CN104153495B - A kind of attachment structure of Multi-function light concrete curtain wall - Google Patents

A kind of attachment structure of Multi-function light concrete curtain wall Download PDF

Info

Publication number
CN104153495B
CN104153495B CN201410336641.4A CN201410336641A CN104153495B CN 104153495 B CN104153495 B CN 104153495B CN 201410336641 A CN201410336641 A CN 201410336641A CN 104153495 B CN104153495 B CN 104153495B
Authority
CN
China
Prior art keywords
shaped plate
plate part
plate face
shaped
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410336641.4A
Other languages
Chinese (zh)
Other versions
CN104153495A (en
Inventor
梁炳恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong, Heyuan, Tian Tian building industrialization Limited by Share Ltd
Original Assignee
GUANGDONG HEYUAN LIANTIAN BUILDING INDUSTRIALIZATION MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG HEYUAN LIANTIAN BUILDING INDUSTRIALIZATION MANUFACTURING Co Ltd filed Critical GUANGDONG HEYUAN LIANTIAN BUILDING INDUSTRIALIZATION MANUFACTURING Co Ltd
Priority to CN201410336641.4A priority Critical patent/CN104153495B/en
Publication of CN104153495A publication Critical patent/CN104153495A/en
Application granted granted Critical
Publication of CN104153495B publication Critical patent/CN104153495B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses the attachment structure of a kind of Multi-function light concrete curtain wall, including fixture and pair of L-shaped plate, the transverse plate face of L shaped plate part in the transverse plate face support of lower L shaped plate part, the vertical plate face of upper L shaped plate part is for being connected with lightweight concrete slab, the transverse plate face of lower L shaped plate part is for being connected with major structure of construction, have, on the transverse plate face of upper L shaped plate part, the bar hole extended in horizontal or vertical direction, have, on the transverse plate face of lower L shaped plate part, the bar hole extended longitudinally or transversely, these two bar holes are decussation shape, fixture is through two bar holes and moves along bar hole and is adjusted fastening so that upper L shaped plate part and lower L shaped plate part connect fixing again.The present invention improves the load bearing stength of attachment structure, regulation can be implemented in the relative position of upper and lower L shaped plate part by the bar hole of upper and lower L shaped plate part, regulation is implemented in i.e. relative with major structure of construction to lightweight concrete slab position, improves installation accuracy, simple installation.

Description

A kind of attachment structure of Multi-function light concrete curtain wall
Technical field
The present invention relates to the concrete curtain wall in architectural engineering applied technical field, particularly to a kind of multifunctional light The attachment structure of matter concrete curtain wall.
Background technology
Curtain wall (Curtain Wall), has another name called building curtain wall, curtain wall, is modern large-scale conventional with skyscraper With the Light Wall of decorative effect, typically it is made up of materials such as metal, glass, stone material and artificial boards, Being arranged on the outermost layer of building, effect such as body of wall, attractive in appearance, Radix Saposhnikoviae, rainproof, energy-conservation etc., curtain wall is not subject to Any structural load, is only connected with structural slab or post and bears deadweight and opposing blast.
Concrete curtain wall is the one of which type of curtain wall, and it is typically with concrete masonry units molding body of wall, then with Wet combining or dry hanging install dalle on molding body of wall.Wet combining mode is used to make the mistake of concrete curtain wall Cheng Shi: first by concrete masonry units molding body of wall, then coats cement on molding body of wall, then takes advantage of cement not Sticking decorative board material time dry;The process using dry hanging to make concrete curtain wall is: build first by concrete Build up type body of wall, then Os Draconis be fixed on molding body of wall, dalle by suspension member be arranged on Os Draconis with Realize the connection of dalle and molding body of wall.
All there is following defect in above two mode: (1) must build by laying bricks or stones at the construction field (site) and plaster, inefficiency, Long construction period;(2), along with the lifting of construction labor cost, employing scene is built the mode of plastering by laying bricks or stones and is directly led Cause construction cost increases considerably;(3) field fabrication curtain wall, body of wall can not carry, noise that construction produces and material The heap of material surrounding of being rivals in a contest causes and has a strong impact on.Therefore, conventional concrete curtain wall has been not suitable with current building The demand of industrialization development.
While construction labor cost promotes, China's steel structure system, prefabricated construction system Foundation be also gradually improved, it is desirable to it is prefabricated that most building element realizes batch production, and along with China building set The quick raising of meter level, building industrialization design software has been carried out the marketization, relevant building industrialization technology Ripe, particularly China market existing building machinery level, construction level, workman operation level Fully meet the demand that active cell formula Curtain Wall is installed.So, under such background, still use biography System method makes curtain wall and is undoubtedly the wasting of resources, real non-wise move.
Application for a patent for invention (application number: 201310268811.5) discloses a kind of multifunction combined lightweight coagulation Soil curtain wall and preparation method thereof, it mainly by lightweight concrete Slab element along the combination of major structure of construction outer surface Becoming, lightweight concrete Slab element is spliced to form the most side by side by least 2 pieces of lightweight concrete slabs, lightweight concrete The outer surface of plate is provided with decorative cover, and the upper and lower end of lightweight concrete Slab element is fixed respectively at cross section For in the shaped steel of groove type, the shaped steel being positioned at lightweight concrete Slab element upper end is provided with for tying with building body The suspension member that structure connects.The rectangular bending of suspension member, lower end is connected with the inner side edge of channel-section steel, and upper end is then main with building Girder steel (H profile steel) top flange in body structure connects.
Although, technique scheme overcomes the defect that conventional concrete curtain wall exists, but uses right angle bending Concrete curtain wall is fixed on major structure of construction and also has the disadvantages that (1) suspension member needs to bear by the suspension member of shape The deadweight of lightweight concrete slab, but the suspension member load-bearing of right angle bending is limited, and applicable limitation is bigger;(2) will When lightweight concrete slab is arranged on major structure of construction by suspension member, owing to there is no location structure, it is difficult to location Accurately so that the plate face of lightweight concrete slab can twist relative to the body of wall of major structure of construction, causes mixing Distance between concrete board from major structure of construction is different, thus has a strong impact on the aesthetic property of concrete curtain wall outward appearance And practical effect.
Summary of the invention
It is an object of the invention to provide and a kind of can improve high and easy multi-functional of load bearing stength, installation accuracy The attachment structure of lightweight concrete curtain wall, it is ensured that the aesthetic property of concrete curtain wall outward appearance and practical effect.
The above-mentioned purpose of the present invention realizes by the following technical solutions: a kind of Multi-function light concrete curtain wall Attachment structure, it is characterised in that: it includes fixture and pair of L-shaped plate, and one of them L shaped plate part is Upper L shaped plate part, another L shaped plate part is lower L shaped plate part, L-shaped in the transverse plate face support of lower L shaped plate part The transverse plate face of plate, the vertical plate face of upper L shaped plate part is used for being connected with lightweight concrete slab, lower L shaped plate part Transverse plate face for being connected with major structure of construction, the transverse plate face of described upper L shaped plate part has transversely Or the bar hole of longitudinal extension, the transverse plate face of described lower L shaped plate part has the bar extended longitudinally or transversely Shape hole, these two bar holes are decussation shape, and described fixture moves through two bar holes and along bar hole Move and be adjusted fastening again so that upper L shaped plate part and lower L shaped plate part connect fixing.
The present invention uses upper and lower L shaped plate part, as attachment structure, lightweight concrete slab is fixed on building body and ties On structure, improve the load bearing stength of attachment structure, it is possible to bear more heavy weight lightweight concrete slab, eliminate It is suitable for limitation;It addition, can be to the phase para-position of upper and lower L shaped plate part by the bar hole of upper and lower L shaped plate part Putting enforcement regulation, i.e. relative with major structure of construction to lightweight concrete slab position is implemented regulation, is improve peace Dress precision, and, install the easiest, improve installation effectiveness.
In order to improve the bearing strength of attachment structure further, as a modification of the present invention, described lower L-shaped The connecting portion of the dual-side in plate transverse plate face and vertical plate face dual-side sets up the reinforcement of pair of plate-shaped separately.
As a further improvement on the present invention, on described, the one end in L shaped plate part transverse plate face is provided with vertical flanging, Described vertical flanging is relative with the vertical plate face of described upper L shaped plate part, in described vertical flanging and described lower L-shaped Having vertically extending bar v notch v on the vertical plate face of plate, this v notch v is by dismountable location Part is through fixing, in order to before fastening fixture, in advance upper and lower L shaped plate part is implemented location transversely To prevent the horizontal changing of the relative positions.After fixture fastens, keeper can be removed so that it is can recycle, fall Low cost.
The present invention can also do following improvement, has hole, a pair location on described on the transverse plate face of L shaped plate part, Hole, described location between bar hole and its vertical plate face in upper L shaped plate part transverse plate face, hole, described location by Dismountable locating part passes, and the lower end of described locating part is pushed against on the transverse plate face of lower L shaped plate part, in order to Before fastening fixture, in advance upper and lower L shaped plate part is implemented the location in rotation direction to prevent to turn round Dynamic.After fixture fastens, locating part can be removed so that it is can recycle, reduce cost.
As one embodiment of the present invention, connector and building are passed through in the transverse plate face of described lower L shaped plate part The girder steel top flange of agent structure is fixing to be connected, and the lower surface periphery in lower L shaped plate part transverse plate face is main with building The girder steel top flange welding of body structure.
Compared with prior art, the present invention has a following significantly effect:
(1) the present invention uses upper and lower L shaped plate part, as attachment structure, lightweight concrete slab is fixed on building body In structure, improve the load bearing stength of attachment structure, it is possible to bear more heavy weight lightweight concrete slab, eliminate Applicable limitation.
(2) the relative position of upper and lower L shaped plate part can be implemented by the present invention by the bar hole of upper and lower L shaped plate part Regulation, i.e. relative with major structure of construction to lightweight concrete slab position is implemented regulation, is improve installation accuracy.
(3) the present invention installs the easiest, improves installation effectiveness.
(4), before fastening fixture, in advance upper and lower L shaped plate part is implemented the location laterally and in rotation direction, Avoid, between upper and lower L shaped plate part, the horizontal changing of the relative positions and twisting occur so that lightweight concrete slab is tied with building body Distance between structure is consistent, it is ensured that the aesthetic property of concrete curtain wall outward appearance and practical effect.
(5), after fixture fastens, keeper and locating part can be removed so that it is can recycle, reduce into This.
Accompanying drawing explanation
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Fig. 1 is the vertical cross-sectional that the present invention connects lightweight concrete slab and major structure of construction;
Fig. 2 is A close-up schematic view in Fig. 1;
Fig. 3 is the perspective view that the present invention connects lightweight concrete slab and major structure of construction;
Fig. 4 is B close-up schematic view in Fig. 3;
Fig. 5 is the perspective view of lower L shaped plate part;
Fig. 6 is the perspective view of upper L shaped plate part.
Detailed description of the invention
As shown in figs. 1 to 6, being the attachment structure of the present invention a kind of Multi-function light concrete curtain wall, it includes solid The L shaped plate part of locking member and a pair steel, fixture uses bolt 5, and one of them L shaped plate part is upper L shaped plate Part 1, another L shaped plate part is lower L shaped plate part 2, L-shaped in transverse plate face 21 support of lower L shaped plate part 2 The transverse plate face 11 of plate 1, the vertical plate face 12 of upper L shaped plate part 1 is by bolt 17 and lightweight concrete slab 3 connect, and the transverse plate face 21 of lower L shaped plate part 2 is used for being connected with major structure of construction, upper L shaped plate part 1 The bar hole 13 that transversely (X-direction shown in Fig. 1) extends, lower L shaped plate part 2 is had on transverse plate face 11 Transverse plate face 21 on have the bar hole 23 extended along longitudinally (Y-direction shown in Fig. 3), these two bars Shape hole 13,23 is in decussation shape, and fixture is through two bar holes 13,23 and along bar hole 13,23 Move and be adjusted fastening again so that upper L shaped plate part 1 and lower L shaped plate part 2 connect fixing.
The dual-side in lower L shaped plate part 2 transverse plate face 21 and the connecting portion of vertical plate face 22 dual-side set up one separately Reinforcement 4 to tabular, can further improve the bearing strength of attachment structure.In upper L shaped plate part 1 transverse plate face One end of 11 is provided with vertical flanging 14, and vertical flanging 14 is relative with the vertical plate face 12 of upper L shaped plate part 1, (Z side shown in Fig. 1 is had vertically on the vertical plate face 22 of vertical flanging 14 and lower L shaped plate part 2 To) the bar v notch v 15,24 that extends, this v notch v 15,24 by dismountable keeper through fixing, fixed Position part uses bolt 6 and nut, in order to before fastening fixture, real to upper and lower L shaped plate part 1,2 in advance Execute location transversely to prevent the horizontal changing of the relative positions.
Having the hole, location 16 of pair of parellel on the transverse plate face 11 of upper L shaped plate part 1, hole 16, location is positioned at Between bar hole 13 and its vertical plate face 12 in upper L shaped plate part 1 transverse plate face 11, hole 16, location is by removable The locating part unloaded passes, and locating part uses screw 7, and the lower end of locating part is pushed against the transverse plate of lower L shaped plate part 2 On face 21, in order to before fastening fixture, in advance upper and lower L shaped plate part 1,2 is implemented rotation direction (figure C, D direction shown in 3) on location with prevent twisting.After fixture fastens, can be by locating part with fixed Position part is removed so that it is can recycle.
The concrete structure that lower L shaped plate part is connected with major structure of construction is: the transverse plate face 21 of lower L shaped plate part 2 It is connected by connector is fixing with girder steel 8 top flange of major structure of construction, and lower L shaped plate part 2 transverse plate face The lower surface periphery of 21 welds with girder steel 8 top flange of major structure of construction.
The installation process of the present invention is as follows: lower L shaped plate part is connected on the girder steel top flange of major structure of construction, Upper L shaped plate part is connected on lightweight concrete slab 3 by bolt 17, and the transverse plate face of lower L shaped plate part is placed in Below the transverse plate face of L shaped plate part, fixture (bolt 5) is through the bar on upper L shaped plate part and lower L shaped plate part Shape hole nut of screwing on (be in and unscrew state), keeper (bolt 6) is through the bar shaped of upper and lower L shaped plate part Breach nut of screwing on (be in and unscrew state), locating part (screw 7) is through the transverse plate face of upper L shaped plate part (being in the state of not pushing against), does horizontal and vertical movement by bolt 5 along bar hole, L shaped plate in regulation The relative position of part and lower L shaped plate part, after regulating, tights a bolt 6 and screw 7, prevents L shaped plate part There is the horizontal changing of the relative positions and twisting with lower L shaped plate part, complete the installation location of lightweight concrete slab, then tight a bolt 5, Lightweight concrete slab is connected on major structure of construction, dismountable bolt 6 and screw 7 so that it is profit can be circulated With.
In other embodiments, the bar hole on the transverse plate face of upper L shaped plate part also can extend transversely, phase Ying Di, the bar hole on the transverse plate face of lower L shaped plate part extends longitudinally, and these two bar holes are that cross is handed over Forked.
Embodiments of the present invention are not limited to this, according to the foregoing of the present invention, according to the common skill of this area Art knowledge and customary means, without departing under the present invention above-mentioned basic fundamental thought premise, the present invention can also do Go out the amendment of other various ways, replace or change, within the scope of all falling within rights protection of the present invention.

Claims (5)

1. the attachment structure of a Multi-function light concrete curtain wall, it is characterised in that: it includes fixture and To L shaped plate part, one of them L shaped plate part is upper L shaped plate part, and another L shaped plate part is lower L shaped plate part, The transverse plate face of L shaped plate part in the transverse plate face support of lower L shaped plate part, the vertical plate face of upper L shaped plate part is used for Being connected with lightweight concrete slab, the transverse plate face of lower L shaped plate part is used for being connected with major structure of construction, described upper L A bar hole extended in horizontal or vertical direction, the horizontal stroke of described lower L shaped plate part is had on the transverse plate face of shape plate Having a bar hole extended longitudinally or transversely on plate face, two bar holes are decussation shape, institute State fixture through two bar holes and to move along bar hole and be adjusted fastening again so that upper L shaped plate part and lower L Shape plate connects fixing.
The attachment structure of Multi-function light concrete curtain wall the most according to claim 1, it is characterised in that: The described lower dual-side in L shaped plate part transverse plate face and the connecting portion of vertical plate face dual-side set up pair of plate-shaped separately Reinforcement.
The attachment structure of Multi-function light concrete curtain wall the most according to claim 2, it is characterised in that: On described, the one end in L shaped plate part transverse plate face is provided with vertical flanging, described vertical flanging and described upper L shaped plate The vertical plate face of part is relative, has edge on the vertical plate face of described vertical flanging and described lower L shaped plate part Vertically extending bar v notch v, this v notch v is passed fixing by dismountable keeper, in order to fixing fastening Before part, in advance upper and lower L shaped plate part is implemented location transversely to prevent the horizontal changing of the relative positions.
The attachment structure of Multi-function light concrete curtain wall the most according to claim 3, it is characterised in that: Having hole, a pair location on described on the transverse plate face of L shaped plate part, it is horizontal that hole, described location is positioned at L shaped plate part Between bar hole and its vertical plate face to plate face, hole, described location is passed by dismountable locating part, described limit The lower end of position part is pushed against on the transverse plate face of lower L shaped plate part, in order to fastening before fixture, in advance to upper, Lower L shaped plate part implements the location in rotation direction to prevent twisting.
5., according to the attachment structure of the Multi-function light concrete curtain wall described in any one of Claims 1 to 4, it is special Levy and be: the transverse plate face of described lower L shaped plate part is solid with the girder steel top flange of major structure of construction by connector Determine to connect, and the lower surface periphery in lower L shaped plate part transverse plate face welds with the girder steel top flange of major structure of construction.
CN201410336641.4A 2014-07-15 2014-07-15 A kind of attachment structure of Multi-function light concrete curtain wall Active CN104153495B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410336641.4A CN104153495B (en) 2014-07-15 2014-07-15 A kind of attachment structure of Multi-function light concrete curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410336641.4A CN104153495B (en) 2014-07-15 2014-07-15 A kind of attachment structure of Multi-function light concrete curtain wall

Publications (2)

Publication Number Publication Date
CN104153495A CN104153495A (en) 2014-11-19
CN104153495B true CN104153495B (en) 2016-10-26

Family

ID=51879109

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410336641.4A Active CN104153495B (en) 2014-07-15 2014-07-15 A kind of attachment structure of Multi-function light concrete curtain wall

Country Status (1)

Country Link
CN (1) CN104153495B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105756246B (en) * 2014-12-17 2019-05-17 北新建材集团有限公司 The connection structure of adjustable wall and beam
CN105756245B (en) * 2014-12-17 2019-01-15 北新建材集团有限公司 The installation method of Curtain wall frame and structural beams
CN105863109A (en) * 2016-05-26 2016-08-17 河南仕腾建筑有限公司 Novel wall body installation structure and novel wall body
WO2018009129A1 (en) * 2016-07-07 2018-01-11 Scandinavian Licence Ab A curtain wall system, a composite module for a curtain wall system and a building comprising a curtain wall system
CN107035035B (en) * 2017-05-25 2022-11-18 浙江中屹建设集团有限公司 Light external vertical curtain wall
CN114961055A (en) * 2022-06-08 2022-08-30 中国建筑第八工程局有限公司 Curtain wall fixing structure and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2499463Y (en) * 2001-10-16 2002-07-10 北京市第一建筑工程公司 Wind-proof anti-shock hanging piece for stone curtain wall
JP3785403B2 (en) * 2003-04-11 2006-06-14 パナホーム株式会社 Curtain wall mounting structure
CN202299054U (en) * 2011-10-28 2012-07-04 沈阳远大铝业工程有限公司 Concrete slab curtain wall member
JP5294305B2 (en) * 2008-06-20 2013-09-18 株式会社Lixil curtain wall
CN103352525A (en) * 2013-07-09 2013-10-16 邱平 Curtain wall dry hanging multidirection adjusting device
CN103374986A (en) * 2013-06-28 2013-10-30 广东莲田金属工程建筑有限公司 Multifunctional combined lightweight concrete curtain wall and constructing method thereof
CN204001309U (en) * 2014-07-15 2014-12-10 广东莲田金属工程建筑有限公司 A kind of syndeton of Multi-function light concrete curtain wall

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2499463Y (en) * 2001-10-16 2002-07-10 北京市第一建筑工程公司 Wind-proof anti-shock hanging piece for stone curtain wall
JP3785403B2 (en) * 2003-04-11 2006-06-14 パナホーム株式会社 Curtain wall mounting structure
JP5294305B2 (en) * 2008-06-20 2013-09-18 株式会社Lixil curtain wall
CN202299054U (en) * 2011-10-28 2012-07-04 沈阳远大铝业工程有限公司 Concrete slab curtain wall member
CN103374986A (en) * 2013-06-28 2013-10-30 广东莲田金属工程建筑有限公司 Multifunctional combined lightweight concrete curtain wall and constructing method thereof
CN103352525A (en) * 2013-07-09 2013-10-16 邱平 Curtain wall dry hanging multidirection adjusting device
CN204001309U (en) * 2014-07-15 2014-12-10 广东莲田金属工程建筑有限公司 A kind of syndeton of Multi-function light concrete curtain wall

Also Published As

Publication number Publication date
CN104153495A (en) 2014-11-19

Similar Documents

Publication Publication Date Title
CN104153495B (en) A kind of attachment structure of Multi-function light concrete curtain wall
CN103374986B (en) A kind of multifunction combined light weight concrete construction curtain wall and preparation method thereof
CN107143034A (en) A kind of assembly concrete frame structure beam column rigid connection node
CN104005502B (en) A kind of precast light building cover board and industrialized building house floor slab structure
CN205421616U (en) Assemble integral shear force wall with steel pipe concrete edge member
CN104895193A (en) Precast outer wallboard connecting box and connecting joint
CN108385871A (en) The precast wall body of fabricated structure
CN205804904U (en) A kind of leveling unit
CN103938767B (en) Trough type energy-saving bearing wall externally wrapped by steel wire mesh mortar plates and foamed concrete
CN208472756U (en) Rim of a cup basis steel column installs verticality and absolute altitude adjuster
CN204001309U (en) A kind of syndeton of Multi-function light concrete curtain wall
CN203834771U (en) Prefabricated light floor cover plate and industrial building floor plate structure
CN104912231A (en) Dry-hanging connecting structure of precast outer wall panel and shear wall and construction method of same
CN205348767U (en) Utilize steel reinforcement cage to make external formwork system of skeleton
CN106150191A (en) A kind of full ground form assembled light bounding wall system and construction method
CN209854976U (en) Assembled heat preservation brickwork wall
CN204343442U (en) A kind of prefabricated assembling type reinforced concrete air-condition plate
CN103112766A (en) Construction elevator suspending over basement roof of building and construction method thereof
CN203256930U (en) Connection structure for concrete wall body and masonry wall face
CN102787717B (en) Self-supporting combined steel template construction method
WO2018126950A1 (en) Modular stairway
CN206503365U (en) A kind of shear wall and filling wall junction aluminum alloy pattern plate erecting device
CN203430006U (en) Quick disassembly and assembly cantilever bracket for building outer wall construction
CN206646645U (en) The connecting joint structure of girder steel and column
CN207032474U (en) A kind of assembly concrete frame structure beam column rigid connection node

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160621

Address after: 517100 Guangdong province Heyuan City Lianping Lung Street Town Logistics Industrial Park

Applicant after: GUANGDONG HEYUAN LIANTIAN BUILDING INDUSTRIALIZATION MANUFACTURING CO., LTD.

Address before: Cai Xin Lu Nansha District Lanhe town Guangzhou city Guangdong province 511480 386-1

Applicant before: Guangdong Lanty Metal Engineering Construction Co., Ltd.

Applicant before: GUANGDONG HEYUAN LIANTIAN BUILDING INDUSTRIALIZATION MANUFACTURING CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 517100 Guangdong province Heyuan City Lianping Lung Street Town Logistics Industrial Park

Patentee after: Guangdong, Heyuan, Tian Tian building industrialization Limited by Share Ltd

Address before: 517100 Guangdong province Heyuan City Lianping Lung Street Town Logistics Industrial Park

Patentee before: GUANGDONG HEYUAN LIANTIAN BUILDING INDUSTRIALIZATION MANUFACTURING CO., LTD.