CN208916585U - A kind of two o'clock hanger with auxiliary balance device - Google Patents
A kind of two o'clock hanger with auxiliary balance device Download PDFInfo
- Publication number
- CN208916585U CN208916585U CN201821463676.4U CN201821463676U CN208916585U CN 208916585 U CN208916585 U CN 208916585U CN 201821463676 U CN201821463676 U CN 201821463676U CN 208916585 U CN208916585 U CN 208916585U
- Authority
- CN
- China
- Prior art keywords
- connecting rod
- girder
- suspension hook
- hanger
- clock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model is concrete component installation Technology field, in particular to a kind of two o'clock hanger with auxiliary balance device.Including girder, connecting rod, angle steel, balance element, roller bearing, suspension hook, girder both ends connecting shackle, suspension hook upper end connects connecting rod lower end, intersect and be connected on angle steel in the upper end of two connecting rods, connecting rod is pulled by lifting suspension centre again, connecting rod drives in suspension hook and takes in into lifting hole(eyelet), and by Bolted angle connection in its perpendicular balance element in the horizontal direction, balance element both ends have the protruding portion that can be embedded in component inner wall simultaneously at girder midpoint.Device described in the utility model, can be applied to concrete component side by side and round corner section etc. and is unsuitable at 4 points to hang underwater installation, and production is simple, easy to operate, reduce operating personnel's workload, save the cost guarantees construction quality requirement.
Description
Technical field
The utility model is concrete component installation Technology field, in particular to a kind of with auxiliary balance device
Two o'clock hanger.
Background technique
In concrete component installation, lifting component is one of critical process.The mechanical hoisting mode generally used has
4 points are hung and hang with 8 points, but in construction, often many precast constructions need close-packed arrays or adjacent members at lesser
Angle is unable to complete lifting operation in this way, the suspender suspension hook folding that multiple spot is hung is difficult.
Utility model content
Purpose of the utility model is to solve multiple spots to be hung at corner location, and the difficult problem of gib head folding provides
A kind of two o'clock hanger with auxiliary balance device, can reduce the construction time, improve construction efficiency.
To achieve the above object, a kind of the technical solution adopted in the utility model are as follows: two o'clock with auxiliary balance device
Hanger, it is characterised in that: including girder, connecting rod, angle steel, balance element, roller bearing, suspension hook, girder both ends connecting shackle, on suspension hook
End connection connecting rod lower end, the upper end of two connecting rods are intersected and are connected on angle steel, then pull connecting rod, connecting rod by lifting suspension centre
It drives in suspension hook and takes in into lifting hole(eyelet), girder midpoint is by Bolted angle connection in its perpendicular balance element in the horizontal direction, balance element
Both ends have the protruding portion that can be embedded in component inner wall simultaneously.
The girder is the 36a channel steel of two back buckles, and long 4740mm is intermediate to be welded by steel plate.
The length of the connecting rod is 4008mm, uses diameter for 10cm, the round steel of wall thickness 10mm.
The balance element is by equalizer bar and is connected to the balancing patch at its both ends and forms, and the balancing patch is the two of thickness 10mm
The hollow structure that block L shape steel plate is welded, upper end are connected on equalizer bar by roller bearing, and equalizer bar passes through Bolted angle connection master
Rubber pad is pasted by the protruding portion and component connecting position of balancing patch in beam midpoint.
The height under hook is 3550mm, is welded by one group of steel plate.
The utility model is in use, and girder is by connector and roller bearing connecting shackle, and by pulling pull rod, pull rod passes through
Connecting rod drives and takes in hole in suspension hook, meanwhile, balance element since Gravitative Loads inlay card enters component inner wall, shake by limiting member horizontal direction
It is dynamic, guarantee that lifting is steady, after being installed, pulls pull rod, suspension hook portals.The device is applicable in concrete prefabricated element continuously side by side
Or laying at an acute angle and round corner section etc. are unsuitable at 4 points and hang underwater installation, and it is tired in the folding of this operating condition to solve more suspension centre gib heads
Difficult problem reduces construction risk, and easy to operate, reduces construction cost, can reduce the construction time, improves construction efficiency.
Detailed description of the invention
Fig. 1 is the structure chart of device described in the utility model.
Fig. 2 is the balance element part-structure figure of device described in the utility model.
Fig. 3 is the application drawing (overlooking visual angle) of device described in the utility model.
In figure: 1- girder, 2- connecting rod, 3- angle steel, 4- balance element, 5- roller bearing, 6- suspension hook.
Specific embodiment
The present invention will be further described with specific embodiment with reference to the accompanying drawing, but the utility model is not limited to have
Body embodiment.
Embodiment
A kind of two o'clock hanger with auxiliary balance device, including girder 1, connecting rod 2, angle steel 3, balance element 4, roller bearing 5,
Suspension hook 6,1 both ends connecting shackle 6 of girder, 6 upper end of suspension hook connect 2 lower end of connecting rod, and the upper end of two connecting rods 2 is intersected and is connected to
On angle steel 3, then by lifting suspension centre pulling connecting rod 2, connecting rod 2, which drives, to be taken in suspension hook 6 into lifting hole(eyelet), and 1 midpoint of girder passes through angle steel 3
It is connected to its perpendicular balance element 4 in the horizontal direction, 4 both ends of balance element have the protruding portion that can be embedded in component inner wall simultaneously.
The girder 1 is the 36a channel steel of two back buckles, and long 4740mm is intermediate to be welded by steel plate.
The length of the connecting rod 2 is 4008mm, uses diameter for 10cm, the round steel of wall thickness 10mm.
The balance element 4 is by equalizer bar and is connected to the balancing patch at its both ends and forms, and the balancing patch is thickness 10mm's
The hollow structure that two blocks of L shape steel plates are welded, upper end are connected on equalizer bar by roller bearing 5, and equalizer bar is connected by angle steel 3
1 midpoint of girder is connect, rubber pad is pasted by the protruding portion and component connecting position of balancing patch.
6 height of suspension hook is 3550mm, is welded by one group of steel plate.
The utility model is in use, and girder is by connector and roller bearing connecting shackle, and by pulling pull rod, pull rod passes through
Connecting rod drives and takes in hole in suspension hook, meanwhile, balance element since Gravitative Loads inlay card enters component inner wall, shake by limiting member horizontal direction
It is dynamic, guarantee that lifting is steady, after being installed, pulls pull rod, suspension hook portals.
Using the utility model, it can solve in concrete member plane arrangement and hung at corners using multiple spot, suspension hook
The problem of can not opening and closing, and it is easy to operate, construction efficiency is improved, construction cost is reduced.
Claims (5)
1. a kind of two o'clock hanger with auxiliary balance device, it is characterised in that: including girder (1), connecting rod (2), angle steel
(3), balance element (4), roller bearing (5), suspension hook (6), girder (1) both ends connecting shackle (6), suspension hook (6) upper end connect under connecting rod (2)
End, the upper end of two connecting rods (2) are intersected and are connected on angle steel (3), then pull connecting rod (2) by lifting suspension centre, connecting rod (2)
It drives in suspension hook (6) and takes in into lifting hole(eyelet), girder (1) midpoint is connected to its perpendicular balance in the horizontal direction by angle steel (3)
Part (4), balance element (4) both ends have the protruding portion that can be embedded in component inner wall simultaneously.
2. a kind of two o'clock hanger with auxiliary balance device according to claim 1, it is characterised in that: the girder
It (1) is the 36a channel steel of two back buckles, long 4740mm, the intermediate steel plate that passes through welds.
3. a kind of two o'clock hanger with auxiliary balance device according to claim 1, it is characterised in that: the connecting rod
(2) length is 4008mm, uses diameter for 10cm, the round steel of wall thickness 10mm.
4. a kind of two o'clock hanger with auxiliary balance device according to claim 1, it is characterised in that: the balance
Part (4) is by equalizer bar and is connected to the balancing patch at its both ends and forms, and two blocks of L shape steel plates that the balancing patch is thickness 10mm weld
Hollow structure made of connecing, upper end are connected on equalizer bar by roller bearing (5), and equalizer bar passes through in angle steel (3) connection girder (1)
Point pastes rubber pad by the protruding portion and component connecting position of balancing patch.
5. a kind of two o'clock hanger with auxiliary balance device according to claim 1, it is characterised in that: the suspension hook
(6) it is highly 3550mm, is welded by one group of steel plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821463676.4U CN208916585U (en) | 2018-09-07 | 2018-09-07 | A kind of two o'clock hanger with auxiliary balance device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821463676.4U CN208916585U (en) | 2018-09-07 | 2018-09-07 | A kind of two o'clock hanger with auxiliary balance device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208916585U true CN208916585U (en) | 2019-05-31 |
Family
ID=66704911
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821463676.4U Active CN208916585U (en) | 2018-09-07 | 2018-09-07 | A kind of two o'clock hanger with auxiliary balance device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208916585U (en) |
-
2018
- 2018-09-07 CN CN201821463676.4U patent/CN208916585U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102162774B (en) | Steel-structure distribution-girder-type double-track whole opening box girder static load test device and construction method thereof | |
CN108194116B (en) | Whole prefabricated rail top wind channel assembly structure of subway station | |
CN201343385Y (en) | Concentrated driving finished product checking crane | |
CN205576744U (en) | Special jack -up hoist is erect to cable -stay bridge cordless district large -tonnage steel case girder segment section | |
CN208603614U (en) | Tower crane anchor for fabricated construction | |
CN208916585U (en) | A kind of two o'clock hanger with auxiliary balance device | |
CN104594206A (en) | Suspended type dragging anchor socket and method for steel trussed beam longitudinal displacement | |
CN207538483U (en) | A kind of steel box-girder suspender | |
CN105780659A (en) | Lifting appliance special for erection of large-tonnage steel box beam segment in non-stayed cable area of cable-stayed bridge | |
CN205802754U (en) | A kind of steel structure hydraulic pressure lift construction auxiliary device | |
CN208884360U (en) | A kind of steel anchor box suitable for rail iron trusses suspension bridge straddle-type hoist cable | |
CN203624808U (en) | Detachable steel structure hanger | |
CN208732486U (en) | Roofing monorail crane | |
CN202227255U (en) | Cat anchor device for steel truss girder | |
CN202787087U (en) | Hook-shaped cable saddle and support structure of track cable | |
CN207484304U (en) | Can double width synchronous construction Segmental assembling bridge-erecting machine | |
CN212317283U (en) | Oblique-pulling type suspended ceiling framework system | |
CN205590111U (en) | Construction elevator attaches wall structure | |
CN213982323U (en) | Device for hoisting single-layer air pipe | |
CN106988543A (en) | Lower supporting type overhanging unloading platform and construction technology | |
CN205617252U (en) | A non -support steel structural system that is used for bridge list pier stud cantilever bent cap to be under construction | |
CN209685121U (en) | A kind of suspender with the main hanging beam of truss-like | |
CN212404858U (en) | Device for supporting rigid suspension cable by using existing suspension rod | |
CN206784960U (en) | Lower supporting type overhanging unloading platform | |
CN111910829A (en) | Oblique-pulling type suspended ceiling framework system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||