CN208685611U - A kind of underwater concrete pouring equipment - Google Patents
A kind of underwater concrete pouring equipment Download PDFInfo
- Publication number
- CN208685611U CN208685611U CN201821100351.XU CN201821100351U CN208685611U CN 208685611 U CN208685611 U CN 208685611U CN 201821100351 U CN201821100351 U CN 201821100351U CN 208685611 U CN208685611 U CN 208685611U
- Authority
- CN
- China
- Prior art keywords
- conduit
- mariages
- trolley
- band card
- concrete pouring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Underground Or Underwater Handling Of Building Materials (AREA)
Abstract
The utility model provides a kind of underwater concrete pouring equipment, the equipment includes perfusion trolley, mariages band card conduit and conduit fastener, trolley is perfused and is equipped with trolley pedestal, trolley skeleton and hoist engine are respectively fixed in trolley submounts, the top of skeleton is equipped with pulley, one end of wirerope is fixed on hoist engine, the other end is connect by wirerope by pulley with mariages band card conduit, and wherein mariages band card conduit connects fastening by conduit fastener in advance.The utility model has the beneficial effects that perfusion trolley, which avoids crane long-time lifting conduit, reduces construction cost and construction risk to improve the service efficiency of crane;Reliability, watertightness and the convenience that conduit connects when mariages band card conduit ensure that filling concrete;Conduit fastener ensures safety of the mariages band card conduit in installation, demolishing process.In addition, this kind of underwater concrete pouring equipment structure is simply easily operated, it is suitable for being widely applied at the construction field (site).
Description
Technical field
The utility model belongs to underground structure and builds construction field, more particularly to a kind of underwater concrete pouring equipment.
Background technique
With the development of productivity, city size constantly expands, and house, subway, municipal administration and port engineering is brought to get over therewith
Come more, the underground structures such as ground-connecting-wall and bored concrete pile are able to extensive promotion and application.With the increase of underground structure depth,
Traditional underwater gliders technologies such as " excavating casting ", " bag block method " and " tilt-pour process " is not able to satisfy modern building fabric development
Speed, tremie method becomes the main construction method that the underground structures such as ground-connecting-wall and bored concrete pile are built.
Underwater gliders used crane to lift by crane conduit in the past, and conduit connection is using single button connection.Crane rises and pulls out conduit
Precision is not easy to control, and then be easy to cause the quality accidents such as broken pile or disconnected wall.The long-term crane that occupies causes construction cost to increase simultaneously
Add, and occupy construction site or working face to influence next process construction.
To sum up, traditional underwater gliders method increases the quantity and use intensity of live crane, improves construction
Cost and construction safety hidden danger;Meanwhile during a large amount of underwater gliders, the durability of monofilament conduit cannot be abundant
Guarantee, to seriously affect the safety and operability of conduit.Traditional underwater gliders device cannot expire
The development speed of foot present age underground structure, the underwater concrete pouring equipment for needing one kind new is to guarantee that construction of underground structure is constructed
It is safer, economical, convenient.
Summary of the invention
To solve the problems, such as above-mentioned underwater gliders process, the utility model provides a kind of safety, warp
The device of Ji property, convenience, especially a kind of underwater concrete pouring equipment.
To achieve the above object, the technical solution adopted in the utility model is to provide a kind of underwater concrete pouring equipment.
The equipment is mainly made of filling concrete trolley, mariages band card conduit, conduit fastener three parts.Filling concrete trolley is by platform
Underbody seat, trolley skeleton, pulley, wirerope, hoist engine composition, are perfused wire rope hoist on trolley trolley pedestal, and hoist engine is logical
Wirerope is crossed to be connected with mariages band card conduit.When needing concrete perfusion, hoist engine is powered after starting, may be implemented to mariages
Flexible operating with card conduit.When connecting or dismantling mariages band card conduit, needs to use conduit fastener, mariages band card is led
Pipe is temporarily fixed on filling concrete trolley, mariages band card conduit is attached using conduit mounting or dismounting tools by worker or
It is disassembly.Implementation through the above steps realizes the filling concrete construction to underground engineerings such as ground-connecting-wall or bored concrete piles.
The utility model has the beneficial effects that the underwater concrete pouring equipment is safe and reliable, easily operated, constructing operation
Speed is fast, security risk is small, and construction site allocation and transportation are convenient, reduces construction cost and construction risk.It ensure that filling concrete
When conduit connection reliability, watertightness and convenience.Reduce crane occupied ground or working face, reduces construction interference.
Concrete-spouting plant is easy to make, and element of installation market is common, for ease of maintenaince maintains.Equipment is used multiple times, construction cost
It is low compared with crane.
Detailed description of the invention
Fig. 1 is the filling concrete trolley schematic diagram of the utility model;
Fig. 2 is the schematic side view of Fig. 1;
Fig. 3 is the mariages band card conduit schematic diagram of the utility model;
Fig. 4 is the conduit fastener schematic diagram of the utility model;
Fig. 5 is the connection schematic diagram of conduit fastener and mariages band card conduit;
Fig. 6 is the schematic top plan view of Fig. 5.
Specific embodiment
The present invention will be further described with reference to the accompanying drawing.
As shown in Figures 1 to 6, a kind of underwater concrete pouring equipment, including trolley 1, mariages band card conduit 2 is perfused and leads
Pipe fastener 3, perfusion trolley 1 are equipped with trolley pedestal T1, are respectively fixed with trolley skeleton T2 and hoist engine on trolley pedestal T1
The top of T3, skeleton T2 are equipped with pulley T4, and one end of wirerope T5 is fixed on hoist engine T3, and the wirerope T5 passes through pulley T4
The other end is connect with mariages band card conduit 2.
The structure of mariages band card conduit 2 specifically includes the outer silk S2 of top waterproof internal thread S1, top stress, the outer silk of bottom end waterproof
S3, bottom end stress internal thread S4, removable attachment cap S5, edge S6 and pipe shaft S7.When being connected between mariages band card conduit 2, first will
The outer silk S3 of top waterproof internal thread S1 and bottom end waterproof is mutually tightened, then transfer removable attachment cap S5 by silk S2 outside the stress of top with
Bottom end stress internal thread S4 is mutually tightened.
Mariages band card conduit 2 is using rigid vertical tube, and internal diameter is preferably 200-350mm, and single-unit length is preferably 1-4m.Single-unit mariages
It is connected between band card conduit 2 using " mariages is buckled ", i.e., a pair of of screw thread guarantees the reliability that mariages band card conduit 2 connects, another pair
Screw thread guarantees the watertightness between mariages band card conduit 2;In order to facilitate mariages band card conduit 2 decentralization and above mention, apart from mariages
Band card conduit 2 pushes up the position 0.6-1m and checkpost S6 is arranged.
Conduit fastener 3 is adapted with 2 edge S6 of mariages band card conduit, is played in the external fastening mariages band card of connection in advance
The effect of interior outer catheter, conduit fastener 3 are made of clamp K1 and toll bar K2, it is desirable that have certain intensity, to meet mariages band
The weight of card conduit 2, while the conduit fastener 3 will have certain rigidity, to prevent its cracking ends, the knot of conduit fastener 3
Structure.The conduit fastener 3 is mainly used when installing or removing mariages band card conduit 2, and conduit fastener 3 is first placed on platform by when use
On underbody seat T1, then the edge S6 of mariages band card conduit 2 is stuck on conduit fastener 3, finally carries out the peace of mariages band card conduit 2
Dress is removed.The connection of conduit fastener 3 and mariages band card conduit 2.
When needing to be perfused underground engineering concrete, first passes through crane and allocate and transport filling concrete trolley to needing to construct
Position, such as ground-connecting-wall slot section need double duct concrete perfusion simultaneously.Hoist engine T3 is powered after starting, and construction worker can
It is the installation carried out between mariages band card conduit 2 first to realize the operation to mariages band card conduit 2, i.e., after internal thread connection again
Outer silk connection is carried out, is sequentially connected all mariages band card conduits 2 using conduit fastener 3, until meeting filling concrete depth
The design requirement of degree.In filling concrete carry out process, the depth of burying of the mariages band card conduit 2 in concrete is 2-6
Rice, needs discontinuously to dismantle mariages band card conduit 2, to meet the requirement of concrete construction specification, until filling concrete finishes
All mariages band card conduits 2 are removed afterwards, and construction part finally is left into 1 handling of filling concrete trolley.
Claims (6)
1. a kind of underwater concrete pouring equipment, it is characterized in that: including perfusion trolley (1), mariages band card conduit (2) and catheter clip
Part (3), the perfusion trolley (1) are equipped with trolley pedestal (T1), are respectively fixed with trolley bone on the trolley pedestal (T1)
The top of frame (T2) and hoist engine (T3), the skeleton (T2) is equipped with pulley (T4), fixes wirerope on the hoist engine (T3)
(T5) other end is connect by one end, the wirerope (T5) by pulley (T4) with mariages band card conduit (2).
2. a kind of underwater concrete pouring equipment according to claim 1, it is characterized in that: the mariages band card conduit (2)
Including inner tube, housing locknut and edge (S6) that top waterproof internal thread (S1) is connect with the outer silk (S3) of bottom end waterproof, the housing
Locknut includes removable attachment cap (S5) and pipe shaft (S7), and the removable attachment cap (S5) is by silk (S2) and bottom outside the stress of top
Hold stress internal thread (S4) connection fastening.
3. a kind of underwater concrete pouring equipment according to claim 2, it is characterized in that: the mariages band card conduit (2)
Internal diameter is 200-350mm, and single-unit length is 1-4m.
4. a kind of underwater concrete pouring equipment according to claim 2, it is characterized in that: the edge (S6) is apart from mariages
It is arranged at the position 0.6-1m at the top of band card conduit (2).
5. a kind of underwater concrete pouring equipment according to claim 1, it is characterized in that: the conduit fastener (3) includesType clamp (K1) and toll bar (K2), one end of the toll bar (K2) withThe connection of type clamp (K1) hinge, the other end are buckle
Connection is formed and the compatible hole of mariages band card conduit (2).
6. a kind of underwater concrete pouring equipment according to claim 1, it is characterized in that: the pulley (T4) is equipped with 2.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821100351.XU CN208685611U (en) | 2018-07-12 | 2018-07-12 | A kind of underwater concrete pouring equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821100351.XU CN208685611U (en) | 2018-07-12 | 2018-07-12 | A kind of underwater concrete pouring equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208685611U true CN208685611U (en) | 2019-04-02 |
Family
ID=65880745
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821100351.XU Active CN208685611U (en) | 2018-07-12 | 2018-07-12 | A kind of underwater concrete pouring equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208685611U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797596A (en) * | 2018-07-12 | 2018-11-13 | 天津深基工程有限公司 | A kind of underwater concrete pouring equipment |
-
2018
- 2018-07-12 CN CN201821100351.XU patent/CN208685611U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797596A (en) * | 2018-07-12 | 2018-11-13 | 天津深基工程有限公司 | A kind of underwater concrete pouring equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208685611U (en) | A kind of underwater concrete pouring equipment | |
CN205636838U (en) | Deviational survey pipe mouth of pipe reinforcing apparatus | |
CN108221694B (en) | The method for installing long-span arch bridge tie-rod | |
CN204001779U (en) | A kind of built with ribbed bricks wall construction reinforced bar guiding device | |
CN205976551U (en) | Safety precaution type platform of unloading | |
CN108797596A (en) | A kind of underwater concrete pouring equipment | |
CN112176871B (en) | Method for erecting suspension bridge main cable with tunnel type anchors at two sides | |
CN106532557B (en) | Across 10KV line construction platform tools devices | |
CN206118641U (en) | Instrument is binded to supplementary rope of portable direction | |
CN205873594U (en) | Special construction elevator of cooling tower section of thick bamboo wall | |
CN105178451B (en) | The anticorrosion structure and its construction method of the cladding node of assembled architecture outer wall | |
CN105923548A (en) | Device for achieving cable logging based on excavator | |
CN208650505U (en) | The integrated template type attachment device of lifting platform | |
CN104410009A (en) | Climbing type steel wire rope ladder | |
CN206495496U (en) | A kind of aluminum alloy mould plate shear wall top bracing means | |
CN205502574U (en) | Swift formula hangs mould | |
CN202012079U (en) | Pile anchor for cable crane | |
CN205575425U (en) | High strength tower crane attachment structure | |
CN207620397U (en) | The drag structure of building | |
CN206707396U (en) | A kind of hand-rail type electric pole group founds gin pole | |
CN205668869U (en) | A kind of boom hoisting for dredge pump maintenance | |
CN207646957U (en) | A kind of cladding system of the assembled flexible of curtain wall | |
CN104344075A (en) | Rapid hoisting and mounting method for suspending temporary air/water pipeline on shaft wall in vertical shaft construction | |
CN205932698U (en) | Cable laying device suitable for small -size one -tenth bundle cable | |
CN209799402U (en) | Transportation built-in fitting of building prefab |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |