CN206319625U - Equipment is installed in a kind of building inner partition plate transhipment - Google Patents
Equipment is installed in a kind of building inner partition plate transhipment Download PDFInfo
- Publication number
- CN206319625U CN206319625U CN201620950161.1U CN201620950161U CN206319625U CN 206319625 U CN206319625 U CN 206319625U CN 201620950161 U CN201620950161 U CN 201620950161U CN 206319625 U CN206319625 U CN 206319625U
- Authority
- CN
- China
- Prior art keywords
- wallboard
- lift arm
- adjutage
- walking underframe
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model is related to a kind of building inner partition plate transhipment and installs equipment, it is characterised in that:The equipment is provided with a walking underframe(1), walking underframe(1)Two ends are provided with road wheel(14), walking underframe(1)On lift arm is installed successively(2), adjutage(3), elevating ram(8)Two ends connect walking underframe(1)And lift arm(2), extend oil cylinder(9)Two ends connect lift arm(2)And upper frame(4), wallboard bracket(7)And adjutage(3)Between lean on rotation assembly(5)Connection, adjutage(3)It is upper that rotary stopper bar is housed(6)And check chain(18).The utility model does not need manpower transport's wallboard when installing wallboard, only need 1 people steadily, easily to complete to take wallboard, rotate wallboard, the installation steps transported wallboard, erect wallboard in place.Installation effectiveness is effectively increased, labor intensity is substantially reduced, the loss of material is reduced, it is ensured that workman's labor safety.
Description
Technical field
The utility model belongs to construction machine field, is related to light cellular partition board transhipment installation in a kind of building and sets
It is standby.
Background technology
Internal partition for building plate is widely used in building, industrial premises, residential houses and the extending old building of frame structure
The cut-off of locellus point family non-weight bearing area, the higher place of public amusement of particularly suitable fire protection requirement.With lightweight, sound insulation, every
The characteristics such as hot, water-fast, fire prevention, possessing can saw, can dig, can follow closely the features such as installation is easy to be quick.Development in recent years is very fast, answer
Consumption is huge.At present, inner wall of building plate has main steps that in installation and first the wallboard of stacking is transported near the station that need to be installed,
Then wallboard is erected, then moves on to accurate installation site.Present installation auxiliary equipment needs manually to carry on wallboard, then
Human assistance erects plate, then by manpower lift to move to installation position.It is now universal wallboard specification most light weight also reach 130KG
More than, heavy will be to more than 200KG.4 ~ 6 people are needed by manpower lift to move.And do the light cellular partition board intensity that non-load bearing wall is used
It is relatively low, shaken during carrying, shock may all be damaged or broken off wallboard, cause the waste even worker injuries of material.By manpower
Lift to move carries out location and installation, inefficiency to wallboard, and easily deviation occurs when installing.
The content of the invention
The purpose of this utility model is to overcome above-mentioned the deficiencies in the prior art to effectively improve installation effectiveness there is provided one kind,
Increase installation quality, reduce labor intensity, protect safety of workers, the building inner partition plate transhipment used manpower and material resources sparingly is installed
Equipment.Realize that the purpose of this utility model is adopted the technical scheme that:Light cellular partition board transhipment installation is set in a kind of building
It is standby, it is characterised in that:The equipment is provided with a walking underframe, and walking underframe two ends are provided with road wheel, and rear end is provided with hydraulic pressure and moved
Power unit and battery, lift arm 2 are connected by lifting axis with walking underframe 1, and adjutage is connected by erecting axle with lift arm,
The rear end of lift arm 2, which is provided with rocking arm, rocking arm, is equipped with console, and rocking arm can rotarily drive console to different on lift arm
Station, allows operating personnel in different azimuth operation equipment.Rotation assembly is installed, rotation assembly side is installed on adjutage
There is a rotary stopper bar, rotation assembly top is fixed with wallboard bracket, wallboard bracket is provided with wallboard fixture block and supporting plate, for by wall
Plate fixation, and the quick dismounting and change of wallboard fixture block energy, for meeting the installation of different-thickness wallboard.Elevating ram 8
Two ends connect walking underframe and lift arm respectively, and extension oil cylinder two ends connect lift arm and upper frame respectively, and the connection of upper frame one end is lifted
Arm is risen, the other end is withstood in the slideway on adjutage, check chain is installed between lift arm and adjutage, the maximum of limitation wallboard is turned over
Corner, battery, hydraulic power unit provide power for the action of two pieces oil cylinder, and the flexible of two pieces oil cylinder is controlled by console
Length, can be accurately positioned the position of adjutage 3, so as to drive wallboard fixed on wallboard bracket to hover over required installation position
Put.
The beneficial effects of the utility model are that whole installation process does not need manpower transport's wallboard, only need 1 people to put down
Surely, easily complete take wallboard, rotate wallboard, the installation steps transported wallboard, erect wallboard in place.Effectively increase installation effect
Rate, substantially reduces labor intensity, reduces the loss of material, it is ensured that workman's labor safety.
Brief description of the drawings
Fig. 1 is of the present utility model to take board status front view;
Fig. 2 is riser state rearview of the present utility model;
Fig. 3 is riser state front view of the present utility model.
In figure, 1- walking underframes, 2- lift arms, 3- adjutages, 4- upper frames, 5- rotation assembly, 6- rotary stopper bars, 7- walls
Board bracket, 8- elevating rams, 9- extension oil cylinders, 10- hydraulic power units, 11- batteries, 12- consoles, 13- wallboard fixture blocks,
14- road wheels, 15- rocking arms, 16- lifting axis, 17- erects axle, 18- check chains, 19- wallboards, 20- slideways, 21- supporting plates.
Embodiment
The utility model is described in detail below in conjunction with the accompanying drawings:
As illustrated, equipment is installed in light cellular partition board transhipment in a kind of building, it is characterised in that:The equipment is provided with a line
Underframe 1 is walked, the two ends of walking underframe 1 are provided with road wheel 14, and rear end is provided with hydraulic power unit 10 and battery 11, lift arm
2 are connected by lifting axis 16 with walking underframe 1, and adjutage 3 is connected by erecting axle 17 with lift arm 2, and the rear end of lift arm 2 is installed
Have and console 12 is housed on rocking arm 15, rocking arm 15, rocking arm 15 can rotarily drive console 12 to different works on lift arm 2
Position, allows operating personnel in different azimuth operation equipment.Rotation assembly 5, the side of rotation assembly 5 peace are installed on adjutage 3
Equipped with rotary stopper bar 6, the top of rotation assembly 5 is fixed with wallboard bracket 7, and wallboard bracket 7 is provided with wallboard fixture block 13 and supporting plate
21, for by the fixation of wallboard 19, and wallboard fixture block 13 can quick dismounting and change, for meeting the peace of different-thickness wallboard
Dress.The two ends of elevating ram 8 connect walking underframe 1 and lift arm 2 respectively, and extension oil cylinder 9 two ends connect lift arm 2 and top respectively
Frame 4, the one end of upper frame 4 connection lift arm 2, the other end withstands in the slideway 20 on adjutage 3, installed between lift arm 2 and adjutage 3
Limited location chain 18, limits the maximum flip angle of wallboard 19, battery 11, hydraulic power unit 10 provide for the action of two pieces oil cylinder
Power, the collapsing length of two pieces oil cylinder is controlled by console 12, the position of adjutage 3 can be accurately positioned, so as to drive wall
In installation site needed for fixed wallboard 19 is hovered on board bracket 7.
The course of work of the present utility model is as follows:
Board status is taken to be of the present utility model as shown in Figure 1, elevating ram 8 is withdrawn, extension oil cylinder 9 is reached properly
Position, makes adjutage 3 hover over bottom and perpendicular to the ground, now the following supporting plate 21 of wallboard bracket 7 can be directly by wallboard
19 hold up, and hold out against wallboard fixture block 13, then withdraw extension oil cylinder 9, stretch out elevating ram 8 and arrive correct position, rise wallboard 19
And it is parked in horizontal level.Then the horizontal direction of wallboard 19 is rotated by 90 ° by rotation assembly 5, the control rotation of rotary stopper bar 6
The precision of angle, makes wallboard 19 not tilt.Then adjusting extension oil cylinder 9 and the extension elongation of elevating ram 8 again makes wallboard 19
When reaching as shown in Figure 3, pushing equipment makes the lower end of wallboard 19 enter installation position, and semi-girder 9 is put off further along, makes upper frame 4
Disengaged with adjutage 3.Now wallboard is close to perpendicular to the ground, and a workman can be promoted with less strength.And check chain
18 can hold adjutage 3, and wallboard 19 will not be poured out.Promote wallboard 19 to enter and wallboard fixture block 13 is unclamped after installation site.
Equipment is pulled out to the installation for completing this block wallboard.
The technical solution of the utility model is relatively effective in summary solves labor intensity when inner wall of building plate is installed
Greatly, recruitment is more, and efficiency is low, wastes the problems such as material is more, is worthy to be popularized.
Claims (1)
1. equipment is installed in light cellular partition board transhipment in a kind of building, it is characterised in that:The equipment is provided with a walking underframe(1),
Walking underframe(1)Two ends are provided with road wheel(14), rear end is provided with hydraulic power unit(10)And battery(11), lift arm
(2)Pass through lifting axis(16)With walking underframe(1)Connection, adjutage(3)By erecting axle(17)With lift arm(2)Connection, is lifted
Rise arm(2)Rear end is provided with rocking arm(15), rocking arm(15)It is upper that console is housed(12), rocking arm(15)Can be in lift arm(2)Upper rotation
Turn drive console(12)To different stations, adjutage(3)On rotation assembly is installed(5), rotation assembly(5)Install side
There is rotary stopper bar(6), rotation assembly(5)Top is fixed with wallboard bracket(7), wallboard bracket(7)It is provided with wallboard fixture block
(13)And supporting plate(21), for by wallboard(19)Fixation, and wallboard fixture block(13), elevating ram(8)Two ends difference
Connect walking underframe(1)And lift arm(2), extend oil cylinder(9)Two ends connect lift arm respectively(2)And upper frame(4), upper frame(4)
One end connects lift arm(2), the other end withstands on adjutage(3)On slideway(20)It is interior, lift arm(2)And adjutage(3)Between pacify
Equipped with check chain(18), limit wallboard(19)Maximum flip angle, battery(11), hydraulic power unit(10)For two pieces oil cylinder
Action provide power, pass through console(12)The collapsing length of two pieces oil cylinder is controlled, adjutage can be accurately positioned(3)Position
Put, so as to drive wallboard bracket(7)The wallboard of upper fixation(19)In installation site needed for hovering over.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620950161.1U CN206319625U (en) | 2016-08-27 | 2016-08-27 | Equipment is installed in a kind of building inner partition plate transhipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620950161.1U CN206319625U (en) | 2016-08-27 | 2016-08-27 | Equipment is installed in a kind of building inner partition plate transhipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206319625U true CN206319625U (en) | 2017-07-11 |
Family
ID=59262262
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620950161.1U Active CN206319625U (en) | 2016-08-27 | 2016-08-27 | Equipment is installed in a kind of building inner partition plate transhipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206319625U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108569646A (en) * | 2018-06-29 | 2018-09-25 | 重庆智酷智造集成房屋有限公司 | A kind of assembled architecture wallboard mounting machine |
CN110104586A (en) * | 2019-05-18 | 2019-08-09 | 广东博智林机器人有限公司 | Carrier |
CN110242058A (en) * | 2019-07-11 | 2019-09-17 | 史志勇 | A kind of electric hydaulic partition plate installation equipment |
CN110593583A (en) * | 2019-10-12 | 2019-12-20 | 浙江年代建设工程有限公司 | Curtain wall moves board support |
-
2016
- 2016-08-27 CN CN201620950161.1U patent/CN206319625U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108569646A (en) * | 2018-06-29 | 2018-09-25 | 重庆智酷智造集成房屋有限公司 | A kind of assembled architecture wallboard mounting machine |
CN110104586A (en) * | 2019-05-18 | 2019-08-09 | 广东博智林机器人有限公司 | Carrier |
CN110242058A (en) * | 2019-07-11 | 2019-09-17 | 史志勇 | A kind of electric hydaulic partition plate installation equipment |
CN110593583A (en) * | 2019-10-12 | 2019-12-20 | 浙江年代建设工程有限公司 | Curtain wall moves board support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206319625U (en) | Equipment is installed in a kind of building inner partition plate transhipment | |
CN206871211U (en) | A kind of detection robot with pole-climbing function | |
CN103526949A (en) | Lifting and slipping device for wall-attached vertical structure and construction method thereof | |
CN204627636U (en) | The multi-functional chassis of wheeled four arm constructing tunnel | |
CN201783769U (en) | Wind power generation tower shell section turning device | |
CN102102344B (en) | Method for quickly assembling assembled corrugated culvert | |
CN110510493A (en) | A kind of square pile vacuum chuck bridge crane | |
CN114045935B (en) | Hoisting method of large-span curve truss | |
CN104234723A (en) | Self-propelled mobile template support trolley for open trench tunnel with rectangular cross section | |
CN102991401B (en) | High Altitude Emergency sets up the special-purpose vehicle of highway crossing wire facility | |
CN211004291U (en) | Internal climbing tower crane | |
CN110723677B (en) | Auxiliary lifting trolley for precast beam | |
CN110439297B (en) | Turnover lifting device for single-piece large-span steel truss and construction method thereof | |
CN212832684U (en) | Self-propelled combined lifting multifunctional aerial work platform truck | |
CN216196428U (en) | Novel ingate operation construction platform | |
CN201074167Y (en) | Indoor light movable crane | |
CN210064983U (en) | High-rise building electromechanical device installation carrying device | |
CN203319589U (en) | Hoisting machine for installing air hose | |
CN205777434U (en) | A kind of hoistway operation rack device | |
CN203555689U (en) | Electric hanging basket for vertical shaft | |
CN107780644B (en) | Operation platform for elevator shaft construction and use method thereof | |
CN205577377U (en) | Superelevation industry factory building operation platform is removed in detachable remote control | |
CN206581951U (en) | A kind of tunnel pin-connected panel preliminary bracing lifts chassis | |
CN212837557U (en) | Combined crawling ladder convenient for installing and welding double-steel-plate box type steel plate wall steel beams | |
CN104947925A (en) | Elevator shaft protecting operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |