CN207827621U - A kind of movable ultrahigh layer construction elevator guide rail bracket attachment device - Google Patents

A kind of movable ultrahigh layer construction elevator guide rail bracket attachment device Download PDF

Info

Publication number
CN207827621U
CN207827621U CN201721871449.0U CN201721871449U CN207827621U CN 207827621 U CN207827621 U CN 207827621U CN 201721871449 U CN201721871449 U CN 201721871449U CN 207827621 U CN207827621 U CN 207827621U
Authority
CN
China
Prior art keywords
body frame
guide rail
rail bracket
movable
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721871449.0U
Other languages
Chinese (zh)
Inventor
李成
张扬
顾作尧
赵波
张晨雨
赵亦范
金之骏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN201721871449.0U priority Critical patent/CN207827621U/en
Application granted granted Critical
Publication of CN207827621U publication Critical patent/CN207827621U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model discloses a kind of movable ultrahigh layer construction elevator guide rail bracket attachment devices, it is related to Construction Technology of Super Tall Buildingin field;It includes several guide rail bracket units, several guide rail bracket units are longitudinal spliced, and each guide rail bracket unit includes chip auxiliary section, link arm, standard knot and cage, and chip auxiliary section is connect by link arm with standard knot, and cage is equipped on standard knot;It further includes several movable attached walls, and movable attached wall is mounted on chip auxiliary section;The problem of existing construction elevator of the utility model effective solution cannot be connect with hydraulic pressure lift steel platform;The utility model is used for movable ultrahigh layer construction elevator guide rail bracket.

Description

A kind of movable ultrahigh layer construction elevator guide rail bracket attachment device
Technical field:
The utility model is related to a kind of movable ultrahigh layer construction elevator guide rail bracket attachment devices, belong to high-rise building and apply Work technical field.
Background technology:
The commonly used Integral type hydraulic lifting formula steel platform (hereinafter referred to as steel platform) of construction of super highrise building is with auxiliary in recent years Help construction.Steel platform multi rack is located in the core tube region of high-rise building, can voluntarily be promoted with hydraulic jacking device, as Platform that is entirety, safe, being promoted certainly facilitate worker to carry out reinforcing bar and template work to the Core Walls Structure wall of high-rise building Industry.Construction elevator is the machinery of the common manned cargo transport vertical transport in construction, conventional construction elevator guide rail bracket one As construction elevator is fixed under construction on completed wall using wall-attaching equipment, met construction elevator and lifted safely, side Person who happens to be on hand for an errand person and the upper and lower construction work surface of material.
Using Integral type hydraulic lifting steel platform system, the wall of steel platform operation layer is in Construction State, cannot be effective Firm attachment point is provided and provides attachment for construction elevator guide rail bracket.Operating personnel can only take construction elevator to completed building Level, then operation layer is risen to by temporary stairways, this means of conveyance efficiency is low, safety is poor, and pole is generated to manpower and materials The earth wastes, while dragging slow construction operation progress, and there are higher security risks.
Utility model content:
In view of the above-mentioned problems, the utility model provides a kind of movable ultrahigh layer construction elevator guide rail bracket attachment device, solution The problem of certainly existing construction elevator cannot be connect with hydraulic pressure lift steel platform.
A kind of movable ultrahigh layer construction elevator guide rail bracket attachment device of the utility model, it includes several guide rail brackets Unit, several guide rail bracket units are longitudinal spliced, and each guide rail bracket unit includes chip auxiliary section, link arm, standard knot and hangs Cage, chip auxiliary section are connect by link arm with standard knot, and cage is equipped on standard knot;It further includes that several activities are attached Wall, movable attached wall are mounted on chip auxiliary section.
Preferably, each activity attached wall includes upper body frame, lower wall-attaching base, lower body frame, upper wall-attaching base, two braces One, two braces, two, two hitch and several assembly pulleys;Upper body frame passes through two braces one and two braces It is connected between two and lower body frame, upper body frame is connect by connection component with upper wall-attaching base, and lower body frame is attached under by connection component Wall base connects, and upper body frame is connect with the rear end of lower body frame with hitch, several assembly pulleys is equipped on each hitch, often A hitch and several assembly pulleys and chip auxiliary section connection.
Preferably, the both ends of brace one and brace two are mounted on connection sheet, and connection is provided in connection sheet Through-hole, brace one and brace two are connect by connection sheet with upper body frame with lower body frame.
Preferably, connection component includes two engaging lugs, two adjusting rod upper covers, two adjusting screw rods and two adjustings Bar lower cover, the front end of each adjusting rod upper cover are equipped with engaging lug, engaging lug by bolt respectively with upper wall-attaching base, lower wall-attaching base The connecting seat of front end connects, and the rear end installation and adjustment screw rod of adjusting rod upper cover, adjusting screw rod is distinguished by adjusting rod lower cover respectively On upper body frame and lower body frame.
Compared with prior art, the beneficial effects of the utility model are:Movable attached wall dependable performance in this programme, effectively Solve the problems, such as that existing construction elevator cannot be connect with hydraulic pressure lift steel platform;Realization personnel, material can be stablized, quickly Arrival hydraulic pressure steel platform on;Construction elevator can also normal use during hydraulic pressure steel platform is promoted.
Description of the drawings:
The utility model is described in detail by following specific implementations and attached drawing for ease of explanation,.
Fig. 1 a to Fig. 1 d are ramp-up period schematic diagram in the utility model;
Fig. 2 is the structural schematic diagram of the utility model;
Fig. 3 is the structural schematic diagram of movable attached wall in the utility model.
In figure:1- activity attached walls;2- chips auxiliary section;3- link arms;4- standard knots;5- cages;6- engaging lugs;7- is adjusted Bar upper cover;8- adjusting screw rods;9- adjusting rod lower covers;The upper body frames of 10-;Wall-attaching base under 11-;Body frame under 12-;13- braces one; 14- braces two;The upper wall-attaching bases of 15-;16- hitch;17- assembles pulley;18- connection sheets.
Specific implementation mode:
To make the objectives, technical solutions and advantages of the present invention clearer, below by shown in the accompanying drawings Specific embodiment describes the utility model.However, it should be understood that these descriptions are merely illustrative, and it is not intended to limit this reality With novel range.In addition, in the following description, descriptions of well-known structures and technologies are omitted, to avoid unnecessarily mixing Confuse the concept of the utility model.
As shown in Figure 2 and Figure 3, present embodiment uses following technical scheme:It includes several guide rail bracket units, Several guide rail bracket units are longitudinal spliced, and each guide rail bracket unit includes chip auxiliary section 2, link arm 3, standard knot 4 and cage 5, chip auxiliary section 2 is connect by link arm 3 with standard knot 4, and cage 5 is equipped on standard knot 4;It further includes several activities Attached wall 1, movable attached wall 1 are mounted on chip auxiliary section 2, and movable attached wall effectively connects construction elevator and hydraulic pressure lift steel platform It connects, realization personnel, material can stablize, quickly reach in hydraulic pressure steel platform.
Further, each movable attached wall 1 includes upper body frame 10, lower wall-attaching base 11, lower body frame 12, upper wall-attaching base 15, two The hitch 16 of brace 2 14, two of a brace one 13, two and several assembly pulleys 17;Upper body frame 10 is oblique by two It is connected between pull rod 1 and two braces 2 14 and lower body frame 12, upper body frame 10 is connected by connection component and upper wall-attaching base 15 It connecing, lower body frame is connect by connection component with lower wall-attaching base 11, and upper body frame 10 is connect with the rear end of lower body frame 12 with hitch 16, Several assembly pulleys 17 are installed, each hitch 16 and several assembly pulleys 17 are assisted with chip on each hitch 16 2 connection of section.
According to construction elevator size in steel platform reserving hole;Movable attached wall 1 passes through upper wall-attaching base 15 and lower wall-attaching base 11 are fixed on steel platform side wall;Upper body frame 10, brace 1, brace 2 14 and lower body frame 12 play connection and adjustment length Effect;Assembly pulley 17 is made of multigroup idler wheel, and during steel platform is climbed, idler wheel end allows carrying attachment device common It climbs upwards, while attachment device need not be dismantled;Chip auxiliary section 2 is fixed on by link arm on people's Cargo Lift standard knot, for dress Guide rail with pulley 17.
Further, the both ends of brace 1 and brace 2 14 are mounted on connection sheet 18, and are set in connection sheet 18 It is equipped with connection through-hole, brace 1 and brace 2 14 are connect by connection sheet 18 with upper body frame 10 with lower body frame 12, this Connection structure is firm.
Further, connection component includes two adjusting screw rods 8 of adjusting rod upper cover 7, two of engaging lug 6, two and two Adjusting rod lower cover 9, the front end of each adjusting rod upper cover 7 are equipped with engaging lug 6, engaging lug 6 by bolt respectively with upper wall-attaching base 15, the connecting seat connection of 11 front end of lower wall-attaching base, the rear end installation and adjustment screw rod 8 of adjusting rod upper cover 7, adjusting screw rod 8 leads to respectively Toning pole lower cover 9 is separately mounted to body frame 10 on lower body frame 12, and above structure is easy to make, and the activity duration is short, is convenient for The time is saved in sharp work on construction ground.
As shown in Fig. 1 a to Fig. 1 d, a kind of construction method of movable ultrahigh layer construction elevator guide rail bracket attachment device, it Construction method be:
Step 1:The movable attached wall 1 of processing suitable dimension is designed according to on-site actual situations;
Step 2:Assembled good movable attached wall 1 is mounted on hydraulic pressure steel platform side wall;
Step 3:Link arm 3 is fixed on the standard knot 4 of construction elevator guide rail bracket by high-strength bolt;
Step 4:Chip auxiliary section 2 is mounted on to the guide rail at the assembled pulley end in link arm as movable attached wall 1;
Step 5:Assembled standard knot 4 and chip auxiliary section 2 are hoisted to mounted construction by tower crane Cage guide frame standard knot top, the installation for carrying out standard knot is reinforced, while being carried out pair with the assembled pulley of movable attached wall 1 It connects;
Step 6:Chip auxiliary section 2 on movable attached wall 1 and cage guide frame standard knot is subjected to last debugging and inspection It surveys;
Step 7:When steel platform is climbed upwards, movable attached wall 1 climbs with steel platform, while the horizontal trajectory to climb limits On construction elevator guide rail bracket standard knot.
This construction method fast implements firm attachment point, and attachment can be provided for construction elevator guide rail bracket, saves manpower object Power avoids the generation of security risk.

Claims (4)

1. a kind of movable ultrahigh layer construction elevator guide rail bracket attachment device, it includes several guide rail bracket units, several are led Rail gantry unit is longitudinal spliced, and each guide rail bracket unit includes chip auxiliary section (2), link arm (3), standard knot (4) and cage (5), chip auxiliary section (2) is connect by link arm (3) with standard knot (4), and cage (5) is equipped on standard knot (4);Its feature It is:It further includes several movable attached walls (1), and movable attached wall (1) is mounted on chip auxiliary section (2).
2. a kind of movable ultrahigh layer construction elevator guide rail bracket attachment device according to claim 1, it is characterised in that:Often A activity attached wall (1) includes upper body frame (10), lower wall-attaching base (11), lower body frame (12), upper wall-attaching base (15), two braces one (13), two braces two (14), two hitch (16) and several assembly pulleys (17);Upper body frame (10) is oblique by two Connected between pull rod one (13) and two braces two (14) and lower body frame (12), upper body frame (10) by connection component with it is upper attached Wall base (15) connects, and lower body frame is connect by connection component with lower wall-attaching base (11), after upper body frame (10) and lower body frame (12) End connect with hitch (16), be equipped on each hitch (16) several assemble pulley (17), each hitch (16) and Several assembly pulleys (17) assist section (2) to connect with chip.
3. a kind of movable ultrahigh layer construction elevator guide rail bracket attachment device according to claim 1 or 2, feature exist In:The both ends of brace one (13) and brace two (14) are mounted on connection sheet (18), and the company of being provided in connection sheet (18) Hole is connected, brace one (13) and brace two (14) are connected by connection sheet (18) and upper body frame (10) with lower body frame (12) It connects.
4. a kind of movable ultrahigh layer construction elevator guide rail bracket attachment device according to claim 3, it is characterised in that:Even Connected components include two engaging lugs (6), two adjusting rod upper covers (7), two adjusting screw rods (8) and two adjusting rod lower covers (9), The front end of each adjusting rod upper cover (7) is equipped with engaging lug (6), engaging lug (6) by bolt respectively with upper wall-attaching base (15), under The connecting seat of wall-attaching base (11) front end connects, the rear end installation and adjustment screw rod (8) of adjusting rod upper cover (7), and adjusting screw rod (8) is respectively It is separately mounted on upper body frame (10) and lower body frame (12) by adjusting rod lower cover (9).
CN201721871449.0U 2017-12-28 2017-12-28 A kind of movable ultrahigh layer construction elevator guide rail bracket attachment device Active CN207827621U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721871449.0U CN207827621U (en) 2017-12-28 2017-12-28 A kind of movable ultrahigh layer construction elevator guide rail bracket attachment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721871449.0U CN207827621U (en) 2017-12-28 2017-12-28 A kind of movable ultrahigh layer construction elevator guide rail bracket attachment device

Publications (1)

Publication Number Publication Date
CN207827621U true CN207827621U (en) 2018-09-07

Family

ID=63390097

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721871449.0U Active CN207827621U (en) 2017-12-28 2017-12-28 A kind of movable ultrahigh layer construction elevator guide rail bracket attachment device

Country Status (1)

Country Link
CN (1) CN207827621U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108190685A (en) * 2017-12-28 2018-06-22 上海建工二建集团有限公司 A kind of movable ultrahigh layer construction elevator guide rail bracket attachment device and its construction method
CN109775511A (en) * 2019-01-30 2019-05-21 中建四局第六建筑工程有限公司 A kind of the construction elevator attaching structure and adherence method of lifting platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108190685A (en) * 2017-12-28 2018-06-22 上海建工二建集团有限公司 A kind of movable ultrahigh layer construction elevator guide rail bracket attachment device and its construction method
CN109775511A (en) * 2019-01-30 2019-05-21 中建四局第六建筑工程有限公司 A kind of the construction elevator attaching structure and adherence method of lifting platform

Similar Documents

Publication Publication Date Title
CN108190685A (en) A kind of movable ultrahigh layer construction elevator guide rail bracket attachment device and its construction method
CN103206074B (en) Elevator shaft template construction method, platform and support
CN207827621U (en) A kind of movable ultrahigh layer construction elevator guide rail bracket attachment device
CN107720575B (en) A kind of towing type construction method for hanging of tower crane support system
CN201826542U (en) Self-climbing protective screening
CN203639011U (en) Safety climbing channel for sized tower crane for building engineering
CN214302811U (en) Self-adaptive all-steel attached lifting scaffold in micro-tilt building
CN203128099U (en) Slipping type pipeline lifting device
CN106904538A (en) A kind of installation method of cucurbit gantry crane
CN214195484U (en) All-steel attached lifting scaffold
CN206418751U (en) One kind can freely lift flexible assembled hoistway operation platform
CN204626930U (en) A kind of integrated form crane operating platform
CN205964749U (en) Formula of climbing for construction scaffold put up fire extinguishing system
CN107190991A (en) The special-shaped curtain wall vertical lifting system of glass plate
CN203874306U (en) Rescue vehicle for climbing building
CN110593582A (en) High-rise curtain wall installation auxiliary assembly with safety facility
CN104612060B (en) Construction working stand under prefabricated side bar lateral roof
CN103977512A (en) Building climbing rescue vehicle
CN204038917U (en) Dismountable external hanging service platform
CN209924409U (en) Wall-attached self-climbing electric lifting platform
CN209890045U (en) Lifting equipment for manual hole digging pile
CN204455839U (en) Construction working stand under prefabricated side bar lateral roof
CN208718326U (en) A kind of building construction scaffold
CN102974864B (en) The top board expansion bolt puncher that Integral mobile is efficient, safe
CN207568157U (en) Construction of lift well hydraulic climbing protection system

Legal Events