CN207418218U - A kind of hung moving platform for Steel Structure Installation - Google Patents
A kind of hung moving platform for Steel Structure Installation Download PDFInfo
- Publication number
- CN207418218U CN207418218U CN201721401682.2U CN201721401682U CN207418218U CN 207418218 U CN207418218 U CN 207418218U CN 201721401682 U CN201721401682 U CN 201721401682U CN 207418218 U CN207418218 U CN 207418218U
- Authority
- CN
- China
- Prior art keywords
- platform
- main body
- steel construction
- sliding slot
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of hung moving platforms for Steel Structure Installation, including steel construction main body, assistance platform, slide post and connecting rod, sliding slot is provided on the right side of the steel construction main body, and main platform is connected among sliding slot, it is connected above the main platform by hinge with protection network, and it is fixed with cat ladder below main platform, cat ladder is provided with outside the slide post, and limited block is installed outside cat ladder, the slip column bottom is fixed with mounting seat, the connecting rod both sides are equipped with steel construction main body, and connecting rod is connected both sides up and down by hydraulic cylinder with main platform.This forms slide construction for the main platform of hung moving platform of Steel Structure Installation with sliding slot, and sliding slot is to be bolted to can be very good to control the position of sliding slot with steel construction main body, so that entire main platform can pass through the mobile working in sliding slot progress both horizontally and vertically with the rise of sliding slot height into the adjusting of row position so as to reach main platform.
Description
Technical field
The utility model is related to steel structure technology fields, are specially that a kind of hung moving for Steel Structure Installation is put down
Platform.
Background technology
Hung moving platform for Steel Structure Installation be it is a kind of hang among main steel construction after installation is complete, with
This is placed come some steel constructions reached to auxiliary, the workbench that staff is facilitated to install it, is come with this
Achieve the effect that facilitate staff to be worked and to steel construction place and easy to use, existing steel construction is carrying out
Often there are problems that during installation, such as the hung moving platform on existing market cannot be well in steel knot
It is moved inside structure, it is impossible to the steel construction part sling largely be placed well, influence staff's work
Efficiency, the stability of entirety is not high when placing steel construction, and therefore, to solve problem above, we just propose one kind for steel construction
The hung moving platform of installation.
The content of the invention
It is above-mentioned to solve the purpose of this utility model is to provide a kind of hung moving platform for Steel Structure Installation
The Steel Structure Installation currently on the market that background technology proposes cannot be moved inside steel construction well with suspension platform,
The steel construction part sling cannot largely be placed well, whole stability is not high when placing steel construction asks
Topic.
To achieve the above object, the utility model provides following technical solution:A kind of suspension type for Steel Structure Installation
Including steel construction main body, assistance platform, slide post and connecting rod, sliding slot is provided on the right side of the steel construction main body for mobile platform,
And main platform is connected among sliding slot, it is connected above the main platform by hinge with protection network, and it is fixed below main platform
There is cat ladder, main platform is provided on the left of the assistance platform, and assistance platform bottom is connected with stent, the assistance platform lower section
It sets fluted, is connected below the stent by fixed block with steel construction main body, and passes through shaft above stent with aiding in
Platform is connected, and cat ladder is provided with outside the slide post, and limited block is equipped with outside cat ladder, and the slip column bottom is fixed
There is mounting seat, the connecting rod both sides are equipped with steel construction main body, and connecting rod passes through hydraulic cylinder and main platform in both sides up and down
It is connected.
Preferably, the steel construction main body is with sliding slot to be bolted, and sliding slot is provided with two groups, and every group is provided with two
It is a.
Preferably, the main mesa base is fixedly connected with cat ladder, and cat ladder forms stretching structure, slide post with slide post
It is structure as a whole with mounting seat, and the minimum point of mounting seat and the minimum point of steel construction main body are on same straight line.
Preferably, the main platform interior is hollow-core construction, and main platform is to be slidably connected with assistance platform, and is aided in
Platform outermost and the outermost of steel construction main body are on same straight line.
Preferably, fluted, and the size of groove and the size phase of stent are inlayed inside the assistance platform
It coincide, and stent forms rotational structure by shaft and assistance platform.
Preferably, the fixed block is structure as a whole with stent, and the connection mode of fixed block and steel construction main body is spiral shell
It tethers and connects.
Preferably, the central axes of the connecting rod and steel construction main body are on same straight line, connecting rod and hydraulic cylinder
Connection mode is is fixedly connected with, and main platform is to be slidably connected with sliding slot by hydraulic cylinder.
Compared with prior art, the beneficial effects of the utility model are:This puts down for the hung moving of Steel Structure Installation
The main platform of platform forms slide construction with sliding slot, and sliding slot and steel construction main body are to be bolted the position that can be very good to sliding slot
Controlled so that entire main platform can with sliding slot height rise into row position adjusting, so as to reach main platform
The mobile working on both horizontally and vertically is carried out by sliding slot, while can also facilitate staff well above main platform
It is constructed and auxiliary steel construction is placed, thus just improved work efficiency of the staff to Steel Structure Installation, climb
Terraced be structure as a whole with main platform facilitates staff to enter above main platform to work, meanwhile, the mounting seat of bottom
It can be very good to ensure stability of the entire platform in work is received to auxiliary steel construction, while pass through assistance platform bottom
Stent is attached with steel construction main body can also ensure that entire main body stretches out steel construction outside and carries out auxiliary steel construction well
Receive process be not in the problem of main platform falls.
Description of the drawings
Fig. 1 is the utility model main structure diagram;
Fig. 2 is the utility model steel construction main body and assistance platform attachment structure schematic diagram;
Fig. 3 is partial enlargement structural representation at A in the utility model Fig. 2;
Fig. 4 is the utility model side structure schematic view;
Fig. 5 is the utility model overlooking the structure diagram.
In figure:1st, steel construction main body, 2, sliding slot, 3, main platform, 4, protection network, 5, hinge, 6, cat ladder, 7, shaft, 8, auxiliary
Help platform, 9, groove, 10, stent, 11, fixed block, 12, slide post, 13, limited block, 14, mounting seat, 15, hydraulic cylinder, 16,
Connecting rod.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work
All other embodiments obtained shall fall within the protection scope of the present invention.
- 5 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of hung moving for Steel Structure Installation
Platform, including steel construction main body 1, sliding slot 2, main platform 3, protection network 4, hinge 5, cat ladder 6, shaft 7, assistance platform 8, groove 9,
Stent 10, fixed block 11, slide post 12, limited block 13, mounting seat 14, hydraulic cylinder 15 and connecting rod 16, steel construction main body 1 are right
Side is provided with sliding slot 2, and main platform 3 is connected among sliding slot 2, and with sliding slot 2 to be bolted, sliding slot 2 is set steel construction main body 1
There are two groups, and there are two every group of settings, it is convenient that sliding slot 2 and steel construction main body 1 are installed and dismantled, it is more convenient to use,
Scope is wider, and main 3 top of platform is connected by hinge 5 with protection network 4, and 3 lower section of main platform is fixed with cat ladder 6, main platform 3
Bottom is fixedly connected with cat ladder 6, and cat ladder 6 forms stretching structure with slide post 12, and slide post 12 is integrated with mounting seat 14
Structure, and the minimum point of mounting seat 14 and the minimum point of steel construction main body 1 are on same straight line, conveniently pass through bottom
Mounting seat 14 carries out preliminary fixation to 3 bottom of main platform entirely stretched out, and avoids the occurrence of unnecessary danger, assistance platform
8 left sides are provided with main platform 3, and 8 bottom of assistance platform is connected with stent 10, and main 3 inside of platform is hollow-core construction, and main platform
3 with assistance platform 8 to be slidably connected, and 8 outermost of assistance platform and the outermost of steel construction main body 1 are in same straight line
On, 8 lower section of assistance platform sets fluted 9, inlays fluted 9, and the size and stent of groove 9 inside assistance platform 8
10 size matches, and stent 10 forms rotational structure by shaft 7 and assistance platform 8, convenient flat by auxiliary
The stent 10 of 8 bottom of platform is supported with steel construction main body 1 to be connected, and then to the effect that main 3 bottom of platform is supported,
And then avoid and the problem of main platform 3 falls occur during carrying out auxiliary steel construction and placing, while be also convenient for being received
Receive flexible, the lower section of stent 10 is connected by fixed block 11 with steel construction main body 1, and 10 top of stent passes through shaft 7 with aiding in
Platform 8 is connected, and fixed block 11 is structure as a whole with stent 10, and the connection mode of fixed block 11 and steel construction main body 1 is spiral shell
It tethers and connects, facilitate and installed and dismantled, just greatly reduce the time consumed during entire Steel Structure Installation, slide post 12
Outside is provided with cat ladder 6, and limited block 13 is equipped with outside cat ladder 6, and 12 bottom of slide post is fixed with mounting seat 14, connecting rod
16 both sides are equipped with steel construction main body 1, and connecting rod is connected both sides about 16 by hydraulic cylinder 15 with main platform 3, connecting rod
16 be in the central axes of steel construction main body 1 on same straight line, and connecting rod 16 is to be fixedly connected with the connection mode of hydraulic cylinder 15,
And main platform 3 is to be slidably connected with sliding slot 2 by hydraulic cylinder 15, and the convenient position used as needed is to main platform 3
Position moved, and then staff is facilitated to work, while can also improve the work efficiency of staff.
Operation principle:Use this for Steel Structure Installation hung moving platform when, first, by bolt by sliding slot
2 are mounted on and are fixed among already installed steel construction main body 1, after the completion of fixed, then will be main by concave-convex connection
Platform 3 is mounted among sliding slot 2 and is fixed, and thus just completes the installment work of entire main platform 3 well, afterwards,
Staff can enter main 3 top of platform by cat ladder 6 and work, during being worked, protection network 4
Staff is protected well, meanwhile, entire main platform 3 can also be moved well by hydraulic cylinder 15,
And then the effect that staff is facilitated to work, when need will auxiliary steel construction be placed on main 3 top of platform when, can be with
The mobile main platform 3 under the action of hydraulic cylinder 15 so that main platform 3 is stretched out outside steel construction main body 1, afterwards, is pulled and slided
Dynamic column 12 so that mounting seat 14 is in same straight line with 1 bottom of steel construction main body, thus just preliminary to be carried out to main platform 3
Fixation, then assistance platform 8 is extracted out inside main platform 3, pass through 7 runing rest of shaft, 10 stent, 10 bottom
Fixed block 11 is bolted with steel construction main body 1, thus just completes the fixation work of main body platform 3 well, fixed
After finishing, suspension can be carried out to auxiliary steel construction to sling, be placed on main 3 top of platform, finally, will bottom be installed by tower crane
Seat 14 rises, and stent 1 dismantles with steel construction main body 1, can continue the mobile working of main platform 3, in this specification
The content not being described in detail belongs to the prior art well known to professional and technical personnel in the field.
Although the utility model is described in detail with reference to the foregoing embodiments, come for those skilled in the art
Say, can still modify to the technical solution recorded in foregoing embodiments or to which part technical characteristic into
Row equivalent substitution, within the spirit and principle of the utility model, any modifications, equivalent replacements and improvements are made should all
It is included within the scope of protection of this utility model.
Claims (7)
1. a kind of hung moving platform for Steel Structure Installation, including steel construction main body(1), assistance platform(8), slide post
(12)And connecting rod(16), it is characterised in that:The steel construction main body(1)Right side is provided with sliding slot(2), and sliding slot(2)It is intermediate
It is connected with main platform(3), the main platform(3)Top passes through hinge(5)With protection network(4)It is connected, and main platform(3)Lower section
It is fixed with cat ladder(6), the assistance platform(8)Left side is provided with main platform(3), and assistance platform(8)Bottom is connected with stent
(10), the assistance platform(8)Lower section sets fluted(9), the stent(10)Lower section passes through fixed block(11)With steel construction
Main body(1)It is connected, and stent(10)Top passes through shaft(7)With assistance platform(8)It is connected, the slide post(12)It is external
It is provided with cat ladder(6), and cat ladder(6)Outside is equipped with limited block(13), the slide post(12)Bottom is fixed with mounting seat
(14), the connecting rod(16)Both sides are equipped with steel construction main body(1), and connecting rod(16)Upper and lower both sides pass through hydraulic cylinder(15)
With main platform(3)It is connected.
2. a kind of hung moving platform for Steel Structure Installation according to claim 1, it is characterised in that:The steel
Main structure body(1)With sliding slot(2)To be bolted, sliding slot(2)Two groups are provided with, and there are two every group of settings.
3. a kind of hung moving platform for Steel Structure Installation according to claim 1, it is characterised in that:The master
Platform(3)Bottom is fixedly connected with cat ladder(6), and cat ladder(6)With slide post(12)Form stretching structure, slide post(12)With peace
Fill pedestal(14)It is structure as a whole, and mounting seat(14)Minimum point and steel construction main body(1)Minimum point be in it is same
On straight line.
4. a kind of hung moving platform for Steel Structure Installation according to claim 1, it is characterised in that:The master
Platform(3)Hollow-core construction is in inside, and main platform(3)With assistance platform(8)To be slidably connected, and assistance platform(8)It is outermost
Side and steel construction main body(1)Outermost be on same straight line.
5. a kind of hung moving platform for Steel Structure Installation according to claim 1, it is characterised in that:It is described auxiliary
Help platform(8)Inlay fluted in inside(9), and groove(9)Size and stent(10)Size match, and
Stent(10)Pass through shaft(7)With assistance platform(8)Form rotational structure.
6. a kind of hung moving platform for Steel Structure Installation according to claim 1, it is characterised in that:It is described solid
Determine block(11)With stent(10)It is structure as a whole, and fixed block(11)With steel construction main body(1)Connection mode to be bolted.
7. a kind of hung moving platform for Steel Structure Installation according to claim 1, it is characterised in that:The company
Extension bar(16)With steel construction main body(1)Central axes be on same straight line, connecting rod(16)With hydraulic cylinder(15)Connection side
Formula is is fixedly connected with, and main platform(3)Pass through hydraulic cylinder(15)With sliding slot(2)To be slidably connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721401682.2U CN207418218U (en) | 2017-10-26 | 2017-10-26 | A kind of hung moving platform for Steel Structure Installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721401682.2U CN207418218U (en) | 2017-10-26 | 2017-10-26 | A kind of hung moving platform for Steel Structure Installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207418218U true CN207418218U (en) | 2018-05-29 |
Family
ID=62309893
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721401682.2U Expired - Fee Related CN207418218U (en) | 2017-10-26 | 2017-10-26 | A kind of hung moving platform for Steel Structure Installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207418218U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112744727A (en) * | 2020-12-25 | 2021-05-04 | 江阴建禾钢品有限公司 | Detachable tower crane steel structure platform |
-
2017
- 2017-10-26 CN CN201721401682.2U patent/CN207418218U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112744727A (en) * | 2020-12-25 | 2021-05-04 | 江阴建禾钢品有限公司 | Detachable tower crane steel structure platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207144799U (en) | A kind of moveable ladder | |
CN207418218U (en) | A kind of hung moving platform for Steel Structure Installation | |
CN208145668U (en) | A kind of gantry crane spray system | |
CN205802864U (en) | Novel architecture lowering or hoisting gear | |
CN207251520U (en) | A kind of foldable anticorrosion solar energy aluminum frame of high-performance | |
CN207499372U (en) | A kind of Architectural Equipment scaffold | |
CN107487723B (en) | A kind of substation equipment maintenance and repair hoisting apparatus | |
CN207144527U (en) | The safeguard protection screen system of Steel Structure Installation | |
CN203559577U (en) | Heightening suspended platform suspension mechanism | |
CN206035360U (en) | Novel prune with ladder in multi -functional gardens | |
CN108270175A (en) | A kind of folding cable construction stent | |
CN208618254U (en) | Support before a kind of trackless triangle hanging basket | |
CN210289043U (en) | Anti-toppling scaffold | |
CN209682079U (en) | Vertical equipment inner part installs the operating platform | |
CN208563340U (en) | A kind of water conservancy and hydropower foundation grouting bracket | |
CN207926087U (en) | A kind of folding cable construction holder | |
CN208022659U (en) | A kind of civil engineering elevator | |
CN206535060U (en) | Safe barbell flat bench | |
CN207804960U (en) | A kind of high bar of lion dance training with protective device | |
CN206144452U (en) | Novel supplementary ladder | |
CN205558447U (en) | Found pole appurtenance | |
CN205591509U (en) | Construct construction equipment that ascends a height | |
CN205936536U (en) | Workbench device and oil pumping equipment | |
CN207092503U (en) | A kind of suspension type workbench for engineering construction | |
CN109626283A (en) | A kind of offshore platform cage of adjustable storage space |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180529 Termination date: 20201026 |