CN208686070U - A kind of constructional column pours bell-mouth structure of air - Google Patents
A kind of constructional column pours bell-mouth structure of air Download PDFInfo
- Publication number
- CN208686070U CN208686070U CN201721658439.9U CN201721658439U CN208686070U CN 208686070 U CN208686070 U CN 208686070U CN 201721658439 U CN201721658439 U CN 201721658439U CN 208686070 U CN208686070 U CN 208686070U
- Authority
- CN
- China
- Prior art keywords
- construction
- horn mouth
- constructional column
- constructional
- metal plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 claims abstract description 33
- 239000002184 metal Substances 0.000 claims abstract description 22
- 238000007789 sealing Methods 0.000 claims abstract description 17
- 230000001953 sensory effect Effects 0.000 abstract description 2
- 238000000465 moulding Methods 0.000 description 3
- 238000005266 casting Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 210000000697 sensory organ Anatomy 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a kind of constructional columns to pour bell-mouth structure of air, including the horn mouth above construction column template is arranged in, the construction column template is provided with the rectangle sealing as the logical horn mouth of width between horn mouth, the metal plate for being less than rectangle seal widths with width is penetrated in the rectangle sealing, is provided with handle below metal plate;Construction column template outer surface in the horn mouth is provided with slideway, and metal plate penetrates in slideway.The utility model constructional column horn mouth can be such that constructional column primary concreting forms, and sensory effects are relatively good, overcome the ropy status of Constructional Col-umn Construction, win the approval of owner and supervisor;Construction cost is greatly reduced simultaneously, and constructional column is the important component of building, and the construction quality of constructional column can react the construction level of an enterprise, and the raising of quality level can win respect, market and future for enterprise.
Description
Technical field
The utility model relates to constructional column security hardening construction applications in construction, specially a kind of constructional column pours loudspeaker
Mouth structure.
Background technique
With the development of society, especially scientific and technical continuous improvement, people's lives level have obtained very big change
Kind and raising, simultaneously for the quality of life, higher requirements are also raised.And as the building inseparable with people's life
Field, especially work China Democratic National Construction Association field, and the housing quality and construction efficiency built, by the concern of vast corporate citizen, especially
It is in the increasingly perfervid line of urbanization process and portion centers city.
Constructional column is concrete component important in brick-and-concrete buildings.For improve tier building masonry structure anti-seismic performance,
Code requirement appropriate site should be arranged reinforced column and connect with collar tie beam in the masonry in house, common reinforcement building
Stability, this reinforced column are usually thus referred to as constructional column.Constructional column is primarily not to undertake vertical load, but use
In lateral loads such as resistance shearing, antidetonations.
Constructional column is generally arranged at the half space of staircase, longitudinal cross wall junction, the corner of wall, and wall length reaches five
The intermediate position of rice will set constructional column.Bearing capacity or stability and not increasing section ruler to improve masonry structure in recent years
Very little, the constructional column in wall is not only provided only on house wall corner, edge, and the middle part of wall is arranged in as needed
Position, collar tie beam must necessarily be located closed.
Say that constructional column will be with collar tie beam ground beam, foundation beam one-piece casting from construction angle.To have in Structural Engineering with brick wall body
Horizontal connecting lacing wire connection.If constructional column will be connect in building, structures middle position with distributing reinforcement.
For improve tier building masonry structure anti-seismic performance, construction standards require should in the masonry in house appropriate site
The stability that reinforced column reinforces building jointly is set.Constructional Col-umn Construction often occurs being unable to primary concreting completion,
Not only it had influenced sense organ but also had spent a large amount of labour;And during entire Constructional Col-umn Construction, constructional column horn mouth is one very heavy
The link wanted.
Therefore, existing constructional column bell-mouth structure of air is improved, constructional column integral one-step molding can be preferably promoted,
And good stability against earthquake relationship is formed between surrounding member, it has been a good problem to study.
Summary of the invention
For above-mentioned deficiency in the prior art, it is false that the utility model provides a kind of structure, and can make constructional column
One piece pouring molding, substantially increases and structural stability, the constructional column for enhancing shock resistance pour bell-mouth structure of air.
Purpose of the utility model is realized as follows:
A kind of constructional column pours horn structure, it is characterised in that: the horn mouth 2 including 5 top of construction column template is arranged in,
It is characterized by: the construction column template 5 is provided with the rectangle sealing as the logical horn mouth of width, institute between horn mouth 2
The metal plate 3 for being less than rectangle seal widths with width is penetrated in the rectangle sealing stated, the lower section of metal plate 3 is provided with handle 4;
5 outer surface of construction column template in the horn mouth 2 is provided with slideway 1, and metal plate 3 penetrates in slideway 1;
The width of the rectangle sealing is 5mm, and the thickness of metal plate is slightly less than 5mm, can be realized on rectangle sealing
Lower movement, and be full shape to rectangle sealing;
Positive beneficial effect: the utility model constructional column horn mouth can be such that constructional column primary concreting forms, sense organ effect
Fruit is relatively good, overcomes the ropy status of Constructional Col-umn Construction, wins the approval of owner and supervisor;It greatly reduces simultaneously
Construction cost, constructional column are the important components of building, and the construction quality of constructional column can react the construction of an enterprise
The raising of level, quality level can win respect, market and future for enterprise.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is sectional view along A-A in Fig. 1;
In figure are as follows: slideway 1, horn mouth 2, metal plate 3, handle 4.
Specific embodiment
With reference to the accompanying drawing, the utility model is described further:
As shown in Figure 1 and Figure 2, a kind of constructional column pours horn structure, the loudspeaker including 5 top of construction column template is arranged in
Mouth 2, the construction column template 5 are provided with the rectangle sealing as the logical horn mouth of width, the rectangle between horn mouth 2
The metal plate 3 for being less than rectangle seal widths with width is penetrated in sealing, the lower section of metal plate 3 is provided with handle 4;
5 outer surface of construction column template in the horn mouth 2 is provided with slideway 1, and metal plate 3 penetrates in slideway 1;
The width of the rectangle sealing is 5mm, and the thickness of metal plate is slightly less than 5mm, can be realized on rectangle sealing
Lower movement, and be full shape to rectangle sealing;
A kind of constructional column pours the construction method of horn structure, specifically: under the horn mouth 2 of traditional sense
The rectangular slits for setting 5mm are stayed in portion, and the same horn mouth of width is passed through out of reserved rectangle slot apertures, metal plate lower part using 5mm thick sheet metal
Metal plate is conveniently moved up and down equipped with handle;The top of metal plate is located in the slideway 1 outside setting construction column template 5;When mixed
Solidifying soil is poured to before constructional column horn mouth elevation of bottom, and metal plate is fixed on the position of its elevation of top Yu horn mouth elevation of bottom
It sets, concrete has not only been facilitated to enter constructional column but also mortar leakage prevention phenomenon;When concreting to constructional column horn mouth position, metal plate
Elevation of top will move up together with concrete casting elevation, until constructional column pours completion.
Constructional column is poured using improved horn mouth, every constructional column can save concrete expense: 0.2m × 0.2m
× 0.25m × 0.5 × 365 yuan/m3=1.8 yuan;Horn mouth after each pouring picks about 8.5 yuan of generation expense of chisel repairing;It is total every
Root constructional column can about save 10 yuan;Xxx project pours constructional column about 18000, if the project is all using improved
Horn mouth pours constructional column, which can be 180,000 yuan with save the cost;It can make to construct using improved constructional column horn mouth
The molding of column primary concreting, sensory effects are relatively good, overcome the ropy status of Constructional Col-umn Construction, win owner and management list
The approval of position.Constructional column is the important component of building, and the construction quality of constructional column can react the construction of an enterprise
The raising of level, quality level can win respect, market and future for enterprise.
The above case study on implementation is merely to illustrate preferred embodiments of the present invention, but the utility model is not limited to
State embodiment, the field those of ordinary skill within the scope of knowledge, the spirit and principles of the utility model it
Any modification, equivalent substitute and improvement etc., are regarded as the protection scope of the application made by interior.
Claims (3)
1. a kind of constructional column pours bell-mouth structure of air, it is characterised in that: including the horn mouth above construction column template, institute is arranged in
The construction column template stated is provided with the rectangle sealing as the logical horn mouth of width between horn mouth, wears in the rectangle sealing
Entering has the metal plate 3 for being less than rectangle seal widths with width, is provided with handle below metal plate.
2. a kind of constructional column according to claim 1 pours bell-mouth structure of air, it is characterised in that: in the horn mouth
Construction column template outer surface is provided with slideway, and metal plate penetrates in slideway.
3. a kind of constructional column according to claim 1 pours bell-mouth structure of air, it is characterised in that: the rectangle sealing
Width is 5mm, and the thickness of metal plate is slightly less than 5mm, can be realized and moves up and down in rectangle sealing, and is full to rectangle sealing
Shape.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721658439.9U CN208686070U (en) | 2017-12-04 | 2017-12-04 | A kind of constructional column pours bell-mouth structure of air |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721658439.9U CN208686070U (en) | 2017-12-04 | 2017-12-04 | A kind of constructional column pours bell-mouth structure of air |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208686070U true CN208686070U (en) | 2019-04-02 |
Family
ID=65875060
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721658439.9U Expired - Fee Related CN208686070U (en) | 2017-12-04 | 2017-12-04 | A kind of constructional column pours bell-mouth structure of air |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208686070U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107724674A (en) * | 2017-12-04 | 2018-02-23 | 上海宝冶集团有限公司 | A kind of constructional column pours bell-mouth structure of air and its construction method |
-
2017
- 2017-12-04 CN CN201721658439.9U patent/CN208686070U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107724674A (en) * | 2017-12-04 | 2018-02-23 | 上海宝冶集团有限公司 | A kind of constructional column pours bell-mouth structure of air and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106121107B (en) | Assemble type concrete slab and its plate dry type connection method | |
CN106149937B (en) | Assembly concrete beam and its dry type connection method | |
CN206090945U (en) | Vertical joint construction of prefabricated assembled shear force wallboard | |
CN206971471U (en) | One kind interval steel pipe and combined concrete shear wall system | |
CN207700438U (en) | A kind of fabricated shear wall cross connected structure | |
CN206467827U (en) | A kind of assembly concrete shear wall | |
CN104153495B (en) | A kind of attachment structure of Multi-function light concrete curtain wall | |
CN105178354A (en) | Tian-shaped beam column cap and beamless slab structure system | |
CN208686070U (en) | A kind of constructional column pours bell-mouth structure of air | |
CN103993672A (en) | Tenon type connecting joint structure of low-rise fabricated composite wall house | |
CN106284653A (en) | The construction method that a kind of balcony construct capital interspaces in advance | |
CN204475529U (en) | The syndeton of a kind of assembling type outer wall and beam | |
CN207633546U (en) | Toilet concrete sealing prefabricated components | |
CN206554318U (en) | Wall is built in a kind of room | |
CN106320601B (en) | Assembly concrete is whole without heat bridge board wall and its vertical connection method | |
CN206752527U (en) | Basement post-pouring zone waterproof construction | |
CN104652608A (en) | Assembly type exterior wall and beam connecting structure | |
CN107747378A (en) | The body composite board processing method of Fast Installation heat insulation decorative load-bearing one | |
CN209468856U (en) | A kind of assembly concrete column beam connecting node | |
CN208056126U (en) | A kind of connecting node construction of steel pipe bundle concrete walls and Base isolation system | |
CN109296074A (en) | A kind of assembly concrete column beam connecting node | |
CN109680868A (en) | Complete prefabricated ribbed plate exterior wall single storey industry workshop | |
CN108824483A (en) | The external wall structure and its construction method of multi-storey basement | |
CN214035078U (en) | Light prefabricated enclosure wall | |
CN205000360U (en) | Basement structure with waterproof structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190402 |
|
CF01 | Termination of patent right due to non-payment of annual fee |