CN209242037U - A kind of oblique glue row pin inserting equipment - Google Patents
A kind of oblique glue row pin inserting equipment Download PDFInfo
- Publication number
- CN209242037U CN209242037U CN201821803314.5U CN201821803314U CN209242037U CN 209242037 U CN209242037 U CN 209242037U CN 201821803314 U CN201821803314 U CN 201821803314U CN 209242037 U CN209242037 U CN 209242037U
- Authority
- CN
- China
- Prior art keywords
- nail
- glue
- material path
- plug pin
- row
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of oblique glue to arrange pin inserting equipment, which includes: to send glue arranging device, has the first material path being obliquely installed, discharges into capable conveying to the glue in the first material path;Feeding device for nail conveys nail;Pressing plate, setting forms the second material path for accommodating nail with plug pin device in feeding device for nail opposite side, during nail in feeding device for nail conveys the second material path, pressing plate is to the nail supporting role in the second material path, to assist feeding device for nail that the nail of second material path one end is delivered to its other end;Plug pin device is rotatably arranged in the top at plug pin, and when nail and glue are arranged when being transported at plug pin, the rotation of plug pin device is each nail to be respectively pressed into glue row;Pressing wheel device carries out secondary compression to the nail after the completion of plug pin device plug pin nail to be all pressed into glue row.The pin inserting equipment of the utility model realizes plug pin from feeding, conveying, the automation of plug pin, improves plug pin efficiency, reduce cost of labor.
Description
Technical field
The utility model belongs to glue nail production technical field more particularly to a kind of oblique glue row pin inserting equipment.
Background technique
With advances in technology, the use of nail is not only the pure manual use hammer head of a nail, currently mostly using row
Nailing machine, nail ordering machine are used cooperatively with nail, just need replacing nail when nail is finished, rather than are finished a nail replacement
A piece nail, improves the production efficiency of nail.
Therefore it is badly in need of developing the low oblique glue nail equipment of a kind of high degree of automation, human cost at present, to meet society
It can be to the wilderness demand of glue nail.
Utility model content
(1) purpose of utility model
The purpose of the utility model is to provide a kind of oblique glue to arrange pin inserting equipment, solve artificial plug pin low efficiency, manually at
This high problem.
(2) technical solution
To solve the above problems, on the one hand the utility model provides a kind of oblique glue row pin inserting equipment, comprising:
Glue arranging device is sent, there is the first material path being obliquely installed, capable conveying, the first material path are discharged into the glue in the first material path
Upper end correspond at plug pin, the tilt angle of the first material path is identical as the tilt angle that glue is arranged;
At least one feeding device for nail is arranged in the top of the first material path, conveys to nail;
Pressing plate, is arranged in the top of the first material path and setting is formed among feeding device for nail opposite side, pressing plate and feeding device for nail
The second material path of nail is accommodated, the top of the first material path and one end of the second material path and the first material path upper end is arranged in the second material path
Plug pin at abut;
During nail in feeding device for nail conveys the second material path, pressing plate is supported to the nail in the second material path to be made
With to assist feeding device for nail that the nail of second material path one end is delivered to the other end positioned at the second material path;
At least one plug pin device, is rotatably arranged in the top at plug pin, when nail and glue row are transported at plug pin
When, the rotation of plug pin device is each nail to be respectively pressed into glue row;
Pressing wheel device is arranged in by the discharge port at the top of the first material path, carries out to the nail after the completion of plug pin device plug pin
Secondary compression, will be in nail all indentation glue row;
Power mechanism is sequentially connected, for send glue arranging device and feeding device for nail to provide with glue arranging device, feeding device for nail is sent
Power is to drive the two to rotate synchronously.
Further, glue arranging device is sent further include:
Glue arranges vibrating disk, can be rotatably set and the discharge port of glue row's vibrating disk is docked with the bottom of the first material path, be used for
By glue arrange vibration pan bottom glue row in the predetermined direction sequentially-fed to top discharge port;
First support;
It send glue to arrange component, is rotationally inclined in first support and is arranged by the first material path, by the first material path
The glue row of bottom is delivered at the plug pin at top.
Further, send glue row component include:
First active runner assembly, rotationally vertical to be arranged in first support, upper end is provided with nibbles with power mechanism
The first gear of conjunction, lower end are rotatably arranged in first support;
First driven rotation component, it is rotationally vertical to be arranged in first support and be arranged in the first active runner assembly
The upstream position of lower section;
First conveyer belt is set on the first active runner assembly and the first driven rotation component;
First clamp assemblies have to be disposed around on first clamp assemblies and hold for clamping multiple glue row foldings of oblique glue row
Part, the first clamp assemblies are set on the first active runner assembly and the first driven rotation component, follow the first active rotating group
Part and the rotation of the first driven rotation component are to arrange the oblique glue in the first material path at the plug pin being delivered to above the first material path.
Further, feeding device for nail further include:
Nail vibrating disk, can be rotatably set and the discharge port of nail vibrating disk is docked with one end of the second material path, be used for
By nail vibration pan bottom nail in the predetermined direction sequentially-fed to top discharge port;
Second support is arranged in first support;
Screw assembly is sent, be rotatably arranged in second support and is arranged by the second material path, it will be more in the second material path
A nail is delivered to the other end above at plug pin from one end.
Further, the screw assembly is sent to include:
Second active runner assembly, rotationally vertical setting on the secondary support bracket, first turn of upper end and power mechanism
Wheel is fixedly connected, and lower end is rotatably arranged in second support;
Second driven rotation component, is rotatably arranged in first support;
Second conveyer belt is set on the second active runner assembly and the second driven rotation component;
Second clamp assemblies have the multiple nail clamping pieces being disposed around on the second clamp assemblies, the second clamp assemblies set
It is located on the second active runner assembly and the second driven rotation component, follows the second active runner assembly and the second driven rotation group
Part is rotated being delivered to multiple nails in the second material path at the plug pin of the second material path other end;Each second clamping group
Part includes: pedestal, and the L shape clamping element being movably disposed on pedestal.
Further, further includes:
First guide groove, along the rotation direction of the second clamp assemblies be sticked second support lower surface and be located at L clevis
The top of tight part;
Second guide groove, along the rotation direction of the second clamp assemblies be sticked first support upper surface and be located at L clevis
The lower section of tight part;
When second clamp assemblies are moved at the first guide groove and the second guide groove, the first guide groove and the second guide groove pair
L shape clamping element is pushed, so that L shape clamping element clamps the nail in the second material path close to pressing plate.
Further, pressing wheel device includes:
At least one fixed plate is arranged in by the discharge port of the first material path;
At least one pinch roller, the inclined direction along the first material path are rotatably arranged in fixed plate, and pinch roller can be close
Or far from the nail after the completion plug pin in the first material path, to carry out secondary compression or release to each nail.
Further, power mechanism includes:
Driving assembly has rotationally output end;
Nail runner assembly is sent, is rotatably arranged in the second support, the upper end setting for sending nail runner assembly
Nail runner is sent, the lower end for sending nail runner assembly is fixedly connected with the second active runner assembly;
It send glue to arrange runner assembly, is rotatably arranged in the second support, the upper end for sending glue row's runner assembly
It is provided with and send nail runner to send glue to arrange runner by what conveyer belt was sequentially connected, the lower end for sending glue row's runner assembly is provided with
The second gear engaged with the first active runner assembly;
The output end with it is described send nail runner assembly or it is described send glue row runner assembly be fixedly connected;
The driving component drive described in send nail runner assembly and it is described send glue row runner assembly rotate synchronously.
Further, plug pin device is rotatably arranged in the top of the second material path and fixes on the secondary support bracket, is sending
During spike devices convey nail, it will be delivered in the glue row that the nail at plug pin is pressed into the first material path.
Further, the oblique glue row is single oblique glue row or double oblique glue row.
(3) beneficial effect
The above-mentioned technical proposal of the utility model has following beneficial technical effect: the oblique glue socket nail of the utility model
Equipment send glue arranging device, feeding device for nail, plug pin device and pressing wheel device by setting, realizes the automation of plug pin, and existing
Technology is compared, and the pin inserting equipment of the utility model improves plug pin efficiency, reduces cost of labor.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of oblique glue row's pin inserting equipment of the utility model;
Fig. 2 is that the oblique glue of the utility model arranges the partial side elevation view of pin inserting equipment;
Fig. 3 is that the oblique glue of the utility model arranges the part isometric structure chart of pin inserting equipment;
Fig. 4 is that the oblique glue of the utility model arranges the top view of pin inserting equipment;
Fig. 5 is that the oblique glue of the utility model arranges the rearview of pin inserting equipment;
Fig. 6 is that the oblique glue of the utility model arranges one of the side view of pin inserting equipment;
Fig. 7 is that the oblique glue of the utility model arranges the two of the side view of pin inserting equipment;
Fig. 8 is that the oblique glue of the utility model arranges the three of the side view of pin inserting equipment;
Fig. 9 is that the oblique glue of the utility model arranges the four of the side view of pin inserting equipment;
Figure 10 is that the oblique glue of the utility model arranges the five of the side view of pin inserting equipment.
Appended drawing reference:
1 oblique glue is arranged, and at 3 plug pins, 4 send glue arranging device, 5 first material paths, 6 feeding device for nail, 7 pressing plates, 8 second material paths, 9 plug pins
Device, 10 pressing wheel devices, 11 power mechanisms, 12 glue arrange vibrating disk, and 13 first supports, 14 send glue to arrange component, and 15 first actively turn
Dynamic component, 16 first driven rotation components, 18 glue row folding gripping members, 19 nail vibrating disks, 20 second supports, 21 send screw assembly, and 22
Second active runner assembly, 23 second driven rotation components, 25 nail clamping pieces, 26 pedestals, 27L shape clamping element, 28 first lead
To slot, 29 second guide grooves, 30 fixed plates, 31 pinch rollers, 32 driving assemblies, 35 send nail runner, and 36 send glue to arrange runner, 37 first teeth
Wheel, 38 second gears, 39 plug pin driving assemblies.
Specific embodiment
To make the objectives, technical solutions and advantages of the present invention clearer, With reference to embodiment
And referring to attached drawing, the utility model is further described.It should be understood that these descriptions are merely illustrative, and do not really want
Limit the scope of the utility model.In addition, in the following description, descriptions of well-known structures and technologies are omitted, to avoid not
Necessarily obscure the concept of the utility model.
In the description of the present invention, it should be understood that term " center ", " longitudinal direction ", " transverse direction ", "front", "rear",
The orientation or positional relationship of the instructions such as "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is based on attached drawing institute
The orientation or positional relationship shown, is merely for convenience of describing the present invention and simplifying the description, rather than indication or suggestion is signified
Device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to this is practical
The limitation of novel protected range.
In order to solve the problems, such as oblique glue socket nail low efficiency in the prior art and take a long time, the utility model provides one
The oblique glue of kind arranges pin inserting equipment.
As Figure 1-10 shows, the utility model oblique glue row pin inserting equipment include: send glue arranging device 4, at least one send nail
Device 6, pressing plate 7, at least one plug pin device 9, pressing wheel device 10 and power mechanism 11.Wherein, glue arranging device 4 is sent, has and inclines
The first material path 5 being tiltedly arranged conveys the oblique glue row 1 in the first material path 5, and the upper end of the first material path 5 corresponds to 3 at plug pin,
The tilt angle (tilt angle that the tilt angle of the first material path 5 refers to the first material path 5 with horizontal plane) of first material path 5 with tiltedly
The tilt angle of glue row 1 is identical;At least one feeding device for nail 6 is arranged in the top of the first material path 5, conveys to nail;Pressure
Plate 7 is arranged in the top of the first material path 5 and is arranged among 6 opposite side of feeding device for nail, pressing plate 7 and feeding device for nail 6 to be formed to accommodate and follows closely
One end and 5 upper end of the first material path of the top of the first material path 5 and the second material path 8 is arranged in second material path 8 of son, the second material path 8
Plug pin at 3 abut;During nail in feeding device for nail 6 conveys the second material path 8, pressing plate 7 is to the nail in the second material path 8
Sub- supporting role, to assist feeding device for nail 6 that the nail of 8 one end of the second material path is delivered to the other end positioned at the second material path 8;Extremely
A few plug pin device 9, is rotatably arranged at plug pin 3 top, when nail and oblique glue row 1 are transported to 3 at plug pin, inserts
The rotation of spike devices 9 is each nail to be respectively pressed into oblique glue row 1;5 top of the first material path is arranged in pressing wheel device 10
By discharge port, secondary compression is carried out to the nail after the completion of 9 plug pin of plug pin device, nail is all pressed into oblique glue row 1;It is dynamic
Force mechanisms 11 are sequentially connected, for send glue arranging device 4 and feeding device for nail 6 to provide power with glue arranging device 4, feeding device for nail 6 is sent
Glue arranging device 4, feeding device for nail 6 is sent to rotate synchronously with driving.
Using the technical solution of the present embodiment, during sending nail, glue is sent to arrange, power mechanism 11 is sent by belt-driven
Glue arranging device 4 and feeding device for nail 6 rotate synchronously, so that sending glue arranging device 4 that the oblique glue in first material path 5 is arranged 1, feeding device for nail 6
Plug pin is waited by the nail synchronous transport to plug pin in the second material path 83.During plug pin, oblique glue row 1 is by sending glue row's dress
Set 4,3 at the plug pin at plug pin device 9 by plug pin 3 above nail be successively pressed into oblique glue row 1, finally in pressing wheel device 10
On carry out secondary compression to completing the nail after plug pin, be fully inserted into nail in oblique glue row 1.In order to guarantee oblique glue row 1 and nail
Son send glue arranging device 4 and feeding device for nail 6 that can be transported at plug pin simultaneously, send glue arranging device 4, feeding device for nail 6 to use same
Power mechanism 11 is driven.Above-mentioned setting so that plug pin process realized on pin inserting equipment nail and oblique glue row 1 it is automatic
Change feeding, feeding and plug pin, and then improve plug pin efficiency, shortens plug pin time-consuming.
Compared with using artificial plug pin in the prior art, the pin inserting equipment in the present embodiment can reduce crew numbers,
It realizes automation plug pin, and then reduces plug pin cost.
As depicted in figs. 1 and 2, glue arranging device 4 is sent further include: glue arranges vibrating disk 12, first support 13 and glue is sent to arrange component
14.Wherein, glue arranges vibrating disk 12, can be rotatably set and glue arranges the discharge port of vibrating disk 12 and the bottom pair of the first material path 5
Connect, for by glue row 12 bottom of vibrating disk oblique glue row 1 in the predetermined direction sequentially-fed to top discharge port;Glue is sent to arrange
Component 14 is rotationally inclined in first support 13 and is arranged by the first material path 5, by the oblique of 5 bottom of the first material path
Glue row 1 is delivered to 3 at the plug pin at top.Specifically, rotation is driven by motor in glue row vibrating disk 12, rotates in glue row's vibrating disk 12
In the process, the oblique glue row 1 of glue row 12 bottom of vibrating disk is transported to the discharge port at top, due to the discharge port of glue row's vibrating disk 12
It is docked with the bottom of the first material path 5, send glue row's component 14 rotation that the oblique glue row 1 of the discharge port of glue row's vibrating disk 12 is delivered to top
3 carry out plug pin at the plug pin in portion.The structure of above structure is simple, is easily worked.
As illustrated in figures 6-10, sending glue row's component 14 includes: the first active runner assembly 15,16 and of the first driven rotation component
First clamp assemblies 18.Wherein, the first active runner assembly 15, rotationally vertical to be arranged in first support 13, upper end is set
It is equipped with the first gear 37 engaged with power mechanism 11, lower end is rotatably arranged in first support 13;First driven rotation
Component 16, it is rotationally vertical to be arranged in first support 13 and the upstream position below the first active runner assembly 15 is set
Place;First clamp assemblies have and are disposed around for clamping multiple glue row folding gripping members 18 of oblique glue row on first clamp assemblies,
First clamp assemblies are set on the first active runner assembly 15 and the first driven rotation component 16, follow the first active rotating group
Part 15 and the rotation of the first driven rotation component 16 are to be delivered to the plug pin above the first material path 5 for the oblique glue row 1 in the first material path 5
Place 3.Specifically, the first active runner assembly 15 is driven and rotated by power mechanism 11, is driven by conveyer belt first from turn
Dynamic component 16 rotates, to drive the rotation of the first clamp assemblies, the front end of each glue row folding gripping member 18, which is formed, accommodates oblique glue row 1
Multiple grooves, the oblique glue row 1 in the first material path 5 is trapped into groove, rotated and driven in the first material path 5 by the first clamp assemblies
Oblique glue row 1 it is mobile at the plug pin of the top of the first material path 53.In the utility model, which is helical gear.
As shown in Figure 1, 2, 3, feeding device for nail 6 further include: nail vibrating disk 19, second support 20 and send screw assembly 21.Its
In, nail vibrating disk 19, can be rotatably set and the discharge port of nail vibrating disk 19 is docked with one end of the second material path 8, be used for
By the nail of 19 bottom of nail vibrating disk in the predetermined direction sequentially-fed to top discharge port;Second support 20, setting
In first support 13;Screw assembly 21 is sent, be rotatably arranged in second support 20 and is arranged by the second material path 8, it will
Multiple nails in second material path 8 are delivered to the other end above at plug pin 3 from one end.Specifically, nail vibrating disk 19
Rotation is driven by motor, in 19 rotation process of nail vibrating disk, the nail of 19 bottom of nail vibrating disk is transported to top
Discharge port send the rotation of screw assembly 21 to vibrate nail since the discharge port of nail vibrating disk 19 is docked with one end of the second material path 8
The nail of the discharge port of disk 19 is delivered to the other end of 3 tops at plug pin.The structure of above structure is simple, is easily worked.
As shown in Fig. 2,6-9, sending screw assembly 21 includes: the second active runner assembly 22,23 and of the second driven rotation component
Second clamp assemblies 25.Wherein, the second active runner assembly 22, rotationally it is vertical be arranged in second support 20, upper end with
Power mechanism 11 send nail runner 35 to be fixedly connected, and lower end is rotatably arranged in second support 20;Second driven rotation group
Part 23 is rotatably arranged in first support 13;Second clamp assemblies have the multiple nails being disposed around on the second clamp assemblies
Sub-folder gripping member 25, the second clamp assemblies are set on the second active runner assembly 22 and the second driven rotation component 23, follow
Two active runner assemblies 22 and the rotation of the second driven rotation component 23 are being delivered to multiple nails in the second material path 8 positioned at the
3 at the plug pin of two material paths, 8 other end.Specifically, the second active runner assembly 22 is driven and rotated by power mechanism 11, passes through biography
Band is sent to drive the rotation of the second driven rotation component 23, so that the rotation of the second clamp assemblies 25 is driven, each nail clamping piece 25
Front end forms the multiple grooves for accommodating nail, and the nail in the second material path 8 is placed side by side in the second material path 8 one by one and is trapped into
In groove, the nail in the second material path 8 of drive is rotated at the plug pin of 8 other end of the second material path 3 by the second clamp assemblies 25
Top it is mobile.The structure of above structure is simple, is easily worked.
As shown in figure 9, each second clamp assemblies 25 include: pedestal 26, and the L being movably disposed on pedestal 26
Shape clamping element 27, the front end of each L shape clamping element 27 are recessed to form the groove of multiple clamping nails.Between adjacent two groove away from
On equal to oblique glue row 1 in every row with a distance from two neighboring jack.The structure of above structure is simple, is easily worked.
The oblique glue of the utility model arranges pin inserting equipment further include: the first guide groove (not shown) and the second guide groove
(not shown).Wherein, the first guide groove, the rotation direction along the second clamp assemblies 25 are sticked in the following table of second support 20
Face and the top for being located at L shape clamping element 27;Second guide groove, the rotation direction along the second clamp assemblies 25 are sticked in first support
13 upper surface and the lower section for being located at L shape clamping element 27;Second clamp assemblies 25 move to the first guide groove and the second guide groove
When place, the first guide groove and the second guide groove push L shape clamping element 27, so that L shape clamping element 27 is close to pressing plate 7 to press from both sides
Nail in tight second material path 8.In order to which nail to be smoothly transported to at plug pin 3 top, L shape clamping element 27 top and
It is respectively arranged below the first guide groove and the second guide groove, applies the active force moved forward to L shape clamping element 27, so that L shape
Clamping element 27 is close to pressing plate 7, so that nail is stably delivered to carry out plug pin above 3 at plug pin.In the present invention,
One guide groove and the second guide groove are substantially in the intermediate bracket structure for straight line.When nail is sent in the preparation of L shape clamping element 27, first is led
It moves forward to the front end portion of slot and the second guide groove guidance L shape clamping element 27 to enter the first guide groove and the second guide groove
Middle section, it is therefore an objective to make L shape clamping element 27 clamp transmission process in nail;During conveying nail, first is led
Steadily guide L shape clamping element 27 that L shape clamping element 27 is made persistently to clamp conveying to slot and the second guide groove intermediate straight portion
Nail in the process;At the end of plug pin, the rear end part guidance L shape clamping element 27 of the first guide groove and the second guide groove is backward
Movement is to exit the first guide groove and the second guide groove.
As seen in figs. 8-10, plug pin device 9 includes: to be rotatably arranged in the top of the second material path 8 and be fixed on second
On bracket 20, during feeding device for nail 6 conveys nail, the oblique glue at plug pin 3 nail the first material path 5 of indentation will be delivered to
In row 1.Specifically, when nail and oblique glue row 1 are transported to respectively 3 at plug pin, plug pin device 9 is rotated, will be at plug pin 3
At the nail indentation plug pin of side in 3 oblique glue row 1.
As shown in Fig. 4,7-9, plug pin device 9 further include: plug pin driving assembly 39 is fixed in second support 20,
For driving plug pin device 9 to rotate.The plug pin driving assembly 39 is motor.
As Figure 1-10 shows, pressing wheel device 10 includes: at least one fixed plate 30 and at least one pinch roller 31.Wherein, until
A few fixed plate 30, is arranged in by the discharge port of the first material path 5;At least one pinch roller 31, along the inclined direction of the first material path 5
Be rotatably arranged in fixed plate 30, pinch roller 31 can close to or far from the first material path 5 complete plug pin after nail, with
Secondary compression or release are carried out to each nail.Specifically, the oblique glue row 1 after completing plug pin, which continues up, is transported to the first material
The discharge outlet in road 5 carries out secondary compression, and the rotation direction of pinch roller 31 and the conveying direction of nail are consistent, and nail is pressed completely
Enter in oblique glue row 1.
As shown in Fig. 1-Figure 10, power mechanism 11 includes: driving assembly 32, send nail runner assembly, glue is sent to arrange runner assembly.
Wherein, driving assembly 32 has a rotationally output end, the output end and send nail runner assembly or glue is sent to arrange runner assembly and fix
Connection;Nail runner assembly is sent, is rotatably arranged in second support 20, this send the upper end of nail runner assembly to be provided with and send nail turn
Wheel 35, this send the lower end of nail runner assembly to be fixedly connected with the second active runner assembly 22;Glue is sent to arrange runner assembly, rotationally
It is arranged in second support 20, this send the upper end of glue row's runner assembly to be provided with and send glue to arrange runner 36, send glue row's runner 36 and send
It follows closely runner 35 to be sequentially connected by conveyer belt, this send the lower end of glue row's runner assembly to be provided with and the first active runner assembly
The second gear 38 of 15 engagements, second gear 38 is helical gear.Specifically, the drive of driving assembly 32 is sent nail runner assembly or is sent
Glue is arranged runner assembly and is rotated synchronously, and nail runner assembly rotation is sent to drive 22 turns of the second active runner assembly being firmly connected with it
It is dynamic, it send screw assembly 21 to rotate to drive, glue row's runner assembly rotation is sent to drive the first gear rotation engaged, and then band
It is dynamic that glue row's component 14 is sent to rotate.In the utility model, which is motor.
The pin inserting equipment of the utility model is suitable for the plug pin of oblique glue row 1, and oblique glue row 1 refers to relative to horizontal or vertical side
To the glue row being obliquely installed.The pin inserting equipment of the utility model can be adapted for the plug pin of single oblique glue row, be readily applicable to
The plug pin of double oblique glue row.When needing to discharge into row plug pin to double oblique glue, it is only necessary to distinguish in the left and right sides of the second material path 8
Two feeding device for nail 6 and two plug pin devices 9 are set.
The utility model additionally provides a kind of plug pin method, carries out plug pin using above-mentioned oblique glue row's pin inserting equipment, this is inserted
Nail method includes:
Step S1, by sending glue arranging device to convey the oblique glue row 1 in the first material path 5;
Step S2 conveys nail by feeding device for nail 6;
Step S3, during nail in feeding device for nail 6 conveys the second material path 8, pressing plate 7 is in the second material path 8
Nail supporting role, to assist feeding device for nail 6 that the nail of 8 one end of the second material path is delivered to the other end positioned at the second material path 8;
Step S4, when nail and oblique glue row 1 be transported to 3 at plug pin when, by plug pin device 9 rotate with by each nail according to
In the secondary oblique glue row 1 of indentation;
Step S5 carries out secondary compression to the nail after the completion of 9 plug pin of plug pin device by pressing wheel device 10, by nail
It is all pressed into oblique glue row 1.
Specifically, it during nail is inserted into oblique glue row 1, send the first material path 5 of glue arranging device 4 that will arrange from glue and shakes
The oblique glue row 1 of 12 discharge port of Moving plate discharge is picked up, and send glue row's component 14 by the oblique glue row 1 of glue row's 12 discharge outlet of vibrating disk
It is delivered to the other end and carries out plug pin;At the same time, the second material path of feeding device for nail 6 will be discharged from 19 discharge port of nail vibrating disk
Nail is picked up, send screw assembly 21 by the nail of 19 discharge outlet of nail vibrating disk be delivered at the plug pin of upper end 3 carry out it is slotting
The nail of 3 tops at plug pin is inserted into oblique glue row 1 by nail, plug pin device 9, finally, pressing wheel device 10 is by the nail after completing plug pin
Son carries out secondary compression, and nail is fully inserted into oblique glue row 1.In this way, above-mentioned setting is so that plug pin is real on pin inserting equipment
Automation is showed to send nail, send oblique glue row and plug pin, and then has improved the plug pin efficiency of plug pin, it is time-consuming to shorten plug pin.Meanwhile plug pin is set
It is standby to reduce crew numbers, realize automation plug pin, and then reduce plug pin cost.
The pin inserting equipment of the utility model can be inserted into the nail of different lengths, and the utility model can be to single
Oblique glue discharge into row plug pin, row plug pin can also be discharged into double oblique glue.
It should be understood that the above-mentioned specific embodiment of the utility model is used only for exemplary illustration or explains this reality
With novel principle, without constituting limitations of the present invention.Therefore, in the spirit and scope without departing from the utility model
In the case of any modification, equivalent substitution, improvement and etc. done, should be included within the scope of protection of this utility model.In addition,
The appended claims for the utility model are intended to cover to fall into attached claim scope and boundary or this range and boundary
Whole change and modification in equivalent form.
Claims (10)
1. a kind of oblique glue arranges pin inserting equipment characterized by comprising
Glue arranging device is sent, there is the first material path being obliquely installed, capable conveying, first material path are discharged into the glue in the first material path
Upper end correspond at plug pin, the tilt angle of first material path is identical as the tilt angle that the glue is arranged;
At least one feeding device for nail is arranged in the top of first material path, conveys to nail;
Pressing plate, is arranged in the top of first material path and setting is in the feeding device for nail opposite side, and the pressing plate send nail with described
Form the second material path for accommodating the nail among device, the top of first material path and described is arranged in second material path
It is abutted at one end of second material path and the plug pin of first material path upper end;
During nail in the feeding device for nail conveys the second material path, the pressing plate is to the nail in second material path
Supporting role, to assist the feeding device for nail that the nail of second material path one end is delivered to positioned at the another of the second material path
One end;
At least one plug pin device, is rotatably arranged in the top at the plug pin, when nail and glue row are transported at plug pin
When, the plug pin device rotation is each nail to be respectively pressed into the glue row;
Pressing wheel device is arranged in by the discharge port at the top of first material path, described in after the completion of the plug pin device plug pin
Nail carries out secondary compression, the nail is all pressed into the glue row;
Power mechanism send glue arranging device, the feeding device for nail to be sequentially connected, for sending glue arranging device and described for described in described
Feeding device for nail provides power to drive the two to rotate synchronously.
2. tiltedly glue as described in claim 1 arranges pin inserting equipment, which is characterized in that described to send glue arranging device further include:
Glue arranges vibrating disk, can be rotatably set and the discharge port of glue row's vibrating disk is docked with the bottom of first material path,
For by the glue arrange vibration pan bottom glue row in the predetermined direction sequentially-fed to top discharge port;
First support;
It send glue to arrange component, is rotationally inclined in the first support and is arranged by first material path, it will be described
The glue row of first material path bottom is delivered at the plug pin at top.
3. tiltedly glue as claimed in claim 2 arranges pin inserting equipment, which is characterized in that described to send glue row's component to include:
First active runner assembly, rotationally vertical to be arranged in the first support, upper end is provided with and the engine
The first gear of structure engagement, lower end is rotatably arranged on the first bracket;
First driven rotation component, it is rotationally vertical to be arranged in the first support and be arranged in the described first actively rotation
Upstream position below component;
First conveyer belt is set on the first active runner assembly and the first driven rotation component;
First clamp assemblies have and are disposed around for clamping multiple glue row folding gripping members of oblique glue row on first clamp assemblies,
First clamp assemblies are set on the first active runner assembly and the first driven rotation component, follow the first active rotating group
Part and the first driven rotation component rotation are the oblique glue row in the first material path to be delivered to above first material path
Plug pin at.
4. tiltedly glue as claimed in claim 3 arranges pin inserting equipment, which is characterized in that the feeding device for nail further include:
Nail vibrating disk, can be rotatably set and the discharge port of the nail vibrating disk is docked with one end of second material path,
For by the nail vibration pan bottom nail in the predetermined direction sequentially-fed to top discharge port;
Second support is arranged in the first support;
Screw assembly is sent, be rotatably arranged in the second support and is arranged by second material path, by second material
Multiple nails in road are delivered to the other end above at the plug pin from one end.
5. tiltedly glue as claimed in claim 4 arranges pin inserting equipment, which is characterized in that described to send the screw assembly to include:
Second active runner assembly, rotationally on the secondary support bracket, the first runner of upper end and power mechanism is solid for vertical setting
Fixed connection, lower end is rotatably arranged in second support;
Second driven rotation component, is rotatably arranged on the first bracket;
Second conveyer belt is set on the second active runner assembly and the second driven rotation component;
Second clamp assemblies have and are disposed around on second clamp assemblies for clamping the nail clamping piece that does of nail, the
Two clamp assemblies are set on the second active runner assembly and the second driven rotation component, follow the second active runner assembly
It is rotated with the second driven rotation component another positioned at second material path being delivered to the nail in the second material path
At the plug pin at end;
Each second clamp assemblies include: pedestal, and the L shape clamping element being movably disposed on the pedestal.
6. tiltedly glue as claimed in claim 5 arranges pin inserting equipment, which is characterized in that further include:
First guide groove, along the rotation direction of second clamp assemblies be sticked second support lower surface and be located at the L
The top of shape clamping element;
Second guide groove, along the rotation direction of second clamp assemblies be sticked the first support upper surface and be located at institute
State the lower section of L shape clamping element;
When second clamp assemblies are moved at first guide groove and second guide groove, first guide groove and
Second guide groove pushes the L shape clamping element so that the L shape clamping element clamped close to the pressing plate it is described
Nail in second material path.
7. tiltedly glue as described in claim 1 arranges pin inserting equipment, which is characterized in that the pressing wheel device includes:
At least one fixed plate is arranged in by the discharge port of first material path;
At least one pinch roller, the inclined direction along first material path are rotatably arranged in the fixed plate, the pinch roller
Can close to or far from the nail completed after plug pin in the first material path, with to each nail carry out secondary compression or
Release.
8. as oblique glue described in claim 5 or 6 arranges pin inserting equipment, which is characterized in that the power mechanism includes:
Driving assembly has rotationally output end;
Nail runner assembly is sent, is rotatably arranged in the second support, the upper end for sending nail runner assembly, which is provided with, to be sent
Runner is followed closely, the lower end for sending nail runner assembly is fixedly connected with the second active runner assembly;
It send glue to arrange runner assembly, is rotatably arranged in the second support, the upper end setting for sending glue row's runner assembly
Have and nail runner is sent to send glue to arrange runner by what conveyer belt was sequentially connected, the lower end for sending glue row's runner assembly is provided with and institute
State the second gear of the first active runner assembly engagement;
The output end with it is described send nail runner assembly or it is described send glue row runner assembly be fixedly connected;
The driving component drive described in send nail runner assembly and it is described send glue row runner assembly rotate synchronously.
9. tiltedly glue as claimed in claim 8 arranges pin inserting equipment, which is characterized in that the plug pin device is rotatably arranged in institute
It states the top of the second material path and is fixed in the second support, it, will be defeated during the feeding device for nail conveys the nail
In the glue row for sending the nail to the plug pin to be pressed into the first material path.
10. as claim 1-7,9 described in any item oblique glue arrange pin inserting equipment, which is characterized in that the oblique glue row is single
Oblique glue row or double oblique glue row.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821803314.5U CN209242037U (en) | 2018-11-02 | 2018-11-02 | A kind of oblique glue row pin inserting equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821803314.5U CN209242037U (en) | 2018-11-02 | 2018-11-02 | A kind of oblique glue row pin inserting equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209242037U true CN209242037U (en) | 2019-08-13 |
Family
ID=67526903
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821803314.5U Active CN209242037U (en) | 2018-11-02 | 2018-11-02 | A kind of oblique glue row pin inserting equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209242037U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109319430A (en) * | 2018-11-02 | 2019-02-12 | 中山慧能科技有限公司 | A kind of oblique glue row's pin inserting equipment and plug pin method |
-
2018
- 2018-11-02 CN CN201821803314.5U patent/CN209242037U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109319430A (en) * | 2018-11-02 | 2019-02-12 | 中山慧能科技有限公司 | A kind of oblique glue row's pin inserting equipment and plug pin method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105870761B (en) | A kind of automatic insert equipment of connector pin | |
CN112621148B (en) | Automatic assembly process for automobile parts | |
CN209242037U (en) | A kind of oblique glue row pin inserting equipment | |
CN106426424A (en) | Full-automatic double-end tenoning production line for finger-joint board | |
CN209867907U (en) | Cell-phone wireless earphone box equipment that charges | |
CN205752945U (en) | A kind of automatic insert equipment of connector pin | |
CN110039331A (en) | A kind of pallet changer with standing function | |
CN113976684A (en) | Panel beating panel frock of bending | |
CN112743859A (en) | Magic cube cross center assembly machine | |
CN202804791U (en) | Feeding device for automatic processing machine tool for special-shaped workpiece | |
CN112621147A (en) | Operating rod posture adjusting unit for auto-parts automatic production line | |
CN2884812Y (en) | Automatic stage feeder for electronic parts | |
CN109319430A (en) | A kind of oblique glue row's pin inserting equipment and plug pin method | |
CN201927498U (en) | Shaping, detecting and transporting mechanism of capacitor | |
CN216462833U (en) | Metal plug connector positioning and feeding device | |
CN106424289B (en) | A kind of automatic stamping equipment of connector shell | |
CN212496403U (en) | Rotating shaft assembling system | |
CN108608212A (en) | A kind of automobile tube body deep-processing system and its processing method | |
CN211992014U (en) | Sheet material ejecting mechanism | |
CN211789952U (en) | Spring and small rubber core assembling mechanism for assembling SD card connector | |
CN212373023U (en) | Book block casing device for casing machine | |
CN108466036A (en) | Glasses arm support joint bar device and its processing technology | |
CN110380318B (en) | Manufacturing system of connecting device of automobile wire harness common contact and using method thereof | |
CN108695675B (en) | A kind of docking device for automotive connector terminal | |
CN117146761B (en) | Gear shaft concentricity detection device and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |