CN208706114U - A kind of simulator for 10KV route nuclear phase training on operation - Google Patents
A kind of simulator for 10KV route nuclear phase training on operation Download PDFInfo
- Publication number
- CN208706114U CN208706114U CN201820571621.9U CN201820571621U CN208706114U CN 208706114 U CN208706114 U CN 208706114U CN 201820571621 U CN201820571621 U CN 201820571621U CN 208706114 U CN208706114 U CN 208706114U
- Authority
- CN
- China
- Prior art keywords
- phase
- nuclear
- nuclear phase
- training
- power supply
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Monitoring And Testing Of Nuclear Reactors (AREA)
Abstract
The utility model discloses a kind of simulators for 10KV route nuclear phase training on operation, simulator includes power module, phase modulation module and control panel, it is provided on control panel at nuclear phase instrument self-test, two simulation electrification displays and disconnecting link wire jack, to carry out self-test to 10KV nuclear phase instrument at nuclear phase instrument self-test, two simulation electrification displays are operated to simulate the nuclear phase of 10KV ring network cabinet, disconnecting link wire jack is connect by lead with equipment on training field column, power module exports three-phase 36V Safety A C mains to phase modulation module, after being adjusted at random by phase sequence of the phase modulation module to three-phase 36V Safety A C mains again, the simulation electrification display and disconnecting link being then connected on control panel draw at hole, the simulator function is complete, it can be safe, rapidly, it is accurately finished 10KV nuclear phase behaviour It trains or examines, the training on operation of 10KV route nuclear phase and examination are completed in the case where route, equipment live, greatlys improve the Project Training or examination effect.
Description
Technical field
The utility model relates to electric power operation skills training technical fields, more particularly to a kind of 10KV route nuclear phase that is used for grasp
Make the simulator trained.
Background technique
Currently, being competent in merit rating examination in the existing post of Guangdong Power Grid Co., Ltd, distribution O&M class makees
Industry personnel should have 10KV route nuclear phase operative skill;And train at the scene and during hilllock comments, it is contemplated that the problem of secure context, extensively
Eastern all Technique Authentication stations of power grid Co., Ltd and each level training field training route and equipment are not charged, training and
Examination 10KV route nuclear phase operative skill during can only simulate associated operating steps, can not reflect it is trained, with reference to the true of student
Practical operation is made horizontal.
In previous 10KV route nuclear phase operative skill training process, since training route and equipment are not charged, make
It obtains the Project Training and examination effect is had a greatly reduced quality, the employee for participating in training can not really grasp 10KV route nuclear phase operation skill
And related request.
Summary of the invention
Purpose of the utility model is to solve disadvantages existing in the prior art, and the one kind proposed is used for 10KV line
The simulator of road nuclear phase training on operation.
To achieve the goals above, the utility model adopts the technical scheme that one kind of the utility model is used for
The simulator of 10KV route nuclear phase training on operation, the simulator include power module, phase modulation module and control panel, institute
State be provided on control panel at nuclear phase instrument self-test, two simulation electrification displays and disconnecting link wire jack, the power module
Output end connect with the input terminal of the phase modulation module, the input terminal of the output end of the phase modulation module and the control panel
It connects, to carry out self-test to 10KV nuclear phase instrument at the nuclear phase instrument self-test, described two simulation electrification displays connect 10KV
Ring network cabinet, the nuclear phase to simulate 10KV ring network cabinet operate, and the disconnecting link wire jack passes through equipment on lead and training field column
Connection, to simulate the operation of 10KV route nuclear phase.
Further, the power module is the power-supply system based on inversion transformation technique, including super capacitor, programmable power supply two
Most of, super capacitor exports the input terminal of 48V single-phase DC voltage to three-phase standard programmable power supply, program-controlled via three-phase standard
Power supply exports three-phase 36V and exchanges safe voltage to phase modulation module, and DC power supply incoming switch is arranged in DC power supply and program-controlled electric
Between source, the setting of AC power source outlet switch occurs between terminal in programmable power supply and AC power source.
Further, the phase modulation module is the power supply phase modulation module based on crosslinking technological, including input terminal, leading-out terminal
Son and phase adjustment control switch are crosslinked interlocking between phase adjustment control switch, and the phase modulation module, which exchanges three-phase 36V, pacifies
Full voltage, after interlocking phase adjustment control switch via crosslinking, then random output three-phase 36V exchange safe voltage is supplied to control
The two simulation electrification displays or disconnecting link wire jack of panel.
The utility model has the advantages that the simulator of the application can realize following three Xiang Gongneng: one, by the nuclear phase instrument on control panel
The self-test of 10KV nuclear phase instrument can be completed at self-test;Two, it will be trained on the column of field and opened by the disconnecting link wire jack on control panel
It closes two sides disconnecting link to connect with 10KV route nuclear phase operation simulation system, then 36 V of three-phase exchange safe voltage is led into training field column
Upper switch two sides disconnecting link can complete 10KV route nuclear phase simulated operation;Three, it is charged by two simulations on control panel aobvious
Show that device (10KV XX line, 10KV YY line) can complete the nuclear phase simulated operation of 10KV ring network cabinet.The simulator function is complete,
Training or the check requirements that can satisfy 10KV nuclear phase operation item completely, in the case where meeting specification can safely, rapidly,
It is accurately finished the training on operation of 10KV nuclear phase or examination, the operation of 10KV route nuclear phase is completed in the case where route, equipment live
Training and examination, greatly improve the Project Training or examination effect.
Detailed description of the invention
Fig. 1 is power module structure schematic diagram;
Fig. 2 is phase modulation modular structure schematic diagram.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.
A kind of simulator for 10KV route nuclear phase training on operation of the utility model, it is described as shown in Fig. 1 to 2
Simulator includes power module, phase modulation module and control panel, is provided at nuclear phase instrument self-test on the control panel, two
Electrification display (10KV XX line, 10KV YY line) and disconnecting link wire jack are simulated, to 10KV at the nuclear phase instrument self-test
Nuclear phase instrument carries out self-test, first by power module output three-phase alternating current safe voltage (36V) to phase modulation module, then by phase modulation module
After being adjusted at random to the phase sequence of three-phase alternating current safe voltage (36V), the simulation electrification display that is then connected on control panel or
Disconnecting link wire jack, then three-phase alternating current safe voltage (36V) is led on training field column and set with 6 leads from disconnecting link wire jack
It is standby, 10KV nuclear phase instrument self-test, 10KV route nuclear phase simulated operation and 10KV ring network cabinet nuclear phase can be completed by the simulator
Simulated operation.
The power module is the power-supply system based on inversion transformation technique, including super capacitor, programmable power supply two large divisions, is surpassed
Grade capacitor exports the input terminal of 48V single-phase DC electricity to programmable power supply, via standard three-phase program-controlled power supply, via three-phase standard journey
It controls power supply output three-phase 36V and exchanges safe voltage to phase modulation module, wherein battery positive voltage+the KM and AC power source of DC power supply
Incoming switch QA connection, battery terminal negative-KM are connect with AC power source incoming switch QB, and programmable power supply is three-phase reference power supply,
DC power supply is super capacitor, and three AC power source outlet switchs SA, SB, SC connect with ac power output X, Y, Z respectively
It connects, between super capacitor and programmable power supply and programmable power supply output end is respectively provided with switch, convenient for overhauling and safeguarding from now on.
The phase modulation module is the power supply phase modulation module based on crosslinking technological, including ac power input end X, Y, Z, is handed over
Galvanic electricity source leading-out terminal A, B, C, 9 phase adjustment control switches (QX-A, QY-A, QZ-A, QX-B, QY-B, QZ-B, QX-C,
QY-C, QZ-C), interlocking is crosslinked between phase adjustment control switch, three-phase 36V is exchanged safe voltage, warp by the phase modulation module
After interlocking phase adjustment control switch by crosslinking, then random output three-phase 36V exchange safe voltage is supplied to the two of control panel
A simulation electrification display or disconnecting link wire jack.It wherein interlocks, cannot be used between QX-A, QY-A, QZ-A simultaneously;QZ-A,
It interlocks, cannot be used between QX-B, QY-B simultaneously;It interlocks, cannot be used between QX-C, QY-C, QZ-C simultaneously.
Firstly, passing through the self-test for completing 10KV nuclear phase instrument at the nuclear phase instrument self-test on control panel.Then, pass through control
Disconnecting link wire jack on panel will train field on-pole switch two sides disconnecting link and connect with 10KV route nuclear phase operation simulation system, then
36 V of three-phase exchange safe voltage is led into training field on-pole switch two sides disconnecting link, 10KV route is completed by 10KV nuclear phase instrument
Nuclear phase simulated operation;Or two simulation electrification displays (10KV XX line, 10KV YY line) on control panel are connected to
10KV ring network cabinet completes the nuclear phase simulated operation of 10KV ring network cabinet by 10KV nuclear phase instrument.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not
It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this
Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model
Within enclosing.
Claims (3)
1. a kind of simulator for 10KV route nuclear phase training on operation, the simulator includes power module, phase modulation mould
Block and control panel, which is characterized in that be provided on the control panel at nuclear phase instrument self-test, two simulation electrification displays and
Disconnecting link wire jack, the output end of the power module are connect with the input terminal of the phase modulation module, the phase modulation module it is defeated
Outlet is connect with the input terminal of the control panel, described to carry out self-test to 10KV nuclear phase instrument at the nuclear phase instrument self-test
Two simulation electrification displays connect 10KV ring network cabinet, and the nuclear phase to simulate 10KV ring network cabinet operates, and the disconnecting link lead is inserted
Hole is connect by lead with equipment on training field column, and to simulate the operation of 10KV route nuclear phase, the power module is based on inverse
The power-supply system of change technology, including super capacitor and programmable power supply, the phase modulation module are the power supply phase modulation based on crosslinking technological
Module, including input terminal, outlet terminal and phase adjustment control switch are crosslinked interlocking between phase adjustment control switch.
2. simulator according to claim 1, it is characterised in that: the super capacitor output 48V single-phase DC electricity is extremely
The input terminal of programmable power supply, the programmable power supply are standard three-phase program-controlled power supply, via standard three-phase program-controlled power supply, then export three
Phase 36V exchanges safe voltage to the phase modulation module.
3. simulator according to claim 2, it is characterised in that: three-phase 36V is exchanged safety electricity by the phase modulation module
Pressure, after interlocking phase adjustment control switch via crosslinking, then random output three-phase 36V exchange safe voltage is supplied to the control
The two simulation electrification displays or disconnecting link wire jack of panel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820571621.9U CN208706114U (en) | 2018-04-20 | 2018-04-20 | A kind of simulator for 10KV route nuclear phase training on operation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820571621.9U CN208706114U (en) | 2018-04-20 | 2018-04-20 | A kind of simulator for 10KV route nuclear phase training on operation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208706114U true CN208706114U (en) | 2019-04-05 |
Family
ID=65935067
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820571621.9U Active CN208706114U (en) | 2018-04-20 | 2018-04-20 | A kind of simulator for 10KV route nuclear phase training on operation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208706114U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112687164A (en) * | 2020-12-16 | 2021-04-20 | 广东电网有限责任公司 | Nuclear phase training system |
CN112946513A (en) * | 2021-02-03 | 2021-06-11 | 山东钢铁股份有限公司 | Phase checking method for power supply of transformer substation |
-
2018
- 2018-04-20 CN CN201820571621.9U patent/CN208706114U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112687164A (en) * | 2020-12-16 | 2021-04-20 | 广东电网有限责任公司 | Nuclear phase training system |
CN112946513A (en) * | 2021-02-03 | 2021-06-11 | 山东钢铁股份有限公司 | Phase checking method for power supply of transformer substation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108777089B (en) | Meter-loading electricity-connection training system with wiring correction and process detection | |
CN108847078B (en) | Dress table meets electric training system | |
CN201893058U (en) | Safe simulation training system for distribution room | |
CN208637023U (en) | Wiring check actual training device before high-voltage metering cubicle power transmission | |
CN208706114U (en) | A kind of simulator for 10KV route nuclear phase training on operation | |
CN104835396A (en) | Simulation system based on anti-electric-larceny skill training | |
CN105788417A (en) | Practical training device for fault simulation on intelligent power grid | |
CN107356830B (en) | Simulation transformer training device | |
CN112467555A (en) | Combined distribution network low-voltage troubleshooting training device and training method | |
CN201364372Y (en) | Wire connection device and polarity test system and transformation ratio test system comprising same | |
CN113990132B (en) | Power transformation and distribution operation and maintenance integrated training system and training method | |
CN104376767A (en) | Practical training platform device for handling typical low-voltage faults | |
CN110942692B (en) | Intelligent debugging and training system and method for auxiliary power supply of urban railway passenger car | |
CN204650853U (en) | A kind of simulation system based on skills training of opposing electricity-stealing | |
CN107507497A (en) | Electric-power metering is high for low meter stealing emulation training device | |
CN103136994B (en) | Based on the open architecture PLC Electrical Engineering Practice device of safe voltage | |
CN204440698U (en) | Portable track switch control module experimental box | |
CN209103574U (en) | A kind of training transformer winding D.C. resistance simulator | |
CN110827633A (en) | Intelligent debugging and training system and method for urban railway passenger car extended power supply | |
CN107978205A (en) | A kind of measuring equipment load simulator | |
CN208384000U (en) | A kind of power distribution automation aviation plug formula primary equipment simulation terminal system | |
CN106128243A (en) | Power failure simulator | |
CN107204144B (en) | A kind of power supply station employee sales service training operation system | |
CN104464430A (en) | Portable switch control unit experimental box | |
CN207780991U (en) | A kind of low-tension distribution box actual training device for rural power grids power distribution station system |