CN208618254U - Support before a kind of trackless triangle hanging basket - Google Patents

Support before a kind of trackless triangle hanging basket Download PDF

Info

Publication number
CN208618254U
CN208618254U CN201820717527.XU CN201820717527U CN208618254U CN 208618254 U CN208618254 U CN 208618254U CN 201820717527 U CN201820717527 U CN 201820717527U CN 208618254 U CN208618254 U CN 208618254U
Authority
CN
China
Prior art keywords
support
plate
fixedly connected
external thread
extension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820717527.XU
Other languages
Chinese (zh)
Inventor
陈熙
宋孝森
吴璞莺
刘宇杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING CONSTRUCTION BRIDGE ENGINEERING Co Ltd
Chongqing Urban Construction Holdings Group Co Ltd
Original Assignee
CHONGQING CONSTRUCTION BRIDGE ENGINEERING Co Ltd
Chongqing Urban Construction Holdings Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING CONSTRUCTION BRIDGE ENGINEERING Co Ltd, Chongqing Urban Construction Holdings Group Co Ltd filed Critical CHONGQING CONSTRUCTION BRIDGE ENGINEERING Co Ltd
Priority to CN201820717527.XU priority Critical patent/CN208618254U/en
Application granted granted Critical
Publication of CN208618254U publication Critical patent/CN208618254U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to building engineering fields, more particularly to support before a kind of trackless triangle hanging basket.Support before a kind of trackless triangle hanging basket, support base, Extension support, fixed footing component and support body, there are two the Extension support settings, two Extension supports are symmetrically slidably connected at the rear and front end of support base, there are two fixed footing component settings, two fixed footing components are symmetricly set on the left and right ends of support base, and the rear and front end of support body is slidably connected at the upper end of two Extension supports respectively.Support before a kind of trackless triangle hanging basket of the utility model, can Fast Installation fix, the height of the utility model can be adjusted according to the topography situation of construction site, Extension support there are two being set in the utility model, the forced area of the utility model can be increased according to installation requirements, keep Hanging Basket more firm during the work time, can guarantee that Hanging Basket installation is efficient, quick, safe, create convenience for subsequent construction.

Description

Support before a kind of trackless triangle hanging basket
Technical field
The utility model relates to building engineering fields, more particularly to support before a kind of trackless triangle hanging basket.
Background technique
Support saddle frame is set on pier, and superstructure can be fixed on to pier, bears the various power for acting on superstructure, and It is reliably transmitted to pier;Under load, temperature and the concrete shrinkage the effects of, support adapt to superstructure corner and Displacement makes superstructure can the Free Transform additional internal force additional without generation.Cradle structure is widely used in prestressed concrete Native continuous beam is used to across more complicated locations of lower parts topography such as valley, rivers.The topography of construction site is complicated, therefore sets Counting a quick fixed and height and the adjustable support of forced area of being not easy to can guarantee that Hanging Basket installation is efficient, quick, after being Convenience is created in continuous construction.
Utility model content
The purpose of the utility model is to provide support before a kind of trackless triangle hanging basket, can Fast Installation fix, Ke Yigen Adjust the height of the utility model according to the topography situation of construction site, the utility model sets that there are two Extension supports, can be according to peace Dress demand increases the forced area of the utility model, keeps Hanging Basket more firm during the work time, can guarantee that Hanging Basket installation is high Effect, quick, safety, create convenience for subsequent construction.
The purpose of this utility model is achieved through the following technical solutions:
Support before a kind of trackless triangle hanging basket, including support base, Extension support, fixed footing component and support body, institute There are two the Extension support settings stated, and two Extension supports are symmetrically slidably connected at the rear and front end of support base, fixed footing component There are two settings, and two fixed footing components are symmetricly set on the left and right ends of support base, the rear and front end point of support body It is not slidably connected at the upper end of two Extension supports.
Rectangular channel, fixed sliding sleeve, sliding chute seat, slide plate sliding slot, jack and screw bolt seat I are provided in the support base, The rear and front end of support base lower end is respectively provided with there are two rectangular channel, and the outer end of four rectangular channels is fixedly connected to fixed cunning It covers, is fixedly connected to sliding chute seat at four angles of support base upper end, slide plate sliding slot is provided on four sliding chute seats, support Jack is provided at four angles of pedestal, four jacks are respectively positioned on the outer end of four rectangular channels, and two screw bolt seats I are symmetrically fixed It is connected to the left and right ends of support base.
The Extension support includes extension board, slide bar, U-shaped seat, upper plate, external thread rod I, external thread rod II and stop collar, The inner end of two extension boards is fixedly connected to two slide bars, and two extension boards pass through two sliding bars and are connected to four squares In shape slot, the upper end of two extension boards is fixedly connected to U-shaped seat, and the upper end of two U-shaped seats is connected with by fastening screw Upper plate, the upper end of two external thread rods I are rotatably connected on respectively on two upper plates, and the lower end of two external thread rods I passes through respectively Rolling bearing units are rotatably connected on two U-shaped seats, and two external thread rods II distinguish clearance fits in the middle-end of two extension boards, and two The inner end of a external thread rod II is threadedly attached in the rear and front end of stop collar, fixed company on two external thread rods II respectively It connects there are two stop collar, two stop collars are bonded with the interior outer end face of extension board respectively.
The fixation footing component includes sliding panel, convex sliding block, external thread rod II, articulated jib and fixes footing, and two The rear and front end of sliding panel is fixedly connected to convex sliding block, and two sliding panels pass through two convex sliding blocks and are slidably connected at four cunnings In plate sliding slot, the inner end of two external thread rods II passes through the outer end that rolling bearing units are rotatably connected on two sliding panels respectively, and two The outer end of external thread rod II is threadedly attached in respectively on two screw bolt seats I, there are two the inner end of two sliding panels is hinged Articulated jib, the other end of four articulated jibs are hinged with fixed footing, and four fixed footing are slidably connected at four jacks respectively Interior, the lower end of fixed footing is set as pyramidal structure.
The support body includes lower support plate, T-type sliding block, annulus seat, rubber support, polyfluortetraethylene plate, stainless Steel plate and upper bracket plate, the rear and front end of lower support plate are fixedly connected to T-type sliding block, and lower support plate passes through two T-type sliding blocks It is slidably connected on two U-shaped seats, two T-type sliding blocks are threadedly attached in respectively on two external thread rods I, lower support plate Upper end is fixedly connected with annulus seat, and the inside of annulus seat is fixedly connected with rubber support, and the upper end of rubber support is fixedly connected with Polyfluortetraethylene plate, the upper end of polyfluortetraethylene plate are fixedly connected with stainless steel plate, and the upper end of stainless steel plate is fixedly connected with Support plate.
Circular through hole is provided at four angles of the upper bracket plate.
The utility model has the beneficial effects that support before a kind of trackless triangle hanging basket of the utility model, it being capable of Fast Installation It is fixed, the height of the utility model can be adjusted according to the topography situation of construction site, the utility model is set there are two Extension support, The forced area that the utility model can be increased according to installation requirements keeps Hanging Basket more firm during the work time, can guarantee Hanging Basket installation is efficient, quick, safe, creates convenience for subsequent construction.
Detailed description of the invention
Fig. 1 is the overall structure diagram one of the utility model;
Fig. 2 is the overall structure diagram two of the utility model;
Fig. 3 is the structural schematic diagram one of the support base inside the utility model;
Fig. 4 is the structural schematic diagram two of the support base inside the utility model;
Fig. 5 is the structural schematic diagram of the Extension support inside the utility model;
Fig. 6 is the structural schematic diagram of the fixation footing component inside the utility model;
Fig. 7 is the structural schematic diagram of the support body inside the utility model.
In figure: support base 1;Rectangular channel 1-1;Fixed sliding sleeve 1-2;Sliding chute seat 1-3;Slide plate sliding slot 1-4;Jack 1-5;Spiral shell I 1-6 of pole socket;Extension support 2;Extension board 2-1;Slide bar 2-2;U-shaped seat 2-3;Upper plate 2-4;I 2-5 of external thread rod;II 2- of external thread rod 6;Stop collar 2-7;Fixed footing component 3;Sliding panel 3-1;Convex sliding block 3-2;II 3-3 of external thread rod;Articulated jib 3-4;Fixed bottom Foot 3-5;Support body 4;Lower support plate 4-1;T-type sliding block 4-2;Annulus seat 4-3;Rubber support 4-4;Polyfluortetraethylene plate 4-5; Stainless steel plate 4-6;Upper bracket plate 4-7.
Specific embodiment
1-7 is described in further detail the utility model with reference to the accompanying drawing.
Specific embodiment 1:
As shown in figs. 1-7, support before a kind of trackless triangle hanging basket, including support base 1, Extension support 2, fixed footing component 3 and support body 4, there are two the settings of Extension support 2, and two Extension supports 2 are symmetrically slidably connected at the front and back of support base 1 Both ends, there are two the fixed settings of footing component 3, and two fixed footing components 3 are symmetricly set on the left and right ends of support base 1, The rear and front end of support body 4 is slidably connected at the upper end of two Extension supports 2 respectively.A kind of trackless triangle of the utility model is hung Support before basket, when in use, two fixed footing components 3 can go deep into that support base 1 is quickly mounted on pier to soil On platform, support body 4 can slide up and down on two Extension supports 2, and then adjust the height of support body 4, two Extension supports 2 It can be slided in support base 1 and the utility model is widened, and then increase the contact between the utility model and pier Area keeps Hanging Basket more firm during the work time, can guarantee that Hanging Basket installation is efficient, quick, safe, create for subsequent construction Convenience.
It is provided with rectangular channel 1-1 in the support base 1, fixed sliding sleeve 1-2, sliding chute seat 1-3, slide plate sliding slot 1-4, inserts I 1-6 of hole 1-5 and screw bolt seat, the rear and front end of 1 lower end of support base are respectively provided with there are two rectangular channel 1-1, four rectangular channel 1-1 Outer end be fixedly connected to fixed sliding sleeve 1-2, be fixedly connected to sliding chute seat 1-3 at four angles of 1 upper end of support base, four It is provided with slide plate sliding slot 1-4 on a sliding chute seat 1-3, jack 1-5, four jacks are provided at four angles of support base 1 1-5 is respectively positioned on the outer end of four rectangular channel 1-1, and two I 1-6 of screw bolt seat are symmetrically fixedly connected on the left and right ends of support base 1.
The Extension support 2 includes extension board 2-1, slide bar 2-2, U-shaped seat 2-3, upper plate 2-4, I 2-5 of external thread rod, outer spiral shell II 2-6 of rasp bar and stop collar 2-7, the inner end of two extension board 2-1 are fixedly connected to two slide bars 2-2, two extension board 2-1 It is slidably connected in four rectangular channel 1-1 by two slide bar 2-2, the upper end of two extension board 2-1 is fixedly connected to U-shaped Seat 2-3, the upper end of two U-shaped seat 2-3 pass through fastening screw and are connected with upper plate 2-4, the upper end point of two I 2-5 of external thread rod It is not rotatably connected on two upper plate 2-4, the lower end of two I 2-5 of external thread rod passes through rolling bearing units respectively and is rotatably connected on two On a U-shaped seat 2-3, middle-end of two II 2-6 of external thread rod difference clearance fits in two extension board 2-1, two external thread rods The inner end of II 2-6 is threadedly attached in the rear and front end of stop collar 2-7, fixed company on two II 2-6 of external thread rod respectively Stop collar 2-7 there are two connecing, two stop collar 2-7 are bonded with the interior outer end face of extension board 2-1 respectively.The Extension support 2 makes Used time drives two slide bars on extension board 2-1 by rotating two external thread rods II 2-6, two II 2-6 of external thread rod respectively 2-2 is slided in rectangular channel 1-1 to outer end, and then is widened support base 1, thus increase the utility model and pier it Between contact area, keep Hanging Basket more firm during the work time.
The fixation footing component 3 include sliding panel 3-1, convex sliding block 3-2, II 3-3 of external thread rod, articulated jib 3-4 and Fixed footing 3-5, the rear and front end of two sliding panel 3-1 are fixedly connected to convex sliding block 3-2, and two sliding panel 3-1 pass through Two convex sliding block 3-2 are slidably connected in four slide plate sliding slot 1-4, and the inner end of two II 3-3 of external thread rod passes through respectively ushers to seat Bearing is rotatably connected on the outer end of two sliding panel 3-1, and the outer end of two II 3-3 of external thread rod is threadedly attached in two respectively On a I 1-6 of screw bolt seat, the inner end of two sliding panel 3-1 is hinged, and there are two articulated jib 3-4, the other ends of four articulated jib 3-4 It is hinged with fixed footing 3-5, four fixed footing 3-5 are slidably connected at respectively in four jack 1-5, fixed footing 3-5's Lower end is set as pyramidal structure.The fixed footing component 3 drives two when in use, by two II 3-3 of external thread rod of rotation A sliding panel 3-1 is slided on slide plate sliding slot 1-4 to inner end, and two sliding panel 3-1 drive four articulated jib 3-4 to rotate, and four Articulated jib 3-4 drives four fixed footing 3-5 slide downwards in four jack 1-5, and four fixed footing 3-5 are inserted into soil Inside quickly support base 1 is mounted on pier.
The support body 4 includes lower support plate 4-1, T-type sliding block 4-2, annulus seat 4-3, rubber support 4-4, poly- four Vinyl fluoride plate 4-5, stainless steel plate 4-6 and upper bracket plate 4-7, the rear and front end of lower support plate 4-1 are fixedly connected to T-type sliding block 4-2, lower support plate 4-1 are slidably connected on two U-shaped seat 2-3 by two T-type sliding block 4-2, two T-type sliding block 4-2 difference It is threadedly attached on two I 2-5 of external thread rod, the upper end of lower support plate 4-1 is fixedly connected with annulus seat 4-3, annulus seat The inside of 4-3 is fixedly connected with rubber support 4-4, and the upper end of rubber support 4-4 is fixedly connected with polyfluortetraethylene plate 4-5, gathers The upper end of tetrafluoroethene plate 4-5 is fixedly connected with stainless steel plate 4-6, and the upper end of stainless steel plate 4-6 is fixedly connected with upper bracket plate 4-7.The support body 4 drives two when in use, by rotation two external thread rods I 2-5, two I 2-5 of external thread rod T-type sliding block 4-2 is slided up and down on two U-shaped seat 2-3, so as to adjust the height of lower support plate 4-1.
It is provided with circular through hole at four angles of the upper bracket plate 4-7, four circles on upper bracket plate 4-7 are logical Fastening bolt can be inserted in hole, and then triangle hanging basket is fixed on upper bracket plate 4-7,
Support before a kind of trackless triangle hanging basket of the utility model, its working principle is that: a kind of trackless of the utility model Support before triangle hanging basket, when in use, two fixed footing components 3 can go deep into soil quickly pacifying support base 1 On pier, support body 4 can slide up and down on two Extension supports 2, and then adjust the height of support body 4, and two Extension support 2 can slide in support base 1 widens device, and then the contact area between aggrandizement apparatus and pier, Keep Hanging Basket more firm during the work time, can guarantee that Hanging Basket installation is efficient, quick, safe, create and facilitate for subsequent construction Condition;The Extension support 2 when in use, is driven respectively by two external thread rod II 2-6 of rotation, two II 2-6 of external thread rod Two slide bar 2-2 on extension board 2-1 are slided in rectangular channel 1-1 to outer end, and then are widened support base 1, thus Contact area between aggrandizement apparatus and pier keeps Hanging Basket more firm during the work time;The fixed footing component 3 makes Used time drives two sliding panel 3-1 to slide on slide plate sliding slot 1-4 to inner end by two II 3-3 of external thread rod of rotation, and two Sliding panel 3-1 drives four articulated jib 3-4 rotations, and four articulated jib 3-4 drive four fixed footing 3-5 in four jack 1-5 Interior slide downward, four fixed footing 3-5 are inserted into soil and quickly support base 1 are mounted on pier;The branch Seat ontology 4 drives two T-type sliding block 4-2 to exist when in use, by rotation two external thread rods I 2-5, two I 2-5 of external thread rod It is slided up and down on two U-shaped seat 2-3, so as to adjust the height of lower support plate 4-1.
According to the disclosure and teachings of the above specification, the utility model those skilled in the art can also be to above-mentioned reality The mode of applying is changed and is modified.Therefore, the utility model is not limited to specific embodiment disclosed and described above, right Some modifications and changes of the utility model should also be as falling into the protection scope of the claims of the present utility model.In addition, to the greatest extent It is used some specific terms in pipe this specification, these terms are merely for convenience of description, not to the utility model Constitute any restrictions.

Claims (6)

1. support before a kind of trackless triangle hanging basket, including support base (1), Extension support (2), fixed footing component (3) and support Ontology (4), it is characterised in that: there are two Extension support (2) settings, and two Extension supports (2) are symmetrically slidably connected at support The rear and front end of pedestal (1), there are two fixed footing component (3) settings, and two fixed footing components (3) are symmetricly set on support The left and right ends of pedestal (1), the rear and front end of support body (4) are slidably connected at the upper end of two Extension supports (2) respectively.
2. support before a kind of trackless triangle hanging basket according to claim 1, it is characterised in that: the support base (1) On be provided with rectangular channel (1-1), fixed sliding sleeve (1-2), sliding chute seat (1-3), slide plate sliding slot (1-4), jack (1-5) and screw bolt seat I (1-6), the rear and front end of support base (1) lower end are respectively provided with there are two rectangular channel (1-1), the outer end of four rectangular channels (1-1) It is fixedly connected to fixed sliding sleeve (1-2), is fixedly connected to sliding chute seat (1-3) at four angles of support base (1) upper end, four It is provided with slide plate sliding slot (1-4) on a sliding chute seat (1-3), is provided with jack (1-5) at four angles of support base (1), Four jacks (1-5) are respectively positioned on the outer end of four rectangular channels (1-1), and two screw bolt seats I (1-6) are symmetrically fixedly connected on support bottom The left and right ends of seat (1).
3. support before a kind of trackless triangle hanging basket according to claim 2, it is characterised in that: Extension support (2) packet Include extension board (2-1), slide bar (2-2), U-shaped seat (2-3), upper plate (2-4), external thread rod I (2-5), external thread rod II (2-6) and Stop collar (2-7), the inner end of two extension boards (2-1) are fixedly connected to two slide bars (2-2), and two extension boards (2-1) are equal It is slidably connected in four rectangular channels (1-1) by two slide bars (2-2), the upper end of two extension boards (2-1) is fixedly connected with Have U-shaped seat (2-3), the upper end of two U-shaped seats (2-3) passes through fastening screw and is connected with upper plate (2-4), two external thread rods I The upper end of (2-5) is rotatably connected on respectively on two upper plates (2-4), and the lower end of two external thread rods I (2-5) passes through respectively ushers to seat Bearing is rotatably connected on two U-shaped seats (2-3), and two external thread rods II (2-6) difference clearance fits are in two extension board (2- 1) middle-end, the inner end of two external thread rods II (2-6) are threadedly attached in the rear and front end of stop collar (2-7) respectively, and two Be fixedly connected to two stop collars (2-7) on a external thread rod II (2-6), two stop collars (2-7) respectively with extension board (2- 1) interior outer end face fitting.
4. support before a kind of trackless triangle hanging basket according to claim 3, it is characterised in that: the fixation footing component It (3) include sliding panel (3-1), convex sliding block (3-2), external thread rod II (3-3), articulated jib (3-4) and fixed footing (3-5), two The rear and front end of a sliding panel (3-1) is fixedly connected to convex sliding block (3-2), and two sliding panels (3-1) pass through two convex cunnings Block (3-2) is slidably connected in four slide plate sliding slots (1-4), and the inner end of two external thread rods II (3-3) passes through axis of usheing to seat respectively The outer end for being rotatably connected on two sliding panels (3-1) is held, the outer end of two external thread rods II (3-3) is threadedly attached in respectively On two screw bolt seats I (1-6), the inner end of two sliding panels (3-1) is hinged, and there are two articulated jib (3-4), four articulated jib (3- 4) the other end is hinged with fixed footing (3-5), and four fixed footing (3-5) are slidably connected at four jacks (1-5) respectively Interior, the lower end of fixed footing (3-5) is set as pyramidal structure.
5. support before a kind of trackless triangle hanging basket according to claim 4, it is characterised in that: the support body (4) Including lower support plate (4-1), T-type sliding block (4-2), annulus seat (4-3), rubber support (4-4), polyfluortetraethylene plate (4-5), no Rust steel plate (4-6) and upper bracket plate (4-7), the rear and front end of lower support plate (4-1) are fixedly connected to T-type sliding block (4-2), under Support plate (4-1) is slidably connected on two U-shaped seats (2-3) by two T-type sliding blocks (4-2), two T-type sliding blocks (4-2) point It is not threadedly attached on two external thread rods I (2-5), the upper end of lower support plate (4-1) is fixedly connected with annulus seat (4- 3), the inside of annulus seat (4-3) is fixedly connected with rubber support (4-4), and the upper end of rubber support (4-4) is fixedly connected with poly- four Vinyl fluoride plate (4-5), the upper end of polyfluortetraethylene plate (4-5) are fixedly connected with stainless steel plate (4-6), stainless steel plate (4-6) Upper end is fixedly connected with upper bracket plate (4-7).
6. support before a kind of trackless triangle hanging basket according to claim 5, it is characterised in that: the upper bracket plate (4- 7) bolt hole is provided at four angles.
CN201820717527.XU 2019-01-02 2019-01-02 Support before a kind of trackless triangle hanging basket Expired - Fee Related CN208618254U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820717527.XU CN208618254U (en) 2019-01-02 2019-01-02 Support before a kind of trackless triangle hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820717527.XU CN208618254U (en) 2019-01-02 2019-01-02 Support before a kind of trackless triangle hanging basket

Publications (1)

Publication Number Publication Date
CN208618254U true CN208618254U (en) 2019-03-19

Family

ID=65701242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820717527.XU Expired - Fee Related CN208618254U (en) 2019-01-02 2019-01-02 Support before a kind of trackless triangle hanging basket

Country Status (1)

Country Link
CN (1) CN208618254U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110184922A (en) * 2019-04-29 2019-08-30 中建市政工程有限公司 Crawler-type self-walking hanging basket and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110184922A (en) * 2019-04-29 2019-08-30 中建市政工程有限公司 Crawler-type self-walking hanging basket and construction method thereof

Similar Documents

Publication Publication Date Title
CN107337163A (en) A kind of lifting device of construction
CN206143646U (en) Bridge construction slip -form system
CN207392708U (en) A kind of Fast Installation scaffold for building
CN208618254U (en) Support before a kind of trackless triangle hanging basket
CN209603534U (en) Multifunctional wall body corrects instrument
CN208518383U (en) One kind being based on civil construction support device
CN113309461A (en) Safe drilling device for geotechnical engineering construction and drilling method thereof
CN218028837U (en) Automatic lifting construction platform for construction site
CN211523849U (en) Building guardrail for civil engineering
CN107939031A (en) A kind of office operation hoistable platform for building
CN208858357U (en) A kind of adjustable builder's staging for heavy grade tunnel
CN206229942U (en) A kind of reinforcing bar cutter sweep with holding function stabilization
CN212453616U (en) Energy-conserving stable template fixed bolster for building
CN204118541U (en) A kind of field work service kit
CN214424210U (en) Foundation ditch construction support for railway engineering
CN202762775U (en) Simple pump shaft straightening device
CN206048522U (en) Rope saw support
CN108775138A (en) A kind of scaffold for building with function of seismic resistance
CN212743494U (en) Civil engineering construction support
CN207418218U (en) A kind of hung moving platform for Steel Structure Installation
CN221703064U (en) Hand and foot rest with protective structure
CN106345945A (en) Reinforcing steel bar cutting device with clamping functional stability
CN205893855U (en) Hydraulic pressure expander in big displacement expansion joint clearance
CN107161923B (en) Energy storage power station staff protection device
CN220870500U (en) Grouting gun head supporting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190319

Termination date: 20200102