CN109469493A - It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure - Google Patents
It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure Download PDFInfo
- Publication number
- CN109469493A CN109469493A CN201811391414.6A CN201811391414A CN109469493A CN 109469493 A CN109469493 A CN 109469493A CN 201811391414 A CN201811391414 A CN 201811391414A CN 109469493 A CN109469493 A CN 109469493A
- Authority
- CN
- China
- Prior art keywords
- grouting
- telescoping
- steel form
- steel plate
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 125
- 239000010959 steel Substances 0.000 title claims abstract description 125
- 238000007596 consolidation process Methods 0.000 title claims abstract description 23
- 238000007789 sealing Methods 0.000 claims abstract description 28
- 230000007246 mechanism Effects 0.000 claims abstract description 11
- 230000003014 reinforcing effect Effects 0.000 claims description 10
- 239000007787 solid Substances 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 25
- 238000000034 method Methods 0.000 abstract description 13
- 230000008569 process Effects 0.000 abstract description 7
- 230000015572 biosynthetic process Effects 0.000 abstract description 4
- 230000006378 damage Effects 0.000 abstract description 4
- 238000006467 substitution reaction Methods 0.000 abstract description 3
- 230000008901 benefit Effects 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 238000004080 punching Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000011440 grout Substances 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 230000001680 brushing effect Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 230000001112 coagulating effect Effects 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000009430 construction management Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000004441 surface measurement Methods 0.000 description 1
- 238000004381 surface treatment Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/102—Removable shuttering; Bearing or supporting devices therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Include telescoping steel form steel plate the invention discloses a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, the structure, offers the through-hole passed through for pre-buried grouting steel pipe on the telescoping steel form steel plate;Nozzle plugging mechanism, the nozzle plugging mechanism include sealing steel plate and sealing Interal fixation component;The sealing Interal fixation component includes the first fixed frame and the second fixed frame being connected with the telescoping steel form Interal fixation.Backfill provided by the present application and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, it is simple and reasonable, it is easy to install and use.By arranging preformed hole in telescoping steel form template, and reserved grouting hole plugging device is set, the substitution grouting pore-creating of later-stage utilization embedded steel tube, carry out backfill and consolidation grouting construction, pore-creating process can be reduced, the destruction to formation of concrete can be prevented again, effectively improve the construction quality of hole lining concrete.
Description
Technical field
The present invention relates to holes to serve as a contrast technical field of concrete construction, more particularly to a kind of backfill and consolidation grouting punching block platform
Vehicle pre-embedment grouting pipe structure.
Background technique
The construction of traditional hole lining concrete mostly uses steel wooden model to combine concrete construction, in work progress, except to work
Outside phase, cost etc. affect greatly, formation of concrete faulting of slab ends, pitted skin phenomenon are more, and presentation quality is poor.Carry out backfill and
When consolidation grouting pore-creating, causes secondary to molded concrete or repeatedly drill breakoff phenomenon, or even reinforcing bar is damaged.
Summary of the invention
The present invention provides a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structures.
The present invention provides following schemes:
It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, comprising:
Telescoping steel form steel plate offers the through-hole passed through for pre-buried grouting steel pipe on the telescoping steel form steel plate;
Nozzle plugging mechanism, the nozzle plugging mechanism include sealing steel plate and sealing Interal fixation component;The sealing steel
Plate fixation kit includes the first fixed frame and the second fixed frame being connected with the telescoping steel form Interal fixation;Described first is solid
Determine frame and is fixed with the vertical plate and the vertical plate that second fixed frame respectively includes being connected with the telescoping steel form Interal fixation
Connected level board;
Wherein, threaded hole is offered on the level board, is provided with bolt in the threaded hole;The sealing steel plate is located at described
Between first fixed frame and second fixed frame and it is located at the bolt lower part;The bolt is for realizing the sealing steel plate
With the fastening of the through-hole.
It is preferred: to be fixedly connected with circular steel plate on the sealing steel plate.
It is preferred: to be fixedly connected with link chain on the sealing steel plate.
It is preferred: between first fixed frame and the second fixed frame vertical plate respectively contained and telescoping steel form steel plate
It is provided with reinforcing rib.
Preferred: the reinforcing rib is to be made using screw-thread steel.
The specific embodiment provided according to the present invention, the invention discloses following technical effects:
By the invention it is possible to realize it is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, in a kind of realization
Under mode, which may include telescoping steel form steel plate, offers on the telescoping steel form steel plate and wears for pre-buried grouting steel pipe
The through-hole crossed;Nozzle plugging mechanism, the nozzle plugging mechanism include sealing steel plate and sealing Interal fixation component;The envelope
Mouth Interal fixation component includes the first fixed frame and the second fixed frame being connected with the telescoping steel form Interal fixation;Described
One fixed frame respectively includes the vertical plate and the vertical plate that are connected with the telescoping steel form Interal fixation with second fixed frame
The level board being fixedly linked;Wherein, threaded hole is offered on the level board, is provided with bolt in the threaded hole;The envelope
Mouth steel plate is between first fixed frame and second fixed frame and is located at the bolt lower part;The bolt is for real
The fastening of existing the sealing steel plate and the through-hole.Backfill provided by the present application and consolidation grouting telescoping steel form pre-embedment grouting pipe
Structure, it is simple and reasonable, it is easy to install and use.By arranging preformed hole in telescoping steel form template, and reserved grouting is set
Hole plugging device, later-stage utilization embedded steel tube substitution grouting pore-creating, carries out backfill and consolidation grouting construction, can reduce pore-creating work
Sequence, and the destruction to formation of concrete can be prevented, effectively improve the construction quality of hole lining concrete.
Certainly, it implements any of the products of the present invention and does not necessarily require achieving all the advantages described above at the same time.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment
Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention
Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings
Obtain other attached drawings.
Fig. 1 is the knot of a kind of backfill provided in an embodiment of the present invention and consolidation grouting telescoping steel form pre-embedment grouting pipe structure
Structure schematic diagram;
Fig. 2 is the structural schematic diagram of nozzle plugging mechanism provided in an embodiment of the present invention.
In figure: telescoping steel form steel plate 1, through-hole 2, sealing steel plate 3, the first fixed frame 401, the second fixed frame 402, bolt 5,
Circular steel plate 6, link chain 7, reinforcing rib 8.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art's every other embodiment obtained belong to what the present invention protected
Range.
Embodiment
It is a kind of backfill and the pre-buried grouting of consolidation grouting telescoping steel form provided in an embodiment of the present invention referring to Fig. 1, Fig. 2
Pipe structure, as shown in Figure 1 and Figure 2, the structure include telescoping steel form steel plate 1, are offered on the telescoping steel form steel plate 1 for pre-
Bury the through-hole 2 that grouting steel pipe passes through;
Nozzle plugging mechanism, the nozzle plugging mechanism include sealing steel plate 3 and sealing Interal fixation component;The sealing steel
Plate fixation kit includes the first fixed frame 401 and the second fixed frame 402 being fixedly linked with the telescoping steel form steel plate 1;Institute
State the first fixed frame 401 with described second fix 402 framves respectively include the vertical plate being fixedly linked with the telescoping steel form steel plate 1 with
And the level board that the vertical plate is fixedly linked;
Wherein, threaded hole is offered on the level board, and bolt 5 is provided in the threaded hole;The sealing steel plate 3 is located at institute
It states between the first fixed frame 401 and second fixed frame 402 and is located at 5 lower part of bolt;The bolt 5 is for realizing institute
State the fastening of sealing steel plate 3 and the through-hole 2.
Further, circular steel plate 6 is fixedly connected on the sealing steel plate 3.It is fixedly connected on the sealing steel plate 3
Link chain 7.The vertical plate and telescoping steel form steel plate 1 that first fixed frame 401 is respectively contained with second fixed frame 402 it
Between be provided with reinforcing rib 8.The reinforcing rib 8 is to be made using screw-thread steel.
The sequence of construction of backfill provided by the present application and consolidation grouting telescoping steel form pre-embedment grouting pipe structure: bedrock surface is clear
Reason → underplate concrete pours → and side and roof arch reinforcement installation → telescoping steel form is in place → brushing release agent → seam surface treatment and measurement
Setting-out → waterstop installation → locking plug template closure → template check → pre-embedment grouting pipe → concreting → waits strong → demoulding
Maintenance → subsequent cycle.
In order to which structure provided by the present application is described in detail, below in the Tasha A Er water-control project power tunnel barrel work
Concrete application in journey is illustrated.
The Xinjiang Tasha A Er water-control project power tunnel barrel engineering construction bid section, concrete engineering construction project are as follows:
I # power tunnel barrel pile No. sends out 1+395.087m~hair 5+979.529m section concrete lining cutting, lining cutting overall length 4584.442m;Ⅱ#
Power tunnel pile No. sends out 1+409.861m~hair 5+962.939m section concrete lining cutting, lining cutting overall length 4553.078m;1# and 2# power generation
Hole working tunnel closure etc..Section is diameter 8.5m round, longitudinal slope 0.2%, III class after two power tunnel barrel concrete linings
Lining thickness 40cm under the conditions of wall rock geology, lining thickness 60cm under IV, V class surrounding rock geological conditions.The main work of concrete works
Cheng Liang are as follows: 12.98 ten thousand m3 of concrete lining, reinforcing bar system pacify 2.31 ten thousand t.
When making telescoping steel form, preformed hole is arranged according to design requirement on punching block.Aperture Φ 60mm, in favor of Φ 50
Steel pipe insertion.6 row's preformed holes are arranged on punching block altogether.First row is 1.0m away from trolley port, remaining spacing is 2m.Preformed hole is plum
Flower-shape arrangement.
The installation site of steel pipe embedded part controls stake wheelbase using total station setting-out by design drawing, forms control net,
To control embedded steel tube position, array pitch uses steel ruler setting-out between grout hole.Telescoping steel form pre-embedment grouting pipe nozzle blocks,
Reserved nozzle is blocked using having a size of 15cm × 8cm, is covered with a thickness of the steel plate of 3mm, and a thickness 5mm is welded on the steel plate,
The circular steel plate and link chain that radius is 2.5cm, to facilitate steel plate when closure to adjust, nozzle blocks steel plate and uses M12 spiral shell
Bolt is reinforced.
This engineering uses steel pipe to be up to 90% or more as grout hole built-in fitting utilization rate, the presentation quality of formation of concrete
It is substantially unaffected.Relative to common drill construction technique, need to repeatedly drill because of situations such as positioning inaccurate or chance reinforcing bar, coagulation
Native surface is destroyed, caused by repairing and rework cost accordingly reduce 90% or more.
Compared with pvc pipe built-in fitting, reinforces positioning and be guaranteed.Meanwhile interference of the pore-creating to steel mesh is avoided, it makes
The efficiency in hole improves 50% or more, has saved construction cost.
From social benefit, power tunnel barrel engineering mainly undertakes diversion task, using telescoping steel form and grouting steel pipe
The application of pre-buried technology, is improved this engineering construction quality, while also just improving the safety system of power tunnel barrel engineering
Number, provides guarantee for reservoir safety.
Telescoping steel form hole serves as a contrast the application of concrete and the pre-buried technology of grouting steel pipe, be similar engineering in Engineering Construction Management and
It summarizes in terms of quality control on construction and has accumulated engineering experience, cultivated a collection of technical staff for skillfully grasping this technology and pipe
Reason personnel provide technical support for later similar engineering project construction.Meanwhile telescoping steel form is carried out in this construction process
Local flow improvement, cavern's construction of concrete lining is innovated, for similar engineering make full use of telescoping steel form globality,
Mobility shortens the construction period, save the cost provides reliable method.
The Tasha A Er water-control project power tunnel barrel engineering carries out power tunnel concrete lining using telescoping steel form
Construction, accelerates construction speed, has saved cost, meanwhile, by carrying out innovation transformation to telescoping steel form, make full use of punching block platform
The globality and mobility of vehicle are realized to the one-time formed effect of concrete construction.Grouting pore-creating is substituted using embedded steel tube,
Grouting pore-creating destruction caused by concrete is greatly reduced, ensure that construction quality.This engineering combine using telescoping steel form and
Both pre-buried grouting steel pipes advantage simultaneously carries out innovation and application, is compared compared with other similar projects using traditional handicraft construction, engineering is applied
Working medium amount and comprehensive benefit significantly improve.
In short, backfill provided by the present application and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, simple and reasonable,
It is easy to install and use.By arranging preformed hole in telescoping steel form template, and reserved grouting hole plugging device, later-stage utilization are set
Embedded steel tube substitution grouting pore-creating, carries out backfill and consolidation grouting construction, can reduce pore-creating process, and can prevent mixed to molding
The destruction for coagulating soil effectively improves the construction quality of hole lining concrete.Final power tunnel barrel engineering uses crawler belt voluntarily trestle type
Needle beam wholecircle telescoping steel form carries out lining cutting, and backfill and consolidation grouting pore-creating use steel pipe built-in process.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that
There is also other identical elements in process, method, article or equipment including the element.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the scope of the present invention.It is all
Any modification, equivalent replacement, improvement and so within the spirit and principles in the present invention, are all contained in protection scope of the present invention
It is interior.
Claims (5)
1. a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure characterized by comprising
Telescoping steel form steel plate offers the through-hole passed through for pre-buried grouting steel pipe on the telescoping steel form steel plate;
Nozzle plugging mechanism, the nozzle plugging mechanism include sealing steel plate and sealing Interal fixation component;The sealing steel
Plate fixation kit includes the first fixed frame and the second fixed frame being connected with the telescoping steel form Interal fixation;Described first is solid
Determine frame and is fixed with the vertical plate and the vertical plate that second fixed frame respectively includes being connected with the telescoping steel form Interal fixation
Connected level board;
Wherein, threaded hole is offered on the level board, is provided with bolt in the threaded hole;The sealing steel plate is located at described
Between first fixed frame and second fixed frame and it is located at the bolt lower part;The bolt is for realizing the sealing steel plate
With the fastening of the through-hole.
2. backfill according to claim 1 and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, which is characterized in that institute
It states and is fixedly connected with circular steel plate on sealing steel plate.
3. backfill according to claim 1 and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, which is characterized in that institute
It states and is fixedly connected with link chain on sealing steel plate.
4. backfill according to claim 1 and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, which is characterized in that institute
It states and is provided with reinforcing rib between the first fixed frame and the second fixed frame vertical plate respectively contained and telescoping steel form steel plate.
5. backfill according to claim 4 and consolidation grouting telescoping steel form pre-embedment grouting pipe structure, which is characterized in that institute
Stating reinforcing rib is to be made using screw-thread steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811391414.6A CN109469493A (en) | 2018-11-21 | 2018-11-21 | It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811391414.6A CN109469493A (en) | 2018-11-21 | 2018-11-21 | It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109469493A true CN109469493A (en) | 2019-03-15 |
Family
ID=65674208
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811391414.6A Pending CN109469493A (en) | 2018-11-21 | 2018-11-21 | It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109469493A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001317297A (en) * | 2000-05-09 | 2001-11-16 | Gifu Kogyo Co Ltd | Method and device for stopping gable of concrete for tunnel lining |
CN202544861U (en) * | 2012-02-17 | 2012-11-21 | 成都市新筑路桥机械股份有限公司 | Exhaust device for bottom mould of needle beam trolley |
CN203890978U (en) * | 2014-05-19 | 2014-10-22 | 中国水电顾问集团贵阳勘测设计研究院有限公司 | Contact grouting structure for buried pressure pipe |
CN207111120U (en) * | 2017-08-24 | 2018-03-16 | 中铁十八局集团隧道工程有限公司 | A kind of pre-embedded device for TBM synchronization lining chassis grout holes and osculum |
CN209100054U (en) * | 2018-11-21 | 2019-07-12 | 中国水利水电第四工程局有限公司 | It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure |
-
2018
- 2018-11-21 CN CN201811391414.6A patent/CN109469493A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001317297A (en) * | 2000-05-09 | 2001-11-16 | Gifu Kogyo Co Ltd | Method and device for stopping gable of concrete for tunnel lining |
CN202544861U (en) * | 2012-02-17 | 2012-11-21 | 成都市新筑路桥机械股份有限公司 | Exhaust device for bottom mould of needle beam trolley |
CN203890978U (en) * | 2014-05-19 | 2014-10-22 | 中国水电顾问集团贵阳勘测设计研究院有限公司 | Contact grouting structure for buried pressure pipe |
CN207111120U (en) * | 2017-08-24 | 2018-03-16 | 中铁十八局集团隧道工程有限公司 | A kind of pre-embedded device for TBM synchronization lining chassis grout holes and osculum |
CN209100054U (en) * | 2018-11-21 | 2019-07-12 | 中国水利水电第四工程局有限公司 | It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104929648B (en) | A kind of tunnel branch base tunnel construction method | |
CN104533446B (en) | Construction method and its structure that a kind of big cross section Support System in Soft Rock Tunnels bilayer pre- Geological disaster prevention of preliminary bracing occurs | |
CN102021911B (en) | Side slope reinforcing method and structure | |
CN104389610B (en) | A kind of ultrashort step construction method of traversing operation freeway tunnel | |
CN201560780U (en) | Ultra-small clear distance tunnel rock pillar pre-stress opposite-pull anchor rod structure | |
CN106400813A (en) | Foundation pit support system and construction method thereof | |
CN104196537A (en) | Construction method of three parallel metro tunnels with ultra-small clear distance | |
CN110130927A (en) | A kind of carbonaceous slate serious deformation control construction method | |
CN203334300U (en) | Root pile supporting structure | |
CN105696602A (en) | Composite pile-anchor supporting method and structure for deepening excavation | |
WO2020259059A1 (en) | Tbm parallel heading tunnel trunk construction method | |
CN205742175U (en) | A kind of steel construction protection wall of bored pile | |
CN103114595A (en) | Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch | |
CN102400694A (en) | Reinforcement method for combined part of shield tunnel and mining-method tunnel | |
CN104141500B (en) | One hardens sand and gravel stratum cavern con struction method | |
CN106522248A (en) | Method for reinforcing soil slope and slope reinforcing device | |
CN203130109U (en) | Large-section karst tunnel supporting equipment | |
CN209100054U (en) | It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure | |
CN203334301U (en) | Cave slope strengthening protection structure | |
CN204436407U (en) | The structure that the pre-Geological disaster prevention of the double-deck preliminary bracing of a kind of big cross section Support System in Soft Rock Tunnels occurs | |
CN204780975U (en) | A four return circuit terminal steel pipe poles are drawn and are dug compound basis of anchor log for medium voltage electric distribution circuit | |
CN203891047U (en) | Equipment equipped with steel platform for foundation construction of land bridge | |
CN205444232U (en) | Stock - gravity type infiltration retaining wall | |
CN102359395B (en) | Method for plugging large-scale water-inrush burst-mud burst hole of tunnel fault | |
CN109469493A (en) | It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |