CN209276924U CN201821885033.9U CN201821885033U CN209276924U CN 209276924 U CN209276924 U CN 209276924U CN 201821885033 U CN201821885033 U CN 201821885033U CN 209276924 U CN209276924 U CN 209276924U
Authority
CN
China
Prior art keywords
hard material
route
layer
pedestrians
material layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821885033.9U
Other languages
Chinese (zh)
Inventor
黄宝山
黄耀东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Weimei Engineering Design Co Ltd
Original Assignee
Guangdong Weimei Engineering Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Weimei Engineering Design Co Ltd filed Critical Guangdong Weimei Engineering Design Co Ltd
Priority to CN201821885033.9U priority Critical patent/CN209276924U/en
Application granted granted Critical
Publication of CN209276924U publication Critical patent/CN209276924U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of corner structures, comprising: the first Route for pedestrians;Second Route for pedestrians, wherein the first Route for pedestrians and the second Route for pedestrians are formed with an at least angle;Corner area is arranged in an at least angle;Wherein, first Route for pedestrians includes the first hard material layer, second Route for pedestrians includes third hard material layer including the second hard material layer, corner area, and the first hard material layer, the second hard material layer and third hard material layer are made of identical hard material.By the above-mentioned means, corner structure disclosed in the utility model allows the corner of Route for pedestrians to walk, to will not influence the beauty of garden landscape by the way that the corner area being made of hard material is arranged in the corner of Route for pedestrians.

Description

A kind of corner structure
Technical field
The utility model relates to field of garden technology, in particular to a kind of corner structure.
Background technique
In garden landscape engineering project, for house class, Gongjian's intermediate item, garden landscape can be built, under normal circumstances, Garden landscape includes flowers, plants and trees and engraving etc., and ornamental for the ease of people, can all be built with Route for pedestrians, and in people's row The both sides of road are built with flowers and plants etc. respectively.
However, not allowing usually to walk, but many people go to Route for pedestrians for the corner of Route for pedestrians When corner, for convenience, directly trample in flowers and plants on the corner, thus trample on step on flowers and plants to die, once for a long time after, corner Soil can be exposed, seriously affect beauty, and at rainy day, the rainwater such as miriness can even more be trampleed on onto Route for pedestrians, significantly Affect the beauty of garden landscape.
Summary of the invention
The utility model passes through and turns in Route for pedestrians mainly solving the technical problems that provide a kind of corner structure The corner area being made of hard material is set at angle, the corner of Route for pedestrians is walked, to will not influence garden The beauty of woods landscape.
In order to solve the above technical problems, the technical solution that the utility model uses is: providing a kind of corner knot Structure, comprising: the first Route for pedestrians;Second Route for pedestrians, wherein the first Route for pedestrians and the second Route for pedestrians are formed at least one Angle;Corner area is arranged in an at least angle;Wherein, the first Route for pedestrians includes the first hard material layer, second people's row It includes third hard material layer that road, which includes the second hard material layer, corner area, and the first hard material layer, the second hard Material layer and third hard material layer are made of identical hard material.
Wherein, the fan-shaped shape of corner area or multilateral shape.
Wherein, the first hard material layer, the second hard material layer and third hard material layer are ceramic tile layer, cement layer or wood Plate layer.
Wherein, multiple drainage holes are arranged at intervals in third hard material layer.
Wherein, corner area further include: the lower section of third hard material layer is arranged in planting soil layer;Pvd layer, setting In the lower section of planting soil layer;The lower section of pvd layer is arranged in rubble drainage layer.
Wherein, corner area further include: coarse sand buffer layer is arranged between planting soil layer and pvd layer.
Wherein, the receiving cavity for accommodating water, and the top of the receiving cavity of coarse sand buffer layer are equipped in coarse sand buffer layer Portion is equipped with partition, and the multiple through-holes being connected to receiving cavity are arranged at intervals in partition.
Wherein, further includes: casting concrete bed course is arranged on rubble drainage layer, the first Route for pedestrians and the second pavement The lower section on road.
The beneficial effects of the utility model are: being in contrast to the prior art, road disclosed in the utility model turns Corner structure includes: the first Route for pedestrians;Second Route for pedestrians, wherein the first Route for pedestrians and the second Route for pedestrians are formed at least One angle;Corner area is arranged in an at least angle;Wherein, the first Route for pedestrians includes the first hard material layer, the second people Trade road includes third hard material layer including the second hard material layer, corner area, and the first hard material layer, second are firmly The material bed of material and third hard material layer are made of identical hard material.By the above-mentioned means, disclosed in the utility model Corner structure is no longer on the corner planted by the way that the corner area being made of hard material is arranged in the corner of Route for pedestrians Flowers and plants are planted, the corner of Route for pedestrians is walked, it will not be by rain such as mirinesss rainy day, people walked on the corner Water is trampleed on onto Route for pedestrians, to will not influence the beauty of garden landscape.
Detailed description of the invention
Fig. 1 is the first structure diagram of the utility model corner structure;
Fig. 2 is the second structural schematic diagram of the utility model corner structure;
Fig. 3 is the first cutting structural schematic diagram in the direction A-A of corner structure in Fig. 1;
Fig. 4 is the second cutting structural schematic diagram in the direction A-A of corner structure in Fig. 1.
Specific embodiment
Fig. 1-4 is please referred to, which includes the first Route for pedestrians 11, the second Route for pedestrians 12 and corner area 13。
It should be understood that the first Route for pedestrians 11 and the second Route for pedestrians 12 can be and be provided with flowers and plants region 10.
In the present embodiment, the first Route for pedestrians 11 and the second Route for pedestrians 12 are formed with an at least angle.That is, First Route for pedestrians 11 and the second Route for pedestrians 12 could be formed with an angle, also can be set there are two angle, three folder Angle and four angles.Preferably, the angle of angle can be acute angle, right angle or obtuse angle.
Corner area 13 is arranged in an at least angle.
In the present embodiment, the first Route for pedestrians 11 includes the first hard material layer, and the second Route for pedestrians 12 includes second Hard material layer, corner area 13 include third hard material layer 131.It should be understood that due to being provided in corner area 13 Three hard material layers 131, therefore people can be allowed to walk on corner area 13, then corner area 13 no longer plants flower Grass effectively avoids the phenomenon that exposing soil discovery of dying because of flowers and plants, will not can be by mud rainy day, people walked on the corner Muddy equal rainwater are trampleed on onto Route for pedestrians, and the beauty of garden landscape is effectively guaranteed.
Preferably, the first hard material layer, the second hard material layer and third hard material layer 131 are by identical hard material Material is constituted.That is, the surface of the first Route for pedestrians 11, the second Route for pedestrians 12 and corner area 13 be able to maintain it is same Color or material, so that the color and unified appearance of 13 three of the first Route for pedestrians 11, the second Route for pedestrians 12 and corner area, With certain aesthetics.
In the present embodiment, the fan-shaped shape of corner area 13 has certain aesthetics.Certainly, in other embodiments, Corner area 13 can also be in other shapes, such as multilateral shape.Further, as shown in Fig. 2, multilateral shape preferably includes triangle Shape.
Preferably, the first hard material layer, the second hard material layer and third hard material layer 131 are ceramic tile layer, cement Layer or plank layer.
In the present embodiment, multiple drainage holes 1311 are arranged at intervals in third hard material layer 131, by multiple Drainage hole 1311 drains.
Further, as shown in figure 3, the corner area further includes planting soil layer 132, coarse sand buffer layer 133, pvd layer 134 and rubble drainage layer 135.The lower section that third hard material layer 131 is arranged in soil layer 132 is wherein planted, it can be by planting soil 132 kinds of plant flowers and plants of layer grow flowers and plants can by multiple drainage holes 1311 and extend to outside third hard material layer 131, make Obtaining corner area 13 can allow people to walk, and can also plant flowers and plants, more practical, also more attractive.The setting of pvd layer 134 is being planted The lower section of soil layer 132 can be drained by pvd layer 134.The lower section of pvd layer 134 is arranged in rubble drainage layer 135.Into one Step, coarse sand buffer layer 133 is arranged between planting soil layer 132 and pvd layer 134.
Further, as shown in figure 4, the receiving cavity 1331 for accommodating water is equipped in coarse sand buffer layer 133, to pass through Receiving cavity 1331, which is collected from planting soil layer 132, seeps the water to get off.It should be understood that the bottom of receiving cavity 1331 and side wall are close Envelope, water energy reaches longer-term persistence in receiving cavity 1331 to provide moisture for planting soil layer 132, so that planting soil layer 132 is protected Hold enough moisture and provides moisture for flowers and plants.Preferably, the top of the receiving cavity 1331 of coarse sand buffer layer 133 is equipped with partition 1332, and the multiple through-holes 1333 being connected to receiving cavity 1331 are arranged at intervals in partition 1332.It should be understood that setting partition 1332 be to prevent the soil in planting soil layer 132 from falling into receiving cavity 1331, and it is to allow accommodating chamber that multiple through-holes 1333, which are arranged, Moisture in body 1331 can be volatized into planting soil layer 132 by multiple through-holes 1333.
It should be understood that in the present embodiment, which further includes casting concrete bed course 136, wherein pouring mixed The lower section of rubble drainage layer 135, the first Route for pedestrians 11 and the second Route for pedestrians 12 is arranged in solidifying soil padding 136, by pouring It builds concrete cushion 136 and supports corner area 13, the first Route for pedestrians 11 and the second Route for pedestrians 12.It should be understood that pouring coagulation 136 hardness of soil padding is big, and corner area 13, the first Route for pedestrians 11 and the second Route for pedestrians 12 can be supported to make corner area It 13, is not in collapse to split phenomenon in 12 three of the first Route for pedestrians 11 and the second Route for pedestrians.
Further, in some embodiments, the table of corner area 13, the first Route for pedestrians 11 and the second Route for pedestrians 12 Face is in same level, and the level where the surface of corner area 13, the first Route for pedestrians 11 and the second Route for pedestrians 12 Face is higher than the horizontal plane where the surface in flowers and plants region 10.
To sum up, corner structure disclosed in the utility model includes: the first Route for pedestrians;Second Route for pedestrians, In the first Route for pedestrians and the second Route for pedestrians be formed with an at least angle;Corner area is arranged in an at least angle;Its In, the first Route for pedestrians includes the first hard material layer, and the second Route for pedestrians includes including the second hard material layer, corner area There is third hard material layer, and the first hard material layer, the second hard material layer and third hard material layer are by identical hard Material is constituted.By the above-mentioned means, corner structure disclosed in the utility model is set by the corner in Route for pedestrians The corner area being made of hard material is set, flowers and plants are no longer on the corner planted, the corner of Route for pedestrians is walked, The rainwater such as miriness will not be trampleed on onto Route for pedestrians rainy day, people walked on the corner, to will not influence Landscape The beauty of sight.
The above description is only the embodiments of the present invention, and therefore it does not limit the scope of the patent of the utility model, all Equivalent structure or equivalent flow shift made based on the specification and figures of the utility model, is applied directly or indirectly in Other related technical areas are also included in the patent protection scope of the utility model.

Claims (8)

1. a kind of corner structure characterized by comprising
First Route for pedestrians;
Second Route for pedestrians, wherein the first trade road and second Route for pedestrians are formed with an at least angle;
Corner area is arranged in an at least angle;
Wherein, first Route for pedestrians includes the first hard material layer, and second Route for pedestrians includes the second hard material Layer, the corner area include third hard material layer, and first hard material layer, second hard material layer and The third hard material layer is made of identical hard material.
2. corner structure according to claim 1, which is characterized in that the fan-shaped shape of the corner area or polygon Shape.
3. corner structure according to claim 1, which is characterized in that first hard material layer, described second Hard material layer and the third hard material layer are ceramic tile layer, cement layer or plank layer.
4. corner structure according to claim 3, which is characterized in that be spaced setting in the third hard material layer There are multiple drainage holes.
5. corner structure according to claim 4, which is characterized in that the corner area further include:
The lower section of the third hard material layer is arranged in planting soil layer;
The lower section of the planting soil layer is arranged in pvd layer;
The lower section of the pvd layer is arranged in rubble drainage layer.
6. corner structure according to claim 5, which is characterized in that the corner area further include:
Coarse sand buffer layer is arranged between the planting soil layer and the pvd layer.
7. corner structure according to claim 6, which is characterized in that be equipped in the coarse sand buffer layer for accommodating The receiving cavity of water, and the top of the receiving cavity of the coarse sand buffer layer is equipped with partition, and is arranged at intervals in the partition The multiple through-holes being connected to the receiving cavity.
8. corner structure according to claim 7, which is characterized in that further include:
The rubble drainage layer, first Route for pedestrians and second Route for pedestrians is arranged in casting concrete bed course Lower section.
CN201821885033.9U 2018-11-16 2018-11-16 A kind of corner structure Active CN209276924U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821885033.9U CN209276924U (en) 2018-11-16 2018-11-16 A kind of corner structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821885033.9U CN209276924U (en) 2018-11-16 2018-11-16 A kind of corner structure

Publications (1)

Publication Number Publication Date
CN209276924U true CN209276924U (en) 2019-08-20

Family

ID=67601433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821885033.9U Active CN209276924U (en) 2018-11-16 2018-11-16 A kind of corner structure

Country Status (1)

Country Link
CN (1) CN209276924U (en)

Similar Documents

Publication Publication Date Title
KR200381321Y1 (en) A grass block for developing a green areas
CN209276924U (en) A kind of corner structure
CN205171302U (en) Novel gardens floor file structure suitable for ancient tree protection is transplanted with megaphanerophyte
CN214902416U (en) Ecological plant pit with landscape function
CN111749534B (en) Villa courtyard ecological flower trough brick and villa courtyard ecological enclosing wall
CN203057941U (en) Water and fertilizer automatically-controlled bonsai maintenance pot
CN203057920U (en) Guardrail flower groove
CN207812465U (en) A kind of landscape ecology bank protection
KR100951635B1 (en) Modeling retaining wall structure for pleasant environment
KR200185833Y1 (en) A planting block for a embankment block plant community
JP3577592B2 (en) Moss vegetation
KR100919182B1 (en) A block used on the parking lot and the assembly thoreof
CN2477698Y (en) Hollow, water storage and afforest environmental protecting street building blocks
JP2007037408A (en) Method and device for cultivating moss
CN104272993B (en) Parterre wall waterproof structure
CN205305549U (en) Ecological tree pond
TWM461652U (en) Soil and water conservation planting brick
JPH0653628U (en) Scenic slope stairs
CN217850515U (en) Sponge type tree pool
JP3107526U (en) Greening base
CN211113735U (en) Novel view barricade structure
JPH078429U (en) Block for revetment
CN212035211U (en) Afforestation lawn planting device
JP2000232820A (en) Greening of building construction
CN102487751A (en) Multifunctional plant cultivation unit and set

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant