CN208777669U - A kind of elevated operating platform - Google Patents

A kind of elevated operating platform Download PDF

Info

Publication number
CN208777669U
CN208777669U CN201821148261.8U CN201821148261U CN208777669U CN 208777669 U CN208777669 U CN 208777669U CN 201821148261 U CN201821148261 U CN 201821148261U CN 208777669 U CN208777669 U CN 208777669U
Authority
CN
China
Prior art keywords
square steel
operating platform
steel
utility
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821148261.8U
Other languages
Chinese (zh)
Inventor
杨宗帅
高春利
王召
那志强
李龙
刘兆添
华纪鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Engineering Co Ltd of China Railway Urban Construction Group Co Ltd
Original Assignee
Beijing Engineering Co Ltd of China Railway Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Engineering Co Ltd of China Railway Urban Construction Group Co Ltd filed Critical Beijing Engineering Co Ltd of China Railway Urban Construction Group Co Ltd
Priority to CN201821148261.8U priority Critical patent/CN208777669U/en
Application granted granted Critical
Publication of CN208777669U publication Critical patent/CN208777669U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses a kind of elevated operating platforms, including two vertical steel pipes parallel to each other, the lower part of described every vertical steel pipe is welded with lower support, the upper end of described two vertical steel pipes is connected with operating platform ontology, the operating platform ontology includes the square steel one being successively welded to connect, square steel two, square steel three and square steel four, it is equipped with square steel five between the square steel one and square steel three, square steel six and square steel seven are equipped between the square steel two and square steel four.The combination that the utility model realizes construction quality and economic benefit is unified, can be widely used for building elevator, among tail gas well construction.

Description

A kind of elevated operating platform
Technical field
The utility model relates to technical field of building construction, it particularly relates to a kind of elevated operating platform.
Background technique
It is required to use operating platform among building elevator, tail gas well construction, current operating platform has branch It is insufficient to support intensity, it has not been convenient to the problems such as carrying, so that the difficulty of construction is increased, for this problem, at present still without solution party Method.
Utility model content
For above-mentioned technical problem in the related technology, the utility model proposes a kind of elevated operating platforms, can Overcome the above-mentioned deficiency of the prior art.
To realize the above-mentioned technical purpose, the technical solution of the utility model is achieved in that
A kind of elevated operating platform, including two vertical steel pipes parallel to each other, under described every vertical steel pipe Portion is welded with lower support, and the upper end of described two vertical steel pipes is connected with operating platform ontology, the operating platform sheet Body includes the square steel one being successively welded to connect, square steel two, square steel three and square steel four, is equipped between the square steel one and square steel three Square steel five is equipped with square steel six and square steel seven between the square steel two and square steel four.
Further, several horizontal steel pipes are connected between described two vertical steel pipes.
Further, square steel diagonal brace is welded between the lower end and operating platform ontology of described every vertical steel pipe.
Further, hanging ring is welded and connected at four angles of the operating platform ontology.
The utility model has the beneficial effects that the utility model realizes construction quality and the combination of economic benefit is unified, it can It is widely used in building elevator, among tail gas well construction.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only the utility model Some embodiments for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other attached drawings.
Fig. 1 is a kind of structural schematic diagram of elevated operating platform according to the utility model embodiment;
Fig. 2 be a kind of elevated operating platform of the utility model it is specifically used when schematic diagram;
In figure: 1, lower support;2, vertical steel pipe;3, horizontal steel pipe;4, square steel one;5, square steel two;6, square steel six;7, square steel Seven;8, square steel three;9, square steel four;10, square steel five;11, square steel diagonal brace;12, hanging ring;13, operating platform ontology.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art's every other embodiment obtained, all belongs to In the range of the utility model protection.
As shown in Figs. 1-2, a kind of elevated operating platform according to the utility model embodiment, including two mutually Parallel vertical steel pipe 2, the lower part of described every vertical steel pipe 2 are welded with lower support 1, described two vertical steel pipes 2 Upper end be connected with operating platform ontology 13, the operating platform ontology 13 includes square steel 1, the square steel being successively welded to connect 25, square steel 38 and square steel 49 are equipped with square steel 5 10, the square steel 25 and side between the square steel 1 and square steel 38 Square steel 66 and square steel 77 are equipped between steel 49.
In one embodiment, several horizontal steel pipes 3 are connected between described two vertical steel pipes 2.
In one embodiment, it is welded between the lower end and operating platform ontology 13 of described every vertical steel pipe 2 There is square steel diagonal brace 11.
In one embodiment, hanging ring 12 is welded and connected at four angles of the operating platform ontology 13.
In order to facilitate the above-mentioned technical proposal for understanding the utility model, below by way of practical new to this in specifically used mode The above-mentioned technical proposal of type is described in detail.
It is vertical including operating platform ontology and lower part according to a kind of elevated operating platform described in the utility model Steel pipe, operating platform ontology are surrounded by hanging ring, and operating platform can improve the use effect of tower crane using tower crane as hoisting tool Rate, and accelerate the speed into mould, the difficulty of construction greatly reduces, the progress of construction is accelerated, so as to shorten the duration;Operation Table top is laid with steel plate, provides storage space for well inner template, reduces the difficulty of template promotion;Using elevated operation Platform replaces constructing in a manner of scaffold building platform, reduces reserved opening quantity, facilitates construction, accelerate construction Progress;Between operating platform and lower support by the way of multiple oblique connection, it is effectively increased the support strength of platform, It is configured to stable triangle system, the effective solution safety problem of operating platform;The utility model realizes construction quality It is unified with the combination of economic benefit, it can be widely used for building elevator, among tail gas well construction.
In conclusion the utility model realizes construction quality and the combination of economic benefit is unified, can be widely used for building Among object elevator, tail gas well construction.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (4)

1. a kind of elevated operating platform, which is characterized in that every described including two vertical steel pipes (2) parallel to each other The lower part of vertical steel pipe (2) is welded with lower support (1), and the upper end of described two vertical steel pipes (2) is connected with operating platform Ontology (13), the operating platform ontology (13) include the square steel one (4), square steel two (5), square steel three being successively welded to connect (8) and square steel four (9), be equipped with square steel five (10) between the square steel one (4) and square steel three (8), the square steel two (5) and Square steel six (6) and square steel seven (7) are equipped between square steel four (9).
2. a kind of elevated operating platform according to claim 1, which is characterized in that two vertical steel pipes (2) several horizontal steel pipes (3) are connected between.
3. a kind of elevated operating platform according to claim 1, which is characterized in that the vertical steel pipe of described every (2) square steel diagonal brace (11) are welded between lower end and operating platform ontology (13).
4. a kind of elevated operating platform according to claim 1, which is characterized in that the operating platform ontology (13) Four angles at be welded and connected with hanging ring (12).
CN201821148261.8U 2018-07-19 2018-07-19 A kind of elevated operating platform Active CN208777669U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821148261.8U CN208777669U (en) 2018-07-19 2018-07-19 A kind of elevated operating platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821148261.8U CN208777669U (en) 2018-07-19 2018-07-19 A kind of elevated operating platform

Publications (1)

Publication Number Publication Date
CN208777669U true CN208777669U (en) 2019-04-23

Family

ID=66154222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821148261.8U Active CN208777669U (en) 2018-07-19 2018-07-19 A kind of elevated operating platform

Country Status (1)

Country Link
CN (1) CN208777669U (en)

Similar Documents

Publication Publication Date Title
CN205367454U (en) Large -size formwork hoisting machine constructs
CN208777669U (en) A kind of elevated operating platform
CN204626998U (en) A kind of attached lift scaffold discharging platform
CN204342298U (en) A kind of double track transfer crane
CN205965514U (en) Device is got to lift clamp of denitration catalyst module
CN205442452U (en) Convenient hoisting accessory of substation equipment safety
CN107675892A (en) A kind of glass curtain wall monorail hoisting structure
CN204126237U (en) A kind of elevator hoistway construction platform
CN209651673U (en) A kind of construction elevator attaching structure of lifting platform
CN204022864U (en) The hanging ladder of welding converter flue
CN204326490U (en) A kind of construction of lift well operating platform
CN204357138U (en) Simple steel structure lifting upending frame
CN204728675U (en) A kind of high rise elevator well is with layer activity operations frame
CN209922694U (en) Lifting appliance
CN203499232U (en) Attached lifting scaffold
CN202481877U (en) Standard section of construction hoist
CN206984058U (en) A kind of construction MPV
CN204754194U (en) Perpendicular conveyer that uses in mould of bump top
CN206571492U (en) Combined shaft shaft equipment is installed with special-shaped hanging scaffold
CN204823735U (en) Crane girder structure
CN206144173U (en) No pre -buried outer hanging platform of unloading
CN204326487U (en) A kind of novel movable lift-type hoistway operation platform
CN208502268U (en) A kind of steel pipe column concrete placings material distributing machine operation platform of convenient disassembly
CN206014340U (en) A kind of cooperation fork truck can 360 degree of pipe risers for rotating
CN215885996U (en) F-shaped prefabricated T-beam template hoisting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant