CN209100054U - It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure - Google Patents

It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure Download PDF

Info

Publication number
CN209100054U
CN209100054U CN201821921570.4U CN201821921570U CN209100054U CN 209100054 U CN209100054 U CN 209100054U CN 201821921570 U CN201821921570 U CN 201821921570U CN 209100054 U CN209100054 U CN 209100054U
Authority
CN
China
Prior art keywords
grouting
telescoping
steel form
steel plate
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821921570.4U
Other languages
Chinese (zh)
Inventor
水龙峡
鲜世雄
刘家宁
耿新春
孟涛
张虎
高飞
胡先举
洪秀安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN201821921570.4U priority Critical patent/CN209100054U/en
Application granted granted Critical
Publication of CN209100054U publication Critical patent/CN209100054U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Include telescoping steel form steel plate the utility model discloses a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, the structure, offers the through-hole passed through for pre-buried grouting steel pipe on the telescoping steel form steel plate;Nozzle plugging mechanism, the nozzle plugging mechanism include sealing steel plate and sealing Interal fixation component;The sealing Interal fixation component includes the first fixed frame and the second fixed frame being connected with the telescoping steel form Interal fixation.Backfill provided by the present application and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, it is simple and reasonable, it is easy to install and use.By arranging preformed hole in telescoping steel form template, and reserved grouting hole plugging device is set, the substitution grouting pore-creating of later-stage utilization embedded steel tube, carry out backfill and consolidation grouting construction, pore-creating process can be reduced, the destruction to formation of concrete can be prevented again, effectively improve the construction quality of hole lining concrete.

Description

It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure
Technical field
The utility model relates to holes to serve as a contrast technical field of concrete construction, more particularly to a kind of backfill and consolidation grouting steel Mould trolley pre-embedment grouting pipe structure.
Background technique
The construction of traditional hole lining concrete mostly uses steel wooden model to combine concrete construction, in work progress, except to work Outside phase, cost etc. affect greatly, formation of concrete faulting of slab ends, pitted skin phenomenon are more, and presentation quality is poor.Carry out backfill and When consolidation grouting pore-creating, causes secondary to molded concrete or repeatedly drill breakoff phenomenon, or even reinforcing bar is damaged.
Utility model content
The utility model provide it is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure.
The utility model provides following scheme:
It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, comprising:
Telescoping steel form steel plate offers the through-hole passed through for pre-buried grouting steel pipe on the telescoping steel form steel plate;
Nozzle plugging mechanism, the nozzle plugging mechanism include sealing steel plate and sealing Interal fixation component;The envelope Mouth Interal fixation component includes the first fixed frame and the second fixed frame being connected with the telescoping steel form Interal fixation;Described One fixed frame respectively includes the vertical plate and the vertical plate that are connected with the telescoping steel form Interal fixation with second fixed frame The level board being fixedly linked;
Wherein, threaded hole is offered on the level board, is provided with bolt in the threaded hole;The sealing steel plate is located at Between first fixed frame and second fixed frame and it is located at the bolt lower part;The bolt is for realizing the sealing The fastening of steel plate and the through-hole.
It is preferred: to be fixedly connected with circular steel plate on the sealing steel plate.
It is preferred: to be fixedly connected with link chain on the sealing steel plate.
It is preferred: between first fixed frame and the second fixed frame vertical plate respectively contained and telescoping steel form steel plate It is provided with reinforcing rib.
Preferred: the reinforcing rib is to be made using screw-thread steel.
According to specific embodiment provided by the utility model, the utility model discloses following technical effects:
By the utility model, a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure may be implemented, Under a kind of implementation, which may include telescoping steel form steel plate, offer on the telescoping steel form steel plate for pre-buried filling The through-hole that slurry steel pipe passes through;Nozzle plugging mechanism, the nozzle plugging mechanism include sealing steel plate and sealing Interal fixation group Part;The sealing Interal fixation component includes that the first fixed frame being connected with the telescoping steel form Interal fixation and second are fixed Frame;First fixed frame and second fixed frame respectively include the vertical plate being connected with the telescoping steel form Interal fixation and The level board that the vertical plate is fixedly linked;Wherein, threaded hole is offered on the level board, is provided with spiral shell in the threaded hole Bolt;The sealing steel plate is between first fixed frame and second fixed frame and is located at the bolt lower part;It is described Bolt is for realizing the fastening for sealing steel plate and the through-hole.Backfill provided by the present application and consolidation grouting telescoping steel form Pre-embedment grouting pipe structure, it is simple and reasonable, it is easy to install and use.By arranging preformed hole in telescoping steel form template, and set Reserved grouting hole plugging device is set, the substitution grouting pore-creating of later-stage utilization embedded steel tube carries out backfill and consolidation grouting construction Pore-creating process is reduced, and the destruction to formation of concrete can be prevented, effectively improves the construction quality of hole lining concrete.
Certainly, any product for implementing the utility model does not necessarily require achieving all the advantages described above at the same time.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only the utility model Some embodiments for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other attached drawings.
Fig. 1 is a kind of backfill provided by the embodiment of the utility model and consolidation grouting telescoping steel form pre-embedment grouting pipe structure Structural schematic diagram;
Fig. 2 is the structural schematic diagram of nozzle plugging mechanism provided by the embodiment of the utility model.
In figure: telescoping steel form steel plate 1, through-hole 2, sealing steel plate 3, the first fixed frame 401, the second fixed frame 402, bolt 5, Circular steel plate 6, link chain 7, reinforcing rib 8.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art's every other embodiment obtained, all belongs to In the range of the utility model protection.
Embodiment
It is that a kind of backfill provided by the embodiment of the utility model and consolidation grouting telescoping steel form are pre-buried referring to Fig. 1, Fig. 2 Grout pipe structure, as shown in Figure 1 and Figure 2, the structure include telescoping steel form steel plate 1, are opened up on the telescoping steel form steel plate 1 useful In the through-hole 2 that pre-buried grouting steel pipe passes through;
Nozzle plugging mechanism, the nozzle plugging mechanism include sealing steel plate 3 and sealing Interal fixation component;The envelope Mouth Interal fixation component includes the first fixed frame 401 and the second fixed frame being fixedly linked with the telescoping steel form steel plate 1 402;First fixed frame 401 fixes what 402 framves respectively included being fixedly linked with the telescoping steel form steel plate 1 with described second The level board that vertical plate and the vertical plate are fixedly linked;
Wherein, threaded hole is offered on the level board, and bolt 5 is provided in the threaded hole;Described sealing steel plate 3 Between first fixed frame 401 and second fixed frame 402 and it is located at 5 lower part of the bolt;The bolt 5 is for real The fastening of existing the sealing steel plate 3 and the through-hole 2.
Further, circular steel plate 6 is fixedly connected on the sealing steel plate 3.It is fixedly connected on the sealing steel plate 3 Link chain 7.The vertical plate and telescoping steel form steel plate 1 that first fixed frame 401 is respectively contained with second fixed frame 402 it Between be provided with reinforcing rib 8.The reinforcing rib 8 is to be made using screw-thread steel.
The sequence of construction of backfill provided by the present application and consolidation grouting telescoping steel form pre-embedment grouting pipe structure: bedrock surface is clear Reason → underplate concrete pours → and side and roof arch reinforcement installation → telescoping steel form is in place → brushing release agent → seam surface treatment and measurement Setting-out → waterstop installation → locking plug template closure → template check → pre-embedment grouting pipe → concreting → waits strong → demoulding Maintenance → subsequent cycle.
In order to which structure provided by the present application is described in detail, below in the Tasha A Er water-control project power tunnel barrel work Concrete application in journey is illustrated.
The Xinjiang Tasha A Er water-control project power tunnel barrel engineering construction bid section, concrete engineering construction project are as follows: I # power tunnel barrel pile No. sends out 1+395.087m~hair 5+979.529m section concrete lining cutting, lining cutting overall length 4584.442m;Ⅱ# Power tunnel pile No. sends out 1+409.861m~hair 5+962.939m section concrete lining cutting, lining cutting overall length 4553.078m;1# and 2# power generation Hole working tunnel closure etc..Section is diameter 8.5m round, longitudinal slope 0.2%, III class after two power tunnel barrel concrete linings Lining thickness 40cm under the conditions of wall rock geology, lining thickness 60cm under IV, V class surrounding rock geological conditions.The main work of concrete works Cheng Liang are as follows: 12.98 ten thousand m3 of concrete lining, reinforcing bar system pacify 2.31 ten thousand t.
When making telescoping steel form, preformed hole is arranged according to design requirement on punching block.Aperture Φ 60mm, in favor of Φ 50 Steel pipe insertion.6 row's preformed holes are arranged on punching block altogether.First row is 1.0m away from trolley port, remaining spacing is 2m.Preformed hole is plum Flower-shape arrangement.
The installation site of steel pipe embedded part controls stake wheelbase using total station setting-out by design drawing, forms control net, To control embedded steel tube position, array pitch uses steel ruler setting-out between grout hole.Telescoping steel form pre-embedment grouting pipe nozzle blocks, Reserved nozzle is blocked using having a size of 15cm × 8cm, is covered with a thickness of the steel plate of 3mm, and a thickness 5mm is welded on the steel plate, The circular steel plate and link chain that radius is 2.5cm, to facilitate steel plate when closure to adjust, nozzle blocks steel plate and uses M12 spiral shell Bolt is reinforced.
This engineering uses steel pipe to be up to 90% or more as grout hole built-in fitting utilization rate, the presentation quality of formation of concrete It is substantially unaffected.Relative to common drill construction technique, need to repeatedly drill because of situations such as positioning inaccurate or chance reinforcing bar, coagulation Native surface is destroyed, caused by repairing and rework cost accordingly reduce 90% or more.
Compared with pvc pipe built-in fitting, reinforces positioning and be guaranteed.Meanwhile interference of the pore-creating to steel mesh is avoided, it makes The efficiency in hole improves 50% or more, has saved construction cost.
From social benefit, power tunnel barrel engineering mainly undertakes diversion task, using telescoping steel form and grouting steel pipe The application of pre-buried technology, is improved this engineering construction quality, while also just improving the safety system of power tunnel barrel engineering Number, provides guarantee for reservoir safety.
Telescoping steel form hole serves as a contrast the application of concrete and the pre-buried technology of grouting steel pipe, be similar engineering in Engineering Construction Management and It summarizes in terms of quality control on construction and has accumulated engineering experience, cultivated a collection of technical staff for skillfully grasping this technology and pipe Reason personnel provide technical support for later similar engineering project construction.Meanwhile telescoping steel form is carried out in this construction process Local flow improvement, cavern's construction of concrete lining is innovated, for similar engineering make full use of telescoping steel form globality, Mobility shortens the construction period, save the cost provides reliable method.
The Tasha A Er water-control project power tunnel barrel engineering carries out power tunnel concrete lining using telescoping steel form Construction, accelerates construction speed, has saved cost, meanwhile, by carrying out innovation transformation to telescoping steel form, make full use of punching block platform The globality and mobility of vehicle are realized to the one-time formed effect of concrete construction.Grouting pore-creating is substituted using embedded steel tube, Grouting pore-creating destruction caused by concrete is greatly reduced, ensure that construction quality.This engineering combine using telescoping steel form and Both pre-buried grouting steel pipes advantage simultaneously carries out innovation and application, is compared compared with other similar projects using traditional handicraft construction, engineering is applied Working medium amount and comprehensive benefit significantly improve.
In short, backfill provided by the present application and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, simple and reasonable, It is easy to install and use.By arranging preformed hole in telescoping steel form template, and reserved grouting hole plugging device, later-stage utilization are set Embedded steel tube substitution grouting pore-creating, carries out backfill and consolidation grouting construction, can reduce pore-creating process, and can prevent mixed to molding The destruction for coagulating soil effectively improves the construction quality of hole lining concrete.Final power tunnel barrel engineering uses crawler belt voluntarily trestle type Needle beam wholecircle telescoping steel form carries out lining cutting, and backfill and consolidation grouting pore-creating use steel pipe built-in process.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
The above is only the preferred embodiment of the utility model only, is not intended to limit the protection model of the utility model It encloses.Any modification, equivalent substitution, improvement and etc. made within the spirit and principle of the present invention, are all contained in this reality With in novel protection scope.

Claims (5)

1. a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure characterized by comprising
Telescoping steel form steel plate offers the through-hole passed through for pre-buried grouting steel pipe on the telescoping steel form steel plate;
Nozzle plugging mechanism, the nozzle plugging mechanism include sealing steel plate and sealing Interal fixation component;The sealing steel Plate fixation kit includes the first fixed frame and the second fixed frame being connected with the telescoping steel form Interal fixation;Described first is solid Determine frame and is fixed with the vertical plate and the vertical plate that second fixed frame respectively includes being connected with the telescoping steel form Interal fixation Connected level board;
Wherein, threaded hole is offered on the level board, is provided with bolt in the threaded hole;The sealing steel plate is located at described Between first fixed frame and second fixed frame and it is located at the bolt lower part;The bolt is for realizing the sealing steel plate With the fastening of the through-hole.
2. backfill according to claim 1 and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, which is characterized in that institute It states and is fixedly connected with circular steel plate on sealing steel plate.
3. backfill according to claim 1 and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, which is characterized in that institute It states and is fixedly connected with link chain on sealing steel plate.
4. backfill according to claim 1 and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, which is characterized in that institute It states and is provided with reinforcing rib between the first fixed frame and the second fixed frame vertical plate respectively contained and telescoping steel form steel plate.
5. backfill according to claim 4 and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, which is characterized in that institute Stating reinforcing rib is to be made using screw-thread steel.
CN201821921570.4U 2018-11-21 2018-11-21 It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure Active CN209100054U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821921570.4U CN209100054U (en) 2018-11-21 2018-11-21 It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821921570.4U CN209100054U (en) 2018-11-21 2018-11-21 It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure

Publications (1)

Publication Number Publication Date
CN209100054U true CN209100054U (en) 2019-07-12

Family

ID=67160801

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821921570.4U Active CN209100054U (en) 2018-11-21 2018-11-21 It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure

Country Status (1)

Country Link
CN (1) CN209100054U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109469493A (en) * 2018-11-21 2019-03-15 中国水利水电第四工程局有限公司 It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109469493A (en) * 2018-11-21 2019-03-15 中国水利水电第四工程局有限公司 It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure

Similar Documents

Publication Publication Date Title
CN104929648B (en) A kind of tunnel branch base tunnel construction method
CN104533446B (en) Construction method and its structure that a kind of big cross section Support System in Soft Rock Tunnels bilayer pre- Geological disaster prevention of preliminary bracing occurs
CN201560780U (en) Ultra-small clear distance tunnel rock pillar pre-stress opposite-pull anchor rod structure
CN104389610B (en) A kind of ultrashort step construction method of traversing operation freeway tunnel
CN105220654B (en) The ruggedized construction and its construction method of a kind of earth and rockfill dam
CN209924998U (en) Shallow earthing shield tunnel is worn road reinforcement protection architecture down
CN109026020B (en) Water-rich tunnel karst cave treatment and excavation method
CN206956742U (en) High precipitous rock roadbed side slope repair system
CN105696602A (en) Composite pile-anchor supporting method and structure for deepening excavation
CN110130927A (en) A kind of carbonaceous slate serious deformation control construction method
CN102817621B (en) Comprehensive construction method applicable to controlling arch basement sedimentation for tunnel in unfavorable geological conditions
CN106522248A (en) Method for reinforcing soil slope and slope reinforcing device
CN209100054U (en) It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure
CN101153494A (en) Underground beam-pile frame construction for reinforcing side slope
CN204436407U (en) The structure that the pre-Geological disaster prevention of the double-deck preliminary bracing of a kind of big cross section Support System in Soft Rock Tunnels occurs
CN203334301U (en) Cave slope strengthening protection structure
CN207348879U (en) Tailwater tunnel structure
CN212563261U (en) Half cut single-pressure type open cut tunnel advances hole protective structure fast
CN204780975U (en) A four return circuit terminal steel pipe poles are drawn and are dug compound basis of anchor log for medium voltage electric distribution circuit
CN111794774A (en) Rapid entering protection structure of half cut single-pressure open cut tunnel and construction method
CN205475257U (en) A composite pile anchor supporting construction for deepening excavation
CN203891047U (en) Equipment equipped with steel platform for foundation construction of land bridge
CN109469493A (en) It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure
CN201908313U (en) Side slope reinforcement structure
CN204703920U (en) A kind of solidifying of the working face system based on fiberglass pipe bolt grouting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant