CN208948611U - Debugging device for construction elevator cage - Google Patents

Debugging device for construction elevator cage Download PDF

Info

Publication number
CN208948611U
CN208948611U CN201821630653.8U CN201821630653U CN208948611U CN 208948611 U CN208948611 U CN 208948611U CN 201821630653 U CN201821630653 U CN 201821630653U CN 208948611 U CN208948611 U CN 208948611U
Authority
CN
China
Prior art keywords
guide rail
cage
rail pipe
parallel
debugging apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201821630653.8U
Other languages
Chinese (zh)
Inventor
陈智龙
邹小平
沙晓鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhangjiagang Rongda Construction Machinery Manufacturing Co ltd
Original Assignee
Zhangjiagang Rongda Construction Machinery Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhangjiagang Rongda Construction Machinery Manufacturing Co ltd filed Critical Zhangjiagang Rongda Construction Machinery Manufacturing Co ltd
Priority to CN201821630653.8U priority Critical patent/CN208948611U/en
Application granted granted Critical
Publication of CN208948611U publication Critical patent/CN208948611U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses a debugging device for a construction elevator cage, which is arranged between two cage girders in a liftable way and comprises two mutually parallel guide rail pipes for the outer side peripheral part of a conflict roller, a connecting rod connected between the two guide rail pipes and a connecting pin shaft arranged on the upper part of the guide rail pipes in a penetrating way and used for connecting the guide rail pipes and the cage girders, wherein the upper parts of the two guide rail pipes are respectively abutted against the inner sides of the two cage girders; the debugging device further comprises an adjusting bolt which is arranged on the lower portion of the guide rail pipe and is located between the guide rail pipe and the inner side of the corresponding suspension cage main beam in an adjustable mode along the length extending direction of the debugging device, a positioning support which is detachably arranged on the lower portion of the guide rail pipe and is used for matching the connecting pin shaft and the adjusting bolt to enable the guide rail pipe to be parallel to the suspension cage main beam, and a rack which is fixedly arranged on the connecting rod and is used for being meshed with the output gear. The utility model relates to a debugging device for construction elevator cage can debug the gyro wheel and the output gear of cage, and the cage after the debugging can directly use.

Description

A kind of debugging apparatus for construction elevator cage
Technical field
The utility model relates to building machinery field, in particular to a kind of debugging apparatus for construction elevator cage.
Background technique
Building hoist is the dual-purpose construction machinery of people's goods for being commonly used in construction site, primarily serves and vertical transports people The effect of member and material, is mainly made of guide rail bracket, cage, driving mechanism.Guide rail bracket along the vertical direction on rack gear is installed, Driving mechanism is connected with cage and cage is driven to run up and down along guide rail bracket, and cage is filled as the delivery of transport personnel and material It sets, is equipped with the safety devices such as guide roller, anti-falling safe protection mechanism and the control protection of other electromechanical interlocks.
Main component of the cage as building hoist will usually be installed in use site to guide rail bracket, when leaving the factory, Cage idler wheel and fall protection equipment are unable to adjust required precision when using, and technical staff is needed to adjust at the scene. Work on the spot large labor intensity, it is inconvenient for operation, two people's co-ordinations are needed, time-consuming, seriously affects the progress of construction site.
Summary of the invention
The purpose of the utility model is to provide a kind of debugging apparatus for construction elevator cage, can adjust idler wheel position It sets to required precision when using;And the back lash of output gear wheel and rack is adjusted to meeting the requirements.
In order to achieve the above objectives, the technical solution adopted in the utility model is:
A kind of debugging apparatus for construction elevator cage, cage include two cage girders being parallel to each other, are set to Idler wheel on the inside of the cage girder, the fall arrest protection mechanism on the cage girder, the fall arrest protection mechanism Including output gear, the debugging apparatus is liftable to be set between two cage girders;The debugging apparatus includes two Guide rail pipe that item is parallel to each other, the connecting rod being connected between two guide rail pipes, the use for being arranged in the guide rail pipe top In the connection pin shaft for connecting the guide rail pipe and the cage girder, the top of two guide rail pipes is supported respectively set on two institutes State the inside of cage girder;
The debugging apparatus further includes along length extending direction adjustable being located at set on the guide rail pipe lower part Bolt is adjusted, removably set on the guide rail pipe lower part between on the inside of the guide rail pipe and the corresponding cage girder For cooperating the connection pin shaft and the locating support for adjusting bolt and the guide rail pipe being made to be parallel to the cage girder;
The guide rail pipe is used to be contradicted by the outside circumference of the idler wheel;
The debugging apparatus further includes the fixed tooth for engaging with the output gear being set in the connecting rod Item.
Preferably, the guide rail pipe is equipped with the mounting hole for being passed through by the connection pin shaft, the connection pin shaft Direction of axis line is parallel to the orientation of two guide rail pipes.
It is highly preferred that the locating support includes for preventing the lower end of the guide rail pipe around connecting pin axial direction side First countercheck rod of rotation, the second blocking for preventing the lower end of the guide rail pipe from rotating around the connecting pin axial direction other side Bar, the connector being connected between first countercheck rod and second countercheck rod.
It is further preferred that first countercheck rod and second countercheck rod are parallel to each other, and both ends are separately connected On two cage girders.
Preferably, the length extending direction of the rack gear is parallel to the length extending direction of the guide rail pipe.
Preferably, the direction of axis line for adjusting bolt is parallel to the orientation of two guide rail pipes.
Preferably, the connecting rod has a plurality of, and is parallel to each other, and the length extending direction of the connecting rod is parallel to two The orientation of the guide rail pipe.
It is highly preferred that the debugging apparatus further includes the support rod being connected between two adjacent connecting rods.
Due to the application of the above technical scheme, the utility model has the advantage that this is practical new compared with prior art A kind of debugging apparatus for construction elevator cage of type can adjust scroll wheel positions to essence when using by the way that guide rail pipe is arranged Degree requires, and can adjust the back lash of output gear wheel and rack to meeting the requirements by the way that rack gear is arranged;Cage is set to enter construction It behind scene, can directly lift into a guide rail bracket, can be connected with driving mechanism and can put into operation without debugging.
Detailed description of the invention
Attached drawing 1 is that utility model device is fitted into the structural schematic diagram in cage.
Wherein: 1, cage girder;2, idler wheel;3, fall arrest protection mechanism;4, output gear;5, guide rail pipe;6, connecting rod; 7, pin shaft is connected;8, bolt is adjusted;9, locating support;91, the first countercheck rod;92, the second countercheck rod;93, connector;10, tooth Item;11, support rod.
Specific embodiment
The technical solution of the utility model is further elaborated with reference to the accompanying drawing.
Shown in Figure 1, a kind of above-mentioned debugging apparatus for construction elevator cage, cage includes two and is parallel to each other Cage girder 1, the idler wheel 2, anti-fall on cage girder 1 that is respectively arranged on 1 inside upper part of cage girder and lower inside Protection mechanism 3 is fallen, which includes output gear 4.
A kind of above-mentioned debugging apparatus for construction elevator cage is liftable to be set between two cage girders 1, energy It enough lowers between two cage girders 1 or rises and extracted out between two cage girders 1.
A kind of above-mentioned debugging apparatus for construction elevator cage includes two being parallel to each other and for by idler wheel 2 The guide rail pipe 5 of outside circumference conflict, is arranged in being used for for 5 top of guide rail pipe at the connecting rod 6 being connected between two guide rail pipes 5 The connection pin shaft 7 of guide rail pipe 5 and cage girder 1 is connected, the top of two guide rail pipes 5 is supported respectively set on two cage girders 1 Inside.In the present embodiment, connection pin shaft 7 is set on cage girder 1, is then equipped with for being worn by the connection pin shaft 7 in guide rail pipe 5 The direction of axis line of the mounting hole crossed, connection pin shaft 7 is parallel to the orientation of two guide rail pipes 5.In the present embodiment, it connects Bar 6 has a plurality of, and is parallel to each other, the length extending direction of connecting rod 6 is parallel to the orientation of two guide rail pipes 5;Above-mentioned one Debugging apparatus of the kind for construction elevator cage further includes the support rod 11 being connected between two adjacent connecting rods 6.
A kind of above-mentioned debugging apparatus for construction elevator cage further includes adjustable along length extending direction Set on 5 lower part of guide rail pipe the adjusting bolt 8 being located between guide rail pipe 5 and the inside of corresponding cage girder 1, be removably set to The locating support 9 for making guide rail pipe 5 be parallel to cage girder 1 for be cooperatively connected pin shaft 7 and adjusting bolt 8 of 5 lower part of guide rail pipe. In the present embodiment, the direction of axis line for adjusting bolt 8 is parallel to the orientation of two guide rail pipes 5, adjusts spiral shell by setting Bolt 8 can guarantee 5 lower part of guide rail pipe to the distance between corresponding cage girder 1 and another 5 lower part of guide rail pipe to right The distance between the cage girder 1 answered is identical, keeps the center line of two cage girders 1 and the center line of two guide rail pipes 5 mutual It is overlapped.
Guide rail pipe 5 is whole in order to prevent rotates around the connection pin shaft 7, and above-mentioned locating support 9 includes for preventing guide rail pipe 5 Lower end around connection pin shaft 7 rotate to side the first countercheck rod 91, for prevent the lower end of guide rail pipe 5 around connect pin shaft 7 to Second countercheck rod 92 of other side rotation, the connector 93 being connected between the first countercheck rod 91 and the second countercheck rod 92.At this In embodiment, the first countercheck rod 91 and the second countercheck rod 92 are parallel to each other, and both ends are connected on two cage girders 1, Orientation of the length extending direction of first countercheck rod 91 and the second countercheck rod 92 each parallel to two guide rail pipes 5.By setting Locating support 9 is set, the length extending direction for adjusting bolt 8 and connection two guide rail pipes 5 of guarantee of pin shaft 7 can be cooperated to hang with two The length extending direction of cage girder 1 is identical, extends along the vertical direction.Make to meet cage between cage and debugging apparatus and work When and guide rail bracket between positional relationship.
A kind of above-mentioned debugging apparatus for construction elevator cage further include it is fixed be set in connecting rod 6 for The rack gear 10 that output gear 4 engages, the length extending direction of rack gear 10 are parallel to the length extending direction of guide rail pipe 5, i.e., along perpendicular Histogram is to extension.
Adjust bolt 8 makes two guide rail pipes 5 in left and right directions (with reference to Fig. 1, the side of two guide rail pipes 5 arrangement for adjusting To as left and right directions) and two centers having the same of cage girder 1, and locating support 9 then makes for the pin shaft 7 that is cooperatively connected Two guide rail pipes 5 are in front-rear direction not run-off the straight.Adjusting bolt 8, locating support 9, connection 7 three of pin shaft mutual cooperation make to lead Rail pipe 5 is parallel to cage girder 1.
The course of work of lower the present embodiment is illustrated in detail below:
Guide rail pipe 5 is sling with shop traveller to bottom and is higher than 1 top of cage girder, is directed at 1 middle position of cage girder Guide rail pipe 5 is filled between cage girder 1, so that the outer circumference surface of guide rail pipe 5 is directed at the concave surface of upper roller 2, decline is straight always To the concave surface of the outer circumference surface aligned with lower idler wheel 2 again of guide rail pipe 5;Then the connection pin shaft 7 being set on cage girder 1 is passed through Mounting hole, and be adjusted by two adjustment bolts, make two guide rail pipes 5 and two centers having the same of cage girder 1 Line;Locating support 9 is installed again and is locked, extends guide rail pipe 5 along the vertical direction, and opposite cage girder 1 is fixed.
Then the required precision that opposite rail pipe 5 adjusts upper bottom roller 2 when its position being made to meet use;And adjust anti-fall plate The back lash between output gear 4 and rack gear 10 is set to meet the requirements.
Locating support 9 is removed after the completion of adjustment, and extracts connection pin shaft 7 out, and guide rail pipe 5 is sling and disengages it from cage girder 1。
The above embodiments are only for explaining the technical ideas and features of the present invention, and its object is to allow be familiar with technique Personage can understand the content of the utility model and implement accordingly, do not limit the protection scope of the present invention. All equivalent change or modifications according to made by the spirit of the present invention essence, should all cover the protection scope of the utility model it It is interior.

Claims (8)

1. a kind of debugging apparatus for construction elevator cage, cage includes two cage girders being parallel to each other, is set to institute State the idler wheel on the inside of cage girder, the fall arrest protection mechanism on the cage girder, the fall arrest protection mechanism packet Include output gear, it is characterised in that: the debugging apparatus is liftable to be set between two cage girders;The debugging dress It sets including two guide rail pipes being parallel to each other, the connecting rod being connected between two guide rail pipes, be arranged in the guide rail pipe The connection pin shaft for being used to connect the guide rail pipe and the cage girder on top, the top of two guide rail pipes is supported respectively to be set In the inside of two cage girders;
The debugging apparatus further includes adjustable described set on being located at for the guide rail pipe lower part along length extending direction Adjustings bolt between on the inside of guide rail pipe and the corresponding cage girder is removably set to being used for for the guide rail pipe lower part Cooperate the connection pin shaft and the locating support for adjusting bolt and the guide rail pipe being made to be parallel to the cage girder;
The guide rail pipe is used to be contradicted by the outside circumference of the idler wheel;
The debugging apparatus further includes the fixed rack gear for engaging with the output gear being set in the connecting rod.
2. a kind of debugging apparatus for construction elevator cage according to claim 1, it is characterised in that: the guide rail Pipe is equipped with the mounting hole for being passed through by the connection pin shaft, and the direction of axis line of the connection pin shaft is parallel to described in two The orientation of guide rail pipe.
3. a kind of debugging apparatus for construction elevator cage according to claim 2, it is characterised in that: the positioning Bracket includes the first countercheck rod for preventing the lower end of the guide rail pipe from rotating around connecting pin axial direction side, for preventing The second countercheck rod that the lower end of the guide rail pipe is rotated around the connecting pin axial direction other side, be connected to first countercheck rod and Connector between second countercheck rod.
4. a kind of debugging apparatus for construction elevator cage according to claim 3, it is characterised in that: described first Countercheck rod and second countercheck rod are parallel to each other, and both ends are connected on two cage girders.
5. a kind of debugging apparatus for construction elevator cage according to claim 1, it is characterised in that: the rack gear Length extending direction be parallel to the length extending direction of the guide rail pipe.
6. a kind of debugging apparatus for construction elevator cage according to claim 1, it is characterised in that: the adjusting The direction of axis line of bolt is parallel to the orientation of two guide rail pipes.
7. a kind of debugging apparatus for construction elevator cage according to claim 1, it is characterised in that: the connection Bar has a plurality of, and is parallel to each other, the length extending direction of the connecting rod is parallel to the orientation of two guide rail pipes.
8. a kind of debugging apparatus for construction elevator cage according to claim 7, it is characterised in that: the debugging Device further includes the support rod being connected between two adjacent connecting rods.
CN201821630653.8U 2018-10-08 2018-10-08 Debugging device for construction elevator cage Withdrawn - After Issue CN208948611U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821630653.8U CN208948611U (en) 2018-10-08 2018-10-08 Debugging device for construction elevator cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821630653.8U CN208948611U (en) 2018-10-08 2018-10-08 Debugging device for construction elevator cage

Publications (1)

Publication Number Publication Date
CN208948611U true CN208948611U (en) 2019-06-07

Family

ID=66740699

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821630653.8U Withdrawn - After Issue CN208948611U (en) 2018-10-08 2018-10-08 Debugging device for construction elevator cage

Country Status (1)

Country Link
CN (1) CN208948611U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109179121A (en) * 2018-10-08 2019-01-11 张家港市荣达建筑机械制造有限公司 Debugging device for construction elevator cage

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109179121A (en) * 2018-10-08 2019-01-11 张家港市荣达建筑机械制造有限公司 Debugging device for construction elevator cage
CN109179121B (en) * 2018-10-08 2024-03-12 张家港市荣达建筑机械制造有限公司 Debugging device for construction elevator cage

Similar Documents

Publication Publication Date Title
CN109179121A (en) Debugging device for construction elevator cage
BR112014024644B1 (en) TANK AND DEVICE ASSEMBLY PROCESS FOR THEIR EXCUTION
CN106426193A (en) Remote control high-altitude spraying and polishing robot
CN204689556U (en) Bay-lift in a kind of harbour construction
CN208948611U (en) Debugging device for construction elevator cage
CN206319625U (en) Equipment is installed in a kind of building inner partition plate transhipment
CN203559575U (en) Adjustable suspended platform for slope
CN103523478B (en) A kind of multiple degrees of freedom automatic traveling dolly
CN113478128A (en) Pipe conveying butt joint positioning system for long-distance pipeline installation
CN205662293U (en) Material lifter
CN107881907A (en) A kind of inspection car for bridge main arch
CN209611598U (en) The wounded suitable for narrow space rush to transport robot waist lifting joint
CN102615407B (en) Lift platform with moving wings
CN207827621U (en) Movable type super high-rise construction elevator guide rail frame attachment device
CN106437722A (en) Segment erector system for vertical shaft development machine
CN208374541U (en) Welder is used in prefabricated pile connection
CN106836109B (en) Suspended platform device for protecting, repairing and processing bottom of suspended building
CN210997324U (en) Tower crane sleeve welding frock
CN207863434U (en) A kind of job platform that can certainly walk along H profile steel
CN203127722U (en) Screen receiving lifter
CN212897456U (en) Scaffold for building construction
CN206215927U (en) Lathe feeding mechanism
CN106629470A (en) Lifting type level gage overhaul device
CN104545667A (en) Rotary track type window cleaning machine
CN210032543U (en) Scaffold for building external wall construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20190607

Effective date of abandoning: 20240312

AV01 Patent right actively abandoned

Granted publication date: 20190607

Effective date of abandoning: 20240312

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned