TWM461652U - Soil and water conservation planting brick - Google Patents
Soil and water conservation planting brick Download PDFInfo
- Publication number
- TWM461652U TWM461652U TW102204326U TW102204326U TWM461652U TW M461652 U TWM461652 U TW M461652U TW 102204326 U TW102204326 U TW 102204326U TW 102204326 U TW102204326 U TW 102204326U TW M461652 U TWM461652 U TW M461652U
- Authority
- TW
- Taiwan
- Prior art keywords
- soil
- water conservation
- planting brick
- conservation planting
- base
- Prior art date
Links
Landscapes
- Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)
Description
本創作係關於一種水土保持植栽磚,尤指一種水土保持用之水土保持植栽磚。This creation is about a soil and water conservation planting brick, especially a soil and water conservation planting brick used for soil and water conservation.
人類對於山坡地的濫墾濫伐嚴重破壞了大自然原本的樣貌,使得每當風雨來臨,山區發生土石流的現象層出不窮,除導致阻斷道路,甚至常常侵害人類的生命財產安全,如何做好山坡地之水土保持成為了最大的課題。The deforestation of human beings on the hillsides has seriously damaged the original appearance of nature, so that whenever the wind and rain come, the phenomenon of earth and stone flow in the mountainous areas emerges endlessly. In addition to causing the road to be blocked, and even often infringing on the safety of human life and property, how to do well Soil and water conservation on hillsides has become the biggest issue.
習知常見為於山坡地上設置擋土牆穩固土石,主要先利用鋼筋綁覆於山坡地上,再以混凝土的方式傾倒灌注於山坡地表面,待混凝土凝固後與鋼筋結合形成堅固的混凝土表面,以防止山坡地土石被雨水直接沖刷而導致崩塌或流失,但此種施工方式相當費工費時且混凝土表面外觀單調無法再覆蓋花草、植栽等植被加以美化,反而破壞了整體景觀。It is common to set up a retaining wall to stabilize the earth and stone on the hillside. It is mainly used to cover the hillside with steel bars, and then poured into the surface of the hillside by concrete. After the concrete solidifies, it combines with the steel to form a solid concrete surface. Preventing the soil and rock on the hillside from being washed away by rain directly causes collapse or loss. However, this construction method is laborious and time-consuming, and the appearance of the concrete surface is monotonous and can no longer cover the vegetation, planting and other vegetation to beautify, but destroy the overall landscape.
因此,如何創作出一種水土保持植栽磚,改善習知擋土牆的問題,將是本創作所欲積極揭露之處。Therefore, how to create a soil and water conservation planting brick and improve the problem of knowing the retaining wall will be the active disclosure of this creation.
本創作之一目的在於提供一種水土保持植栽磚,以期達到水土保持並兼具美化環境的功效。One of the aims of this creation is to provide a soil and water conservation planting brick in order to achieve soil and water conservation and to beautify the environment.
為達上述目的,本創作提供一種水土保持植栽磚,其包括一基底、一分隔部、一第一止擋部、一第二止擋部及複數加強柱。其中,該分隔部 設於該基底並具有複數第一固定孔;該第一止擋部設於該基底之一端並與該分隔部形成一第一容置槽,且該第一止擋部具有至少一貫孔與複數第二固定孔;該第二止擋部設於該基底之另一端並與該分隔部形成一第二容置槽;以及該等加強柱係分別埋設於該基底、該分隔部、該第一止擋部與該第二止擋部內,且該等加強柱係相互固定,並至少一加強柱自該基底之下方穿出。To achieve the above object, the present invention provides a soil and water conservation planting brick comprising a base, a partition, a first stop, a second stop and a plurality of reinforcing columns. Wherein the partition Provided on the base and having a plurality of first fixing holes; the first stopping portion is disposed at one end of the base and forms a first receiving groove with the partitioning portion, and the first stopping portion has at least a consistent hole and a plurality of a second fixing hole; the second stopping portion is disposed at the other end of the base and forms a second receiving groove with the partition; and the reinforcing pillars are respectively embedded in the base, the partition, the first The retaining portion and the second retaining portion are fixed to each other, and at least one reinforcing post is passed out from below the base.
於一實施例中,該第一止擋部之頂端與該分隔部之頂端分別具有一第一凹部,該等第一凹部係朝向該第一容置槽。In one embodiment, the top end of the first stop portion and the top end of the partition portion respectively have a first recess portion, and the first recess portions face the first receiving groove.
於一實施例中,該第二止擋部之頂端與該分隔部之頂端分別具有一第二凹部,該等第二凹部係朝向該第二容置槽。In one embodiment, the top end of the second stop portion and the top end of the partition portion respectively have a second recess portion, and the second recess portions face the second receiving groove.
於一實施例中,其中自該基底之下方穿出的加強柱係位於該第二止擋部下方。In an embodiment, the reinforcing column penetrating from below the substrate is located below the second stop.
於一實施例中,該第一止擋部之底端較該第一止擋部之頂端厚。In an embodiment, the bottom end of the first stop portion is thicker than the top end of the first stop portion.
於一實施例中,該第二止擋部之底端較該第二止擋部之頂端厚。In an embodiment, the bottom end of the second stop portion is thicker than the top end of the second stop portion.
於一實施例中,該分隔部之底端較該第分隔部之頂端厚。In an embodiment, the bottom end of the partition is thicker than the top end of the first partition.
於一實施例中,自該基底之下方穿出的加強柱之底端彎摺形成一勾狀。In one embodiment, the bottom end of the reinforcing column penetrating from below the substrate is bent to form a hook shape.
於一實施例中,該等加強柱為鋼筋。In an embodiment, the reinforcing columns are steel bars.
藉此,本創作之水土保持植栽磚,係可透過複數個彼此堆疊固定而迅速建立擋土牆,並可利用該第一容置槽與該第二容置栽種植栽及作為排水用溝渠,而達到水土保持並兼具美化環境的功效。In this way, the soil and water conservation planting bricks of the present invention can quickly establish a retaining wall by stacking and fixing each other, and can utilize the first accommodating groove and the second accommodating planting plant and serve as a drainage ditch. , to achieve soil and water conservation and a landscaping effect.
10,10’,10”‧‧‧水土保持植栽磚10,10’,10”‧‧‧ Soil and Water Conservation Planting Bricks
11‧‧‧基底11‧‧‧Base
12‧‧‧分隔部12‧‧‧Departure
121‧‧‧第一固定孔121‧‧‧First fixing hole
13‧‧‧第一止擋部13‧‧‧First stop
131‧‧‧貫孔131‧‧‧through holes
132‧‧‧第二固定孔132‧‧‧Second fixing hole
14‧‧‧第二止擋部14‧‧‧Second stop
15,15’,15”‧‧‧加強柱15,15’,15”‧‧‧Strengthen Column
16‧‧‧第一容置槽16‧‧‧First accommodating slot
161‧‧‧第一凹部161‧‧‧First recess
17‧‧‧第二容置槽17‧‧‧Second accommodating slot
171‧‧‧第二凹部171‧‧‧Second recess
20‧‧‧鉚釘20‧‧‧ Rivets
30‧‧‧水溝蓋30‧‧‧Ditch cover
40‧‧‧水耕盆栽40‧‧‧Hydroculture potted plants
41‧‧‧凸緣41‧‧‧Flange
W‧‧‧水W‧‧‧Water
第1圖係本創作一具體實施例水土保持植栽磚之剖面示意圖。Fig. 1 is a schematic cross-sectional view showing a soil and water conservation planting brick according to a specific embodiment of the present invention.
第2圖係本創作一具體實施例水土保持植栽磚的使用狀態之剖面示意圖。Fig. 2 is a schematic cross-sectional view showing the state of use of a soil and water conservation planting brick according to a specific embodiment of the present invention.
第3圖係本創作另一具體實施例水土保持植栽磚的使用狀態之剖面示意圖。Fig. 3 is a schematic cross-sectional view showing the state of use of a soil and water conservation planting brick according to another embodiment of the present invention.
第4圖係本創作又一具體實施例水土保持植栽磚的使用狀態之剖面示意圖。Fig. 4 is a schematic cross-sectional view showing the state of use of the soil and water conservation planting brick according to still another embodiment of the present invention.
為充分瞭解本創作之目的、特徵及功效,茲藉由下述具體之實施例,並配合所附之圖式,對本創作做一詳細說明,說明如後:請參照第1圖,係本創作一具體實施例水土保持植栽磚之剖面示意圖。如圖所示,該水土保持植栽磚10包括一基底11、一分隔部12、一第一止擋部13、一第二止擋部14及複數加強柱15。其中,該水土保持植栽磚10為朝向垂直其剖面的方向延伸之立體塊體。In order to fully understand the purpose, features and effects of this creation, we will give a detailed explanation of the creation by the following specific examples and with the accompanying drawings. For the following: Please refer to Figure 1 for the creation. A cross-sectional view of a soil and water conservation planting brick according to a specific embodiment. As shown, the soil and water conservation planting brick 10 includes a base 11, a partition 12, a first stop portion 13, a second stop portion 14, and a plurality of reinforcing columns 15. The soil and water conservation planting brick 10 is a three-dimensional block that extends in a direction perpendicular to its cross section.
該分隔部12設於該基底11並具有複數第一固定孔121,該等第一固定孔121係用於供額外的加強柱(圖未示)穿設,以加強該水土保持植栽磚10之結構,並輔助將該水土保持植栽磚10與另一水土保持植栽磚(圖未示)相互固定。The partitioning portion 12 is disposed on the base 11 and has a plurality of first fixing holes 121 for receiving an additional reinforcing column (not shown) to reinforce the soil and water conservation planting brick 10 The structure is configured to assist in fixing the soil and water conservation planting brick 10 to another soil and water conservation planting brick (not shown).
該第一止擋部13設於該基底11之一端並與該分隔部12形成一第一容置槽16,且該第一止擋部13具有至少一貫孔131與複數第二固定孔132。該貫孔131係穿透該第一止擋部13,該貫孔131係用於供一鉚釘(圖未示)穿設,進而將該水土保持植栽磚10固定於山坡地之壁面(圖未示)上;該等第二固定孔132係用於供額外的加強柱(圖未示)穿設,以加強該水土保持植栽磚10之結構,並輔助將該水土保持植栽磚10與另一水土保持植栽磚(圖未示)相互固定。The first stop portion 13 is disposed at one end of the base 11 and defines a first receiving groove 16 with the partition portion 12 , and the first stopping portion 13 has at least a consistent hole 131 and a plurality of second fixing holes 132 . The through hole 131 is penetrated through the first stopping portion 13 for being worn by a rivet (not shown), and the soil and water conservation planting brick 10 is fixed on the wall surface of the hillside (Fig. The second fixing holes 132 are used for the additional reinforcing columns (not shown) to strengthen the structure of the soil and water conservation planting bricks 10 and assist the soil and water conservation planting blocks 10 It is fixed to another soil and water conservation planting brick (not shown).
該第二止擋部14設於該基底11之另一端並與該分隔部12形成 一第二容置槽17。The second stopping portion 14 is disposed at the other end of the base 11 and forms with the partition portion 12 A second receiving groove 17.
該等加強柱15係分別埋設於該基底11、該分隔部12、該第一止擋部13與該第二止擋部14內,且該等加強柱15係相互固定,並至少一加強柱15自該基底11之下方穿出,用於插設地面或固定於另一水土保持植栽磚(圖未示)。The reinforcing columns 15 are embedded in the base 11 , the partitioning portion 12 , the first stopping portion 13 and the second stopping portion 14 , and the reinforcing columns 15 are fixed to each other and at least one reinforcing column 15 is pierced from below the substrate 11 for inserting the ground or fixing to another soil and water conservation planting brick (not shown).
藉此,本創作之水土保持植栽磚10的第一容置槽16與第二容置槽17係可供種植花草、植栽,以美化環境,且該第一容置槽16與該第二容置槽17亦可作為排水用之溝渠,用於供山坡地排水,再者該第一容置槽16與該第二容置槽17亦可種植茶樹等具經濟效益的植栽並可同時達成水土保持的功效。Therefore, the first accommodating groove 16 and the second accommodating groove 17 of the soil and water conservation planting brick 10 of the present invention can be used for planting flowers and plants to beautify the environment, and the first accommodating groove 16 and the first The second accommodating groove 17 can also be used as a drainage ditch for the drainage of the hillside, and the first accommodating groove 16 and the second accommodating groove 17 can also be planted with economical plants such as tea trees. At the same time, the effect of soil and water conservation is achieved.
值得注意的是,第1圖僅為該水土保持植栽磚10之一剖面的示意圖,其中該貫孔131、該第一固定孔121、該第二固定孔132、該加強柱15的數量,可沿著該水土保持植栽磚10之剖面的垂直方向並排增加,以符合實際需求。It is to be noted that FIG. 1 is only a schematic view of a section of the soil and water conservation planting brick 10, wherein the through hole 131, the first fixing hole 121, the second fixing hole 132, and the number of the reinforcing columns 15 are The vertical direction of the cross section of the soil and water conservation planting bricks 10 can be increased side by side to meet actual needs.
於本實施例中,該第一止擋部13之頂端與該分隔部12之頂端分別具有一第一凹部161,該等第一凹部161係朝向該第一容置槽16,該等第一凹部161可供設置一水溝蓋(圖未示),使該水溝蓋覆蓋於該第一容置槽16之上方,且限制該水溝蓋的位置而不會任意滑動,並仍可使該水土保持植栽磚10之表面維持平坦。In the present embodiment, the top end of the first stop portion 13 and the top end of the partition portion 12 respectively have a first recessed portion 161, and the first recessed portion 161 faces the first receiving slot 16, the first The recess 161 can be provided with a gutter cover (not shown), so that the gutter cover covers the first receiving groove 16 and limits the position of the gutter cover without any sliding, and can still be The surface of the soil and water conservation planting brick 10 is kept flat.
於本實施例中,該第二止擋部14之頂端與該分隔部12之頂端分別具有一第二凹部171,該等第二凹部171係朝向該第二容置槽17,該等第二凹部171可供設置一水溝蓋(圖未示),使該水溝蓋覆蓋於該第二容置槽17上方, 且限制該水溝蓋的位置而不會任意滑動,並仍可使該水土保持植栽磚10之表面維持平坦。In this embodiment, the top end of the second stop portion 14 and the top end of the partition portion 12 respectively have a second recess portion 171, and the second recess portion 171 faces the second receiving slot 17, the second The recess 171 is configured to cover a drain cover (not shown), and the drain cover covers the second receiving slot 17 Moreover, the position of the gutter cover is restricted without arbitrarily sliding, and the surface of the soil and water conservation planting brick 10 can be kept flat.
於本實施例中,該第一止擋部13之底端較該第一止擋部13之頂端厚。由於土石擠壓該第一止擋部13時,鄰近該第一止擋部13之底端的擠壓力量大於鄰近該第一止擋部13之頂端的擠壓力量,從而底端較厚之第一止擋部13的設計將使該水土保持植栽磚10可支撐土石的擠壓力量而不易損壞,並可使該水土保持植栽磚10設置時更為穩固。此外,於複數水土保持植栽磚10堆疊設置時,該第一止擋部13可支撐來自其上方施壓的重量,而使該水土保持植栽磚10不易損壞。In the embodiment, the bottom end of the first stopping portion 13 is thicker than the top end of the first stopping portion 13 . When the earth stop presses the first stopping portion 13, the pressing force adjacent to the bottom end of the first stopping portion 13 is greater than the pressing force adjacent to the top end of the first stopping portion 13, so that the bottom end is thicker The design of a stop portion 13 is such that the soil and water conservation planting brick 10 can support the pressing force of the earth and stone without being easily damaged, and can make the soil and water conservation planting tile 10 more stable. In addition, when the plurality of soil and water conservation planting bricks 10 are stacked, the first stopper portion 13 can support the weight applied from above, and the soil and water conservation planting brick 10 is not easily damaged.
於本實施例中,該第二止擋部14之底端較該第二止擋部14之頂端厚。此種底端較厚之第二止擋部14的設計亦可使該水土保持植栽磚10設置時更為穩固而不易損壞。In the embodiment, the bottom end of the second stopping portion 14 is thicker than the top end of the second stopping portion 14 . The design of the second stop portion 14 having a thicker bottom end can also make the soil and water conservation plant block 10 more stable and less susceptible to damage.
於本實施例中,該分隔部12之底端較該第分隔部12之頂端厚。此種分隔部12的設計可使該水土保持植栽磚10設置時更為穩固,尤其於複數水土保持植栽磚10堆疊設置時,該分隔部12可支撐來自其上方施壓的重量,而使該水土保持植栽磚10不易損壞。In the embodiment, the bottom end of the partition portion 12 is thicker than the top end of the first partition portion 12. The design of the partitioning portion 12 can make the soil and water conservation planting brick 10 more stable, especially when the plurality of soil and water conservation planting bricks 10 are stacked, the partitioning portion 12 can support the weight applied from above. The soil and water conservation planting brick 10 is not easily damaged.
於本實施例中,該等加強柱15為鋼筋,而該基底11、該分隔部12、該第一止擋部13、該第二止擋部14係由混凝土一體成型地形成,使該水土保持植栽磚10具有堅固的結構,以抵擋土石的擠壓及雨水的沖刷。In the embodiment, the reinforcing columns 15 are steel bars, and the base 11, the partitioning portion 12, the first stopping portion 13, and the second stopping portion 14 are integrally formed of concrete, so that the water and soil The planting brick 10 is maintained in a strong structure to withstand the squeezing of earth and stone and the scouring of rain.
請參照第2圖與第3圖,第2圖係本創作一具體實施例水土保持植栽磚的使用狀態之剖面示意圖,第3圖係本創作另一具體實施例水土保持植栽磚的使用狀態之剖面示意圖。如圖所示,將複數水土保持植栽磚10’,10”設置 於山坡地之壁面時,係將該等水土保持植栽磚10’,10”沿著山坡地之壁面以階梯形式彼此堆疊固定。於本實施例中,自該基底11之下方穿出的加強柱15係位於該第二止擋部14下方。Please refer to FIG. 2 and FIG. 3 . FIG. 2 is a schematic cross-sectional view showing the use state of the soil and water conservation planting brick according to a specific embodiment of the present invention, and FIG. 3 is a view showing the use of the soil and water conservation planting brick according to another specific embodiment of the present creation. A schematic view of the state. As shown in the figure, the multiple soil and water conservation planting bricks 10', 10" setting In the case of the wall surface of the hillside, the soil and water conservation planting bricks 10', 10" are stacked and fixed to each other along the wall surface of the hillside in a stepped manner. In the present embodiment, the reinforcement is formed from the bottom of the substrate 11. The post 15 is located below the second stop 14 .
具體而言,先設置一水土保持植栽磚10’於鄰近山坡地之壁面底部的平坦處,使該水土保持植栽磚10’之基底11下方穿出的加強柱15固定於該平坦處,並以一鉚釘20穿過該水土保持植栽磚10’之第一止檔部13的貫孔131,進而將該水土保持植栽磚10’固定於山坡地之壁面,再取另一水土保持植栽磚10”堆疊於該水土保持植栽磚10’之上方,並使該水土保持植栽磚10”的第二容置槽17位於該水土保持植栽磚10’的第一容置槽16上方,此時自該水土保持植栽磚10”之基底11下方穿出的加強柱15會被位於下方之水土保持植栽磚10’的第一容置槽16所容置,進而於該水土保持植栽磚10’之第一容置槽16內相對應之第一固定孔121與第二固定孔132設置複數加強柱15’,並將該等加強柱15’與自該水土保持植栽磚10”之基底11下方穿出的加強柱15彼此綁縛固定,接著可再於該水土保持植栽磚10’的第一容置槽16中設置垂直剖面方向的加強柱15”,以增強整體結構,最後於該水土保持植栽磚10’的第一容置槽16中灌入混凝土,等待該混凝土凝固後即可將該水土保持植栽磚10”與該水土保持植栽磚10’穩固地相互固定,同時可再進一步以另一鉚釘20穿過該水土保持植栽磚10”之第一止檔部13的貫孔131,進而將該水土保持植栽磚10”固定於山坡地之壁面。Specifically, a soil and water conservation planting brick 10' is first disposed at a flat portion near the bottom of the wall surface of the hillside land, and the reinforcing column 15 piercing the base 11 of the soil and water conservation planting brick 10' is fixed to the flat portion. And a rivet 20 is passed through the water hole to maintain the through hole 131 of the first stop portion 13 of the planting brick 10', thereby fixing the soil and water conservation planting brick 10' to the wall surface of the hillside, and then taking another soil and water conservation. The planting brick 10" is stacked above the soil and water conservation planting brick 10', and the second accommodating groove 17 of the soil and water conservation planting brick 10" is located in the first accommodating groove of the soil and water conservation planting brick 10' 16 above, at this time, the reinforcing column 15 penetrating from below the substrate 11 of the soil and water conservation planting brick 10" is received by the first accommodating groove 16 of the soil and water conservation planting brick 10' below, and The first fixing hole 121 and the second fixing hole 132 in the first receiving hole 16 of the soil and water conservation planting brick 10' are provided with a plurality of reinforcing columns 15', and the reinforcing columns 15' are kept from the soil and water. The reinforcing columns 15 pierced under the base 11 of the brick 10" are fixed to each other and then can be retained by the soil and water. A reinforcing column 15 ′ in a vertical cross-sectional direction is disposed in the first accommodating groove 16 of the planting brick 10 ′ to enhance the overall structure, and finally the concrete is poured into the first accommodating groove 16 of the soil and water conservation planting brick 10 ′. After the concrete is solidified, the soil and water conservation planting bricks 10" and the soil and water conservation planting bricks 10' can be firmly fixed to each other, and the other rivets 20 can be further passed through the soil and water conservation planting bricks 10" The through hole 131 of the first stopper portion 13 further fixes the soil and water conservation planting brick 10" to the wall surface of the hillside.
值得注意的是,該鉚釘20的數量、該等加強柱15’的數量,可沿著該水土保持植栽磚10’之剖面的垂直方向並排增加,進而使該等水土保持植栽磚10’,10”可被確實地相互固定。此外,應可瞭解地,可進一步於該水土保持 植栽磚10”上方依序堆疊其他水土保持植栽磚(圖未示),並以上述方式彼此固定,以進行整片山坡地之壁面的水土保持。此外,可依據山坡地之壁面的傾斜程度,調整自該水土保持植栽磚10”之基底11穿出的加強柱15於該水土保持植栽磚10’的第一容置槽16內的位置,以符合實際水土保持需求。It should be noted that the number of the rivets 20 and the number of the reinforcing columns 15' may be increased side by side along the vertical direction of the section of the soil and water conservation planting brick 10', so that the soil and water conservation planting bricks 10' , 10" can be reliably fixed to each other. In addition, it should be understood that the soil and water conservation can be further Planting other soil and water conservation planting bricks (not shown) are sequentially stacked above the planting bricks 10", and are fixed to each other in the above manner to carry out soil and water conservation on the wall surface of the whole hillside. In addition, depending on the inclination of the wall surface of the hillside land The reinforcing column 15 which is inserted from the substrate 11 of the soil and water conservation planting brick 10" is placed in the first accommodating groove 16 of the soil and water conservation planting brick 10' to meet the actual soil and water conservation demand.
再者,自該水土保持植栽磚10”之基底11下方穿出的加強柱15,其底端可進一步彎摺形成一勾狀,以增加其與混凝土之間的接觸面積,藉此強化該等水土保持植栽磚10’,10”之間的結合力。Furthermore, the reinforcing column 15 penetrating from below the substrate 11 of the soil and water conservation planting brick 10" can be further bent to form a hook shape to increase the contact area with the concrete, thereby strengthening the The soil and water retains the bonding force between the planting blocks 10', 10".
於本實施例中,如第2圖所示,係於該水土保持植栽磚10”之第一容置槽16上設置一水溝蓋30以作為排水用之溝渠,並於該水土保持植栽磚10”之第二容置槽17中種植花草,並於該水土保持植栽磚10’之第二容置槽17上設置另一水溝蓋30以作為排水用之溝渠。其中,該水土保持植栽磚10”之第一容置槽16、第二容置槽17及該水土保持植栽磚10’之第二容置槽17的使用形式不限於本實施例與圖式所示,亦可於該水土保持植栽磚10”之第一容置槽16中種植花草,並於該水土保持植栽磚10’之第二容置槽17中種植花草,或於該水土保持植栽磚10”之第一容置槽16與第二容置槽17上皆設置水溝蓋30,可依據實際需求調整。In the present embodiment, as shown in FIG. 2, a gutter cover 30 is disposed on the first accommodating groove 16 of the soil and water conservation planting brick 10" as a ditch for drainage, and is maintained in the soil and water. The flower is planted in the second accommodating groove 17 of the planting brick 10", and another gully cover 30 is disposed on the second accommodating groove 17 of the soil and water conservation planting brick 10' as a ditch for drainage. The use form of the first accommodating groove 16 , the second accommodating groove 17 and the second accommodating groove 17 of the soil and water conservation planting brick 10 ′ is not limited to the embodiment and the figure. As shown in the formula, the flower can be planted in the first accommodating groove 16 of the soil and water conservation planting brick 10", and the flower is planted in the second accommodating groove 17 of the soil and water conservation planting brick 10', or The first accommodating groove 16 and the second accommodating groove 17 of the soil and water conservation planting brick 10" are provided with a gutter cover 30, which can be adjusted according to actual needs.
如第3圖所示,係於該水土保持植栽磚10”之第一容置槽16、第二容置槽17中種植花草,並於該水土保持植栽磚10’之第二容置槽17中種植花草,以達成美化環境的功效,且若為於整片山坡地之壁面上堆疊複數水土保持植栽磚,則可於山坡地上呈現整片的花草景觀並同時達成水土保持的功效。As shown in FIG. 3, the plant is planted in the first accommodating tank 16 and the second accommodating tank 17 of the soil and water conservation planting brick 10", and the second accommodating of the planting brick 10' is maintained in the soil and water. Planting flowers and plants in the trough 17 to achieve the effect of beautifying the environment, and if a plurality of soil and water conservation planting bricks are stacked on the wall of the entire hillside, the whole flower and grass landscape can be presented on the hillside and the soil and water conservation effect can be achieved at the same time.
請參照第4圖,係本創作又一具體實施例水土保持植栽磚的使用狀態之剖面示意圖。如圖所示,該等水土保持植栽磚10’,10”沿著壁面以階梯方 式彼此堆疊,並於該水土保持植栽磚10’之第二容置槽17及該水土保持植栽磚10”之第一容置槽16、第二容置槽17中注入一定高度的水W,並放入水耕盆栽40種植,此處以於該水土保持植栽磚10’之第二容置槽17放置一盆水耕盆栽40為例來說明,種植時使該水耕盆栽40的凸緣41架設於該第二凹部171,此時水W會藉由該水耕盆栽40底部的排水孔(圖未示)進入該水耕盆栽40中,以使水耕植物能吸收水分順利生長,且該水耕盆栽40可方便地隨季節直接更換為種植不同種類的花草之水耕盆栽40,使得各個季節山坡地的壁面上也能有不同的美麗景觀。Please refer to FIG. 4, which is a schematic cross-sectional view showing the state of use of the soil and water conservation planting brick according to another embodiment of the present invention. As shown, the soil and water conservation planting bricks 10', 10" are stepped along the wall. Stacked on each other, and injecting a certain height of water into the second accommodating tank 17 of the soil and water conservation planting brick 10' and the first accommodating tank 16 and the second accommodating tank 17 of the soil and water conservation planting brick 10" W, and placed in the hydroponic potted plant 40, here to the second holding trough 17 of the soil and water conservation planting brick 10' placed a pot of hydroponic potted plants 40 as an example to illustrate, the planting of the hydroponic potted 40 The flange 41 is erected in the second recessed portion 171, and the water W enters the hydroponic potted plant 40 through a drain hole (not shown) at the bottom of the hydroponic potted plant 40, so that the hydroponic plant can absorb water and grow smoothly. Moreover, the hydroponic potted plant 40 can be conveniently replaced with a hydroponic potted plant 40 of different kinds of flowers and plants with the seasons, so that the different surface of the hillside of each season can also have different beautiful landscapes.
此外,應可瞭解地,亦可於該水土保持植栽磚10’之第二容置槽17及該水土保持植栽磚10”之第一容置槽16、第二容置槽17中不注入水W,而直接放置一般盆栽,亦可達成方便地隨季節直接更換為種植不同種類的花草之盆栽的功效。In addition, it should be understood that the second accommodating groove 17 of the soil and water conservation planting brick 10' and the first accommodating groove 16 and the second accommodating groove 17 of the soil and water conservation planting brick 10" are not Injecting water W, and directly placing the general potted plants, it is also possible to easily replace the potted plants with different types of flowers and plants with the seasons.
綜上所述,本創作之水土保持植栽磚,係可透過複數個彼此堆疊固定而迅速建立擋土牆,並可利用該第一容置槽與該第二容置栽種植栽及作為排水用溝渠,而達到水土保持並兼具美化環境的功效。In summary, the water and soil conservation planting bricks of the present invention can quickly establish a retaining wall through a plurality of stacked and fixed ones, and can utilize the first accommodating groove and the second accommodating plant to grow and serve as drainage. Ditch is used to achieve soil and water conservation and to beautify the environment.
本創作在上文中已以較佳實施例揭露,然熟習本項技術者應理解的是,該實施例僅用於描繪本創作,而不應解讀為限制本創作之範圍。應注意的是,舉凡與該實施例等效之變化與置換,均應設為涵蓋於本創作之範疇內。因此,本創作之保護範圍當以申請專利範圍所界定者為準。The present invention has been disclosed in the above preferred embodiments, and it should be understood by those skilled in the art that the present invention is only intended to depict the present invention and should not be construed as limiting the scope of the present invention. It should be noted that variations and permutations equivalent to those of the embodiments are intended to be included within the scope of the present invention. Therefore, the scope of protection of this creation is subject to the definition of the scope of patent application.
10‧‧‧水土保持植栽磚10‧‧‧Water and soil conservation planting bricks
11‧‧‧基底11‧‧‧Base
12‧‧‧分隔部12‧‧‧Departure
121‧‧‧第一固定孔121‧‧‧First fixing hole
13‧‧‧第一止擋部13‧‧‧First stop
131‧‧‧貫孔131‧‧‧through holes
132‧‧‧第二固定孔132‧‧‧Second fixing hole
14‧‧‧第二止擋部14‧‧‧Second stop
15‧‧‧加強柱15‧‧‧Strengthen column
16‧‧‧第一容置槽16‧‧‧First accommodating slot
161‧‧‧第一凹部161‧‧‧First recess
17‧‧‧第二容置槽17‧‧‧Second accommodating slot
171‧‧‧第二凹部171‧‧‧Second recess
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW102204326U TWM461652U (en) | 2013-03-08 | 2013-03-08 | Soil and water conservation planting brick |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW102204326U TWM461652U (en) | 2013-03-08 | 2013-03-08 | Soil and water conservation planting brick |
Publications (1)
Publication Number | Publication Date |
---|---|
TWM461652U true TWM461652U (en) | 2013-09-11 |
Family
ID=49629250
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
TW102204326U TWM461652U (en) | 2013-03-08 | 2013-03-08 | Soil and water conservation planting brick |
Country Status (1)
Country | Link |
---|---|
TW (1) | TWM461652U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWD206051S (en) | 2020-02-04 | 2020-07-21 | 南韓商Ms Pipe股份有限公司 | Construction tube |
TWD206297S (en) | 2020-02-04 | 2020-08-01 | 南韓商Ms Pipe股份有限公司 | Construction tube |
-
2013
- 2013-03-08 TW TW102204326U patent/TWM461652U/en not_active IP Right Cessation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWD206051S (en) | 2020-02-04 | 2020-07-21 | 南韓商Ms Pipe股份有限公司 | Construction tube |
TWD206297S (en) | 2020-02-04 | 2020-08-01 | 南韓商Ms Pipe股份有限公司 | Construction tube |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100927393B1 (en) | Ecological block | |
JP3813934B2 (en) | Green body | |
CN203113374U (en) | Strengthening type verdurization retaining wall | |
CN205329713U (en) | Green retaining wall building block | |
KR101583664B1 (en) | Vegetation unit and slope greening method using vegetation unit | |
CN101982626A (en) | Three-dimensional greening method of slope built on roof roofing | |
JP2011144615A (en) | Assembly vegetation block compatible with environment | |
KR101659168B1 (en) | Rock cutting slope revegetation method | |
CN202899064U (en) | Improved road greening guardrail | |
CN109403370B (en) | Cast-in-place greening concrete retaining wall and construction method thereof | |
TWM461652U (en) | Soil and water conservation planting brick | |
KR100481160B1 (en) | The retaining wall for a block | |
KR101429481B1 (en) | Block for engineering works | |
KR101215838B1 (en) | Vegetation block and retaining wall using the same | |
KR200461229Y1 (en) | Wall Block for Vegetation | |
CN207567790U (en) | A kind of ecological revetment system | |
KR101308822B1 (en) | Binding structure of vegetation and revetment block and method for constructing using the same | |
KR101365658B1 (en) | Racks for sand bags | |
JP2012254023A (en) | Water storage and water discharge base material and greening structure using the same | |
CN209276924U (en) | A kind of corner structure | |
CN108103878A (en) | A kind of ecological floor file structure | |
CN203057920U (en) | Guardrail flower groove | |
JP5975381B2 (en) | Planting base, planting base construction method, greening area border structure | |
KR101250001B1 (en) | Tree guard | |
KR101877024B1 (en) | Civil Block for Vegetation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4K | Annulment or lapse of a utility model due to non-payment of fees |