CN206736742U - Inter-tie and pier stud global formation falsework - Google Patents

Inter-tie and pier stud global formation falsework Download PDF

Info

Publication number
CN206736742U
CN206736742U CN201720515530.9U CN201720515530U CN206736742U CN 206736742 U CN206736742 U CN 206736742U CN 201720515530 U CN201720515530 U CN 201720515530U CN 206736742 U CN206736742 U CN 206736742U
Authority
CN
China
Prior art keywords
inter
tie
pier
pier stud
hounds
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720515530.9U
Other languages
Chinese (zh)
Inventor
程高峰
席晓彬
黄亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Road And Bridge No2 Engineering Co Ltd
Original Assignee
Shanxi Road And Bridge No2 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Road And Bridge No2 Engineering Co Ltd filed Critical Shanxi Road And Bridge No2 Engineering Co Ltd
Priority to CN201720515530.9U priority Critical patent/CN206736742U/en
Application granted granted Critical
Publication of CN206736742U publication Critical patent/CN206736742U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model inter-tie and pier stud global formation falsework, belong to highway bridge pier stud and inter-tie technical field of construction;Technical problem to be solved is a kind of falsework that can make inter-tie and pier stud global formation of offer;The technical scheme used for:Inter-tie and pier stud global formation falsework, inter-tie template is fixed between two Pier Formworks, the upper end of two hounds is bolted at the middle part of inter-tie template bed die bottom surface, two hounds are that oblique 45° angle is symmetrical arranged, the lower end of two hounds is linked together with a Pier Formwork respectively by bolt, drag link is horizontally set between two Pier Formworks, and is linked together by bolt and Pier Formwork;Drag link forms an isosceles right triangle positioned at the lower section of two hounds, three;The utility model is used for the global formation of highway bridge pier stud and inter-tie.

Description

Inter-tie and pier stud global formation falsework
Technical field
The utility model inter-tie and pier stud global formation falsework, belong to highway bridge pier stud and are applied with inter-tie Work technical field.
Background technology
Recently as constantly putting into operation for each standard highway, highway bridge also substantial amounts of application therewith.At present in public affairs In the design of road and bridge beam, for the lower height of bridge, it is most of to be less than 30m designs is column pier, typically by holding in pile foundation Platform(Binder between stake), pillar pier shaft, inter-tie(When pier stud is higher)Formed with bent cap.Advantage is to mitigate pier shaft deadweight, section About masonry material, better appearance, rigidity and intensity are all larger, can be used in having the river of drift and floating ice.Carry out All it was the construction for first carrying out lower pier stud in the past when the bridge bottom for having inter-tie is constructed, simultaneously form removal is completed in the construction of lower pier stud The construction of inter-tie is carried out using Hold Hoop method, Support Method afterwards.
Anchor ear in Hold Hoop method is typically made of two blocks of semicircular arc steel plates, is connected by high-strength bolt.Anchor ear lock ring exists Caused frictional force provides the reaction of bearing of superstructure on pier stud, is main support force structure.Set up on anchor ear flat Platform carries out the construction of inter-tie and upper pier stud.This construction method has the following disadvantages:
1st, project progress is affected;
2nd, engineering cost increase;
3rd, the stubble that connects of upper pier stud and lower pier stud easily produces faulting of slab ends, spillage.
Support Method is usually to set up support on inter-tie lower ground after the completion of lower pier stud pours, and is carrying out intercolumniation The installation of binder template.There is also insufficient with Hold Hoop method identical for this method.
Utility model content
The utility model overcomes the shortcomings of the prior art, and technical problem to be solved can make post to provide one kind Between binder and pier stud global formation falsework.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is:Inter-tie and pier stud integral into Pattern board mount, including Pier Formwork, inter-tie template, hound and drag link, inter-tie template are fixed on two piers Between column template, bolt hole is provided with inter-tie template in the middle part of bed die bottom surface, spiral shell is also equipped with two Pier Formworks Keyhole, the upper end of two hounds are bolted in the middle part of inter-tie template bed die bottom surface, two hounds It is symmetrical arranged for oblique 45° angle, the lower end of two hounds is linked together with a Pier Formwork respectively by bolt, drag link It is horizontally set between two Pier Formworks, and is linked together by bolt and Pier Formwork;The drag link is located at two The lower section of hound, three form an isosceles right triangle.
The structure of the hound is:Body of rod both ends are respectively fixed with a circle chimb, and multiple spiral shells are provided with the chimb Keyhole;
The structure of the drag link is:Body of rod both ends are respectively fixed with a circle chimb, and multiple spiral shells are provided with the chimb Keyhole.
Bolt hole in the hound and drag link on each chimb is four.
The utility model has the advantages that compared with prior art.
The utility model can realize the global formation of pier stud and inter-tie, i.e., the template one of upper and lower pier stud and inter-tie Secondary property installation, concrete one-piece casting, on the premise of construction quality is ensured, improves construction speed, reduces engineering Expense and appearance looks elegant.
Brief description of the drawings
The utility model is described in more detail below in conjunction with the accompanying drawings.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is bed die bolt hole on underside schematic diagram in inter-tie template.
Fig. 3 is Pier Formwork bolt hole schematic diagram.
Fig. 4 is the structural representation of hound.
Fig. 5 is the structural representation of diagonal brace rod end surface.
Fig. 6 is the structural representation of drag link.
Fig. 7 is the structural representation of drag link end face.
In figure:1 is Pier Formwork, and 2 be inter-tie template, and 3 be hound, and 4 be drag link.
Embodiment
As shown in figure 1, the utility model inter-tie and pier stud global formation falsework, including Pier Formwork 1, intercolumniation Binder template 2, hound 3 and drag link 4, inter-tie template 2 are fixed between two Pier Formworks 1, inter-tie template 2 Bolt hole is provided with the middle part of middle bed die bottom surface, bolt hole, the upper end of two hounds 3 are also equipped with two Pier Formworks 1 It is bolted at the middle part of the bed die bottom surface of inter-tie template 2, two hounds 3 are that oblique 45° angle is symmetrical arranged, two The lower end of root hound 3 is linked together with a Pier Formwork 1 respectively by bolt, and drag link 4 is horizontally set on two piers Between column template 1, and linked together by bolt and Pier Formwork 1;The drag link 4 is located at the lower section of two hounds 3, Three forms an isosceles right triangle.
The structure of the hound 3 is:Body of rod both ends are respectively fixed with a circle chimb, and multiple spiral shells are provided with the chimb Keyhole;
The structure of the drag link 4 is:Body of rod both ends are respectively fixed with a circle chimb, and multiple spiral shells are provided with the chimb Keyhole.
Bolt hole in the hound 3 and drag link 4 on each chimb is four.
Inter-tie is with pier stud global formation construction method:Pier stud reinforcing bar is first installed, the reinforcing bar of binder is tied up between completion stake Bundle, formwork erection and concreting, after binder form removal between stake, the template of upper and lower pier stud and inter-tie is disposably installed Complete, during installation, first carry out the formwork erection of lower pier stud, the drag link between pier stud is installed after the completion of installing, then carries out intercolumniation The installation of binder bed die, first two hounds are connected firmly with inter-tie bed die before lifting inter-tie bed die, intercolumniation system After beam bottom board installation, position is stitched during the bottom of hound is connected on the inside of lower Pier Formwork, then carries out inter-tie Reinforcing bar colligation, installing for inter-tie side form and upper Pier Formwork is carried out after the completion of colligation, after the completion of whole formwork support arrangements, according to Highly set 3-4 roads to pull air hardening steel rope, tightened up with jack, then carry out upper and lower pier stud, the concrete of inter-tie integrally pours Build.

Claims (3)

1. inter-tie and pier stud global formation falsework, it is characterised in that:Including Pier Formwork(1), inter-tie template (2), hound(3)And drag link(4), inter-tie template(2)It is fixed on two Pier Formworks(1)Between, inter-tie mould Plate(2)Bolt hole, two Pier Formworks are provided with the middle part of middle bed die bottom surface(1)On be also equipped with bolt hole, two hounds (3)Upper end be bolted in inter-tie template(2)The middle part of bed die bottom surface, two hounds(3)For oblique 45 ° Angle is symmetrical arranged, two hounds(3)Lower end by bolt respectively with a Pier Formwork(1)Link together, drag link (4)It is horizontally set on two Pier Formworks(1)Between, and pass through bolt and Pier Formwork(1)Link together;The drag link (4)Positioned at two hounds(3)Lower section, three form an isosceles right triangle.
2. inter-tie according to claim 1 and pier stud global formation falsework, it is characterised in that:The hound (3)Structure be:Body of rod both ends are respectively fixed with a circle chimb, and multiple bolts hole are provided with the chimb;
The drag link(4)Structure be:Body of rod both ends are respectively fixed with a circle chimb, and multiple bolts are provided with the chimb Hole.
3. inter-tie according to claim 2 and pier stud global formation falsework, it is characterised in that:The hound (3)And drag link(4)In bolt hole on each chimb be four.
CN201720515530.9U 2017-05-10 2017-05-10 Inter-tie and pier stud global formation falsework Expired - Fee Related CN206736742U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720515530.9U CN206736742U (en) 2017-05-10 2017-05-10 Inter-tie and pier stud global formation falsework

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720515530.9U CN206736742U (en) 2017-05-10 2017-05-10 Inter-tie and pier stud global formation falsework

Publications (1)

Publication Number Publication Date
CN206736742U true CN206736742U (en) 2017-12-12

Family

ID=60565144

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720515530.9U Expired - Fee Related CN206736742U (en) 2017-05-10 2017-05-10 Inter-tie and pier stud global formation falsework

Country Status (1)

Country Link
CN (1) CN206736742U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930194A (en) * 2017-05-10 2017-07-07 山西路桥第二工程有限公司 Inter-tie and pier stud global formation construction method and template used support

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930194A (en) * 2017-05-10 2017-07-07 山西路桥第二工程有限公司 Inter-tie and pier stud global formation construction method and template used support
CN106930194B (en) * 2017-05-10 2018-10-30 山西路桥第二工程有限公司 Inter-tie and pier stud global formation construction method and template used holder

Similar Documents

Publication Publication Date Title
JP3177157U (en) A simple tower instrument in a high-rise bridge.
CN101994293B (en) High pier coping construction method
CN106930194B (en) Inter-tie and pier stud global formation construction method and template used holder
CN104746422A (en) Bridge prefabricated hollow pier column post-poured connecting structure and construction method
CN103938533B (en) The construction method of Simply supported non-uniform structure
CN101424073A (en) Bridge deck and steel girder second combination method for whole arch precasted steel-concrete composite continuous box girder
CN105239594A (en) Prestressed pipe pile upright
CN106012960A (en) Assembly type long piled wharf upper structure system and construction method thereof
CN109440634A (en) The prefabricated high strength concrete hollow bent cap structure that internal model can be taken off
CN105672144B (en) A kind of medium-small span bridges are reinforced with spelling wide structure and its construction method
CN103184722A (en) Large-span double-layer Bailey truss structure and construction method thereof
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN106012851A (en) Synchronous construction method of steel box girder and concrete pier studs
CN206736742U (en) Inter-tie and pier stud global formation falsework
CN102206934B (en) Method for block-by-block casting of concrete continuous beam bridge by using military truss shift mould
CN103510458B (en) Pile type continuous rigid frame bridge and construction method thereof
CN209779640U (en) foundation pit supporting pile top crown beam construction structure
CN208328660U (en) The U-shaped girder construction of the Two bors d's oeuveres of combined bridge
CN105672145A (en) Structure for broadening bridge by additionally arranging steel cap beam on top of pier
CN209619836U (en) The prefabricated high strength concrete hollow bent cap structure that internal model can be taken off
CN204000641U (en) A kind of large-scale pier stud concrete vertical reinforcement locating rack
CN206887746U (en) A kind of concrete circular stub binder backward construction column-form
TWM608166U (en) Precast column pile structure with combined component
CN207537870U (en) A kind of precast beam unit of cantilevered shape of a hoof bent cap
CN207646621U (en) The asymmetric mixing girder stayed-cable bridge horizontal swing structure of super-tonnage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171212

CF01 Termination of patent right due to non-payment of annual fee