CN205000345U - Slope planting soil property bearing structure - Google Patents

Slope planting soil property bearing structure Download PDF

Info

Publication number
CN205000345U
CN205000345U CN201520774168.8U CN201520774168U CN205000345U CN 205000345 U CN205000345 U CN 205000345U CN 201520774168 U CN201520774168 U CN 201520774168U CN 205000345 U CN205000345 U CN 205000345U
Authority
CN
China
Prior art keywords
firming
layer
soil property
drainage layer
slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520774168.8U
Other languages
Chinese (zh)
Inventor
李金标
金春茂
祝蔚晨
王国峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Yuan Jing Built Environment Co Ltd
Original Assignee
Hangzhou Yuan Jing Built Environment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Yuan Jing Built Environment Co Ltd filed Critical Hangzhou Yuan Jing Built Environment Co Ltd
Priority to CN201520774168.8U priority Critical patent/CN205000345U/en
Application granted granted Critical
Publication of CN205000345U publication Critical patent/CN205000345U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a slope planting soil property bearing structure, including the slope body, cover on the astable soil property layer of the one deck of sloping body surface face with by the honeycomb that main skeleton the formed skeleton that intercepts water, the every intercepts water the center of skeleton and all is equipped with circular shape firming drainage layer, firming drainage layer is built by laying bricks or stones by the slabstone and is formed, each all be equipped with on the firming drainage layer from boring the formula stock, should bore the formula stock certainly and pass firming drainage layer, astable soil property layer and the slope body in proper order and realize firm compaction, through firming drainage layer, can with the astable soil property layer that is in sloping body surface layer through boring the firmly compaction of formula stock certainly, greatly increased the stability of the sloping body, reduce the probability that takes place the landslide because the soil property is soft, and firming drainage layer is built by laying bricks or stones by the slabstone and is formed, has increased its water permeability, has increased self ability of soil.

Description

A kind of greening side slope soil property braced structures
Technical field
The utility model relates to a kind of side slope, and more particularly, it relates to a kind of greening side slope soil property braced structures.
Background technology
In the geotechnical engineering in the fields such as railway, highway, water conservancy, building, the protection method that ordinary soil side slope is usually taked to put slope, propped up gear or both combinations, to ensure the stability of side slope.
In existing side slope protection administering method, this class formation that side slope arranges planting groove is more and more diversified.As patent announcement CN2825747Y a kind of plants for ecological treatment of slope a kind of light flexible structure greening groove be applicable on high abrupt slope that raw groove and patent announcement number are CN203559424U, these two patents are all in side slope, arrange the structure of similar barricade and the structure of domatic formation planting groove, and then in planting groove, filling planting soil plants green plants afterwards to reach the object of ecological treatment of slope.
Even if but like this, the side slope after raining still goes wrong often, there is landslide phenomenon, when the soil property of side slope is comparatively soft, is easy to form coming off of planting groove, causes security incident.So the soil property braced structures further improving side slope is a direction needing research and development for a long time.
Utility model content
For the deficiency that prior art exists, the purpose of this utility model is to provide a kind of greening side slope soil property braced structures preventing slope and land slide effective.
For achieving the above object, the utility model provides following technical scheme: a kind of greening side slope soil property braced structures, the cellular skeleton that intercepts water comprising slope body, cover the astable soil layer of one deck of slope surface and formed by main framing, circular firming drainage layer is equipped with every the center of the skeleton that intercepts water, described firming drainage layer is built by laying bricks or stones by slabstone and is formed, firming drainage layer described in each is equipped with automatic anchor pole, and this automatic anchor pole passes firming drainage layer, astable soil layer and slope body successively and realizes firm compacting.
The utility model is set to further: the skeleton that intercepts water described in each is all equipped with grid iron wire.
The utility model is set to further: the termination of described automatic anchor pole is provided with barb structure.
Compared with prior art, the utility model has the advantage of: can in each intercepts water skeleton planting groove tank plant, can be used for tackle surface water, prevent surface water from washing away domatic; And by firming drainage layer, by being in the astable soil layer of slope surface layer by automatic anchor pole firmly compacting, the stability of slope body can be considerably increased, reducing the probability that landslide occurs because soil property is soft; And firming drainage layer is built by laying bricks or stones by slabstone and is formed, and adds its water permeability, adds the self-ability of soil; And the cellular skeleton that intercepts water make use of orthohexagonal structural integrity, the reinforcement performance of main framing on slope surface is promoted again; Barb structure is arranged in the termination of automatic anchor pole, more firm by the connection of the firming drainage layer again making to be fixed by automatic anchor pole, astable soil layer and slope body, prevent the generation of the sliding phenomenon of the loosening astable soil layer caused due to automatic anchor pole.
Accompanying drawing explanation
Fig. 1 is the part-structure front view of a kind of greening side slope soil property of the utility model braced structures embodiment;
Fig. 2 is the A-A view of Fig. 1.
In figure, 1, intercept water skeleton; 2, grid iron wire; 3, automatic anchor pole; 31, barb structure; 4, firming drainage layer; 5, astable soil layer; 6, slope body.
Detailed description of the invention
Referring to figs. 1 through Fig. 2, the embodiment of a kind of greening side slope soil property of the utility model braced structures is described further.
A kind of greening side slope soil property braced structures, comprise slope body 6, the astable soil layer of one deck 5 covering slope body 6 surface and the cellular skeleton 1 that intercepts water formed by main framing, intercept water described in each on skeleton 1 and be all equipped with grid iron wire 2, circular firming drainage layer 4 is equipped with every the center of the skeleton 1 that intercepts water, described firming drainage layer 4 is built by laying bricks or stones by slabstone and is formed, firming drainage layer 4 described in each is equipped with automatic anchor pole 3, this automatic anchor pole 3 is successively through firming drainage layer 4, astable soil layer 5 and slope body 6 also realize firm compacting, the termination of described automatic anchor pole 3 is provided with barb structure 31.
According to said structure and accompanying drawing, can in each intercepts water skeleton 1 planting groove tank plant, can be used for tackling surface water, prevent surface water from washing away domatic, and the center due to the skeleton 1 that intercepts water at each is provided with firming drainage layer 4, its longer plant can be distributed ringwise, more elegant in appearance; And in order to plant longer from the skeleton 1 that intercepts water more reasonable, the plant of shape of swashing can be planted in the bottom of slope body 6, plant the plant of sagging type on the top of slope body 6, plant flat elongated plant in the stage casing of slope body 6, reach " upper to hang down, under climb, middle-grade " afforestation effect.
By firming drainage layer 4, by being in the astable soil layer 5 on slope body 6 top layer by automatic anchor pole 3 firmly compacting, the stability of slope body 6 can be considerably increased, reducing the probability that landslide occurs because soil property is soft; And firming drainage layer 4 is built by laying bricks or stones by slabstone and is formed, and adds its water permeability, adds the self-ability of soil; And the cellular skeleton 1 that intercepts water make use of orthohexagonal structural integrity, the reinforcement performance of main framing on slope body 6 surface is promoted again; Barb structure 31 is arranged in the termination of automatic anchor pole 3, more firm by the connection of the firming drainage layer 4, astable soil layer 5 and the slope body 6 that again make to be fixed by automatic anchor pole 3, prevent the generation of the sliding phenomenon of the loosening astable soil layer 5 caused due to automatic anchor pole 3.
The above is only preferred embodiment of the present utility model, protection domain of the present utility model be not only confined to above-described embodiment, and all technical schemes belonged under the utility model thinking all belong to protection domain of the present utility model.It should be pointed out that for those skilled in the art, do not departing from the some improvements and modifications under the utility model principle prerequisite, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (3)

1. a greening side slope soil property braced structures, the cellular skeleton that intercepts water comprising slope body, cover the astable soil layer of one deck of slope surface and formed by main framing, it is characterized in that, circular firming drainage layer is equipped with every the center of the skeleton that intercepts water, described firming drainage layer is built by laying bricks or stones by slabstone and is formed, firming drainage layer described in each is equipped with automatic anchor pole, and this automatic anchor pole passes firming drainage layer, astable soil layer and slope body successively and realizes firm compacting.
2. a kind of greening side slope soil property braced structures according to claim 1, is characterized in that, the skeleton that intercepts water described in each is all equipped with grid iron wire.
3. a kind of greening side slope soil property braced structures according to claim 2, it is characterized in that, the termination of described automatic anchor pole is provided with barb structure.
CN201520774168.8U 2015-09-30 2015-09-30 Slope planting soil property bearing structure Expired - Fee Related CN205000345U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520774168.8U CN205000345U (en) 2015-09-30 2015-09-30 Slope planting soil property bearing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520774168.8U CN205000345U (en) 2015-09-30 2015-09-30 Slope planting soil property bearing structure

Publications (1)

Publication Number Publication Date
CN205000345U true CN205000345U (en) 2016-01-27

Family

ID=55157242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520774168.8U Expired - Fee Related CN205000345U (en) 2015-09-30 2015-09-30 Slope planting soil property bearing structure

Country Status (1)

Country Link
CN (1) CN205000345U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110042846A (en) * 2019-03-11 2019-07-23 昆明理工大学 A kind of construction method of the increase soil moved in improve the original stability suitable for high precipitous rock slope

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110042846A (en) * 2019-03-11 2019-07-23 昆明理工大学 A kind of construction method of the increase soil moved in improve the original stability suitable for high precipitous rock slope

Similar Documents

Publication Publication Date Title
CN101580305B (en) Wetland governance method for improving ecological environmental in reservoir falling zone
CN204590045U (en) A kind of rock side slope lattice ecological safeguard structure
CN203113374U (en) Strengthening type verdurization retaining wall
CN203167652U (en) Greening and planting system for saline and alkaline land
CN106069271A (en) A kind of method of desert afforestation
CN109594567A (en) A kind of shotcrete protection rock slope ecological safeguard structure arrangement and its method
CN203320535U (en) Rock slope green protection structure
CN204059376U (en) The slope protection greening structure of the steep exposed rock side slope of a kind of urgency
CN102758417A (en) Method for water control and farmland building for environmental protection through water and soil separation and water and soil separation structure
CN202524735U (en) Composite concealed conduit for salt elimination and alkalinity reduction in saline-alkali land
CN203866858U (en) Riverway revetment plant-growing retaining wall
CN206873395U (en) A kind of ecological revetment dike
CN205000345U (en) Slope planting soil property bearing structure
CN205000346U (en) Slope frame for slope reinforcement and water drainage
CN204023588U (en) A kind of pervious ecological protective slope structure
CN203878536U (en) Novel ecological intercepting ditch
CN205894024U (en) River ecologic revetment structure
CN205502026U (en) Planting technique slight slope structure of floor load sees bottom
CN209011155U (en) A kind of greening soil blocking wall constructing sponge city
CN204212141U (en) Sandstone matter building waste gravel sand stabilization structure
CN202587802U (en) Earth ditch structure for saline-alkali land to improve planting
CN205511296U (en) Abrupt slope greening protection device
CN107476251B (en) A kind of sector ecological revetment body and the bank protection structure using the shore protection body
CN202954369U (en) Three-dimension honeycomb structure greening afforesting mesh
CN205188905U (en) Ecological slope protection structure of mountain area stone riprap river course river bank step

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160127

Termination date: 20210930