CN209296332U - A kind of dry run device - Google Patents

A kind of dry run device Download PDF

Info

Publication number
CN209296332U
CN209296332U CN201920111160.1U CN201920111160U CN209296332U CN 209296332 U CN209296332 U CN 209296332U CN 201920111160 U CN201920111160 U CN 201920111160U CN 209296332 U CN209296332 U CN 209296332U
Authority
CN
China
Prior art keywords
control unit
region
work station
central control
station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920111160.1U
Other languages
Chinese (zh)
Inventor
朱军科
董明福
陈小宾
梁林
徐剑
苏华显
秦小红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGXI MANCHEBISI AUTOMATION EQUIPMENT Co Ltd
Original Assignee
GUANGXI MANCHEBISI AUTOMATION EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGXI MANCHEBISI AUTOMATION EQUIPMENT Co Ltd filed Critical GUANGXI MANCHEBISI AUTOMATION EQUIPMENT Co Ltd
Priority to CN201920111160.1U priority Critical patent/CN209296332U/en
Application granted granted Critical
Publication of CN209296332U publication Critical patent/CN209296332U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of dry run device, central control unit work station is set, region control unit work station, monitor control unit work station, central control unit, region control unit and active station and simulation trolley, test item program can be uploaded to one of central control unit in central control unit work station by user, in region, test item program is uploaded to each region control unit by control unit work station, region control unit collects the operating status of each simulation trolley connected to it, task, the information such as real time position, and feed back to the central control unit being attached thereto, the execution information that the transmission of each region control unit comes is uploaded to monitoring control unit work station by each central control unit in real time, and by some instructions, operation information is sent to each region control unit, complete the processing of data and instruction, Transfer, monitoring realize the dry run to intelligent track logistics system, avoid the cost of idleness in commissioning test.

Description

A kind of dry run device
Technical field
The utility model relates to intelligent track logistics trial operation fields, and in particular to a kind of dry run device.
Background technique
Intelligent track logistics system mainly includes logistics trolley, logistics track, points etc., in the control in computer Under, trolley transporting articles on logistics track are simulated, in transmission process, it is sometimes desirable to pass through points and change track operation.Intelligence Before energy Rail logistics system comes into operation after completing the design, commissioning test is needed, actual use is put into after debugging successfully again, avoids Occur unexpected failure, defect in actual use, or generate the serious consequence of logistics paralysis, influences scheduling effect Rate.
When commissioning test, during finding failure or defect, software and hardware may be needed to modify repeatedly, be debugged repeatedly, It is no matter excessive in human and material resources, time, fund aspect investment, therefore, it is necessary to dry run is carried out before commissioning test, The control that intelligent track logistics system is related to, the accuracy of transmission, processing are verified by dry run, by dry run, Insufficient or defect can be found ahead of time, improved in advance, avoided the cost of idleness in commissioning test.
Utility model content
The utility model provides a kind of dry run device, solves intelligent track logistics system existing in the prior art not Dry run is carried out before commissioning test, is caused when commissioning test in human and material resources, time, fund aspect cost is excessively high asks Topic.
The utility model solves technical problem by the following technical programs:
A kind of dry run device, including central control unit work station, region control unit work station, monitoring control list First work station, at least one central control unit, at least one region control unit, at least one active station and at least one simulation Trolley;The central control unit work station, region control unit work station, monitoring control unit work station and the same center Control unit connection;Each central control unit is sequentially connected, two-way communication;At each central control unit, it is connected with At least one region control unit;At each region control unit, it is connected at least one active station and at least one simulation is small Vehicle.
Further, the central control unit be 2, this 2 central control units be the first central control unit and Second central control unit;The central control unit work station, region control unit work station, monitoring control unit work station It is connect respectively with the first central control unit, two-way communication;First central control unit and the second central control unit connect It connects, two-way communication.
Further, the region control unit is 4, this 4 region control units are first area control unit, the Two region control units, third region control unit and the fourth region control unit;The first area control unit and first Central control unit connection, two-way communication;The second area control unit is connect with the first central control unit, two-way Letter;Third region control unit is connect with the second central control unit, two-way communication;The fourth region control unit with The connection of second central control unit, two-way communication.
Further, the type of the active station includes transmitting station, receiving station and maintenance website;It is controlled in each region In unit processed, it is connected with transmitting station, receiving station and repairs at least one kind of types of sites in website.
It further, further include SMS module;The SMS module is connect with monitoring control unit work station.
Further, in each region control unit, region control unit and each simulation trolley are wirelessly connected.
Further, the monitoring control unit work station is equipped with KingView.
Further, the central control unit is S7-300 programmable controller.
It further, further include interchanger;The central control unit work station, region control unit work station, monitoring Between control unit work station and the central control unit being connect jointly with them by the interchanger transmit control instruction and Data;When each central control unit is sequentially connected, control instruction and data are transmitted by the interchanger;In each center At control unit, pass through interchanger transmission control between the central control unit and the region control unit being attached thereto Instruction and data;At each region control unit, pass through friendship between the region control unit and the active station being attached thereto It changes planes and transmits control instruction and data.
It further, further include communication module;Between the region control unit and the simulation trolley being wirelessly connected therewith Control instruction and data are transmitted by communication module.
Compared with prior art, it has a characteristic that
1, central control unit work station, region control unit work station, monitoring control unit work station, at least 1 are set A central control unit, at least one region control unit and at least one active station communicated with region control unit and at least Test item program can be uploaded to one of center control list in central control unit work station by 1 simulation trolley, user Member, in region, test item program is uploaded to each region control unit by control unit work station, region control unit collect with The information such as its operating status, task, real time position of each simulation trolley for connecting, and it is single to feed back to the center control being attached thereto The execution information that the transmission of each region control unit comes is uploaded to monitoring control unit in real time and worked by member, each central control unit It stands, and some instructions, operation information is sent to each region control unit, complete the processing, transfer, monitoring of data and instruction, Realize dry run to intelligent track logistics system, avoid in commissioning test waste of manpower, material resources, time, fund etc. at This.
2, corresponding region control unit can be set according to the difference of points quantity, and each territory element can be according to reality Border demand binds the website of at least 1 seed type, fully considers logistics trolley, logistics track, points, dispatching station, receiving station, dimension The factor for repairing each component part harmony operation such as station, improves the authenticity of dry run, can truly react commissioning test, reality Insufficient and defect that may be present in the operation of border.
Detailed description of the invention
Fig. 1 is the utility model structural principle block diagram.
Specific embodiment
The utility model is described in further detail with reference to embodiments, but the utility model is not limited to these implementations Example.
A kind of dry run device, including central control unit work station, region control unit work station, monitoring control list First work station, at least one central control unit, at least one region control unit, at least one active station and at least one simulation Trolley;The central control unit work station, region control unit work station, monitoring control unit work station and the same center Control unit connection;Each central control unit is sequentially connected, two-way communication;At each central control unit, it is connected with At least one region control unit;At each region control unit, it is connected at least one active station and at least one simulation is small Vehicle.
Test item program is uploaded to one of central control unit in central control unit work station by user, test Related control executes project procedure when generally including the operation of intelligent track logistics system, data transmission and processing and data pass It is defeated, for example, the moving forward and backward of logistics trolley, whether have in logistics trolley operational process obstacle, logistics trolley real time position, Whether transition is normal etc..
Central control unit is equipped with S7-300 controller, and S7-300 controller is compiling suitable for more complicated control Journey cyclelog provides multi-point interface and distributed Peripheral Interface, is suitable for the application.Central control unit is simulation The hinge of operation realizes that the upload of control instruction, data is assigned: each central control unit collects each region control being attached thereto Unit transmitting come monitoring data, as the communication conditions of territory element, the parking quantity of each active station, each active station it is hard Part operation, the signal intelligence of each active station, the operating status for the simulation trolley being currently running and real time position etc..Each center The data being collected into are uploaded to monitoring control unit work station by control unit, and each central control unit is also each to what is be attached thereto Region control unit forwards control instruction, then control instruction is sent to the active station and mould being attached thereto by region control unit Quasi- trolley, to complete the verifying to control logic, the correctness of data exchange.
User is uploaded in the control unit of each region in region control unit work station test item program, will also be all kinds of The project procedure of the active station of type website is downloaded in the touch screen of active station.Region control unit work station and each region are controlled Unit connection processed, and switch to monitoring monitoring control unit work station.
The application is additionally provided with communication module, and in each region control unit, region control unit and each simulation are small Vehicle radio connection is referred between the region control unit and the simulation trolley being wirelessly connected therewith by communication module transmission control Order and data.Region control unit is equipped with S7-1200 controller, and S7-1200 controller has multiple and different modules, can be to each mould Block is extended, and S7-1200 controller is compact, modular programmable controller, achievable simple logic control, The tasks such as higher-order logic control, HMI and network communication, just meet a variety of different types, quantity in intelligent track logistics system Demand of the points to different controller modules, exchange and refer to active station touch screen while also satisfaction to simulation trolley control It enables, the demand of data.The effect of region control unit is: carrying out data by ethernet communication mode with central control unit Transmission simulates trolley, points, active station data into central control unit transmitting one's respective area;According to central control unit Instruction, controls simulation trolley, points, the active station in one's respective area;With adjacent area control unit in simulation trolley Information exchange and walking logic control are carried out when discrepancy;Data friendship is carried out by simulation trolley in carrier communication mode and region It changes, and travelling control, solution lock control, destination switching, parameter modification etc. is carried out to simulation trolley;It receives in one's respective area and operates The operational order stood, through logic control, the instruction of upload is sent to central control unit, and the control instruction issued is sent to this The active station in region and simulation trolley, realization dispatches a car, shunts, bicycle parking, unlock, travelling control etc.;According to the purpose of simulation trolley Ground, control points carry out path change.
Active station is equipped with touch screen, and user can carry out task setting in touch screen.Active station generally include transmitting station, Receiving station and maintenance website, transmitting station refer to that the current parking stall of simulation trolley is set, and receiving station refers to simulation trolley Destination, maintenance website then refer to the website of maintenance, repair simulation trolley.Each region control unit, can bind dispatching station At least one kind of types of sites in point, receiving station and maintenance website.In general, each region control unit can be according to the IP of setting Address and port numbers bind 1-3 active station.Active station carries out real-time control to the simulation trolley for entering one's respective area, to being parked in Simulation trolley in one's respective area dispatched a car, shunt, bicycle parking, unlock, travelling control etc., can also be to the mould for being parked in adjacent area Quasi- trolley is transferred.
Monitoring control unit work station is equipped with KingView, monitors the operation road of each region during dry run in real time Line, operating status, the position of points of simulating trolley etc..KingView is a kind of monitor system software, provides real-time data base, It is one and provides data summarization, analysis and the platform of management for user.It is three layers that the monitor system software, which can be divided into, that is, is controlled Layer, supervisory layers and management level, supervisory layers are connected with control layer and management level, in the dry run process of intelligent track logistics system Middle completion upload is assigned, real-time monitoring and control.
The application is additionally provided with SMS module;The SMS module is connect with monitoring control unit work station.Work as simulation process There is equipment fault, fault message is uploaded to central control unit by region control unit, then is sent to by central control unit Control unit work station is monitored, issues failure letter by monitoring control unit work station handling failure information, and by SMS module It ceases to external reception equipment, while showing fault message in monitoring interface.
According to actual needs, central control unit is preferably set up 2, this 2 central control units are the first center control Unit processed and the second central control unit;The central control unit work station, region control unit work station, monitoring control are single First work station is connect with the first central control unit respectively, two-way communication;First central control unit and the second center are controlled Unit connection processed, two-way communication.First central control unit is connect at least one region control unit;In described second Centre control unit is connect at least one region control unit.Region control unit is preferably set up 4, this 4 region controls are single Member is first area control unit, second area control unit, third region control unit and the fourth region control unit;It is described First area control unit is connect with the first central control unit, two-way communication;In the second area control unit and first Entreat control unit connection, two-way communication;Third region control unit is connect with the second central control unit, two-way communication; The fourth region control unit is connect with the second central control unit, two-way communication.
First central control unit and central control unit work station, region control unit work station, monitoring control unit Work station is all connected with, and assigns control instruction and data toward region control unit connected to it upload, while laterally to adjacent Control instruction and data are assigned in the upload of second central control unit.4 region control units are set, derived from existing logistics track Multidirectional, the points that simulation trolley passes through in the process of running may be 1,2,3 or even 4, the increasing of points Add, in terms of control instruction and data, there is the increase of verifying content, it is necessary to set according to the quantity specific aim of points Corresponding region control unit.
The application is additionally provided with interchanger;The central control unit work station, region control unit work station, monitoring control Control instruction and data are transmitted by the interchanger between work station unit and the central control unit connecting jointly with them; When each central control unit is sequentially connected, control instruction and data are transmitted by the interchanger;In each center control At unit, control instruction is transmitted by the interchanger between the central control unit and the region control unit being attached thereto And data;At each region control unit, pass through interchanger between the region control unit and the active station being attached thereto Transmit control instruction and data.Each work station, control unit, the control instruction between active station and data transmission, pass through friendship It changes planes switching.
The application provides all kinds of work stations, control unit, active station and simulates trolley accordingly, and provides and connect accordingly Relationship is connect, user can upload according to the hardware of offer composition, hardware annexation, upload the test program for meeting dry run Dry run can be completed, the application is not directed to the improvement of program it is intended that hardware platform is built in dry run.

Claims (10)

1. a kind of dry run device, it is characterised in that:
Including central control unit work station, region control unit work station, monitoring control unit work station, at least one center Control unit, at least one region control unit, at least one active station and at least one simulate trolley;
The central control unit work station, region control unit work station, monitoring control unit work station and the same center Control unit connection;Each central control unit is sequentially connected, two-way communication;At each central control unit, it is connected with At least one region control unit;At each region control unit, it is connected at least one active station and at least one simulation is small Vehicle.
2. a kind of dry run device according to claim 1, it is characterised in that:
The central control unit is 2, this 2 central control units are that the first central control unit and the second center control are single Member;
The central control unit work station, region control unit work station, monitoring control unit work station respectively with first in Entreat control unit connection, two-way communication;First central control unit is connect with the second central control unit, two-way communication.
3. a kind of dry run device according to claim 2, it is characterised in that:
The region control unit is 4, this 4 region control units are first area control unit, second area control list Member, third region control unit and the fourth region control unit;
The first area control unit is connect with the first central control unit, two-way communication;The second area control unit It is connect with the first central control unit, two-way communication;Third region control unit is connect with the second central control unit, double To communication;The fourth region control unit is connect with the second central control unit, two-way communication.
4. a kind of dry run device according to claim 1, it is characterised in that:
The type of the active station includes transmitting station, receiving station and maintenance website;In each region control unit, connection There is at least one kind of types of sites in transmitting station, receiving station and maintenance website.
5. a kind of dry run device according to claim 1, it is characterised in that: further include SMS module;The short message Module is connect with monitoring control unit work station.
6. a kind of dry run device according to claim 1, it is characterised in that: in each region control unit In, region control unit and each simulation trolley are wirelessly connected.
7. a kind of dry run device according to claim 1, it is characterised in that: the monitoring control unit work station peace Equipped with KingView.
8. a kind of dry run device according to claim 1, it is characterised in that: the central control unit is S7-300 Programmable controller.
9. a kind of dry run device according to claim 1, it is characterised in that:
It further include interchanger;
The central control unit work station, region control unit work station, monitoring control unit work station and common with them Control instruction and data are transmitted by the interchanger between the central control unit of connection;Each central control unit is successively When connection, control instruction and data are transmitted by the interchanger;At each central control unit, the central control unit Control instruction and data are transmitted by the interchanger between the region control unit being attached thereto;It is controlled in each region single At member, control instruction and data are transmitted by interchanger between the region control unit and the active station being attached thereto.
10. a kind of dry run device according to claim 6, it is characterised in that:
It further include communication module;It is passed between the region control unit and the simulation trolley being wirelessly connected therewith by communication module Defeated control instruction and data.
CN201920111160.1U 2019-01-23 2019-01-23 A kind of dry run device Active CN209296332U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920111160.1U CN209296332U (en) 2019-01-23 2019-01-23 A kind of dry run device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920111160.1U CN209296332U (en) 2019-01-23 2019-01-23 A kind of dry run device

Publications (1)

Publication Number Publication Date
CN209296332U true CN209296332U (en) 2019-08-23

Family

ID=67642589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920111160.1U Active CN209296332U (en) 2019-01-23 2019-01-23 A kind of dry run device

Country Status (1)

Country Link
CN (1) CN209296332U (en)

Similar Documents

Publication Publication Date Title
CN107807539B (en) A kind of glass post-processing production line distributed integeration method and its system
CN101673479B (en) High-speed railway traffic dispatching command and train running control network cooperation system
CN201163361Y (en) Control system used for industry assembly line
CN102645930B (en) Hardware in-loop simulation test system for traffic signal control system
CN108173929A (en) Wireless upload and expert diagnostic system of the medium-and low-speed maglev train based on TRDP agreements
CN103926843A (en) General simulation method and system for rail transit signal system
CN110711974B (en) Multi-vehicle flexible welding line information management and scheduling system
CN109559027A (en) Planning scheduling system applied to iron and steel enterprise's high-speed tool steel smelting process
DE112008002573T5 (en) Testing compatibility and behavior of factory automation system components with a virtual and real environment
CN108717623A (en) A kind of assembled architecture tracks of device, method and system based on BIM
CN109676280A (en) Auto-body manufacturing generalization system and Auto-body manufacturing generalization intelligent plant system
CN113219855B (en) Simulation verification method and device for TACS (terminal-to-terminal Security System)
CN107563947A (en) A kind of transportation integration synthetic service method and system
CN106647336A (en) Simulation-based intelligent monitoring system for aircraft assembling process
DE112006000397T5 (en) System and method for adaptive machine programming
CN106527384A (en) Production control mechanism based on cloud platform assisted switching strategy
CN114488847B (en) Semi-physical simulation system of vehicle-mounted network control system
CN112164272A (en) Signal simulation system and simulation method of tramcar signal system
CN111137328B (en) Tramcar driving dispatching management system
RU2723051C1 (en) System for operative administration of movement of transit trains
CN209296332U (en) A kind of dry run device
Bal et al. Virtual factory approach for implementation of holonic control in industrial applications: A case study in die-casting industry
CN110942695A (en) Switching method between railway multiplex teaching and training organization and training modes
CN112002179B (en) Rail transit multiplex linkage control method and system based on remote distribution
CN108427320A (en) A kind of high-speed EMUs real time execution semi-matter simulating system testing stand

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant