CN206571492U - Combined shaft shaft equipment is installed with special-shaped hanging scaffold - Google Patents
Combined shaft shaft equipment is installed with special-shaped hanging scaffold Download PDFInfo
- Publication number
- CN206571492U CN206571492U CN201720276230.XU CN201720276230U CN206571492U CN 206571492 U CN206571492 U CN 206571492U CN 201720276230 U CN201720276230 U CN 201720276230U CN 206571492 U CN206571492 U CN 206571492U
- Authority
- CN
- China
- Prior art keywords
- hanging scaffold
- suspension bracket
- special
- shaft
- main body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Installed the utility model discloses a kind of combined shaft shaft equipment with special-shaped hanging scaffold, including hanging scaffold main body, the first suspension bracket and the second suspension bracket are connected with above the hanging scaffold main body, first suspension bracket and the second suspension bracket are located at below the both sides above the hanging scaffold main center, the hanging scaffold main body respectively is connected with the 3rd suspension bracket.The utility model has the advantage of:The security of combined shaft shaft equipment construction is improved, makes combined shaft shaft equipment mounting construction integration, reduces the input of labor intensity and material installation, improve efficiency of construction, reduce construction cost.
Description
Technical field
The utility model is related to a kind of shaft equipment installation hanging scaffold, more particularly to a kind of combined shaft shaft equipment is installed and used
Special-shaped hanging scaffold.
Background technology
During shaft construction, staff need to be carried out the installation of shaft equipment component and be laid using hanging scaffold.Carried out in the past
When shaft equipment is installed, hanging scaffold and suspension bracket design for standard.
Combined shaft shaft equipment includes a set of cage hoisting system and a set of skip hoisting system, and construction content is complicated, applies
Work technique is cumbersome, wherein, it is independent system New Equipment Engineering between skip bucket, difficulty of construction is larger.Existing hanging scaffold can not meet mixed
Closing well shaft equipment installation needs, and potential safety hazard is huge.
Utility model content
Technical problem to be solved in the utility model is to provide one kind and improves combined shaft shaft equipment working security
Combined shaft shaft equipment install with special-shaped hanging scaffold.
The utility model is to solve above-mentioned technical problem by the following technical programs:Combined shaft shaft equipment is installed with different
Be connected with the first suspension bracket and the second suspension bracket above shape hanging scaffold, including hanging scaffold main body, the hanging scaffold main body, first suspension bracket and
Second suspension bracket is located at below the both sides above the hanging scaffold main center, the hanging scaffold main body respectively is connected with the 3rd suspension bracket.
First suspension bracket, the second suspension bracket and the 3rd suspension bracket are respectively used between narrow tank, the equipment between skip bucket between wide tank is installed, and are conducive to mixing
Well shaft equips the integration of installation.First suspension bracket and the second suspension bracket are located at the top of hanging scaffold main body, and suspension rope is taken root
In the hanging scaffold main body of lower section, the stability and security of top suspension bracket are added.
As the technical scheme of optimization, the bottom plate of first suspension bracket, the second suspension bracket and the 3rd suspension bracket is rectangle, respectively
The long side in bottom surface of suspension bracket is parallel to each other.It is reasonable in design, facilitate between narrow tank, the equipment between skip bucket between wide tank is installed.
As the technical scheme of optimization, second suspension bracket includes two layers of bottom plate up and down, and two layers of bottom plate is connected by column.
The equipment between skip bucket is facilitated to install.
As the technical scheme of optimization, the hanging scaffold main body includes two layers of disk up and down, and two layers of disk is connected by column,
The bottom plate of first suspension bracket and the second suspension bracket is connected to the top of upper disc, the bottom of the 3rd suspension bracket by column respectively
Plate is connected to the lower section of lower disc by column.Double-deck circular tray designs make the suspension bracket for being connected to hanging scaffold main body upper and lower is convenient to pacify
Dress equipment and Stability Analysis of Structures.
As the technical scheme of optimization, the column use for connecting special-shaped each layer of hanging scaffold is welded and fixed and by steel
Cord is reinforced.Be connected firmly stabilization.
As the technical scheme of optimization, ladder is respectively connected between each layer of the special-shaped hanging scaffold.Facilitate above and below staff.
As the technical scheme of optimization, it is equipped with each layer bottom plate of first suspension bracket, the second suspension bracket and the 3rd suspension bracket
Railing.It ensure that working security.
As the technical scheme of optimization, the hanging scaffold main body is suspended in midair in the wellbore by some suspension ropes, the suspention
Rope connects the hanging scaffold main body by capel.Stable connection.
As the technical scheme of optimization, the centre of the hanging scaffold main body is provided with the well-bucket for suspending in midair to get off from the upper side.It is convenient
Blanking.
As the technical scheme of optimization, carriage apparatus is connected with above the well-bucket, the carriage apparatus is perpendicular along two
The direct-connected steady tank rope being connected on above the hanging scaffold main body is slided up and down.By carriage apparatus and steady tank rope allow well-bucket it is steady on
Lower movement.
The utility model has the advantage of:The security of combined shaft shaft equipment construction is improved, mixing well shaft is filled
Standby installation integration, reduces the input of labor intensity and material installation, improves efficiency of construction, reduce and be constructed into
This.
Brief description of the drawings
Fig. 1 is combined shaft shaft equipment sectional drawing.
Fig. 2 is the schematic front view of the special-shaped hanging scaffold of the utility model combined shaft shaft equipment installation.
Fig. 3 is the left view schematic diagram of the special-shaped hanging scaffold of the utility model combined shaft shaft equipment installation.
Embodiment
As shown in figure 1, the equipment in mixing well shaft includes a pair of width cages, a pair of skip buckets, solar and pipeline etc..
As Figure 2-3, combined shaft shaft equipment is installed with special-shaped hanging scaffold, including hanging scaffold main body 1, the first suspension bracket 2, second
Suspension bracket 3, the 3rd suspension bracket 4, ladder 5, railing 6, suspension rope 7, well-bucket 8, carriage apparatus 9 and steady tank rope 10.
Hanging scaffold main body 1 includes two layers of disk up and down, and two layers of disk spacing 5.2m is connected by column.
The bottom plate of first suspension bracket 2, the second suspension bracket 3 and the 3rd suspension bracket 4 is rectangle, and the long side in bottom surface of each suspension bracket is mutually put down
OK.
The bottom plate of first suspension bracket 2 and the second suspension bracket 3 is connected to the top of upper disc by column respectively, positioned at upper strata circle
Both sides above disk center, the bottom plate of the 3rd suspension bracket 4 is connected in the middle of the lower section of lower disc by column, the He of the first suspension bracket 2
The orlop bottom plate of second suspension bracket 3 is away from upper disc 5m, and the superiors' bottom plate of the 3rd suspension bracket 4 is away from lower disc 5m.
Second suspension bracket 3 includes two layers of bottom plate up and down, and two layers of bottom plate spacing 5m is connected by column.
Column use for connecting special-shaped each layer of hanging scaffold is welded and fixed, and weld bead height is 8mm, passes through Φ 28mm's
One curved two burst of reinforcement by connection of steel wire rope, point is burn-on after connecting rope card bolt is tightened.
Ladder 5 is respectively connected between each layer of the special-shaped hanging scaffold.
The railing 6 enclosed around it, column are equipped with each layer bottom plate of first suspension bracket 2, the second suspension bracket 3 and the 3rd suspension bracket 4
Bar 6 is formed by the steel pipe scene self-control of L40 × 40 × 4.
Hanging scaffold main body 1 is suspended in midair in the wellbore by some steel wire suspension ropes 7, and suspension rope 7 connects hanging scaffold by capel
Main body 1.
The centre of hanging scaffold main body 1 is provided with the well-bucket 8 for suspending in midair to get off from the upper side, and the volume of well-bucket 8 is 1.5m3, using 5t
Terminal hooking device suspension well-bucket 8.
The top of well-bucket 8 is connected with carriage apparatus 9, and the width of carriage apparatus 9 is 1.7m, is connected by two sets of nylon sliding sleeves
Between two vertical steady tank ropes 10 being connected to above hanging scaffold main body 1, slided up and down along steady tank rope 10, steady tank rope 10 passes through chicken
Thimble is connected in hanging scaffold main body 1.
The security reliability for being arranged right below support beam and railing, adding construction of well-bucket 8.
Special-shaped hanging scaffold enters after pit shaft, is constructed on hanging scaffold, well head fore shaft crossbeam is first installed, then by stock ± 0m
The column and stock crossbeam of following part, well head cage chair crossbeam etc. are installed.Pacify on stock crossbeam and cage chair crossbeam
Fill Manhole closing disk.When later stage group is to stock and lifting stock construction, closure plate is temporarily without removing, and well head is totally-enclosed
State.
During first time rule, by the use of the second suspension bracket 3 as suspension bracket between skip bucket, all bracket brackets of pit shaft, cable support are installed
The installation task of all equipments between frame, skip bucket buntons, skip bucket closed plate and skip bucket cage guide etc., disposable completion skip bucket.Rise
During disk, by the use of the first suspension bracket 2 as suspension bracket, the 3rd suspension bracket 4 between narrow tank as suspension bracket between wide tank, pit shaft residue dress is installed
It is standby.
Preferred embodiment of the present utility model is the foregoing is only, it is all in this practicality not to limit the utility model
Any modifications, equivalent substitutions and improvements made within new spirit and principle etc., should be included in guarantor of the present utility model
Within the scope of shield.
Claims (10)
1. a kind of combined shaft shaft equipment is installed with special-shaped hanging scaffold, including hanging scaffold main body (1), it is characterised in that:The hanging scaffold master
The first suspension bracket (2) and the second suspension bracket (3), first suspension bracket (2) and the second suspension bracket (3) difference position are connected with above body (1)
The 3rd suspension bracket (4) is connected with below the both sides of hanging scaffold main body (1) overcentre, the hanging scaffold main body (1).
2. combined shaft shaft equipment as claimed in claim 1 is installed with special-shaped hanging scaffold, it is characterised in that:First suspension bracket
(2), the bottom plate of the second suspension bracket (3) and the 3rd suspension bracket (4) is rectangle, and the long side in bottom surface of each suspension bracket is parallel to each other.
3. combined shaft shaft equipment as claimed in claim 1 is installed with special-shaped hanging scaffold, it is characterised in that:Second suspension bracket
(3) two layers of bottom plate up and down is included, two layers of bottom plate is connected by column.
4. combined shaft shaft equipment as claimed in claim 1 is installed with special-shaped hanging scaffold, it is characterised in that:The hanging scaffold main body
(1) two layers of disk up and down is included, two layers of disk is connected by column, the bottom plate point of first suspension bracket (2) and the second suspension bracket (3)
The top of upper disc is not connected to by column, the bottom plate of the 3rd suspension bracket (4) is connected to lower disc by column
Lower section.
5. the combined shaft shaft equipment as described in claim 3 or 4 is installed with special-shaped hanging scaffold, it is characterised in that:For connecting this
The column of special-shaped each layer of hanging scaffold is used and is welded and fixed and by wire cable strengthening.
6. the combined shaft shaft equipment as described in claim 3 or 4 is installed with special-shaped hanging scaffold, it is characterised in that:The special-shaped hanging scaffold
Each layer between be respectively connected with ladder (5).
7. combined shaft shaft equipment as claimed in claim 3 is installed with special-shaped hanging scaffold, it is characterised in that:First suspension bracket
(2), it is equipped with railing (6) on each layer bottom plate of the second suspension bracket (3) and the 3rd suspension bracket (4).
8. combined shaft shaft equipment as claimed in claim 1 is installed with special-shaped hanging scaffold, it is characterised in that:The hanging scaffold main body
(1) by some suspension rope (7) suspentions in the wellbore, the suspension rope (7) connects the hanging scaffold main body by capel
(1)。
9. combined shaft shaft equipment as claimed in claim 1 is installed with special-shaped hanging scaffold, it is characterised in that:The hanging scaffold main body
(1) centre is provided with the well-bucket (8) for suspending in midair to get off from the upper side.
10. combined shaft shaft equipment as claimed in claim 9 is installed with special-shaped hanging scaffold, it is characterised in that:The well-bucket (8)
Top is connected with carriage apparatus (9), the carriage apparatus (9) along two be connected to vertically above the hanging scaffold main body (1) it is steady
Tank rope (10) is slided up and down.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720276230.XU CN206571492U (en) | 2017-03-21 | 2017-03-21 | Combined shaft shaft equipment is installed with special-shaped hanging scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720276230.XU CN206571492U (en) | 2017-03-21 | 2017-03-21 | Combined shaft shaft equipment is installed with special-shaped hanging scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206571492U true CN206571492U (en) | 2017-10-20 |
Family
ID=60055028
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720276230.XU Active CN206571492U (en) | 2017-03-21 | 2017-03-21 | Combined shaft shaft equipment is installed with special-shaped hanging scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206571492U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106761767A (en) * | 2017-03-21 | 2017-05-31 | 淮南矿业(集团)有限责任公司 | Combined shaft shaft equipment is installed with special-shaped hanging scaffold |
-
2017
- 2017-03-21 CN CN201720276230.XU patent/CN206571492U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106761767A (en) * | 2017-03-21 | 2017-05-31 | 淮南矿业(集团)有限责任公司 | Combined shaft shaft equipment is installed with special-shaped hanging scaffold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105484162B (en) | Suspension bridge construction stiff girder secondary on the bank swings moving device and method | |
CN106348189A (en) | Hoisting type rack device special for distribution area | |
CN206571492U (en) | Combined shaft shaft equipment is installed with special-shaped hanging scaffold | |
CN205653069U (en) | Steady gantry crane rises | |
CN201793330U (en) | Gantry hanger frame device | |
CN203487767U (en) | Cross plate scaffold | |
CN106012861B (en) | The construction method of the mounting and positioning device of Wavelike steel webplate and the Wavelike steel webplate | |
CN205204672U (en) | Two hook crane | |
CN108252218A (en) | A kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device | |
CN204418629U (en) | A kind of integrated form climbing frame | |
CN204212065U (en) | Bridge crossing anticollision barrier punching block erection equipment | |
CN204662501U (en) | A kind of pass in and out immersed tube vertical occasional passage | |
CN201148726Y (en) | Independent hanging scaffold super large operating platform | |
CN206109992U (en) | Bridge bottom surface construction platform | |
CN106761767A (en) | Combined shaft shaft equipment is installed with special-shaped hanging scaffold | |
CN205529928U (en) | Operation platform is removed in installation of bridge cable duct | |
CN204897102U (en) | Electronic cat ladder of instrument formula | |
CN211638772U (en) | Cage is hung in high altitude welding of large cross-section box girder | |
CN105060124B (en) | Intra-frame portal crane system and hoisting use method thereof | |
CN204038917U (en) | Dismountable external hanging service platform | |
CN209430211U (en) | One kind hanging mould support device for shield end well to be closed | |
CN203715136U (en) | Tool for hoisting lifting hole cover plate in nuclear power plant | |
CN209651673U (en) | A kind of construction elevator attaching structure of lifting platform | |
CN216240384U (en) | Operation platform assembly with ladder stand suitable for steel structure high altitude installation | |
CN105952369A (en) | Maintenance ladder in butt joint with fixed ladder of transmission tower pole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |