CN202227255U - Cat anchor device for steel truss girder - Google Patents

Cat anchor device for steel truss girder Download PDF

Info

Publication number
CN202227255U
CN202227255U CN201120303737.2U CN201120303737U CN202227255U CN 202227255 U CN202227255 U CN 202227255U CN 201120303737 U CN201120303737 U CN 201120303737U CN 202227255 U CN202227255 U CN 202227255U
Authority
CN
China
Prior art keywords
steel truss
bearing plate
ribs
plate
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120303737.2U
Other languages
Chinese (zh)
Inventor
王福光
张锐光
彭洪波
黄峻峻
冀侠荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 10 Engineering Group Co Ltd
Original Assignee
China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 10 Engineering Group Co Ltd filed Critical China Railway No 10 Engineering Group Co Ltd
Priority to CN201120303737.2U priority Critical patent/CN202227255U/en
Application granted granted Critical
Publication of CN202227255U publication Critical patent/CN202227255U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/80Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in fisheries management
    • Y02A40/81Aquaculture, e.g. of fish

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A cat anchor device for a steel truss girder comprises a base board (1), a bearing board (2) and reinforcing rib plates, wherein bolt holes (11) are arranged on the base board (1); the bearing board (2) is arranged at the middle part of the base board (1) and is vertically connected with the base board (1); the reinforcing rib plates are arranged on the side surface of the bearing board (2); therefore, the damage degree of the steel truss girder is small, and the moving speed is fast.

Description

钢桁梁拉锚器steel truss anchor puller

一、     技术领域 1. Technical field

本实用新型涉及一种钢桁梁拉锚器,尤其是一种适应用于以千斤顶为牵引动力、钢绞线或精轧螺纹粗钢筋为牵引拉杆的钢桁梁拉锚器。 The utility model relates to a steel truss girder anchor puller, in particular to a steel truss girder anchor puller which is suitable for using a jack as the traction power and a steel strand or fine-rolled thick threaded steel bar as the traction rod.

二、     背景技术 2. Background technology

钢桁梁作为一种重要的桥梁结构,被广泛地应用,其安装方法以纵移法架设较为常用,无论是纵移安装还是墩顶微调,都需要对钢桁梁进行顶推,因此用于钢桁梁顶推的拉锚器是一个重要的工具,目前,钢桁梁纵移架设多采用拖拉牵引方式,其牵引装置的后锚点大多采用钢丝绳在钢桁梁下平联节点处栓系方式或自制后支座捆挂于钢梁端横梁上或下平联节点处。这些后锚点设置方式存在的主要问题:一是后锚点与钢桁梁的连接工作量大且牢固性差,连接件容易损坏且钢梁易受损伤;二是后锚点易变位,梁的方向不易控制,拖拉过程中不断纠偏调整,拖拉的速度不易提高,也费工费时,因此容易使钢桁梁损坏,施工进度慢。 As an important bridge structure, steel truss girders are widely used, and the installation method is more commonly used by the vertical movement method. Whether it is vertical movement installation or pier top fine-tuning, it is necessary to push the steel truss girder, so it is used for The anchor puller for pushing steel truss girders is an important tool. At present, the vertical movement of steel truss girders is usually erected by dragging and pulling. Or the self-made rear support is tied and hung on the steel beam end beam or at the lower parallel connection node. The main problems in the setting of these rear anchor points are as follows: first, the connection workload between the rear anchor point and the steel truss girder is heavy and the firmness is poor, the connecting piece is easily damaged and the steel beam is easily damaged; second, the rear anchor point is easy to change position, and the beam The direction of the truss is not easy to control, and the deviation is constantly adjusted during the dragging process. The speed of the dragging is not easy to increase, and it is labor-intensive and time-consuming. Therefore, it is easy to damage the steel truss girder and the construction progress is slow.

三、     发明内容 3. Contents of the invention

为了克服上述技术缺点,本实用新型的目的是提供一种能直接与钢桁梁联结的顶推工具,因此对钢桁梁的损坏程度小、移动速度快。 In order to overcome the above-mentioned technical shortcomings, the purpose of this utility model is to provide a pushing tool that can be directly connected to the steel truss beam, so the damage to the steel truss beam is small and the moving speed is fast.

为达到上述目的,本实用新型采取的技术方案是:包含有底板、承力板和加强肋板,在底板上设置有螺栓孔,承力板设置在底板的中间部位并设置为与底板垂直式联接,在承力板的侧面设置有加强肋板。 In order to achieve the above purpose, the technical solution adopted by the utility model is: it includes a bottom plate, a load-bearing plate and a reinforcing rib plate, and bolt holes are arranged on the bottom plate, and the force-bearing plate is arranged in the middle of the bottom plate and is arranged to be perpendicular to the bottom plate. For connection, reinforcing ribs are arranged on the side of the bearing plate.

把螺栓穿在底板的螺栓孔中,使底板与钢桁梁固定联接,把牵引力作用在承力板上,通过底板和承力板使钢桁梁移动,由于设计了底板和承力板,牵引力通过底板和承力板作用在钢桁梁上,不再直接作用到钢桁梁上,同时牵引力与承力板的作用点不再移动,因此对钢桁梁的损坏程度小、移动速度快。 Put the bolts in the bolt holes of the bottom plate, so that the bottom plate and the steel truss beam are fixedly connected, and the traction force acts on the bearing plate, and the steel truss girder moves through the bottom plate and the bearing plate. Due to the design of the base plate and the bearing plate, the traction force It acts on the steel truss girder through the bottom plate and bearing plate, and no longer directly acts on the steel truss girder. At the same time, the action point of the traction force and the bearing plate does not move anymore, so the damage to the steel truss girder is small and the moving speed is fast.

本实用新型设计了,在承力板上设置有牵拉束穿孔。 The utility model is designed, and the pulling beam perforation is arranged on the bearing plate.

本实用新型设计了,加强肋板设置为包含有后肋板、前肋板、边肋板和横隔板,在承力板的后侧面设置有两个后肋板,后肋板的纵向截面设置为三角形并一个侧面设置为与底板联接、另一个侧面设置为与承力板联接,在两个后肋板之间设置有横隔板,横隔板的两端分别设置为与后肋板联接,在承力板的前侧面设置有两个前肋板,前肋板的纵向截面设置为三角形并一个侧面设置为与底板联接、另一个侧面设置为与承力板联接,在前肋板的外侧面设置有边肋板,边肋板的纵向截面设置为三角形并一个侧面设置为与底板联接、另一个侧面设置为与承力板联接。 The utility model is designed, the reinforcing ribs are set to include rear ribs, front ribs, side ribs and transverse partitions, two rear ribs are arranged on the rear side of the bearing plate, the longitudinal section of the rear ribs It is set as a triangle and one side is set to be connected with the bottom plate, and the other side is set to be connected with the load-bearing plate. A transverse diaphragm is arranged between the two rear ribs. Connection, two front ribs are arranged on the front side of the load-bearing plate, the longitudinal section of the front rib is set to be triangular, one side is set to be connected with the bottom plate, and the other side is set to be connected to the load-bearing plate, and the front rib is set Side ribs are arranged on the outer side of the side rib, the longitudinal section of the side rib is set to be triangular, one side is set to be connected with the bottom plate, and the other side is set to be connected with the bearing plate.

本实用新型的技术效果在于:底板按照钢桁梁端横梁下拼接板进行制作,具体实施时,将拉锚器代替端横梁下拼接板,用高强螺栓与钢桁梁联结牢固,既是钢桁梁的临时联结构件,又是牵引装置的后支座。钢桁梁牵拉到位后,用端横梁下拼接板将拉锚器换下即可;解决了牵引后锚点易损坏、易变位的问题,使钢桁梁的拖拉更加平稳。该拉锚器制作简单、安拆方便,尤其对以顶推千斤顶为牵引动力、钢绞线或精轧螺纹粗钢筋为牵引拉杆的牵引装置更为实用。 The technical effect of the utility model is that the bottom plate is made according to the splicing plate of the end beam of the steel truss girder. During the specific implementation, the anchor puller is used to replace the splicing plate of the end beam, and the high-strength bolts are used to firmly connect the steel truss girder. The temporary coupling member is also the rear support of the traction device. After the steel truss girder is pulled in place, the anchor puller can be replaced with the lower splicing plate of the end beam; the problem of easy damage and easy displacement of the anchor point after pulling is solved, and the pulling of the steel truss girder is more stable. The anchor puller is simple to manufacture and convenient to install and disassemble, and is especially more practical for a traction device that uses a jacking jack as the traction power and steel strands or fine-rolled thick steel bars as traction rods.

四、     附图说明 4. Description of the drawings

图1为本实用新型的示意图: 图2为图1的俯视图: Fig. 1 is a schematic diagram of the utility model: Fig. 2 is a top view of Fig. 1:

图3为图1的右视图。 Fig. 3 is a right side view of Fig. 1 .

五、     具体实施方式 5. Specific implementation methods

附图为本实用新型的一个实施例,结合附图具体说明本实施例,包含有底板1、承力板2、后肋板3、前肋板4、边肋板5和横隔板6,在底板1上设置有螺栓孔11,在承力板2上设置有牵拉束穿孔21,承力板2设置在底板1的中间部位并设置为与底板1垂直式联接,在承力板2的后侧面设置有两个后肋板3,后肋板3的纵向截面设置为三角形并一个侧面设置为与底板1联接、另一个侧面设置为与承力板2联接,在两个后肋板3之间设置有横隔板6,横隔板6的两端分别设置为与后肋板3联接,在承力板2的前侧面设置有两个前肋板4,前肋板4的纵向截面设置为三角形并一个侧面设置为与底板1联接、另一个侧面设置为与承力板2联接,在前肋板4的外侧面设置有边肋板5,边肋板5的纵向截面设置为三角形并一个侧面设置为与底板1联接、另一个侧面设置为与承力板2联接。 The accompanying drawing is an embodiment of the utility model, and this embodiment is described in detail in conjunction with the accompanying drawings, including a bottom plate 1, a bearing plate 2, a rear rib 3, a front rib 4, a side rib 5 and a diaphragm 6, Bolt holes 11 are provided on the bottom plate 1, and traction beam perforations 21 are provided on the bearing plate 2. Two rear ribs 3 are arranged on the rear side of the rear rib 3, the longitudinal section of the rear rib 3 is set to be triangular and one side is set to be connected with the bottom plate 1, and the other side is set to be connected with the bearing plate 2. 3 is provided with a transverse diaphragm 6, and the two ends of the transverse diaphragm 6 are respectively arranged to connect with the rear rib 3, and two front ribs 4 are arranged on the front side of the bearing plate 2, and the longitudinal direction of the front rib 4 The cross-section is set to be triangular and one side is set to be connected with the base plate 1, and the other side is set to be connected with the load-bearing plate 2. A side rib 5 is arranged on the outer side of the front rib 4, and the longitudinal section of the side rib 5 is set as It is triangular and one side is set to be connected with the bottom plate 1, and the other side is set to be connected with the bearing plate 2.

在使用本实施例时,把螺栓穿在底板1的螺栓孔11中,使底板1与钢桁梁固定联接,当不需要牵引绳时,可以直接把液压油缸的伸缩端与承力板2接触,启动液压油缸,通过承力板2和底板1使钢桁梁移动,当需要牵引绳时,把牵引绳通过牵拉束穿孔21与承力板2联接,再通过牵引绳的拉力,使钢桁梁移动。 When using this embodiment, the bolts are passed through the bolt holes 11 of the bottom plate 1, so that the bottom plate 1 is fixedly connected with the steel truss girder. When the traction rope is not needed, the telescopic end of the hydraulic cylinder can be directly contacted with the bearing plate 2 , start the hydraulic cylinder, and move the steel truss beam through the bearing plate 2 and the bottom plate 1. When a traction rope is needed, connect the traction rope with the bearing plate 2 through the traction beam perforation 21, and then use the pulling force of the traction rope to make the steel truss girder move. Truss moves.

该拉锚器设置在钢桁梁梁底端横梁拼接板处,临时取代原有拼接板,利用原有高强螺栓与钢桁梁进行联结,既保证了钢桁梁的整体联结牢固,又能做为钢桁梁牵引的后支座。该拉锚器由底板、承力板、肋板、横隔板等9块钢板组焊而成,钢板均采用A3钢,各钢板间均采用双面直角角焊缝。底板用于与钢桁梁的联结,其制作尺寸及预留螺栓孔的大小、排列布置必须与钢桁梁端横梁下盖板底层拼接板相同(承力板、纵向肋板、隔板位置处不设螺栓孔)。承力板上预留牵拉束穿孔,牵拉束穿过承力板后直接锁于锚具或夹具上。 The anchor puller is set at the splicing plate of the cross beam at the bottom of the steel truss girder, temporarily replacing the original splicing plate, and using the original high-strength bolts to connect with the steel truss girder, which not only ensures that the overall connection of the steel truss girder is firm, but also can be used Rear support for steel truss beam traction. The anchor puller is assembled and welded by 9 steel plates, including the bottom plate, load-bearing plate, rib plate, and transverse diaphragm. The steel plates are all made of A3 steel, and the double-sided right-angle welds are used between each steel plate. The bottom plate is used for connection with the steel truss girder, and its manufacturing size and the size and arrangement of the reserved bolt holes must be the same as those of the splicing plate at the bottom of the lower cover plate of the steel truss girder end beam (at the positions of bearing plates, longitudinal ribs, and partitions) without bolt holes). The tension beam is reserved on the load-bearing plate, and the traction beam passes through the load-bearing plate and is directly locked on the anchor or fixture.

本实用新型具有下特点: The utility model has the following characteristics:

1、由于设计了底板1和承力板2,牵引力通过底板1和承力板2作用在钢桁梁上,不再直接作用到钢桁梁上,同时牵引力与承力板2的作用点不再移动,因此对钢桁梁的损坏程度小、移动速度快。 1. Due to the design of the bottom plate 1 and the bearing plate 2, the traction force acts on the steel truss beam through the bottom plate 1 and the bearing plate 2, and no longer directly acts on the steel truss beam. At the same time, the traction force and the bearing plate 2 have different action points Then move, so the damage to the steel truss beam is small and the moving speed is fast.

2、拉锚器利用钢桁梁横梁拼接板处现有螺栓孔和高强螺栓进行联结,对钢梁结构不会造成损坏。 2. The anchor puller uses the existing bolt holes and high-strength bolts at the splicing plate of the steel truss beam to connect, and will not cause damage to the steel beam structure.

3、拉锚器安拆方便、不易变形,与钢桁梁联结牢固,增强了钢桁梁拖拉过程中的平稳性,减少了纠偏和过程调整工作量,提高了工效。 3. The anchor puller is easy to install and disassemble, not easy to deform, and firmly connected with the steel truss girder, which enhances the stability of the steel truss girder during the pulling process, reduces the workload of deviation correction and process adjustment, and improves work efficiency.

4、由于目前大多钢桁梁采用定型设计,该拉锚器可以在同型钢桁梁施工中周转使用。 4. Since most steel truss girders adopt stereotyped design at present, the anchor puller can be used repeatedly in the construction of steel truss girders of the same type.

在钢桁梁拉锚器的技术领域内;凡是包含有在底板1上设置有螺栓孔11,承力板2设置在底板1的中间部位并设置为与底板1垂直式联接,在承力板2的侧面设置有加强肋板的技术内容都在本实用新型的保护范围内。 In the technical field of steel truss anchor pullers; any bolt hole 11 is provided on the bottom plate 1, and the bearing plate 2 is arranged in the middle of the bottom plate 1 and connected vertically with the bottom plate 1. The technical content that the side of 2 is provided with reinforcing ribs is all within the scope of protection of the present utility model.

Claims (3)

1.一种钢桁梁拉锚器;其特征是:包含有底板(1)、承力板(2)和加强肋板,在底板(1)上设置有螺栓孔(11),承力板(2)设置在底板(1)的中间部位并设置为与底板(1)垂直式联接,在承力板(2)的侧面设置有加强肋板。 1. A steel truss beam anchor puller; it is characterized in that: it includes a bottom plate (1), a load-bearing plate (2) and a reinforcing rib plate, and a bolt hole (11) is arranged on the bottom plate (1), and the load-bearing plate (2) It is arranged in the middle of the bottom plate (1) and is arranged to be vertically connected with the bottom plate (1), and a reinforcing rib is set on the side of the bearing plate (2). 2.根据权利要求1所述的钢桁梁拉锚器;其特征是:在承力板(2)上设置有牵拉束穿孔(21)。 2. The anchor puller for steel truss beams according to claim 1; its characteristic is that a pulling beam perforation (21) is provided on the bearing plate (2). 3.根据权利要求1或2所述的钢桁梁拉锚器;其特征是:加强肋板设置为包含有后肋板(3)、前肋板(4)、边肋板(5)和横隔板(6),在承力板(2)的后侧面设置有两个后肋板(3),后肋板(3)的纵向截面设置为三角形并一个侧面设置为与底板(1)联接、另一个侧面设置为与承力板(2)联接,在两个后肋板(3)之间设置有横隔板(6),横隔板(6)的两端分别设置为与后肋板(3)联接,在承力板(2)的前侧面设置有两个前肋板(4),前肋板(4)的纵向截面设置为三角形并一个侧面设置为与底板(1)联接、另一个侧面设置为与承力板(2)联接,在前肋板(4)的外侧面设置有边肋板(5),边肋板(5)的纵向截面设置为三角形并一个侧面设置为与底板(1)联接、另一个侧面设置为与承力板(2)联接。 3. The steel truss beam anchor puller according to claim 1 or 2; it is characterized in that: the reinforcing ribs are set to include rear ribs (3), front ribs (4), side ribs (5) and The diaphragm (6) is provided with two rear ribs (3) on the rear side of the bearing plate (2). connection, the other side is set to be connected to the load-bearing plate (2), a transverse diaphragm (6) is arranged between the two rear ribs (3), and the two ends of the transverse diaphragm (6) are respectively arranged to be connected to the rear The ribs (3) are connected, and two front ribs (4) are arranged on the front side of the bearing plate (2). Connection, the other side is set to be connected with the bearing plate (2), and a side rib (5) is set on the outer side of the front rib (4), the longitudinal section of the side rib (5) is set to be triangular and one side It is set to be connected with the bottom plate (1), and the other side is set to be connected with the bearing plate (2).
CN201120303737.2U 2011-08-19 2011-08-19 Cat anchor device for steel truss girder Expired - Fee Related CN202227255U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120303737.2U CN202227255U (en) 2011-08-19 2011-08-19 Cat anchor device for steel truss girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120303737.2U CN202227255U (en) 2011-08-19 2011-08-19 Cat anchor device for steel truss girder

Publications (1)

Publication Number Publication Date
CN202227255U true CN202227255U (en) 2012-05-23

Family

ID=46077848

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120303737.2U Expired - Fee Related CN202227255U (en) 2011-08-19 2011-08-19 Cat anchor device for steel truss girder

Country Status (1)

Country Link
CN (1) CN202227255U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594206A (en) * 2014-12-22 2015-05-06 中铁大桥局集团有限公司 Suspended type dragging anchor socket and method for steel trussed beam longitudinal displacement
CN108517776A (en) * 2018-03-02 2018-09-11 中铁大桥局集团有限公司 A kind of counter-force seat for steel truss girder incremental launching construction
WO2023030123A1 (en) * 2021-09-03 2023-03-09 中交路桥华东工程有限公司 Steel box girder structure and construction method therefor

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594206A (en) * 2014-12-22 2015-05-06 中铁大桥局集团有限公司 Suspended type dragging anchor socket and method for steel trussed beam longitudinal displacement
CN104594206B (en) * 2014-12-22 2017-01-04 中铁大桥局集团有限公司 A steel truss girder longitudinally moving hanging type dragging anchor and method
CN108517776A (en) * 2018-03-02 2018-09-11 中铁大桥局集团有限公司 A kind of counter-force seat for steel truss girder incremental launching construction
WO2023030123A1 (en) * 2021-09-03 2023-03-09 中交路桥华东工程有限公司 Steel box girder structure and construction method therefor

Similar Documents

Publication Publication Date Title
CN202731297U (en) Adjustable beam form support jacking bracket apparatus
CN203188589U (en) Rigid-frame continuous beam zero block construction bracket supporting system
CN203594213U (en) Flexible assembling and disassembling bearing truss
CN102926333B (en) External prestressed reinforcement structure for old bridge and construction method thereof
CN202227255U (en) Cat anchor device for steel truss girder
CN203199913U (en) Assembling and disassembling type hoisting truss
CN103628675A (en) Bailey beam type formwork supporting system and construction method thereof for super high-rise transfer story crossbeam
CN202131600U (en) Dual cross fixing end
CN204079226U (en) A kind of movable beam string hanging apparatus that can increase rigidity when tubular truss lifts
CN203514200U (en) Pin rod support for bridge capping beam construction
CN214995990U (en) A steel-reinforced concrete independent beam formwork tool-type support assembly
CN206554500U (en) Steel structure concrete, which is poured, uses adjustable transverse support bar
CN205712565U (en) A kind of prefabricated two-sided wall
CN108708281A (en) A kind of porous freely-supported approximation arch steel truss beam erection method
CN203361642U (en) Cast-in-place stair steel formwork of assembled structure
CN202766974U (en) Bent cap bearing frame without full framing
CN208121586U (en) A kind of attachment device for porous freely-supported approximation arch steel truss erection
CN207847079U (en) Hanging mould structure
CN202321958U (en) Integrated sling for reinforcement cage
CN102127962B (en) The bidirectional stress base section of the attached lift scaffold improved
CN203867164U (en) Cantilever type scaffold structure with positioning steel pipe
CN211736387U (en) Expansion joint formwork supporting tool
CN209066837U (en) A kind of combined type construction supporting platform
CN211228136U (en) A combined construction platform for prefabricated T beams with negative bending moment tension
CN202359826U (en) Structure for fixing stiff steel columns temporarily

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120523

Termination date: 20140819

EXPY Termination of patent right or utility model