CN209389009U - A kind of semiconductor devices production line - Google Patents

A kind of semiconductor devices production line Download PDF

Info

Publication number
CN209389009U
CN209389009U CN201822233511.4U CN201822233511U CN209389009U CN 209389009 U CN209389009 U CN 209389009U CN 201822233511 U CN201822233511 U CN 201822233511U CN 209389009 U CN209389009 U CN 209389009U
Authority
CN
China
Prior art keywords
connection sheet
lead
screen tray
graphite
chip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822233511.4U
Other languages
Chinese (zh)
Inventor
邓华鲜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LESHAN SHARE ELECTRONIC CO Ltd
Original Assignee
LESHAN SHARE ELECTRONIC CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LESHAN SHARE ELECTRONIC CO Ltd filed Critical LESHAN SHARE ELECTRONIC CO Ltd
Priority to CN201822233511.4U priority Critical patent/CN209389009U/en
Application granted granted Critical
Publication of CN209389009U publication Critical patent/CN209389009U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Screen Printers (AREA)

Abstract

The utility model discloses a kind of semiconductor devices production lines, are related to semiconductor device production field, including automatic lead assembly equipment, lead dispensing and lower connection sheet assembly equipment, chip assembly equipment and upper connection sheet assembly equipment;Automatic lead assembly equipment includes Pin arrangement device, lead grabbing device, hawkeye identification device and lead mounting device;Lead dispensing and lower connection sheet assembly equipment include tool locating hole, tin cream pond, connection sheet screen tray, graphite positioning tool, three-axis moving device, wetting device, connection sheet sucking pen device and support base;Chip assembly equipment includes tool locating hole, tin cream pond, chip screen tray, graphite positioning tool, tin sticky telecontrol equipment, wetting device and support base;Upper connection sheet assembly equipment includes tool locating hole, connection sheet screen tray, graphite positioning tool, connection sheet telecontrol equipment, connection sheet sucking pen device and two support bases.The utility model has the advantages that high-efficient, accurate positioning and breakage rate are low etc..

Description

A kind of semiconductor devices production line
Technical field
The utility model belongs to semiconductor device production field, and in particular to a kind of semiconductor devices production line.
Background technique
Semiconductor devices is widely applied to rail traffic, household electrical appliances, new energy, power supply, frequency converter, consumer electronics, calculating The fields such as machine and peripheral hardware, network communication, automotive electronics, LED.In process of production, it needs to be welded by multiple assembling parts, Traditional technique production, which is all made of, manually to be assembled in graphite jig, and this mode inefficiency, labor intensity is high, employee's shoulder The positions such as neck, arm, waist are easily strained, and in the case that employee is tired or not careful, are also easy to leakage putting material occur, counter to put material Material, the quality problems such as damage of material.Traditional technique, as welding material, causes to hold between components using solid solder plate Easy deviation, quality cannot ensure.
Summary of the invention
The purpose of this utility model is to provide the low semiconductor devices productions of a kind of high-efficient, accurate positioning and breakage rate Line.
The purpose of this utility model is achieved through the following technical solutions:
A kind of semiconductor devices production line, it is characterised in that: including automatic lead assembly equipment, lead dispensing and lower connection Piece assembly equipment, chip assembly equipment and upper connection sheet assembly equipment;The automatic lead assembly equipment includes that lead is equipped It sets, lead grabbing device, hawkeye identification device and lead mounting device;The lead dispensing and lower connection sheet assembly equipment include Tool locating hole, tin cream pond, connection sheet screen tray, graphite positioning tool, three-axis moving device, wetting device, connection sheet sucking pen Device and two support bases;The chip assembly equipment includes tool locating hole, tin cream pond, chip screen tray, graphite positioning work Dress, tin sticky telecontrol equipment, wetting device and two support bases;The upper connection sheet assembly equipment includes tool locating hole, connection Piece screen tray, graphite positioning tool, connection sheet telecontrol equipment, connection sheet sucking pen device and two support bases.
Preferably, the automatic lead assembly equipment includes work top, is provided with Pin arrangement on the work top Device, lead grabbing device, hawkeye identification device and lead mounting device, the Pin arrangement device include vibrating disk installation bottom Seat, vibrating disk and lifting body;The lead grabbing device includes manipulator mounting base, four axis robots and lead gripper Structure;The hawkeye identification device includes hawkeye mounting rack, hawkeye mobile mechanism and CCD industrial camera;The lead mounting device Disc mechanism and graphite transmission mechanism are positioned including graphite;PLC controller, the lead are provided with below the work top Collating unit, lead grabbing device, hawkeye identification device and lead mounting device and PLC controller are electrically connected.
Preferably, the lead dispensing and lower connection sheet assembly equipment include work top, are arranged on the work top There are tool locating hole, tin cream pond, connection sheet screen tray, graphite positioning tool, three-axis moving device, wetting device, connection sheet to inhale Pen device and two support bases, the tin cream pond, connection sheet screen tray and graphite positioning tool pass through tool locating bolt and tooling Location hole is fixedly connected, and three axis moves device and is fixedly connected by support base with work top, the three-axis moving device packet X-axis motion structure, Y-axis motion structure, Z axis motion structure, mounting plate and three-axis moving main body are included, the Y-axis motion structure is set It sets on the support base being arranged on the left of work top, mounting plate, the X-axis movement is fixedly installed between described two support bases On a mounting board, the Z axis motion structure is arranged in three-axis moving main body, the tin sticky for structure and the setting of three-axis moving main body Device and the setting of connection sheet sucking pen device are provided with PLC controller below Z axis motion structure lower end, the work top, institute Tin cream pond, connection sheet screen tray, three-axis moving device, wetting device and connection sheet sucking pen device is stated electrically to connect with PLC controller It connects.
Preferably, the chip assembly equipment includes work top, and tool locating hole, tin are provided on the work top Cream pond, chip screen tray, graphite positioning tool, tin sticky telecontrol equipment, wetting device and two support bases, the tin cream pond, core Piece screen tray and graphite positioning tool are fixedly connected by tool locating bolt with tool locating hole, and the tin sticky telecontrol equipment passes through Support base is fixedly connected with work top, and the tin sticky telecontrol equipment includes X-axis motion structure, Y-axis motion structure, Z axis movement Structure, mounting plate and tin sticky moving person, the Y-axis motion structure are arranged on the support base being arranged on the left of work top, institute It states and is fixedly installed mounting plate between two support bases, the X-axis motion structure and tin sticky moving person are arranged on a mounting board, The Z axis motion structure is arranged on tin sticky moving person, and the wetting device is arranged in Z axis motion structure lower end, the work Make to be provided with PLC controller below table top, the tin cream pond, chip screen tray, tin sticky telecontrol equipment and wetting device are controlled with PLC Device processed is electrically connected.
Preferably, the upper connection sheet assembly equipment includes work top, is provided with tool locating on the work top Hole, connection sheet screen tray, graphite positioning tool, connection sheet telecontrol equipment, connection sheet sucking pen device and two support bases, the company Contact pin screen tray and graphite positioning tool are fixedly connected by tool locating bolt with tool locating hole, the connection sheet telecontrol equipment It is fixedly connected by support base with work top, the connection sheet telecontrol equipment includes X-axis motion structure, Y-axis motion structure, Z The support being arranged on the left of work top is arranged in axis motion structure, mounting plate and connection sheet moving person, the Y-axis motion structure On seat, mounting plate is fixedly installed between described two support bases, the X-axis motion structure and the setting of connection sheet moving person exist On mounting plate, the Z axis motion structure is arranged on connection sheet moving person, and the connection sheet sucking pen device setting is transported in Z axis Dynamic structure lower end, the work top lower section are provided with PLC controller, the connection sheet screen tray, connection sheet telecontrol equipment and company Contact pin sucking pen device is electrically connected with PLC controller.
Preferably, the tin cream pond includes that tin cream pond ontology, scraper driving mechanism, tin cream prestore area, two scraper mechanisms With multiple tin cream disks, the scraper driving mechanism includes that scraper servo motor, scraper sliding rail, the mobile screw rod of scraper and scraper are sliding Block, the scraper servo motor and scraper sliding rail are mounted on the ontology of tin cream pond, and the scraper servo motor driving scraper is mobile Screw rod, the mobile screw rod of the scraper are connected with scraper sliding block, and the scraper sliding block is slidably connected with scraper sliding rail, the scraper machine Structure is fixedly connected with scraper sliding block, and the blade construction includes scraper mounting rack and scraper, and the tin cream disk and tin cream prestore area It is arranged in the ontology of tin cream pond.
Preferably, the chip screen tray includes screen tray ontology, vacuum chamber, chip Restricted Permutations slot and the positioning of chip screen tray Hole is provided with vacuum chamber in the screen tray ontology, and the vacuum chamber is connected with vacuum pump, and setting is multiple above the screen tray ontology Chip Restricted Permutations slot, the chip Restricted Permutations slot and chip are mating, and the chip Restricted Permutations slot is used for chip placement, institute It states and is respectively provided at least one chip screen tray location hole above and below screen tray ontology;The connection sheet screen tray include shine disk ontology, Vacuum chamber, connection sheet Restricted Permutations slot and connection sheet location hole, are provided with vacuum chamber in the screen tray ontology, the vacuum chamber with Vacuum pump is connected, and multiple connection sheet Restricted Permutations slots, the connection sheet Restricted Permutations slot and company are arranged above the screen tray ontology Contact pin is mating, and the connection sheet Restricted Permutations slot is respectively provided with multiple companies at left and right sides of the screen tray ontology for placing connection sheet Contact pin screen tray location hole.
Preferably, the graphite positioning tool includes graphite positioning plate, graphite positioning support block and graphite Positioning pin, the graphite positioning plate lower section are arranged graphite positioning support block, set below the graphite positioning support block Graphite positioning pin is set, the graphite positioning pin and tool locating hole cooperate.
Preferably, the wetting device includes tin sticky mounting base, cylinder of clapping, pressing plate, tin sticky needle and buffer spring, described Tin sticky mounting base is fixedly connected with Z axis sliding block, and the cylinder of clapping is mounted in tin sticky mounting base, the output of the cylinder of clapping End is fixedly connected with the pressing plate, and is uniformly arranged multiple tin sticky needles below the tin sticky mounting base, is arranged buffering elastic on the tin sticky needle Spring.
Preferably, the connection sheet sucking pen device includes connection sheet sucking pen main body, connection sheet sucking pen positioning pin, vacuum suction Mouth, vacuum interface and limit for height frame, the connection sheet sucking pen main body are fixedly connected with Z axis sliding block, the connection sheet sucking pen main body Surrounding is provided with limit for height frame, and multiple vacuum slots, the vacuum slot and connection sheet are arranged in the connection sheet sucking pen main body The cavity set in sucking pen main body is connected, and the cavity is connected by vacuum interface with vacuum pump, and the connection sheet sucking pen main body is left Right two sides are provided with connection sheet sucking pen positioning pin, and the connection sheet sucking pen positioning pin makes with the cooperation of connection sheet screen tray location hole With.
The technical program has the beneficial effect that:
One, semiconductor devices production line provided by the utility model, before use, electrographite box is placed on lead installation On device, lead is poured into Pin arrangement device, automatic lead assembly equipment is started by PLC controller, lead is in lead It is arranged in array apparatus, lead mounting device is moved to hawkeye identification device, and hawkeye identification device is to graphite and takes pictures, and adopts Collecting location information, lead grabbing device clamps the lead arranged, is moved to above lead mounting device, it is inserted into graphite, The mold for sticking with lead is removed lead assembly station by lead mounting device, manually takes out graphite;Lead will be manually plugged Graphite is placed on the graphite positioning tool of lead dispensing and lower connection sheet assembly equipment, and connection sheet is placed on connection sheet On screen tray, in use, starting lead dispensing and lower connection sheet assembly equipment, PLC controller control three-axis moving device drive is stained with Tin device enters tin cream pond, and wetting device is moved at graphite positioning tool by subsequent three-axis moving device, and tin sticky is abundant Contact lead-wire, three-axis moving device is moved at connection sheet screen tray, and connection sheet sucking pen device is started to work, and connection sheet is adsorbed On connection sheet sucking pen device, connection sheet telecontrol equipment moves to connection sheet sucking pen device at graphite positioning tool, connection Piece sucking pen device and graphite cooperate, and connection sheet sucking pen device removes suction, and connection sheet is assemblied in graphite under the effect of gravity On corresponding position, connection is on chip under completing, and three-axis moving device drives wetting device to be again introduced into tin cream pond, subsequent tin sportswear It sets and wetting device is moved at chip screen tray, wetting device is sticked up chip by tin cream, and tin sticky telecontrol equipment is moved to stone At print cartridge positioning tool, chip is detached from tin sticky needle, is rested in welding point, chip assembling is completed;It will complete chip assembling Graphite be placed on the graphite positioning tool of connection sheet assembly equipment, connection sheet is placed on connection sheet screen tray, In use, starting connection sheet assembly equipment, PLC controller control at connection sheet telecontrol equipment to connection sheet screen tray, connection sheet is inhaled Pen device is started to work, and connection sheet is adsorbed on connection sheet sucking pen device, and connection sheet telecontrol equipment is by connection sheet sucking pen device It moves at graphite positioning tool, connection sheet sucking pen device and graphite cooperate, and connection sheet sucking pen device removes suction, connection Piece is assemblied under the effect of gravity on graphite corresponding position, completes rectifier bridge assembly.The utility model has high-efficient, positioning The advantages that quasi- and product quality is high.
Two, semiconductor devices production line provided by the utility model, automatic lead assembly equipment lead assembly precision is high, nothing Error greatly reduces the labor intensity of operator, improves production efficiency, guarantees product quality.
Three, semiconductor devices production line provided by the utility model, lead dispensing and lower connection sheet assembly equipment are automatically complete Dispensing and the assembly of lower connection sheet are assembled at lead, the labor intensity of operator is greatly reduced, effectively reduces tin cream dosage not Uniform connection sheet position inaccurate the phenomenon that, ensure that product quality.
Four, semiconductor devices production line provided by the utility model, chip assembly equipment are rapidly completed chip assembling, have The accurate advantages such as low with breakage rate of high-efficient, chip positioning.
Five, semiconductor devices production line provided by the utility model, upper connection sheet assembly equipment complete the dress of upper connection sheet Match, has many advantages, such as high-efficient and connection sheet accurate positioning.
Six, semiconductor devices production line provided by the utility model is guaranteed by the setting that tin cream disk and tin cream prestore area Tin cream is sufficient in tin cream disk, the setting of scraper mechanism and scraper movement mechanism, guarantees that tin cream is in horizontal plane, so that each tin sticky Tin cream on device is impartial, guaranteed quality.
Seven, semiconductor devices production line provided by the utility model, by tool locating pin and chip screen tray location hole and The cooperation in tool locating hole, so that chip screen tray accurate positioning, realizes chip positioning by vacuum chamber and chip Restricted Permutations slot, It is accurate to effectively improve chip positioning;By the cooperation of tool locating pin and connection sheet screen tray location hole and tool locating hole, so that Connection sheet screen tray accurate positioning realizes the positioning of connection sheet piece by vacuum chamber and connection sheet Restricted Permutations slot, effectively improves connection Piece accurate positioning.
Eight, semiconductor devices production line provided by the utility model, graphite positioning tool are placed multiple graphites, are passed through The graphite positioning pin and station location hole being arranged below graphite positioning support block realize the accurate fixed of graphite positioning tool Position.
Nine, semiconductor devices production line provided by the utility model, cylinder band dynamic pressure plate of clapping when using make tin sticky needle It is straight and even, guarantee that the tin cream for taking equivalent can be glued when tin sticky needle enters tin cream pond, guarantees the quality of product.
Ten, semiconductor devices production line provided by the utility model realizes the transfer of connection sheet by vacuum slot, so that Working efficiency and connection sheet positioning all greatly improve.
Detailed description of the invention
The utility model aforementioned and being detailed description below becomes more apparent upon when reading in conjunction with the following drawings, in attached drawing:
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of the utility model cabinet automatic lead assembly equipment;
Fig. 3 is the structural schematic diagram of the dispensing of the utility model lead and lower connection sheet assembly equipment;
Fig. 4 is the structural schematic diagram of the utility model chip assembly equipment;
Fig. 5 is the structural schematic diagram of connection sheet assembly equipment on the utility model;
Fig. 6 is the structural schematic diagram in the utility model tin cream pond;
Fig. 7 is the structural schematic diagram of the utility model chip sieve version;
Fig. 8 is the main view of the utility model chip sieve version;
Fig. 9 is the structural schematic diagram of the utility model connection sheet screen tray;
Figure 10 is the structural schematic diagram of the utility model graphite positioning tool;
Figure 11 is the structural schematic diagram of the utility model wetting device;
Figure 12 is the structural schematic diagram of the utility model connection sheet sucking pen device;
In figure:
1, cabinet automatic lead assembly equipment;2, lead dispensing and lower connection sheet assembly equipment;3, chip assembly equipment;4, Upper connection sheet assembly equipment;5, Pin arrangement device;6, lead grabbing device;7, hawkeye identification device;8, lead mounting device; 9, tool locating hole;10, tin cream pond;11, connection sheet screen tray;12, graphite positioning tool;13, three-axis moving device;14, it is stained with Tin device;15, connection sheet sucking pen device;16, support base;17, chip screen tray;18, tin sticky telecontrol equipment;19, connection sheet moves Device;20, work top;21, vibrating disk mounting seat;22, vibrating disk;23, lifting body;24, manipulator mounting base;25, Four axis robots;26, lead grasping mechanism;27, hawkeye mounting rack;28, hawkeye mobile mechanism;29, CCD industrial camera;30, stone Print cartridge positions disc mechanism;31, graphite transmission mechanism;32, X-axis motion structure;33, Y-axis motion structure;34, Z axis movement knot Structure;35, mounting plate;36, three-axis moving main body;37, tin sticky moving person;38, connection sheet moving person;39, tin cream pond ontology; 40, scraper driving mechanism;41, tin cream prestores area;42, scraper mechanism;43, tin cream disk;44, scraper servo motor;45, scraper is sliding Rail;46, scraper sliding block;47, scraper mounting rack;48, scraper;49, screen tray ontology;50, vacuum chamber;51, chip Restricted Permutations slot; 52, chip screen tray location hole;53, connection sheet Restricted Permutations slot;54, connection sheet location hole;55, graphite positioning plate;56, stone Print cartridge positioning support block;57, graphite positioning pin;58, tin sticky mounting base;59, clap cylinder;60, pressing plate;61, tin sticky needle; 62, buffer spring;63, connection sheet sucking pen main body;64, connection sheet sucking pen positioning pin;65, vacuum slot;66, vacuum interface;67, Limit for height frame.
Specific embodiment
It is further illustrated below by several specific embodiments and realizes the utility model aim technical solution, needed Bright, the technical solution of the requires of the utility model protection includes but is not limited to following embodiment.
Embodiment 1
As a kind of most basic embodiment of the utility model, present embodiment discloses a kind of productions of semiconductor devices Line, as Figure 1-Figure 5, including automatic lead assembly equipment 1, lead dispensing and lower connection sheet assembly equipment 2, chip assembly Equipment 3 and upper connection sheet assembly equipment 4;The automatic lead assembly equipment 1 includes Pin arrangement device 5, lead grabbing device 6, hawkeye identification device 7 and lead mounting device 8;The lead dispensing and lower connection sheet assembly equipment 2 include tool locating hole 9, tin cream pond 10, connection sheet screen tray 11, graphite positioning tool 12, three-axis moving device 13, wetting device 14, connection sheet sucking pen Device 15 and two support bases 16;The chip assembly equipment 3 includes tool locating hole 9, tin cream pond 10, chip screen tray 17, stone Print cartridge positioning tool 12, tin sticky telecontrol equipment 18, wetting device 14 and two support bases 16;The upper connection sheet assembly equipment 4 Including tool locating hole 9, connection sheet screen tray 11, graphite positioning tool 12, connection sheet telecontrol equipment 19, connection sheet sucking pen device 15 and two support bases 16.
Semiconductor devices production line provided by the utility model, before use, electrographite box is placed on lead installation dress It sets on 8, lead is poured into Pin arrangement device 5, automatic lead assembly equipment 1 is started by PLC controller, lead is in lead It is arranged in array apparatus 5, lead mounting device 8 is moved to hawkeye identification device 7, and hawkeye identification device 7 is to graphite and claps According to acquisition position information, lead grabbing device 6 clamps the lead arranged, is moved to 8 top of lead mounting device, is inserted into stone In print cartridge, the mold for sticking with lead is removed lead assembly station by lead mounting device 8, manually takes out graphite;It will manually insert The graphite of good lead is placed on the graphite positioning tool 12 of lead dispensing and lower connection sheet assembly equipment 2, by connection sheet It is placed on connection sheet screen tray 11, in use, starting lead dispensing and lower connection sheet assembly equipment 2, PLC controller controls three axis Telecontrol equipment 13 drives wetting device 14 to enter tin cream pond 10, and wetting device 14 is moved to graphite by subsequent three-axis moving device 13 At box positioning tool 12, by the sufficient contact lead-wire of tin sticky, three-axis moving device 13 is moved at connection sheet screen tray 11, connection sheet Sucking pen device 15 is started to work, and connection sheet is adsorbed on connection sheet sucking pen device 15, and connection sheet telecontrol equipment 19 is by connection sheet Sucking pen device 15 moves at graphite positioning tool 12, and connection sheet sucking pen device 15 and graphite cooperate, connection sheet sucking pen dress 15 removal suction are set, connection sheet is assemblied under the effect of gravity on graphite corresponding position, completes on chip, the three-axis moving of lower connection Device 13 drives wetting device 14 to be again introduced into tin cream pond 10, and wetting device 14 is moved to chip screen tray by subsequent tin telecontrol equipment At 17, wetting device 14 is sticked up chip by tin cream, and tin sticky telecontrol equipment 18 is moved at graphite positioning tool 12, by core Piece is detached from tin sticky needle 61, rests in welding point, completes chip assembling;The graphite for completing chip assembling is placed on upper company On the graphite positioning tool 12 of contact pin assembly equipment 4, connection sheet is placed on connection sheet screen tray 11, in use, starting connects Contact pin assembly equipment, PLC controller control at connection sheet telecontrol equipment 19 to connection sheet screen tray 11, and connection sheet sucking pen device 15 is opened Connection sheet is adsorbed on connection sheet sucking pen device 15 by beginning work, and connection sheet telecontrol equipment 19 transports connection sheet sucking pen device 15 It moving at graphite positioning tool 12, connection sheet sucking pen device 15 and graphite cooperate, and connection sheet sucking pen device 15 removes suction, Connection sheet is assemblied under the effect of gravity on graphite corresponding position, completes rectifier bridge assembly.The utility model have it is high-efficient, The advantages that positioning is quasi- and product quality is high.
Embodiment 2
As a kind of preferred embodiment of the utility model, present embodiment discloses a kind of semiconductor devices production line, As Figure 1-Figure 5, including automatic lead assembly equipment 1, lead dispensing and lower connection sheet assembly equipment 2, chip assembly equipment 3 and upper connection sheet assembly equipment 4;The automatic lead assembly equipment 1 includes Pin arrangement device 5, lead grabbing device 6, hawk Eye identification device 7 and lead mounting device 8;The lead dispensing and lower connection sheet assembly equipment 2 include tool locating hole 9, tin Cream pond 10, connection sheet screen tray 11, graphite positioning tool 12, three-axis moving device 13, wetting device 14, connection sheet sucking pen device 15 and two support bases 16;The chip assembly equipment 3 includes tool locating hole 9, tin cream pond 10, chip screen tray 17, graphite Positioning tool 12, tin sticky telecontrol equipment 18, wetting device 14 and two support bases 16;The upper connection sheet assembly equipment 4 includes Tool locating hole 9, connection sheet screen tray 11, graphite positioning tool 12, connection sheet telecontrol equipment 19,15 and of connection sheet sucking pen device Two support bases 16.
Preferably, the automatic lead assembly equipment 1 includes work top 20, is provided with lead on the work top 20 Collating unit 5, lead grabbing device 6, hawkeye identification device 7 and lead mounting device 8, the Pin arrangement device 5 include vibration Moving plate mounting seat 21, vibrating disk 22 and lifting body 23;The lead grabbing device 6 includes manipulator mounting base 24, four axis Manipulator 25 and lead grasping mechanism 26;The hawkeye identification device 7 includes hawkeye mounting rack 27,28 and of hawkeye mobile mechanism CCD industrial camera 29;The lead mounting device 8 includes graphite positioning disc mechanism 30 and graphite transmission mechanism 31;It is described PLC controller, the Pin arrangement device 5, lead grabbing device 6,7 and of hawkeye identification device are provided with below work top 20 Lead mounting device 8 and PLC controller are electrically connected.
Preferably, the lead dispensing and lower connection sheet assembly equipment 2 include work top 20, on the work top 20 It is provided with tool locating hole 9, tin cream pond 10, connection sheet screen tray 11, graphite positioning tool 12, three-axis moving device 13, tin sticky Device 14, connection sheet sucking pen device 15 and two support bases 16, the tin cream pond 10, connection sheet screen tray 11 and graphite position work It fills 12 to be fixedly connected by tool locating bolt with tool locating hole 9, three axis moves device and passes through support base 16 and work top 20 are fixedly connected, and the three-axis moving device 13 includes X-axis motion structure 32, Y-axis motion structure 33, Z axis motion structure 34, peace Loading board 35 and three-axis moving main body 36, the Y-axis motion structure 33 are arranged on the support base 16 being arranged on the left of work top 20, Mounting plate 35 is fixedly installed between described two support bases 16, the X-axis motion structure 32 and three-axis moving main body 36 are arranged On mounting plate 35, the Z axis motion structure 34 is arranged in three-axis moving main body 36, and the wetting device 14 and connection sheet are inhaled The setting of pen device 15 is provided with PLC controller, the tin cream pond below 34 lower end of Z axis motion structure, the work top 20 10, connection sheet screen tray 11, three-axis moving device 13, wetting device 14 and connection sheet sucking pen device 15 are electrical with PLC controller Connection.
Preferably, the chip assembly equipment 3 includes work top 20, is provided with tool locating on the work top 20 Hole 9, tin cream pond 10, chip screen tray 17, graphite positioning tool 12, tin sticky telecontrol equipment 18, wetting device 14 and two supports Seat 16, the tin cream pond 10, chip screen tray 17 and graphite positioning tool 12 are fixed by tool locating bolt and tool locating hole 9 Connection, the tin sticky telecontrol equipment 18 are fixedly connected by support base 16 with work top 20, and the tin sticky telecontrol equipment 18 wraps Include X-axis motion structure 32, Y-axis motion structure 33, Z axis motion structure 34, mounting plate 35 and tin sticky moving person 37, the Y-axis Motion structure 34 is arranged on the support base 16 being arranged on the left of work top 20, is fixedly installed between described two support bases 16 Mounting plate 35, the X-axis motion structure 32 and tin sticky moving person 37 are arranged on mounting plate 35, the Z axis motion structure 34 It is arranged on tin sticky moving person 37, the wetting device 14 is arranged under 34 lower end of Z axis motion structure, the work top 20 Side is provided with PLC controller, and the tin cream pond 10, chip screen tray 17, tin sticky telecontrol equipment 18 and wetting device 14 are controlled with PLC Device processed is electrically connected.
Preferably, the upper connection sheet assembly equipment 4 includes work top 20, is provided with tooling on the work top 20 Location hole 9, connection sheet screen tray 11, graphite positioning tool 12, connection sheet telecontrol equipment 19, connection sheet sucking pen device 15 and two Support base 16, the connection sheet screen tray 11 and graphite positioning tool 12 connect by the way that tool locating bolt and tool locating hole 9 are fixed It connects, the connection sheet telecontrol equipment 19 is fixedly connected by support base 16 with work top 20, the connection sheet telecontrol equipment 19 It is described including X-axis motion structure 32, Y-axis motion structure 33, Z axis motion structure 34, mounting plate 35 and connection sheet moving person 38 Y-axis motion structure 33 is arranged on the support base 16 being arranged on the left of work top 20, and fixation is set between described two support bases 16 It is equipped with mounting plate 35, the X-axis motion structure 32 and connection sheet moving person 38 are arranged on mounting plate 35, the Z axis movement Structure 34 is arranged on connection sheet moving person 38, and the connection sheet sucking pen device 15 is arranged in 34 lower end of Z axis motion structure, institute It states and is provided with PLC controller below work top 20, the connection sheet screen tray 11, connection sheet telecontrol equipment 19 and connection sheet sucking pen Device 15 is electrically connected with PLC controller.
As shown in Figure 6, it is preferred that the tin cream pond 10 is prestored including tin cream pond ontology 39, scraper driving mechanism 40, tin cream 41, two, area scraper mechanism 42 and multiple tin cream disks 43, the scraper driving mechanism 40 are sliding including scraper servo motor 44, scraper The mobile screw rod of rail 45, scraper and scraper sliding block 46, the scraper servo motor 44 and scraper sliding rail 45 are mounted on tin cream pond ontology On 39, the scraper servo motor 44 drives the mobile screw rod of scraper, and the scraper servo motor 44 is using ring will SM0402AE4- KCD-NNV servo motor;The mobile screw rod of the scraper is connected with scraper sliding block 46, and the scraper sliding block 46 and scraper sliding rail 45 are sliding Dynamic connection, the scraper mechanism 42 are fixedly connected with scraper sliding block 46, and the blade construction 42 includes scraper mounting rack 47 and scrapes Knife 48, the tin cream disk 43 and tin cream prestore area 41 and are arranged in tin cream pond ontology 39.
As shown in Fig. 7-Fig. 9, it is preferred that the chip screen tray 17 includes screen tray ontology 49, vacuum chamber 50, chip limit Slot 51 and chip screen tray location hole 52 are arranged, is provided with vacuum chamber 50, the vacuum chamber 50 and vacuum in the screen tray ontology 49 Pump is connected, and multiple chip Restricted Permutations slots 51, the chip Restricted Permutations slot 51 and chip are arranged above the screen tray ontology 49 Mating, the chip Restricted Permutations slot 51 is used for chip placement, is respectively provided at least one above and below the screen tray ontology 49 Chip screen tray location hole 52;The connection sheet screen tray 11 includes shining disk ontology 49, vacuum chamber 50,53 and of connection sheet Restricted Permutations slot Connection sheet location hole 54 is provided with vacuum chamber 50 in the screen tray ontology 49, and the vacuum chamber 50 is connected with vacuum pump, the sieve Multiple connection sheet Restricted Permutations slots 53 are set above disk ontology 49, and the connection sheet Restricted Permutations slot 53 is mating with connection sheet, institute Connection sheet Restricted Permutations slot 53 is stated for placing connection sheet, multiple connection sheet screen trays are respectively provided at left and right sides of the screen tray ontology 49 Location hole 54.
As shown in Figure 10, it is preferred that the graphite positioning tool 12 includes graphite positioning plate 55, graphite positioning Graphite positioning support block 56 is arranged below the graphite positioning plate 55 for supporting block 56 and graphite positioning pin 57, described Graphite positioning pin 57 is set below graphite positioning support block 56, and the graphite positioning pin 57 cooperates with tool locating hole 9.
As shown in figure 11, it is preferred that the wetting device 14 includes tin sticky mounting base 58, cylinder 59 of clapping, pressing plate 60, is stained with Tin needle 61 and buffer spring 62, the tin sticky mounting base 58 are fixedly connected with Z axis sliding block, and the cylinder 59 of clapping is mounted on tin sticky In mounting base 58, the cylinder 59 of clapping uses SMC MGJ10-10-F8B cylinder, the output end and pressure of the cylinder 59 of clapping Plate 60 is fixedly connected, and multiple tin sticky needles 61 are uniformly arranged below the tin sticky mounting base 58, are arranged buffering on the tin sticky needle 61 Spring 62.
As shown in figure 12, it is preferred that the connection sheet sucking pen device 15 includes connection sheet sucking pen main body 63, connection sheet sucking pen Positioning pin 64, vacuum slot 65, vacuum interface 66 and limit for height frame 67, the connection sheet sucking pen main body 63 are fixed with Z axis sliding block Connection, 63 surrounding of connection sheet sucking pen main body are provided with limit for height frame 67, are arranged in the connection sheet sucking pen main body 63 multiple The cavity set in vacuum slot 65, the vacuum slot 65 and connection sheet sucking pen main body 63 is connected, and the cavity is connect by vacuum Mouth 66 is connected with vacuum pump, and connection sheet sucking pen positioning pin 64 is provided at left and right sides of the connection sheet sucking pen main body 63, described Connection sheet sucking pen positioning pin 64 is used cooperatively with connection sheet screen tray location hole 54.
Semiconductor devices production line provided by the utility model, before use, electrographite box is placed on lead installation dress It sets on 8, lead is poured into Pin arrangement device 5, automatic lead assembly equipment 1 is started by PLC controller, lead is in lead It is arranged in array apparatus 5, lead mounting device 8 is moved to hawkeye identification device 7, and hawkeye identification device 7 is to graphite and claps According to acquisition position information, lead grabbing device 6 clamps the lead arranged, is moved to 8 top of lead mounting device, is inserted into stone In print cartridge, the mold for sticking with lead is removed lead assembly station by lead mounting device 8, manually takes out graphite;It will manually insert The graphite of good lead is placed on the graphite positioning tool 12 of lead dispensing and lower connection sheet assembly equipment 2, by connection sheet It is placed on connection sheet screen tray 11, in use, starting lead dispensing and lower connection sheet assembly equipment 2, PLC controller controls three axis Telecontrol equipment 13 drives wetting device 14 to enter tin cream pond 10, and wetting device 14 is moved to graphite by subsequent three-axis moving device 13 At box positioning tool 12, by the sufficient contact lead-wire of tin sticky, three-axis moving device 13 is moved at connection sheet screen tray 11, connection sheet Sucking pen device 15 is started to work, and connection sheet is adsorbed on connection sheet sucking pen device 15, and connection sheet telecontrol equipment 19 is by connection sheet Sucking pen device 15 moves at graphite positioning tool 12, and connection sheet sucking pen device 15 and graphite cooperate, connection sheet sucking pen dress 15 removal suction are set, connection sheet is assemblied under the effect of gravity on graphite corresponding position, completes on chip, the three-axis moving of lower connection Device 13 drives wetting device 14 to be again introduced into tin cream pond 10, and wetting device 14 is moved to chip screen tray by subsequent tin telecontrol equipment At 17, wetting device 14 is sticked up chip by tin cream, and tin sticky telecontrol equipment 18 is moved at graphite positioning tool 12, by core Piece is detached from tin sticky needle 61, rests in welding point, completes chip assembling;The graphite for completing chip assembling is placed on upper company On the graphite positioning tool 12 of contact pin assembly equipment 4, connection sheet is placed on connection sheet screen tray 11, in use, starting connects Contact pin assembly equipment, PLC controller control at connection sheet telecontrol equipment 19 to connection sheet screen tray 11, and connection sheet sucking pen device 15 is opened Connection sheet is adsorbed on connection sheet sucking pen device 15 by beginning work, and connection sheet telecontrol equipment 19 transports connection sheet sucking pen device 15 It moving at graphite positioning tool 12, connection sheet sucking pen device 15 and graphite cooperate, and connection sheet sucking pen device 15 removes suction, Connection sheet is assemblied under the effect of gravity on graphite corresponding position, completes rectifier bridge assembly.The utility model have it is high-efficient, The advantages that positioning is quasi- and product quality is high.
1 lead assembly precision of automatic lead assembly equipment is high, error free, greatly reduces the labor intensity of operator, Production efficiency is improved, guarantees product quality.Lead dispensing and lower connection sheet assembly equipment 2 be automatically performed lead assembly dispensing and Lower connection sheet assembly, greatly reduces the labor intensity of operator, effectively reduces tin cream dosage and unevenly positions with connection sheet The phenomenon of inaccuracy, ensure that product quality.Chip assembling is rapidly completed in chip assembly equipment 3, has high-efficient, chip positioning The advantages such as accurate and breakage rate is low.Upper connection sheet assembly equipment 4 completes the assembly of upper connection sheet, has high-efficient and connection sheet fixed The advantages that level is true.Guarantee that tin cream is sufficient in tin cream disk 43 by the setting that tin cream disk 43 and tin cream prestore area 41, scraper mechanism 42 and 48 movement mechanism of scraper setting, guarantee that tin cream be in horizontal plane so that the tin cream on wetting device 14 is impartial every time, guarantor Demonstrate,prove quality.By the cooperation of tool locating pin and chip screen tray location hole 52 and tool locating hole 9, so that chip screen tray 17 positions Accurately, chip positioning is realized by vacuum chamber 50 and chip Restricted Permutations slot 51, it is accurate effectively improves chip positioning;Pass through tooling The cooperation of positioning pin and connection sheet screen tray 11 location hole and tool locating hole 9, so that 11 accurate positioning of connection sheet screen tray, by true Cavity 50 and connection sheet Restricted Permutations slot 53 realize the positioning of connection sheet piece, effectively improve connection sheet accurate positioning.Graphite positioning Tooling 12 places 3 graphites, and the graphite positioning pin 57 by being arranged below graphite positioning support block 56 and station position The accurate positionin of hole realization graphite positioning tool 12.Cylinder 59 of clapping when using with dynamic pressure plate 60 makes tin sticky needle 61 straight and even, Guarantee that the tin cream for taking equivalent can be glued when tin sticky needle 61 enters tin cream pond 10, guarantees the quality of product.It is realized by vacuum slot 65 The transfer of connection sheet, so that working efficiency and connection sheet positioning all greatly improve.

Claims (10)

1. a kind of semiconductor devices production line, it is characterised in that: including automatic lead assembly equipment, lead dispensing and lower connection sheet Assembly equipment (2), chip assembly equipment (3) and upper connection sheet assembly equipment (4);The automatic lead assembly equipment includes lead Collating unit (5), lead grabbing device (6), hawkeye identification device (7) and lead mounting device (8);The lead dispensing and under Connection sheet assembly equipment (2) includes tool locating hole (9), tin cream pond (10), connection sheet screen tray (11), graphite positioning tool (12), three-axis moving device (13), wetting device (14), connection sheet sucking pen device (15) and two support bases (16);The core Piece assembly equipment (3) includes tool locating hole (9), tin cream pond (10), chip screen tray (17), graphite positioning tool (12), is stained with Tin telecontrol equipment (18), wetting device (14) and two support bases (16);The upper connection sheet assembly equipment (4) includes that tooling is fixed Position hole (9), connection sheet screen tray (11), graphite positioning tool (12), connection sheet telecontrol equipment (19), connection sheet sucking pen device (15) and two support bases (16).
2. semiconductor devices production line according to claim 1, it is characterised in that: the automatic lead assembly equipment includes Work top (20) is provided with Pin arrangement device (5), lead grabbing device (6), hawkeye identification on the work top (20) Device (7) and lead mounting device (8), the Pin arrangement device (5) include vibrating disk mounting seat (21), vibrating disk (22) With lifting body (23);The lead grabbing device (6) includes that manipulator mounting base (24), four axis robots (25) and lead are grabbed Take mechanism (26);The hawkeye identification device (7) includes hawkeye mounting rack (27), hawkeye mobile mechanism (28) and CCD industry phase Machine (29);The lead mounting device (8) includes graphite positioning disc mechanism (30) and graphite transmission mechanism (31);The work Make to be provided with PLC controller below table top (20), the Pin arrangement device (5), lead grabbing device (6), hawkeye identification dress It sets (7) and lead mounting device (8) and PLC controller is electrically connected.
3. semiconductor devices production line according to claim 1, it is characterised in that: the lead dispensing and lower connection are on chip Include work top (20) with equipment (2), tool locating hole (9) is provided on the work top (20), tin cream pond (10), is connected Contact pin screen tray (11), graphite positioning tool (12), three-axis moving device (13), wetting device (14), connection sheet sucking pen device (15) and two support bases (16), the tin cream pond (10), connection sheet screen tray (11) and graphite positioning tool (12) pass through work Dress pilot pin is fixedly connected with tool locating hole (9), and the three-axis moving device (13) passes through support base (16) and work top (20) it is fixedly connected, the wetting device (14) and connection sheet sucking pen device (15) are arranged in Z axis motion structure (34) lower end, institute It states and is provided with PLC controller, the tin cream pond (10), connection sheet screen tray (11), three-axis moving device below work top (20) (13), wetting device (14) and connection sheet sucking pen device (15) are electrically connected with PLC controller.
4. semiconductor devices production line according to claim 1, it is characterised in that: the chip assembly equipment (3) includes Work top (20) is provided with tool locating hole (9), tin cream pond (10), chip screen tray (17), stone on the work top (20) Print cartridge positioning tool (12), tin sticky telecontrol equipment (18), wetting device (14) and two support bases (16), the tin cream pond (10), chip screen tray (17) and graphite positioning tool (12) are fixedly connected by tool locating bolt with tool locating hole (9), institute It states tin sticky telecontrol equipment (18) to be fixedly connected by support base (16) with work top (20), tin sticky telecontrol equipment (18) packet Include X-axis motion structure (32), Y-axis motion structure (33), Z axis motion structure (34), mounting plate (35) and tin sticky moving person (37), on the support base (16) that Y-axis motion structure (33) setting is arranged on the left of work top (20), described two supports It is fixedly installed mounting plate (35) between seat (16), the X-axis motion structure (32) and tin sticky moving person (37) setting are being pacified In loading board (35), the Z axis motion structure (34) is arranged on tin sticky moving person (37), and wetting device (14) setting exists Z axis motion structure (34) lower end, work top (20) lower section are provided with PLC controller, the tin cream pond (10), chip sieve Disk (17), tin sticky telecontrol equipment (18) and wetting device (14) are electrically connected with PLC controller.
5. semiconductor devices production line according to claim 1, it is characterised in that: the upper connection sheet assembly equipment (4) Including work top (20), tool locating hole (9), connection sheet screen tray (11), graphite are provided on the work top (20) Positioning tool (12), connection sheet telecontrol equipment (19), connection sheet sucking pen device (15) and two support bases (16), the connection sheet Screen tray (11) and graphite positioning tool (12) are fixedly connected by tool locating bolt with tool locating hole (9), the connection sheet Telecontrol equipment (19) is fixedly connected by support base (16) with work top (20), and the connection sheet telecontrol equipment (19) includes X Axis motion structure (32), Y-axis motion structure (33), Z axis motion structure (34), mounting plate (35) and connection sheet moving person (38), on the support base (16) that Y-axis motion structure (33) setting is arranged on the left of work top (20), described two supports It is fixedly installed mounting plate (35) between seat (16), the X-axis motion structure (32) and connection sheet moving person (38) setting exist On mounting plate (35), the Z axis motion structure (34) is arranged on connection sheet moving person (38), the connection sheet sucking pen device (15) setting is provided with PLC controller, the connection sheet below Z axis motion structure (34) lower end, the work top (20) Screen tray (11), connection sheet telecontrol equipment (19) and connection sheet sucking pen device (15) are electrically connected with PLC controller.
6. semiconductor devices production line according to claim 1, it is characterised in that: the tin cream pond (10) includes tin cream pond Ontology (39), scraper driving mechanism (40), tin cream prestore area (41), two scraper mechanisms (42) and multiple tin cream disks (43), institute Stating scraper driving mechanism (40) includes that scraper servo motor (44), scraper sliding rail (45), the mobile screw rod of scraper (48) and scraper are sliding Block (46), the scraper servo motor (44) and scraper sliding rail (45) are mounted on tin cream pond ontology (39), the scraper servo Motor (44) drives scraper (48) mobile screw rod, and the mobile screw rod of the scraper (48) is connected with scraper sliding block (46), the scraper Sliding block (46) is slidably connected with scraper sliding rail (45), and the scraper mechanism (42) is fixedly connected with scraper sliding block (46), described to scrape Knife (48) structure includes scraper mounting rack (47) and scraper (48), and the tin cream disk (43) and tin cream prestore area (41) and be arranged at In tin cream pond ontology (39).
7. semiconductor devices production line according to claim 1, it is characterised in that: the chip screen tray (17) includes screen tray Ontology (49), vacuum chamber (50), chip Restricted Permutations slot (51) and chip screen tray location hole (52), the screen tray ontology (49) are interior It is provided with vacuum chamber (50), the vacuum chamber (50) is connected with vacuum pump, and multiple chips are arranged above the screen tray ontology (49) Restricted Permutations slot (51), the chip Restricted Permutations slot (51) and chip are mating, and the chip Restricted Permutations slot (51) is for putting Chip is set, at least one chip screen tray location hole (52) is respectively provided with above and below the screen tray ontology (49);The connection sheet Screen tray (11) includes shining disk ontology, vacuum chamber (50), connection sheet Restricted Permutations slot (53) and connection sheet location hole (54), the sieve It is provided with vacuum chamber (50) in disk ontology (49), the vacuum chamber (50) is connected with vacuum pump, above the screen tray ontology (49) Multiple connection sheet Restricted Permutations slots (53) are set, and the connection sheet Restricted Permutations slot (53) and connection sheet are mating, the connection sheet Restricted Permutations slot (53) is respectively provided with multiple connection sheet screen trays (11) at left and right sides of the screen tray ontology (49) for placing connection sheet Location hole.
8. semiconductor devices production line according to claim 1, it is characterised in that: graphite positioning tool (12) packet Graphite positioning plate (55), graphite positioning support block (56) and graphite positioning pin (57) are included, the graphite positions bottom Graphite positioning support block (56) are set below plate (55), setting graphite positions below the graphite positioning support block (56) It sells (57), the graphite positioning pin (57) and tool locating hole (9) cooperate.
9. semiconductor devices production line according to claim 1, it is characterised in that: the wetting device (14) includes tin sticky Mounting base (58), cylinder of clapping (59), pressing plate (60), tin sticky needle (61) and buffer spring (62), the tin sticky mounting base (58) Be fixedly connected with Z axis sliding block, the cylinder of clapping (59) is mounted on tin sticky mounting base (58), the cylinder of clapping (59) it is defeated Outlet is fixedly connected with pressing plate (60), is uniformly arranged multiple tin sticky needles (61), the tin sticky below the tin sticky mounting base (58) Buffer spring (62) are arranged on needle (61).
10. semiconductor devices production line according to claim 1, it is characterised in that: the connection sheet sucking pen device (15) Including connection sheet sucking pen main body (63), connection sheet sucking pen positioning pin (64), vacuum slot (65), vacuum interface (66) and hight limiting side Frame (67), the connection sheet sucking pen main body (63) are fixedly connected with Z axis sliding block, connection sheet sucking pen main body (63) the surrounding setting Have hight limiting side frame (67), is arranged multiple vacuum slots (65) on the connection sheet sucking pen main body (63), the vacuum slot (65) It is connected with the cavity set in connection sheet sucking pen main body (63), the cavity is connected by vacuum interface (66) with vacuum pump, described Connection sheet sucking pen positioning pin (64), the connection sheet sucking pen positioning pin are provided at left and right sides of connection sheet sucking pen main body (63) (64) it is used cooperatively with connection sheet screen tray (11) location hole.
CN201822233511.4U 2018-12-28 2018-12-28 A kind of semiconductor devices production line Active CN209389009U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822233511.4U CN209389009U (en) 2018-12-28 2018-12-28 A kind of semiconductor devices production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822233511.4U CN209389009U (en) 2018-12-28 2018-12-28 A kind of semiconductor devices production line

Publications (1)

Publication Number Publication Date
CN209389009U true CN209389009U (en) 2019-09-13

Family

ID=67862578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822233511.4U Active CN209389009U (en) 2018-12-28 2018-12-28 A kind of semiconductor devices production line

Country Status (1)

Country Link
CN (1) CN209389009U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109473386A (en) * 2018-12-28 2019-03-15 乐山希尔电子股份有限公司 A kind of semiconductor devices assemble method and its production line
CN113314443A (en) * 2021-07-05 2021-08-27 南通皋鑫科技开发有限公司 System device for filling diode frame with solder bumps

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109473386A (en) * 2018-12-28 2019-03-15 乐山希尔电子股份有限公司 A kind of semiconductor devices assemble method and its production line
CN109473386B (en) * 2018-12-28 2023-10-24 乐山希尔电子股份有限公司 Semiconductor device assembling method and production line thereof
CN113314443A (en) * 2021-07-05 2021-08-27 南通皋鑫科技开发有限公司 System device for filling diode frame with solder bumps

Similar Documents

Publication Publication Date Title
CN106001930B (en) A kind of multistation laser carving equipment of automatic loading/unloading
CN102601295B (en) Automatic riveting machine
CN209389009U (en) A kind of semiconductor devices production line
CN202759670U (en) Chip mounter
CN102819983B (en) A kind of automatic sealing device of electric energy meter seal
CN109382270A (en) A kind of automatic dispensing device
CN109473386A (en) A kind of semiconductor devices assemble method and its production line
CN209177579U (en) A kind of full-automatic sliver of glass, insert rack all-in-one machine
CN205353301U (en) Accurate electron base plate function automatic checkout device of polycell formula
CN212526737U (en) Automatic kludge of line formula
CN219152889U (en) Industrial automation robot
CN210886183U (en) Tin coating machine
CN205723231U (en) The automatic assembling of switch panel
CN207948017U (en) Full-automatic SMD loaders
CN210260291U (en) Feeding and discharging equipment of manipulator
CN203804376U (en) Tin soldering machine for automatically performing insertion on car lamp LED substrate by robot
CN204248893U (en) Realize the z-axis die set of open-close type manipulator accurate pick-and-place fritter rule material
CN113695861B (en) Automatic assembling machine for adhesive piece and burr of eyeliner
CN104439604A (en) Automatic terminal plug tin dipping machine
CN210617087U (en) Novel drip plastic oven all-in-one machine
CN209578756U (en) Flexible automatic equipment for assembling notebook rear cover screw and gasket
CN203617255U (en) Semi-automatic wafer ball mounting device
CN208708074U (en) A kind of automatic patch drawing strickle guide sealing-tape machine
CN208070679U (en) A kind of mobile phone thimble automated packaging equipment
CN209149887U (en) A kind of resistor intelligent production line

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant