CN207620397U CN201721391396.2U CN201721391396U CN207620397U CN 207620397 U CN207620397 U CN 207620397U CN 201721391396 U CN201721391396 U CN 201721391396U CN 207620397 U CN207620397 U CN 207620397U
Authority
CN
China
Prior art keywords
portal frame
steel
hauling rope
pulling equipment
concrete joist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721391396.2U
Other languages
Chinese (zh)
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721391396.2U priority Critical patent/CN207620397U/en
Application granted granted Critical
Publication of CN207620397U publication Critical patent/CN207620397U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of drag structures of building, it is characterized in that the indwelling preformed hole among concrete joist, wear hauling rope in concrete joist preformed hole, hauling rope couples with towing plate, and towing plate is bolted on concrete joist side;Hauling rope is fixed on pulling equipment, and bracing members couple pulling equipment and steel portal frame, and steel portal frame provides tractive force for pulling equipment, and steel portal frame is coupled with basement by steel truss, and the counter-force of steel portal frame is provided by basement.

Description

The drag structure of building
Technical field
The utility model is related to a kind of drag structures of building, are suitable for building field.
Background technology
The traditional construction mode of building is first constructed basement, then builds superstructure, since basement is related to soil Side is excavated, and earth excavation will be done temporary support structures and be also required to the regular hour using supporting construction as guarantee, and basement is mixed Solidifying soil curing time is also longer, therefore basement construction will take a substantial amount of time.It is applied if synchronized during building basement Work superstructure will necessarily save a large amount of engineering times.It can carry out pouring building coagulation at from 50~200m of basement Then building is slid onto above basement bottom board by soil, how safely and reliably to be drawn using reliable drag structure It is engineering staff's project to be faced.
Utility model content
The utility model is to provide a kind of drag structure of building, and solution is difficult to safely and reliably draw in the prior art The problem of.
The utility model indwelling preformed hole among concrete joist, a diameter of 30~40mm of preformed hole, concrete joist Hauling rope is worn in preformed hole, hauling rope couples with towing plate, and towing plate is bolted on concrete joist side.Tradition Hauling rope be fixed on the bail of concrete joist front end, concrete joist is possible to break because local tensile capacity is insufficient It is bad.Hauling rope through behind building, is fixed to by towing plate on concrete joist by the utility model, draws plate suqare phase It is much greater to bail, concentration of local stress can be alleviated significantly.Another aspect towing plate is applied to the power of concrete joist It is pressure, the power that traditional bail is applied to concrete joist is pulling force, and concrete anti-compression ability is obviously than tensile capacity It is strong very much, therefore the utility model is survivable relative to traditional scheme.
Hauling rope is fixed on pulling equipment, and bracing members couple pulling equipment and steel portal frame, and bracing members use The cylindrical steel tube of a diameter of 100mm, bracing members use bolt-connection, steel portal frame to be carried for pulling equipment with steel portal frame connecting mode For tractive force, steel portal frame is coupled with basement by steel truss, and the counter-force of steel portal frame is provided by basement.
Fabric structure is drawn to designated position, pulling equipment is laid down, hauling rope is taken out in concrete joist preformed hole, With epoxy resin sealing concrete joist preformed hole.
The utility model has a safety feature.
Description of the drawings
Fig. 1 is the drag structure schematic diagram of building.
1, hauling rope, 2, towing plate, 3, steel portal frame, 4, pulling equipment, 5, bracing members, 6, steel truss.
Specific implementation mode
The present embodiment is described in detail below in conjunction with attached drawing.
Embodiment
The present embodiment indwelling preformed hole among concrete joist, a diameter of 30~40mm of preformed hole, concrete joist are pre- Hauling rope 1 is worn in boxing out, hauling rope 1 couples with towing plate 2, and towing plate 2 is bolted on concrete joist side.
Hauling rope 1 is fixed on pulling equipment 4, and bracing members 5 couple pulling equipment 4 and steel portal frame 3, bracing members 5 use the cylindrical steel tube of a diameter of 100mm, and it is to lead that bracing members 5 use bolt-connection, steel portal frame 3 with 3 connecting mode of steel portal frame Draw equipment 4 and tractive force is provided, steel portal frame 3 is coupled with basement by steel truss 6, and the counter-force of steel portal frame 3 is by underground Room provides.
Fabric structure is drawn to designated position, pulling equipment 4 is laid down, hauling rope is taken out in concrete joist preformed hole 1, with epoxy resin sealing concrete joist preformed hole.

Claims (4)

1. a kind of drag structure of building, it is characterized in that the indwelling preformed hole among concrete joist, concrete joist is reserved Hauling rope is worn in hole, hauling rope couples with towing plate, and towing plate is bolted on concrete joist side;Hauling rope is solid It is scheduled on pulling equipment, bracing members couple pulling equipment and steel portal frame, and steel portal frame provides traction for pulling equipment Power, steel portal frame are coupled with basement by steel truss, and the counter-force of steel portal frame is provided by basement.
2. the drag structure of building according to claim 1, it is characterized in that a diameter of 30~40mm of preformed hole.
3. the drag structure of building according to claim 1, it is characterized in that bracing members are justified using the steel of a diameter of 100mm Pipe.
4. the drag structure of building according to claim 1, it is characterized in that bracing members are adopted with steel portal frame connecting mode It is bolted.
CN201721391396.2U 2017-10-26 2017-10-26 The drag structure of building Expired - Fee Related CN207620397U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721391396.2U CN207620397U (en) 2017-10-26 2017-10-26 The drag structure of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721391396.2U CN207620397U (en) 2017-10-26 2017-10-26 The drag structure of building

Publications (1)

Publication Number Publication Date
CN207620397U true CN207620397U (en) 2018-07-17

Family

ID=62826834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721391396.2U Expired - Fee Related CN207620397U (en) 2017-10-26 2017-10-26 The drag structure of building

Country Status (1)

Country Link
CN (1) CN207620397U (en)

Similar Documents

Publication Publication Date Title
CN210562157U (en) Post-grouting composite pile
CN205935621U (en) Simple and easy outer scaffold frame and shear force wall connecting device
CN101942830B (en) Construction method of combined concrete soil pile with core pile
CN204898672U (en) Discard device of pulling out of pile foundation
CN201605590U (en) Soft soil foundation pit soil nail supporting structure
CN205171547U (en) Recoverable miniature stock wall
CN204436407U (en) The structure that the pre-Geological disaster prevention of the double-deck preliminary bracing of a kind of big cross section Support System in Soft Rock Tunnels occurs
CN203855967U (en) Drilling and filling trolley on slope gallery
CN206408611U (en) A kind of adaptive Recyclable anchor rope system
CN207620397U (en) The drag structure of building
CN202731938U (en) Super-soft rock stratum coal bunker well wall ring beam support device
CN204418169U (en) The recoverable prestressed anchor cable of a kind of assembling
CN201201866Y (en) Multifunctional tower crane
CN201671104U (en) Combined tower type crane base
CN203891047U (en) Equipment equipped with steel platform for foundation construction of land bridge
CN203583501U (en) Deep-layer shear resistant device capable of preventing rock sliding
CN206308697U (en) Pile for prestressed pipe supporting waist rail attachment structure
CN207192584U (en) A kind of boom hoisting of torsion-bending ratio
CN202017197U (en) Multi-section H-shaped reinforced concrete plate pile welding structure
CN202323941U (en) Retaining wall device for manual hole digging pile
CN203174605U (en) Gravity type anchor body applied in special geology
CN204662435U (en) The recoverable prestressed anchor head of a kind of pressure dispersing type
CN209100054U (en) It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure
CN103274329B (en) A kind of top draws jack for the construction method of pile-anchor retaining
CN203924043U (en) A kind of bamboo concrete stake

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180717