CN109469493A - It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure - Google Patents

It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure Download PDF

Info

Publication number
CN109469493A
CN109469493A CN201811391414.6A CN201811391414A CN109469493A CN 109469493 A CN109469493 A CN 109469493A CN 201811391414 A CN201811391414 A CN 201811391414A CN 109469493 A CN109469493 A CN 109469493A
Authority
CN
China
Prior art keywords
grouting
telescoping
steel form
steel plate
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811391414.6A
Other languages
Chinese (zh)
Inventor
水龙峡
鲜世雄
刘家宁
耿新春
孟涛
张虎
高飞
胡先举
洪秀安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN201811391414.6A priority Critical patent/CN109469493A/en
Publication of CN109469493A publication Critical patent/CN109469493A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Include telescoping steel form steel plate the invention discloses a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, the structure, offers the through-hole passed through for pre-buried grouting steel pipe on the telescoping steel form steel plate;Nozzle plugging mechanism, the nozzle plugging mechanism include sealing steel plate and sealing Interal fixation component;The sealing Interal fixation component includes the first fixed frame and the second fixed frame being connected with the telescoping steel form Interal fixation.Backfill provided by the present application and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, it is simple and reasonable, it is easy to install and use.By arranging preformed hole in telescoping steel form template, and reserved grouting hole plugging device is set, the substitution grouting pore-creating of later-stage utilization embedded steel tube, carry out backfill and consolidation grouting construction, pore-creating process can be reduced, the destruction to formation of concrete can be prevented again, effectively improve the construction quality of hole lining concrete.

Description

It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure
Technical field
The present invention relates to holes to serve as a contrast technical field of concrete construction, more particularly to a kind of backfill and consolidation grouting punching block platform Vehicle pre-embedment grouting pipe structure.
Background technique
The construction of traditional hole lining concrete mostly uses steel wooden model to combine concrete construction, in work progress, except to work Outside phase, cost etc. affect greatly, formation of concrete faulting of slab ends, pitted skin phenomenon are more, and presentation quality is poor.Carry out backfill and When consolidation grouting pore-creating, causes secondary to molded concrete or repeatedly drill breakoff phenomenon, or even reinforcing bar is damaged.
Summary of the invention
The present invention provides a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structures.
The present invention provides following schemes:
It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, comprising:
Telescoping steel form steel plate offers the through-hole passed through for pre-buried grouting steel pipe on the telescoping steel form steel plate;
Nozzle plugging mechanism, the nozzle plugging mechanism include sealing steel plate and sealing Interal fixation component;The sealing steel Plate fixation kit includes the first fixed frame and the second fixed frame being connected with the telescoping steel form Interal fixation;Described first is solid Determine frame and is fixed with the vertical plate and the vertical plate that second fixed frame respectively includes being connected with the telescoping steel form Interal fixation Connected level board;
Wherein, threaded hole is offered on the level board, is provided with bolt in the threaded hole;The sealing steel plate is located at described Between first fixed frame and second fixed frame and it is located at the bolt lower part;The bolt is for realizing the sealing steel plate With the fastening of the through-hole.
It is preferred: to be fixedly connected with circular steel plate on the sealing steel plate.
It is preferred: to be fixedly connected with link chain on the sealing steel plate.
It is preferred: between first fixed frame and the second fixed frame vertical plate respectively contained and telescoping steel form steel plate It is provided with reinforcing rib.
Preferred: the reinforcing rib is to be made using screw-thread steel.
The specific embodiment provided according to the present invention, the invention discloses following technical effects:
By the invention it is possible to realize it is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, in a kind of realization Under mode, which may include telescoping steel form steel plate, offers on the telescoping steel form steel plate and wears for pre-buried grouting steel pipe The through-hole crossed;Nozzle plugging mechanism, the nozzle plugging mechanism include sealing steel plate and sealing Interal fixation component;The envelope Mouth Interal fixation component includes the first fixed frame and the second fixed frame being connected with the telescoping steel form Interal fixation;Described One fixed frame respectively includes the vertical plate and the vertical plate that are connected with the telescoping steel form Interal fixation with second fixed frame The level board being fixedly linked;Wherein, threaded hole is offered on the level board, is provided with bolt in the threaded hole;The envelope Mouth steel plate is between first fixed frame and second fixed frame and is located at the bolt lower part;The bolt is for real The fastening of existing the sealing steel plate and the through-hole.Backfill provided by the present application and consolidation grouting telescoping steel form pre-embedment grouting pipe Structure, it is simple and reasonable, it is easy to install and use.By arranging preformed hole in telescoping steel form template, and reserved grouting is set Hole plugging device, later-stage utilization embedded steel tube substitution grouting pore-creating, carries out backfill and consolidation grouting construction, can reduce pore-creating work Sequence, and the destruction to formation of concrete can be prevented, effectively improve the construction quality of hole lining concrete.
Certainly, it implements any of the products of the present invention and does not necessarily require achieving all the advantages described above at the same time.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is the knot of a kind of backfill provided in an embodiment of the present invention and consolidation grouting telescoping steel form pre-embedment grouting pipe structure Structure schematic diagram;
Fig. 2 is the structural schematic diagram of nozzle plugging mechanism provided in an embodiment of the present invention.
In figure: telescoping steel form steel plate 1, through-hole 2, sealing steel plate 3, the first fixed frame 401, the second fixed frame 402, bolt 5, Circular steel plate 6, link chain 7, reinforcing rib 8.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art's every other embodiment obtained belong to what the present invention protected Range.
Embodiment
It is a kind of backfill and the pre-buried grouting of consolidation grouting telescoping steel form provided in an embodiment of the present invention referring to Fig. 1, Fig. 2 Pipe structure, as shown in Figure 1 and Figure 2, the structure include telescoping steel form steel plate 1, are offered on the telescoping steel form steel plate 1 for pre- Bury the through-hole 2 that grouting steel pipe passes through;
Nozzle plugging mechanism, the nozzle plugging mechanism include sealing steel plate 3 and sealing Interal fixation component;The sealing steel Plate fixation kit includes the first fixed frame 401 and the second fixed frame 402 being fixedly linked with the telescoping steel form steel plate 1;Institute State the first fixed frame 401 with described second fix 402 framves respectively include the vertical plate being fixedly linked with the telescoping steel form steel plate 1 with And the level board that the vertical plate is fixedly linked;
Wherein, threaded hole is offered on the level board, and bolt 5 is provided in the threaded hole;The sealing steel plate 3 is located at institute It states between the first fixed frame 401 and second fixed frame 402 and is located at 5 lower part of bolt;The bolt 5 is for realizing institute State the fastening of sealing steel plate 3 and the through-hole 2.
Further, circular steel plate 6 is fixedly connected on the sealing steel plate 3.It is fixedly connected on the sealing steel plate 3 Link chain 7.The vertical plate and telescoping steel form steel plate 1 that first fixed frame 401 is respectively contained with second fixed frame 402 it Between be provided with reinforcing rib 8.The reinforcing rib 8 is to be made using screw-thread steel.
The sequence of construction of backfill provided by the present application and consolidation grouting telescoping steel form pre-embedment grouting pipe structure: bedrock surface is clear Reason → underplate concrete pours → and side and roof arch reinforcement installation → telescoping steel form is in place → brushing release agent → seam surface treatment and measurement Setting-out → waterstop installation → locking plug template closure → template check → pre-embedment grouting pipe → concreting → waits strong → demoulding Maintenance → subsequent cycle.
In order to which structure provided by the present application is described in detail, below in the Tasha A Er water-control project power tunnel barrel work Concrete application in journey is illustrated.
The Xinjiang Tasha A Er water-control project power tunnel barrel engineering construction bid section, concrete engineering construction project are as follows: I # power tunnel barrel pile No. sends out 1+395.087m~hair 5+979.529m section concrete lining cutting, lining cutting overall length 4584.442m;Ⅱ# Power tunnel pile No. sends out 1+409.861m~hair 5+962.939m section concrete lining cutting, lining cutting overall length 4553.078m;1# and 2# power generation Hole working tunnel closure etc..Section is diameter 8.5m round, longitudinal slope 0.2%, III class after two power tunnel barrel concrete linings Lining thickness 40cm under the conditions of wall rock geology, lining thickness 60cm under IV, V class surrounding rock geological conditions.The main work of concrete works Cheng Liang are as follows: 12.98 ten thousand m3 of concrete lining, reinforcing bar system pacify 2.31 ten thousand t.
When making telescoping steel form, preformed hole is arranged according to design requirement on punching block.Aperture Φ 60mm, in favor of Φ 50 Steel pipe insertion.6 row's preformed holes are arranged on punching block altogether.First row is 1.0m away from trolley port, remaining spacing is 2m.Preformed hole is plum Flower-shape arrangement.
The installation site of steel pipe embedded part controls stake wheelbase using total station setting-out by design drawing, forms control net, To control embedded steel tube position, array pitch uses steel ruler setting-out between grout hole.Telescoping steel form pre-embedment grouting pipe nozzle blocks, Reserved nozzle is blocked using having a size of 15cm × 8cm, is covered with a thickness of the steel plate of 3mm, and a thickness 5mm is welded on the steel plate, The circular steel plate and link chain that radius is 2.5cm, to facilitate steel plate when closure to adjust, nozzle blocks steel plate and uses M12 spiral shell Bolt is reinforced.
This engineering uses steel pipe to be up to 90% or more as grout hole built-in fitting utilization rate, the presentation quality of formation of concrete It is substantially unaffected.Relative to common drill construction technique, need to repeatedly drill because of situations such as positioning inaccurate or chance reinforcing bar, coagulation Native surface is destroyed, caused by repairing and rework cost accordingly reduce 90% or more.
Compared with pvc pipe built-in fitting, reinforces positioning and be guaranteed.Meanwhile interference of the pore-creating to steel mesh is avoided, it makes The efficiency in hole improves 50% or more, has saved construction cost.
From social benefit, power tunnel barrel engineering mainly undertakes diversion task, using telescoping steel form and grouting steel pipe The application of pre-buried technology, is improved this engineering construction quality, while also just improving the safety system of power tunnel barrel engineering Number, provides guarantee for reservoir safety.
Telescoping steel form hole serves as a contrast the application of concrete and the pre-buried technology of grouting steel pipe, be similar engineering in Engineering Construction Management and It summarizes in terms of quality control on construction and has accumulated engineering experience, cultivated a collection of technical staff for skillfully grasping this technology and pipe Reason personnel provide technical support for later similar engineering project construction.Meanwhile telescoping steel form is carried out in this construction process Local flow improvement, cavern's construction of concrete lining is innovated, for similar engineering make full use of telescoping steel form globality, Mobility shortens the construction period, save the cost provides reliable method.
The Tasha A Er water-control project power tunnel barrel engineering carries out power tunnel concrete lining using telescoping steel form Construction, accelerates construction speed, has saved cost, meanwhile, by carrying out innovation transformation to telescoping steel form, make full use of punching block platform The globality and mobility of vehicle are realized to the one-time formed effect of concrete construction.Grouting pore-creating is substituted using embedded steel tube, Grouting pore-creating destruction caused by concrete is greatly reduced, ensure that construction quality.This engineering combine using telescoping steel form and Both pre-buried grouting steel pipes advantage simultaneously carries out innovation and application, is compared compared with other similar projects using traditional handicraft construction, engineering is applied Working medium amount and comprehensive benefit significantly improve.
In short, backfill provided by the present application and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, simple and reasonable, It is easy to install and use.By arranging preformed hole in telescoping steel form template, and reserved grouting hole plugging device, later-stage utilization are set Embedded steel tube substitution grouting pore-creating, carries out backfill and consolidation grouting construction, can reduce pore-creating process, and can prevent mixed to molding The destruction for coagulating soil effectively improves the construction quality of hole lining concrete.Final power tunnel barrel engineering uses crawler belt voluntarily trestle type Needle beam wholecircle telescoping steel form carries out lining cutting, and backfill and consolidation grouting pore-creating use steel pipe built-in process.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the scope of the present invention.It is all Any modification, equivalent replacement, improvement and so within the spirit and principles in the present invention, are all contained in protection scope of the present invention It is interior.

Claims (5)

1. a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure characterized by comprising
Telescoping steel form steel plate offers the through-hole passed through for pre-buried grouting steel pipe on the telescoping steel form steel plate;
Nozzle plugging mechanism, the nozzle plugging mechanism include sealing steel plate and sealing Interal fixation component;The sealing steel Plate fixation kit includes the first fixed frame and the second fixed frame being connected with the telescoping steel form Interal fixation;Described first is solid Determine frame and is fixed with the vertical plate and the vertical plate that second fixed frame respectively includes being connected with the telescoping steel form Interal fixation Connected level board;
Wherein, threaded hole is offered on the level board, is provided with bolt in the threaded hole;The sealing steel plate is located at described Between first fixed frame and second fixed frame and it is located at the bolt lower part;The bolt is for realizing the sealing steel plate With the fastening of the through-hole.
2. backfill according to claim 1 and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, which is characterized in that institute It states and is fixedly connected with circular steel plate on sealing steel plate.
3. backfill according to claim 1 and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, which is characterized in that institute It states and is fixedly connected with link chain on sealing steel plate.
4. backfill according to claim 1 and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, which is characterized in that institute It states and is provided with reinforcing rib between the first fixed frame and the second fixed frame vertical plate respectively contained and telescoping steel form steel plate.
5. backfill according to claim 4 and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, which is characterized in that institute Stating reinforcing rib is to be made using screw-thread steel.
CN201811391414.6A 2018-11-21 2018-11-21 It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure Pending CN109469493A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811391414.6A CN109469493A (en) 2018-11-21 2018-11-21 It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811391414.6A CN109469493A (en) 2018-11-21 2018-11-21 It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure

Publications (1)

Publication Number Publication Date
CN109469493A true CN109469493A (en) 2019-03-15

Family

ID=65674208

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811391414.6A Pending CN109469493A (en) 2018-11-21 2018-11-21 It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure

Country Status (1)

Country Link
CN (1) CN109469493A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001317297A (en) * 2000-05-09 2001-11-16 Gifu Kogyo Co Ltd Method and device for stopping gable of concrete for tunnel lining
CN202544861U (en) * 2012-02-17 2012-11-21 成都市新筑路桥机械股份有限公司 Exhaust device for bottom mould of needle beam trolley
CN203890978U (en) * 2014-05-19 2014-10-22 中国水电顾问集团贵阳勘测设计研究院有限公司 Contact grouting structure for buried pressure pipe
CN207111120U (en) * 2017-08-24 2018-03-16 中铁十八局集团隧道工程有限公司 A kind of pre-embedded device for TBM synchronization lining chassis grout holes and osculum
CN209100054U (en) * 2018-11-21 2019-07-12 中国水利水电第四工程局有限公司 It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001317297A (en) * 2000-05-09 2001-11-16 Gifu Kogyo Co Ltd Method and device for stopping gable of concrete for tunnel lining
CN202544861U (en) * 2012-02-17 2012-11-21 成都市新筑路桥机械股份有限公司 Exhaust device for bottom mould of needle beam trolley
CN203890978U (en) * 2014-05-19 2014-10-22 中国水电顾问集团贵阳勘测设计研究院有限公司 Contact grouting structure for buried pressure pipe
CN207111120U (en) * 2017-08-24 2018-03-16 中铁十八局集团隧道工程有限公司 A kind of pre-embedded device for TBM synchronization lining chassis grout holes and osculum
CN209100054U (en) * 2018-11-21 2019-07-12 中国水利水电第四工程局有限公司 It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure

Similar Documents

Publication Publication Date Title
CN104929648B (en) A kind of tunnel branch base tunnel construction method
CN104533446B (en) Construction method and its structure that a kind of big cross section Support System in Soft Rock Tunnels bilayer pre- Geological disaster prevention of preliminary bracing occurs
CN102021911B (en) Side slope reinforcing method and structure
CN104389610B (en) A kind of ultrashort step construction method of traversing operation freeway tunnel
CN201560780U (en) Ultra-small clear distance tunnel rock pillar pre-stress opposite-pull anchor rod structure
CN106400813A (en) Foundation pit support system and construction method thereof
CN104196537A (en) Construction method of three parallel metro tunnels with ultra-small clear distance
CN110130927A (en) A kind of carbonaceous slate serious deformation control construction method
CN203334300U (en) Root pile supporting structure
CN105696602A (en) Composite pile-anchor supporting method and structure for deepening excavation
WO2020259059A1 (en) Tbm parallel heading tunnel trunk construction method
CN205742175U (en) A kind of steel construction protection wall of bored pile
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN102400694A (en) Reinforcement method for combined part of shield tunnel and mining-method tunnel
CN104141500B (en) One hardens sand and gravel stratum cavern con struction method
CN106522248A (en) Method for reinforcing soil slope and slope reinforcing device
CN203130109U (en) Large-section karst tunnel supporting equipment
CN209100054U (en) It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure
CN203334301U (en) Cave slope strengthening protection structure
CN204436407U (en) The structure that the pre-Geological disaster prevention of the double-deck preliminary bracing of a kind of big cross section Support System in Soft Rock Tunnels occurs
CN204780975U (en) A four return circuit terminal steel pipe poles are drawn and are dug compound basis of anchor log for medium voltage electric distribution circuit
CN203891047U (en) Equipment equipped with steel platform for foundation construction of land bridge
CN205444232U (en) Stock - gravity type infiltration retaining wall
CN102359395B (en) Method for plugging large-scale water-inrush burst-mud burst hole of tunnel fault
CN109469493A (en) It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination