- Publication number
- CN206887782U CN206887782U CN201720739847.0U CN201720739847U CN206887782U CN 206887782 U CN206887782 U CN 206887782U CN 201720739847 U CN201720739847 U CN 201720739847U CN 206887782 U CN206887782 U CN 206887782U
- Authority
- CN
- China
- Prior art keywords
- bracket
- triangular beam
- main backstop
- pour
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 24
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 23
- 238000011084 recovery Methods 0.000 claims abstract description 9
- 239000002699 waste material Substances 0.000 claims abstract description 9
- 229910000831 Steel Inorganic materials 0.000 claims description 11
- 239000010959 steel Substances 0.000 claims description 11
- 230000005484 gravity Effects 0.000 claims description 8
- 238000009434 installation Methods 0.000 claims description 3
- 230000035807 sensation Effects 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 239000002994 raw material Substances 0.000 description 3
- 238000005266 casting Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 235000012054 meals Nutrition 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses one kind to be used for end bay cast-in-place construction bracket,Including main backstop and bottom surface pedestal,The main backstop is directly fixedly mounted on bottom surface pedestal upper surface,Secondary support frame is also installed with main backstop side,The secondary support frame other end is extended to below bottom of foundation ditch through bottom surface pedestal,Also it is installed with the top of main backstop and pours proportioning platform,And bracket triangular beam and operation triangular beam are fixedly mounted respectively pouring proportioning platform both sides,It is installed with respectively at the top of the bracket triangular beam and operation triangular beam and pours bracket and operating platform,And pour waste recovery pipe pouring to be installed with the outside of bracket and operating platform,It is described pour bracket and extend to pour directly over proportioning platform,Can be on the premise of little space be taken,Improve stability on the whole,It can be laid out according to the demand of reality to adapt to different demands,The operation of worker easy to operation,Functional,It disclosure satisfy that actual various demands.
Description
Technical field
End bay technical field of construction is the utility model is related to, is specially that one kind is used for end bay cast-in-place construction bracket.
Background technology
In modern architecture, particularly on traffic construction, mountains and rivers valley is frequently encountered, and enters trade in this place
Construction necessity of making use of momentum in road adds bridge and can just passed through.With advances in technology, when bridge crosses over massif or valley, typically
Using the large span bridge type of high pier continuous steel frame bridge type either cement concrete constructions, in modern bridge construction, one
As can use continuous steel construction bridge type, in this configuration, construction is more use Hanging Basket cast-in-place cantilever method, and in casting method construction
In, just have to carry out pouring for No. 0 beam section of girder, platform is provided for the assembly and construction of follow-up Hanging Basket.
When No. 0 beam section to girder is constructed, it is necessary to carry out complementary construction using bracket.Existing construction bar
It is no longer merely that requirement bracket can bear corresponding pressure inelastic deformation does not occur, but also require that bracket can under part
The situation of different girders carries out appropriate adjustment, specifically, existing with the complexity of technology so as to meet the needs of different
Some brackets it is also required to provide the operative position of worker, to carry out the operation of cast in situs, but also can in time supply and pour
Raw material and defeated time dead meal are built, complete circulation loop can be formed all the time.But in existing carrier structure, often focus on
Simply support and lift effect, and the conveying and realization that other functions are then depended in side wall, therefore existing bracket knot
Structure is simple, and feature is poor, it is difficult to meets the demand of the actual casting process in modern times.
Utility model content
In order to overcome the shortcomings of prior art, the utility model provides one kind and is used for end bay cast-in-place construction bracket, energy
It is enough to improve stability on the whole on the premise of little space is taken, it can be laid out according to the demand of reality to adapt to
Different demands, the operation of worker easy to operation, functional, actual various demands are disclosure satisfy that, can effectively solve to carry on the back
The problem of in scape technology.
Technical scheme is used by the utility model solves its technical problem:One kind is used for end bay cast-in-place construction bracket,
Including main backstop and bottom surface pedestal, the main backstop is directly fixedly mounted on bottom surface pedestal upper surface, in main backstop side
Face is also installed with secondary support frame, and the secondary support frame other end is extended to below bottom of foundation ditch through bottom surface pedestal,
Also it is installed with the top of main backstop and pours proportioning platform, and bracket three is fixedly mounted respectively pouring proportioning platform both sides
It is installed with respectively at the top of cantilevered corner beam and operation triangular beam, the bracket triangular beam and operation triangular beam and pours bracket and operation is flat
Platform, and waste recovery pipe is poured pouring to be installed with the outside of bracket and operating platform, it is described pour bracket and extend to pour
Build directly over proportioning platform.
As a kind of preferable technical scheme of the utility model, compacting and process in the bottom surface pedestal embedment earth's surface foundation ditch
Concreting is fixed.
As a kind of preferable technical scheme of the utility model, bracket and the operating platform center of gravity of pouring supports in secondary
In the closed figures that frame and main backstop are formed, and pour center of gravity subpoint and the main backstop center of bracket and operating platform
It is not more than 10% apart from departure degree.
As a kind of preferable technical scheme of the utility model, the quantity of the secondary support frame is three or the six roots of sensation, and
Some secondary support frames equidistantly uniformly connect installation in Γ types by the fixed card buckle being located on main backstop.
As a kind of preferable technical scheme of the utility model, by wearing inside the bracket triangular beam and operation triangular beam
Slotting being connected to form one of girder steel structure, and connection forms triangle between interspersed girder steel and bracket triangular beam and operation triangular beam
Structure.
As a kind of preferable technical scheme of the utility model, the bracket that pours is in L-type of lying on one's side, and close to operating platform
Side is higher than other side.
Compared with prior art, the beneficial effects of the utility model are:The utility model is by the way that ground pedestal compacting is existed
Below ground and fixed by concreting, main backstop is fixedly mounted in ground pedestal afterwards, and in side
Auxiliary support also is carried out by multiple secondary support frames, expands the distributed area of overall center of gravity, little space can taken
Under the premise of, stability on the whole is improved, raw material is poured by carrying out conveying on main backstop, and by pouring proportioning platform
The bracket triangular beam and operation triangular beam that both sides are set can be laid out to adapt to different demands according to the demand of reality, and
Bracket and operating platform will be poured to separate, the operation of worker easy to operation, and two-way pour is carried out by pouring waste recovery pipe
Waste recovery is built, prevents from causing environment too much influence, overall structure is simple, but functional, disclosure satisfy that actual each
Kind demand.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
In figure:1- main backstops;2- bottom surfaces pedestal;3- level support frame;4- pours proportioning platform;5- bracket triangular beams;
6- operates triangular beam;7- pours bracket;8- operating platforms;9- pours waste recovery pipe;10- fixed card buckles;11- interts girder steel.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Embodiment:
As shown in figure 1, the utility model, which provides one kind, is used for end bay cast-in-place construction bracket, including main backstop 1 and bottom
Face pedestal 2, the bottom surface pedestal 2 are embedded to compacting in earth's surface foundation ditch and fixed by concreting, and the main backstop 1 is direct
The upper surface of bottom surface pedestal 2 is fixedly mounted on, secondary support frame 3, the secondary support are also installed with the side of main backstop 1
The quantity of frame 3 is three or the six roots of sensation, and some secondary support frames 3 are equidistant uniformly by being located at main backstop in Γ types
The connection installation of fixed card buckle 10 on 1, the secondary other end of support frame 3 are extended to below bottom of foundation ditch through bottom surface pedestal 2,
Also it is installed with the top of main backstop 1 and pours proportioning platform 4, and support is fixedly mounted respectively pouring the both sides of proportioning platform 4
Frame triangular beam 5 and operation triangular beam 6, the bracket triangular beam 5 and the top of operation triangular beam 6 are installed with pour bracket respectively
7 and operating platform 8, and pouring bracket 7 and the outside of operating platform 8 is installed with and pours waste recovery pipe 9, it is described to pour
Bracket 7, which extends to, to be poured directly over proportioning platform 4.
Preferably, bracket 7 and the center of gravity of operating platform 8 of pouring is closed what secondary support frame 3 and main backstop 4 were formed
Close in figure, and pour the little apart from departure degree of the center of gravity subpoint of bracket 7 and operating platform 8 and the center of main backstop 1
In 10%;The bracket 7 that pours is higher than other side in L-type of lying on one's side, and close to the side of operating platform 8.
Further preferably connected with explanation, the bracket triangular beam 5 with inside operation triangular beam 6 by interspersed girder steel 11
Connect to form integral structure, and connection forms triangle knot between interspersed girder steel 11 and bracket triangular beam 5 and operation triangular beam 6
Structure, the bracket triangular beam 5 and operation triangular beam 6 are to be laid out erection by girder steel, and by interting girder steel 11
Stable triangular structure is formed to improve stability, therefore, during the use of reality, bracket triangular beam 5 and operation triangular beam 6
Different demands can be applicable to be laid out according to the demand and needs of reality.
It is other, in the utility model, it is also necessary to which further explanation is:In the utility model, foundation ditch refers to
Excavate and be used for the dell for installing bottom surface pedestal 2 after the soil horizon on top layer, in general, the depth of foundation ditch needs to dig the soil for wearing surface
Earth layer, further, in special area, such as in the region containing competent bed, the depth of foundation ditch can be reduced, and main backstop
1 inside is hollow structure, can add feeding device according to demand.
Of the present utility model to be mainly characterized by, the utility model is by tamping in below ground and leading to ground pedestal
Cross concreting to fix, main backstop is fixedly mounted in ground pedestal afterwards, and also pass through multiple secondary in side
Support frame carries out Auxiliary support, expands the distributed area of overall center of gravity, can be improved overall on the premise of little space is taken
On stability, pour raw material by carrying out conveying on main backstop, and by the bracket for pouring proportioning platform both sides and setting
Triangular beam and operation triangular beam can be laid out to adapt to different demands according to the demand of reality, and will pour bracket and behaviour
Separated as platform, the operation of worker easy to operation, and by pour waste recovery pipe carry out it is two-way pour waste recovery, prevent
Too much influence is caused to environment, overall structure is simple, but functional, disclosure satisfy that actual various demands.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and
And in the case of without departing substantially from spirit or essential attributes of the present utility model, it can realize that this practicality is new in other specific forms
Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new
The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained
All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation
Involved claim.
Claims (6)
1. one kind is used for end bay cast-in-place construction bracket, including main backstop (1) and bottom surface pedestal (2), the main backstop (1) is straight
Connect and be fixedly mounted on bottom surface pedestal (2) upper surface, it is characterised in that:Secondary branch is also installed with main backstop (1) side
Support (3), secondary support frame (3) other end is extended to below bottom of foundation ditch through bottom surface pedestal (2), in main backstop
(1) top, which is also installed with, pours proportioning platform (4), and bracket three is fixedly mounted respectively pouring proportioning platform (4) both sides
It is installed with and pours respectively at the top of cantilevered corner beam (5) and operation triangular beam (6), the bracket triangular beam (5) and operation triangular beam (6)
Bracket (7) and operating platform (8), and pour waste recovery pouring to be installed with the outside of bracket (7) and operating platform (8)
Manage (9), it is described pour bracket (7) and extend to pour directly over proportioning platform (4).
2. one kind according to claim 1 is used for end bay cast-in-place construction bracket, it is characterised in that:The bottom surface pedestal (2)
Tamp in embedment earth's surface foundation ditch and fixed by concreting.
3. one kind according to claim 1 is used for end bay cast-in-place construction bracket, it is characterised in that:The secondary support frame
(3) quantity is three or the six roots of sensation, and some secondary support frames (3) are equidistant uniformly by being located at main support in Γ types
Fixed card buckle (10) connection installation on frame (1).
4. one kind according to claim 1 is used for end bay cast-in-place construction bracket, it is characterised in that:The bracket triangular beam
(5) and operation triangular beam (6) is internal by interting girder steel (11) being connected to form one structure, and interspersed girder steel (11) and bracket
Connection forms three-legged structure between triangular beam (5) and operation triangular beam (6).
5. one kind according to claim 1 is used for end bay cast-in-place construction bracket, it is characterised in that:It is described to pour bracket (7)
With operating platform (8) center of gravity in the closed figures that secondary support frame (3) and main backstop are formed, and pour bracket (7) and behaviour
The center of gravity subpoint for making platform (8) is not more than 10% with main backstop (1) center apart from departure degree.
6. one kind according to claim 1 is used for end bay cast-in-place construction bracket, it is characterised in that:It is described to pour bracket (7)
It is higher than other side in L-type of lying on one's side, and close to operating platform (8) side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720739847.0U CN206887782U (en) | 2017-06-23 | 2017-06-23 | One kind is used for end bay cast-in-place construction bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720739847.0U CN206887782U (en) | 2017-06-23 | 2017-06-23 | One kind is used for end bay cast-in-place construction bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206887782U true CN206887782U (en) | 2018-01-16 |
Family
ID=61316301
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720739847.0U Expired - Fee Related CN206887782U (en) | 2017-06-23 | 2017-06-23 | One kind is used for end bay cast-in-place construction bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206887782U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109371846A (en) * | 2018-11-28 | 2019-02-22 | 中交第二航务工程局有限公司 | A kind of assembled Multifunction side is across cast-in-place support and its construction method |
-
2017
- 2017-06-23 CN CN201720739847.0U patent/CN206887782U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109371846A (en) * | 2018-11-28 | 2019-02-22 | 中交第二航务工程局有限公司 | A kind of assembled Multifunction side is across cast-in-place support and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108316323A (en) | Prefabricated lattice beam and construction method thereof | |
CN106223183B (en) | Assembled concrete-filled rectangular steel tube combines truss bridge and construction method | |
CN109371989B (en) | A kind of combined type retaining structure and its construction method suitable for stability of slope supporting | |
CN106245544B (en) | A kind of assembled steel reinforced concrete guard wall type general channels hole of L-type | |
CN108374319A (en) | A kind of through tied arch bridge structural unit and arch bridge structure and its construction method | |
CN206090275U (en) | Assembled rectangular concrete -filled steel tube makes up truss bridge | |
CN107794942A (en) | Riverbed comprehensive pipe gallery structure and its construction method are worn under one kind | |
CN106012851A (en) | Synchronous construction method of steel box girder and concrete pier studs | |
CN208293597U (en) | A kind of super plane size well foundation structure | |
CN109184699A (en) | Existing river construction is worn under open trench tunnel | |
CN206887782U (en) | One kind is used for end bay cast-in-place construction bracket | |
CN207003212U (en) | A kind of combined truss arch bridge | |
CN208105293U (en) | Prefabricated lattice beam | |
CN207862744U (en) | A kind of composite construction of bridge, tunnel, embankment | |
CN209620049U (en) | A kind of pin-connected panel anchor bolt frame girder construction | |
CN209084167U (en) | Cross a river segment pipe aerial construction | |
CN107587476B (en) | Wave-blocking wall with prefabricated reverse arc olecranon structure and design and construction method thereof | |
CN110485461A (en) | A kind of drop board construction method of underground structure | |
CN105155377A (en) | Roadbed structure close to expressway pier | |
CN211898167U (en) | Reservoir dam seepage prevention structure based on concrete panel | |
CN209243486U (en) | A kind of steep slope region underloading road structure | |
CN209722887U (en) | A kind of anti-seismic arch dam support crossbeam formwork structure | |
CN209703524U (en) | A kind of side slope precast lattice beam of reinforcing bar connection | |
CN209665721U (en) | A kind of Precast T-Beam anchored end formwork for placing | |
CN208717919U (en) | A kind of road based on contrary sequence method changes bridge section foundation pit supporting construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180116 |
|
CF01 | Termination of patent right due to non-payment of annual fee |