserted into inside spacer pin post holes, is fixed on the outside of expanding support pillar 4 It is connected with top plate 6, top plate is respectively fixed with poly- power band 8 above and below 6 outside, is additionally provided between expanding support pillar 4 and top plate 6 Stiffener plate 7, pedestal 1 and 3 rear of connecting column are additionally provided with reinforcing rib column 2, above and below poly- power band 8 respectively correspond coagulation Above and below native 10 periphery of baffle at position, poly- 8 shape of power band is matched with 10 peripheral shape of concrete baffle, top plate 6 Working face is arcwall face, and arcwall face shape is matched with 10 peripheral shape of concrete baffle, and pedestal 1 is embedded in Construction of Civil Engineering Below ground.
Actual installation is in use, the first pre-buried pedestal 1 at 10 surrounding suitable position of concrete baffle, while by reinforcing rib column 2 a part and 3 a part of connecting column are also pre-buried simultaneously, the position of top plate 6 are then adjusted by expanding support pillar 4, so that poly- power item Band 8 compresses concrete baffle 10, might not fully wrapped around firmly concrete baffle 10 after the completion of all poly- power band 8 arrangements (depending on the dimensional conditions of foundation pile) are stuck between the extension end and upstream end of expanding support pillar 4 finally in arrangement stiffener plate 7, After the completion of pouring, reverse above-mentioned steps are removed one by one to component is stablized.
The advantages of basic principles and main features and the utility model of the utility model have been shown and described above.This The technical staff of industry is retouched in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments That states only illustrates the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model It will also have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention.This is practical new Type is claimed range and is defined by the appending claims and its equivalent thereof.

Claims (4)

1. a kind of high cushion cap foundation pile stabilising arrangement of Construction of Civil Engineering, it is characterised in that: including foundation pile body, concrete baffle and Three stable units, described three stable units are distributed around concrete baffle in equilateral triangle, and each stable unit is equal Including pedestal, connecting column and expanding support pillar, below the connecting column and side difference firm banking and expanding support pillar are described Expanding support pillar side is equipped with several spacer pin post holes, and spacing pin is inserted into inside the spacer pin post holes, and described is flexible It is fixedly connected with top plate on the outside of top pillar, poly- power band is respectively fixed with above and below the top plate outside, described is flexible Stiffener plate is additionally provided between top pillar and top plate, the pedestal and connecting column rear are additionally provided with reinforcing rib column.
2. a kind of high cushion cap foundation pile stabilising arrangement of Construction of Civil Engineering according to claim 1, it is characterised in that: described Above and below poly- power band respectively correspond above and below concrete baffle periphery at position, the poly- power strip-form Shape is matched with concrete baffle peripheral shape.
3. a kind of high cushion cap foundation pile stabilising arrangement of Construction of Civil Engineering according to claim 1, it is characterised in that: described Top plate working face be arcwall face, the arcwall face shape matches with concrete baffle peripheral shape.
4. a kind of high cushion cap foundation pile stabilising arrangement of Construction of Civil Engineering according to claim 1, it is characterised in that: described Pedestal be embedded in Construction of Civil Engineering below ground.
CN201822237941.3U 2018-12-28 2018-12-28 A kind of high cushion cap foundation pile stabilising arrangement of Construction of Civil Engineering Expired - Fee Related CN209509003U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822237941.3U CN209509003U (en) 2018-12-28 2018-12-28 A kind of high cushion cap foundation pile stabilising arrangement of Construction of Civil Engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822237941.3U CN209509003U (en) 2018-12-28 2018-12-28 A kind of high cushion cap foundation pile stabilising arrangement of Construction of Civil Engineering

Publications (1)

Publication Number Publication Date
CN209509003U true CN209509003U (en) 2019-10-18

Family

ID=68198155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822237941.3U Expired - Fee Related CN209509003U (en) 2018-12-28 2018-12-28 A kind of high cushion cap foundation pile stabilising arrangement of Construction of Civil Engineering

Country Status (1)

Country Link
CN (1) CN209509003U (en)

Similar Documents

Publication Publication Date Title
CN103741657B (en) The construction method of large-sized multifunction waterborne traffic accident
CN105970811B (en) Long span space three-dimensional curved surface fish-bellied type box shape steel structure elevated bridge construction technology
CN109440634A (en) The prefabricated high strength concrete hollow bent cap structure that internal model can be taken off
CN203654196U (en) Guide apparatus for large and multifunctional over-water construction platform
CN109629576B (en) Suspension protection system for water supply pipe crossing foundation pit and construction method
CN204418198U (en) A kind of pin-connected panel open caisson foundation of punching block structure
CN209509003U (en) A kind of high cushion cap foundation pile stabilising arrangement of Construction of Civil Engineering
CN207567784U (en) Deep basal pit combined type supporting
CN107227741B (en) Basement supporting construction
CN210263929U (en) A preformed hole template for building civil engineering
CN202672167U (en) Steel sheet pile cofferdam structure
CN104329101B (en) The device of small radius variable curvature section curvature and thickness between accurate control tunnel side wall and inverted arch
CN209619836U (en) The prefabricated high strength concrete hollow bent cap structure that internal model can be taken off
CN209508954U (en) A kind of Construction of Civil Engineering small pile
CN203383229U (en) Over-form construction formwork for oblique earth-retaining walls
CN203878630U (en) Inclination and straightness alternated pile group-bearing platform-upper structure similar model manufacturing template
CN105672140A (en) Erecting, constructing and wind preventing method for long-span cable-stayed bridge steel box girder long cantilever in violent typhoon region
CN206887782U (en) One kind is used for end bay cast-in-place construction bracket
CN204703185U (en) A kind of precast reinforced concrete structure
CN205530400U (en) Batter pile test model steel reinforcement cage cushion inclines
CN206736742U (en) Inter-tie and pier stud global formation falsework
CN206545206U (en) A kind of civil engineering built pile
CN204662629U (en) A kind of overflow well derrick
CN217684182U (en) A portable monitoring device for water conservancy is supervised
CN205742249U (en) A kind of prestressed concrete back cover cushion cap template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191018

Termination date: 20201228

CF01 Termination of patent right due to non-payment of annual fee