CN209277175U - A kind of mine rock slope answers green system - Google Patents

A kind of mine rock slope answers green system Download PDF

Info

Publication number
CN209277175U
CN209277175U CN201821686231.2U CN201821686231U CN209277175U CN 209277175 U CN209277175 U CN 209277175U CN 201821686231 U CN201821686231 U CN 201821686231U CN 209277175 U CN209277175 U CN 209277175U
Authority
CN
China
Prior art keywords
green system
anchor pole
lattice cage
steel wire
slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821686231.2U
Other languages
Chinese (zh)
Inventor
陈友光
陈振雄
邵峰
钟艺
吕芳富
罗燕贞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Ruchun Ecology Group Co., Ltd.
Original Assignee
Guangdong Spring Garden Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Spring Garden Design Co Ltd filed Critical Guangdong Spring Garden Design Co Ltd
Priority to CN201821686231.2U priority Critical patent/CN209277175U/en
Application granted granted Critical
Publication of CN209277175U publication Critical patent/CN209277175U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The utility model relates to Slope greening technical field, refers in particular to a kind of mine rock slope and answer green system, include the vegetable layer being laid in side slope and organic group sheet material layers, organic substrate is placed below vegetable layer;It is provided with hook flower steel wire and geotechnological lattice cage in organic group sheet material layers, hooks flower steel wire and geotechnological lattice cage links into an integrated entity and is fixed in organic group sheet material layers;Multiple green system further includes having the anchor pole being threaded through again in green system, and anchor pole passes through geotechnological lattice cage and hooks flower steel wire, and multiple green system is fixed in side slope.The utility model is suitable for the multiple green of ore rock slope, especially 60 ° -75 ° of side slope, green system can be made again whole more firm, it is not easy by rain drop erosion, while plays the role of root circle with vegetable layer, enhances again the stability of green system, more effectively prevent the appearance of landslide phenomenon, make again green system be less likely to occur to be displaced, can be suitably used for abrupt slope, efficiently solves the problems, such as the multiple green system soil erosion in the presence of the prior art.

Description

A kind of mine rock slope answers green system
Technical field
The utility model relates to Slope greening technical field, refers in particular to a kind of mine rock slope and answer green system.
Background technique
China's economic development in recent years is swift and violent, and the infrastructures such as highway, railway, water conservancy and municipal administration are maked rapid progress.However it builds If largely cutting into a mountain, quarrying in the process, many exposed rock slopes are formed, vegetation is both destroyed, causes soil erosion, and damage Ecoscape runs counter to requirement of the modern society to environmental protection.
Slope greening is always industry focus of attention, difficult point, although there is some technologies using at present, due to by The restriction of slope surface land occupation condition, weather conditions and execution conditions, construction quality are difficult to control, it is more difficult to it is green to meet extensive side slope Change engineering construction.Generally use the mode of greening grass at present, but this safeguard procedures are not easy to survive there is straw mattress and people The disadvantages of member is washed away because of geological disasters such as landslide, mud-rock flow, soil erosions.
The application for a patent for invention that number of patent application is 201810114049.8 discloses a kind of Slope greening system, including base Material layer is provided with several the first soakaway trench being connected with side slope along side slope inclined direction in the substrate layer, and described adjacent the It is provided with several the second soakaway trench communicated therewith between one soakaway trench, is respectively provided on first soakaway trench and the second soakaway trench There is water seepage hole, is provided with and is connected with side slope for fixing its anchor pole in side slope on first soakaway trench, described several One soakaway trench bottom end is connected with the collecting pipe for confluence jointly, and the side slope side is provided with first communicated with collecting pipe and stores Whether pond is provided on the collecting pipe and stores for limiting it and draining to the first valve in the first reservoir, described first Be provided in pond pump pump and both ends respectively with pump pump and the delivery pipe that connect of the first soakaway trench.The patent of invention Shen A kind of Slope greening system that can improve side slope vegetation survival rate is please mainly provided, but not can solve institute in the prior art The problem of existing multiple green system soil erosion.
Utility model content
The goal of the invention of the utility model is: in order to solve the multiple green system soil erosion in the presence of the prior art Problem, the utility model provide a kind of mine rock slope and answer green system.
In order to solve the problems of in the prior art, the utility model uses following technical scheme:
A kind of mine rock slope answers green system, includes the vegetable layer being laid in the side slope and organic group sheet material layers, The organic substrate is placed below the vegetable layer;Hook flower steel wire and geotechnological lattice are provided in the organic group sheet material layers Cage, the hook flower steel wire and the geotechnological lattice cage link into an integrated entity and are fixed in the organic group sheet material layers;The multiple green system System further includes having the anchor pole being threaded through in the multiple green system, and the anchor pole passes through the geotechnological lattice cage and hook flower steel wire Net, and the multiple green system is fixed in the side slope.
A kind of improvement of the technical solution of green system is answered as the utility model mine rock slope, geotechnique's lattice cage is in Web-like forms geotechnological lattice cage layer in the organic group sheet material layers, and the vertical section diameter of geotechnique's lattice cage layer is 5-6cm.
A kind of improvement of the technical solution of green system, geotechnique's lattice cage layer are answered as the utility model mine rock slope Fixing layer is formed after being connected with each other with hook flower steel wire;The anchor pole includes anchor pole head and anchor bar body interconnected, The anchor bar body is interspersed in the fixing layer, and the fixing layer, on the anchor pole head, the anchor pole head is for limiting The depth in the multiple green system of the fixed fixing layer.
A kind of improvement of the technical solution of green system, the anchor pole head and institute are answered as the utility model mine rock slope After stating anchor bar body connection, the anchor pole head is placed in the anchor bar body top, and the anchor pole head and the anchor bar body upper end Distance is 5-6cm, and the length of the anchor pole head is 3-4cm;The angular range formed between the anchor pole head and the anchor bar body It is 75 ° -105 °.
A kind of improvement of the technical solution of green system, the upper end of the anchor pole are answered as the utility model mine rock slope Portion is 10-15cm at a distance from the side slope surface.
A kind of improvement of the technical solution of green system, the organic group sheet material layers are answered as the utility model mine rock slope With a thickness of 13-15cm.
Answer a kind of improvement of the technical solution of green system as the utility model mine rock slope, geotechnique's lattice cage by PP polypropylene material is made.
A kind of improvement of the technical solution of green system is answered as the utility model mine rock slope, the anchor pole is vertically worn Cross the geotechnological lattice cage and hook flower steel wire.
The utility model has the beneficial effects that
The utility model is suitable for multiple green, especially 60 ° -75 ° of the side slope of ore rock slope, the hook in multiple green system Flower steel wire and geotechnological lattice cage link into an integrated entity, and are fixed on again in the organic group sheet material layers of green system by anchor pole, can make multiple Green system is whole more firm, it is not easy to play the role of root circle by rain drop erosion, while with vegetable layer, enhance again green system Stability, more effectively prevent landslide phenomenon appearance also due to fixing by anchor pole green system is less likely to occur Displacement, can be suitably used for abrupt slope, efficiently solve the problems, such as the multiple green system soil erosion in the presence of the prior art.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the schematic cross-section of the utility model;
Fig. 3 is the structural schematic diagram of web-like geotechnique's lattice cage in the utility model;
Fig. 4 is the structural schematic diagram of the another embodiment of the utility model.
Description of symbols: 1- side slope;2- vegetable layer;3- anchor pole;4- organic group sheet material layers;5- geotechnique's lattice cage;6- hooks flower steel Silk screen;31- anchor bar body;32- anchor pole head.
Specific embodiment
It is practical below in conjunction with this to keep the goal of the invention, technical scheme and beneficial effects of the utility model clearer Attached drawing in new embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that institute The embodiment of description is only the utility model a part of the embodiment, instead of all the embodiments.
As depicted in figs. 1 and 2, a kind of mine rock slope answers green system, includes the vegetable layer 2 being laid in side slope 1 With organic group sheet material layers 4, organic group sheet material layers 4 are placed in below vegetable layer 2.Hook flower steel wire 6 and soil are provided in organic group sheet material layers 4 Work lattice cage 5, hooks flower steel wire 6 and geotechnological lattice cage 5 links into an integrated entity and is fixed in organic group sheet material layers 4.Green system further includes again There is anchor pole 3, anchor pole 3 passes through geotechnological lattice cage 5 and hooks flower steel wire 6, and multiple green system is fixed in side slope 1.
Vegetable layer 2 is mainly the growth surface layer of vegetation seed, spends steel wire 6 and geotechnique by the hook in organic group sheet material layers 4 The connection of lattice cage 5 and the reinforcing of anchor pole 3, are fixed on vegetable layer 2 in side slope 1, become effective item that vegetation invests side slope 1 Part.Geotechnological lattice cage 5 is used for the intensity for reinforcing hooking flower steel wire 6, to enhance the stability of plant production.Preferably, Tu Gongge Cage 5 is made of PP polypropylene material, saves the production cost of geotechnological lattice cage 5, while reducing again the construction cost of green system, More for the feature of environmental protection.
The utility model when in use, hooks flower steel wire 6 and geotechnological lattice cage 5 links into an integrated entity, passed through by anchor pole 3 Geotechnological lattice cage 5 and hook flower steel wire 6 hook the connection of flower steel wire 6 with geotechnological lattice cage 5 with reinforcement, then hook flower 6 He of steel wire Geotechnological lattice cage 5 is fixed in organic group sheet material layers 4 after linking into an integrated entity, and green system can be made again whole more firm, it is not easy to quilt Rain drop erosion, while playing the role of root circle with vegetable layer 2, the stability of green system is enhanced again, more effectively prevents to slide The appearance of slope phenomenon, also due to it is fixed by anchor pole 3, make again green system be less likely to occur to be displaced, can be suitably used for abrupt slope, effectively Solves the problems, such as the multiple green system soil erosion in the presence of the prior art.
Organic group sheet material layers 4 in the utility model are by greening backing, planting soil, water-retaining agent, binder, plant fiber, specially It is mixed together with compound fertilizer, paper muscle, vegetable seeds etc., wherein greening backing includes peat soil.Greening backing and plantation Soil is preferentially mixed by the volume ratio of 1:2, other are then added assist material mixture ratio and stir together, the time of stirring is many In 3min;Wherein the vegetable seeds dosage of every square metre of organic group sheet material layers 4 is 30-40 grams, wherein shrub and draft seed amount ratio Example is 1:2.Meanwhile in the present invention, it hooks flower steel wire 6 and geotechnological lattice cage 5 links into an integrated entity, then anchor pole 3 is passed through After hooking flower steel wire 6 and geotechnological lattice cage 5, organic base is sprayed or is filled in geotechnological lattice cage 5, makes to hook colored 6 He of steel wire Geotechnological lattice cage 5 is fixed in organic group sheet material layers 4.
Further, as shown in Figure 3 and Figure 4, geotechnological lattice cage 5 is in web-like, and geotechnological lattice cage 5 is formed in organic group sheet material layers 4 Geotechnological lattice cage layer increases volume of the geotechnological lattice cage 5 in organic group sheet material layers 4, avoids the occurrence of geotechnological lattice cage 5 in organic group sheet material layers It is mobile that position occurs in 4.In more detail, geotechnological lattice cage layer and hook flower steel wire 6 form fixing layer, anchor pole 3 after being connected with each other It include anchor pole head 32 and anchor bar body 31 interconnected, anchor bar body 31 is interspersed in fixing layer, and fixing layer is wrapped around anchor pole On first 32, anchor pole head 32 can be used for limiting depth of the fixing layer in green system again.Preferably, anchor pole head 32 and anchor bar body 31 connect After connecing, anchor pole head 32 is placed in the top of anchor bar body 31.Preferably, anchor pole 3 passes perpendicularly through geotechnological lattice cage 5 and hooks flower steel wire 6, i.e., Angle between anchor pole 3 and fixing layer is right angle, can avoid the problem of anchor pole 3 is easy to appear deformation appearance.
As a kind of embodiment of the utility model, since anchor pole head 32 is placed in the top of anchor bar body 31, anchor pole head 32 Be 5-6cm at a distance from 31 upper end of anchor bar body, the length of anchor pole head 32 is 3-4cm, shape between anchor pole head 32 and anchor bar body 31 At angle, angular range is 75 ° -105 °, and the best angle of angle is 90 °.Further, the upper end of anchor pole 3 and side slope 1 The distance on surface is 10-15cm, organic group sheet material layers 4 with a thickness of 13-15cm, the vertical section diameter of geotechnological lattice cage layer is 5- 6cm.In this way, the utility model mine rock slope answers green system can form the thickness of 30-40cm in side slope 1,30-40cm's With a thickness of the soil texture of suitable vegetation growth, can preferably solve in side slope 1, it is multiple green especially in ore side slope 1 The higher problem of difficulty.
Based on the embodiments of the present invention, those of ordinary skill in the art institute without making creative work The every other embodiment obtained, fall within the protection scope of the utility model.

Claims (8)

1. a kind of mine rock slope answers green system, which is characterized in that include the vegetable layer being laid in the side slope and to have Machine substrate layer, the organic substrate are placed below the vegetable layer;Hook flower steel wire is provided in the organic group sheet material layers With geotechnological lattice cage, the hook flower steel wire and the geotechnological lattice cage link into an integrated entity and are fixed in the organic group sheet material layers;Institute Stating again green system further includes having the anchor pole being threaded through in the multiple green system, and the anchor pole passes through the geotechnological lattice cage and the hook Flower steel wire, and the multiple green system is fixed in the side slope.
2. mine rock slope according to claim 1 answers green system, which is characterized in that geotechnique's lattice cage is in web-like, Geotechnological lattice cage layer is formed in the organic group sheet material layers, the vertical section diameter of geotechnique's lattice cage layer is 5-6cm.
3. mine rock slope according to claim 2 answers green system, which is characterized in that geotechnique's lattice cage layer and described It hooks after flower steel wire is connected with each other and forms fixing layer;The anchor pole includes anchor pole head and anchor bar body interconnected, the anchor The body of rod is interspersed in the fixing layer, and the fixing layer, on the anchor pole head, the anchor pole head is described for limiting The depth in the multiple green system of fixing layer.
4. mine rock slope according to claim 3 answers green system, which is characterized in that the anchor pole head and the anchor pole After body connection, the anchor pole head is placed in the anchor bar body top, and the anchor pole head is at a distance from the anchor bar body upper end 5-6cm, the length of the anchor pole head are 3-4cm;The angle formed between the anchor pole head and the anchor bar body, the angle Range is 75 ° -105 °.
5. mine rock slope according to claim 4 answers green system, which is characterized in that the upper end of the anchor pole and institute The distance for stating side slope surface is 10-15cm.
6. mine rock slope according to claim 1 answers green system, which is characterized in that the thickness of the organic group sheet material layers For 13-15cm.
7. mine rock slope described in -6 any one answers green system according to claim 1, which is characterized in that geotechnique's lattice Cage is made of PP polypropylene material.
8. mine rock slope described in -6 any one answers green system according to claim 1, which is characterized in that the anchor pole hangs down The excessively described geotechnological lattice cage of direct puncture and hook flower steel wire.
CN201821686231.2U 2018-10-18 2018-10-18 A kind of mine rock slope answers green system Active CN209277175U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821686231.2U CN209277175U (en) 2018-10-18 2018-10-18 A kind of mine rock slope answers green system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821686231.2U CN209277175U (en) 2018-10-18 2018-10-18 A kind of mine rock slope answers green system

Publications (1)

Publication Number Publication Date
CN209277175U true CN209277175U (en) 2019-08-20

Family

ID=67604807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821686231.2U Active CN209277175U (en) 2018-10-18 2018-10-18 A kind of mine rock slope answers green system

Country Status (1)

Country Link
CN (1) CN209277175U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111034544A (en) * 2019-12-19 2020-04-21 郑楚英 Plant measure method for high and steep concrete and rock slope
CN113519299A (en) * 2021-07-14 2021-10-22 上海新园林实业有限公司 Method and system for quickly and ecologically restoring stone side slope

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111034544A (en) * 2019-12-19 2020-04-21 郑楚英 Plant measure method for high and steep concrete and rock slope
CN113519299A (en) * 2021-07-14 2021-10-22 上海新园林实业有限公司 Method and system for quickly and ecologically restoring stone side slope

Similar Documents

Publication Publication Date Title
CN204305674U (en) Anchor pole grid is utilized to carry out shale side slope plantation greening structure
CN103828745B (en) A kind of Deepwater Open Sea marine site cultivation purse seine
CN103924605A (en) Sash girder ecological slope protection structure and construction method thereof
CN102060386A (en) Method for constructing floating wetland
CN209277175U (en) A kind of mine rock slope answers green system
CN110565586A (en) Construction process for protecting slope water and soil of silty sandy soil saline-alkali soil
CN205894023U (en) View type ecological embankment structure
CN203985355U (en) The longitudinal deep insertion filtration irrigation device of a kind of ancient tree
CN212641481U (en) Ecological restoration structure of massif multi-element matrix
CN210887252U (en) Prevent soil erosion and water loss's protector
CN207260164U (en) A kind of hard slope planting structure
CN207362790U (en) A kind of river disappears unrestrained shore protection
CN106745788A (en) A kind of river sewage purification and the stero of landslide control
CN205530293U (en) Novel slope surface structure
KR101482203B1 (en) Structure of slantface tree-planted and plant method thereof
CN209854653U (en) Ecological city river course stereoplasm high retaining wall structure
CN201415161Y (en) Water and soil moisture conservation device
CN212294541U (en) Ecological bank protection that water utilized
CN205000345U (en) Slope planting soil property bearing structure
CN202009593U (en) Vegetation planting trough for ecological recovery of highway cut slope in semiarid regions
CN205444205U (en) Wall -hanging afforestation groove
CN105155560A (en) Protecting structure and protecting method used for greening high-steep rock slope
CN205742067U (en) The reservoir structure of limestone basic unit
CN204780951U (en) Side slope afforestation and protector
CN101569274B (en) Quickly prepared greening hanging bag for slope

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 510000 A5 nineteenth nineteenth, headquarters Economic Zone, 243 science Avenue, Guangzhou development area, Whampoa, Guangdong.

Patentee after: Guangdong Ruchun Ecology Group Co., Ltd.

Address before: 510000 A5 nineteenth nineteenth, headquarters Economic Zone, 243 science Avenue, Guangzhou development area, Whampoa, Guangdong.

Patentee before: Guangdong Spring Garden Design Co., Ltd.

CP01 Change in the name or title of a patent holder