CN208858357U - A kind of adjustable builder's staging for heavy grade tunnel - Google Patents
A kind of adjustable builder's staging for heavy grade tunnel Download PDFInfo
- Publication number
- CN208858357U CN208858357U CN201821265664.0U CN201821265664U CN208858357U CN 208858357 U CN208858357 U CN 208858357U CN 201821265664 U CN201821265664 U CN 201821265664U CN 208858357 U CN208858357 U CN 208858357U
- Authority
- CN
- China
- Prior art keywords
- thread stud
- hinge
- tunnel
- rack
- staging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model belongs to technical field of tunnel construction, disclose a kind of adjustable builder's staging for heavy grade tunnel, it is provided with removable rack, removable rack, which is connected by a hinge, diagonal brace I-steel, positive and negative silk screw shell both ends screw in plus thread stud and left-hand thread stud respectively, plus thread stud, which is connected by a hinge, to be fixed on removable rack, left-hand thread stud, which is connected by a hinge, to be fixed on diagonal brace I-steel, hinge, which is bolted, to be fixed on removable rack, through-hole is opened up in the middle part of positive and negative silk screw shell, the outer end of plus thread stud and left-hand thread stud is respectively welded semicircle connecting plate.The utility model is that a kind of modified bored tunnel digging tool of optimization access tunnel excavation method increases the versatility of rack by improving tunnel piercing rack, improvement cost is cheap, it is easy to operate, site work environment can be improved, accelerate speed of application under the premise of guaranteeing operation safety.
Description
Technical field
The utility model belongs to technical field of tunnel construction more particularly to a kind of applies for the adjustable of heavy grade tunnel
Work rack.
Background technique
Currently, the prior art commonly used in the trade is such that
Into after 21 century, human society has welcome high speed development.As population, resource, environment and traffic etc. are asked
Topic becomes increasingly conspicuous, Speeding up development Underground Space Resource, makes the whole mankind's second of safety and comfort life on earth
The content that space has become various countries' extensive concern and studies energetically.
With the continuous propulsion of urbanization process, subway construction is also being rapidly developed.In urban center domain, traffic main artery
The daily life of Around resident is not influenced with densely populated location in order not to destroy existing transportation condition, it is more and more
Subway station constructed using subsurface excavation method.And in the tunnel entrance construction in shallow mining method, access tunnel is applied
Generally there are the biggish excavation gradients for work.
When coping with the construction of tunnel heavy grade entrance, conventional method are as follows: when bored tunnel entrance is constructed, by platform
The mode of frame side pad slag continues pad slag reduction rack and inclines to reduce the tilt angle of rack while tunneling movable stand
Tiltedly.This method program is complicated, and pad slag project amount is big, the bad control of gantry angle;And pad slag holding time is longer, gives birth to construction
It produces there are certain interference, work efficiency is caused to reduce;And padding the slag later period need to clear up in time, need to reuse slag-tapping device, cause
The waste of resource.
In conclusion problem of the existing technology is:
When constructing tunnel, the bad control of gantry angle, the mode for padding slag reduces working efficiency, causes the waste of resource.
Solve the difficulty and meaning of above-mentioned technical problem:
The height of the support rod of rack is fixed, and can not carry out the adjustment of angle, pads the engineering that the mode of slag needs
Amount is big, and to construction production, there are certain interference, and pads the slag later period and need to clear up in time, need to reuse slag-tapping device;
In face of increasingly widely used Tunnels in Shallow Buried excavating construction method, constructs in access tunnel and carry out in this link
Invention improves, and production makes the more efficient tool of construction, is just able to satisfy the needs of tunnel development.
Summary of the invention
In view of the problems of the existing technology, the utility model provides a kind of applies for the adjustable of heavy grade tunnel
Work rack increases the versatility of rack, improves economic benefit and working efficiency.
The utility model is realized in this way a kind of adjustable builder's staging for heavy grade tunnel be provided with it is removable
Dynamic rack, removable rack, which is connected by a hinge, diagonal brace I-steel;
Positive and negative silk screw shell both ends screw in plus thread stud and left-hand thread stud respectively, and plus thread stud is connected by hinge
It connects and is fixed on removable rack, left-hand thread stud, which is connected by a hinge, to be fixed on diagonal brace I-steel.
Further, hinge, which is bolted, is fixed on removable rack, can dismantle at any time and move the position of hinge.
Further, through-hole is opened up in the middle part of positive and negative silk screw shell, reinforcing bar or other tools can be inserted into through-hole, side
Just operator is easy to rotate positive and negative silk thread bush.
Further, the outer end of plus thread stud and left-hand thread stud is respectively welded semicircle connecting plate, semicircle connection
Circular hole is offered on plate, is connect respectively with the hinge on removable rack and diagonal brace I-steel by circular hole.
In conclusion the advantages of the utility model and good effect are as follows:
The utility model is a kind of modified bored tunnel digging tool for optimizing access tunnel excavation method, and existing
Technology is compared, and by improving tunnel piercing rack, increases the versatility of rack.It is screwed in respectively just at positive and negative silk thread bush both ends
Threaded stud and left-hand thread stud pass through rotation when plus thread stud and left-hand thread stud are separately fixed on rack and diagonal brace
Anti- silk thread bush become a full member to achieve the purpose that control diagonal brace I-steel angle.Through-hole is opened up among positive and negative silk thread bush, by steel
In muscle or other tools insertion through-hole, operator is easy to rotate positive and negative silk thread bush.By such modified digging tool,
So that when access tunnel excavation construction, the lengthy process for carrying out dregs place mat rack repeatedly, the utility model transformation are avoided
It is low in cost, it is easy to operate, site work environment can be improved, accelerate speed of application under the premise of guaranteeing operation safety.
Detailed description of the invention
Fig. 1 is the adjustable builder's staging structural representation provided by the embodiment of the utility model for heavy grade tunnel
Figure;
Fig. 2 is the adjustable builder's staging diagonal brace I-steel provided by the embodiment of the utility model for heavy grade tunnel
Connection schematic diagram;
Fig. 3 is the positive and negative silk screw thread of the adjustable builder's staging for heavy grade tunnel provided by the embodiment of the utility model
Tube-in-tube structure schematic diagram;
Fig. 4 is the adjustable builder's staging mounted configuration provided by the embodiment of the utility model for heavy grade tunnel
Schematic diagram;
In figure: 1, moving rack;2, positive and negative silk screw shell;3, plus thread stud;4, left-hand thread stud;5, hinge;
6, diagonal brace I-steel;7, through-hole;8, semicircle connecting plate.
Specific embodiment
For the invention, features and effects that can further appreciate that the utility model, the following examples are hereby given, and cooperates
Detailed description are as follows for attached drawing.
As Figure 1-Figure 4, the adjustable builder's staging provided by the embodiment of the utility model for heavy grade tunnel
Include: removable rack 1, positive and negative silk screw shell 2, plus thread stud 3, left-hand thread stud 4, hinge 5, diagonal brace I-steel 6, lead to
Hole 7, semicircle connecting plate 8.
Diagonal brace I-steel 6 is connect by hinge 5 with removable rack 1, and positive and negative 2 both ends of silk screw shell screw in positive spiral shell respectively
Line stud 3 and left-hand thread stud 4, plus thread stud 3 are connected and fixed on removable rack 1 by hinge 5, left-hand thread stud 4
It is connected and fixed on diagonal brace I-steel 6 by hinge 5.Hinge 5, which is bolted, to be fixed on removable rack 2, positive and negative silk
The middle part of screw shell 2 opens up through-hole 7, and the outer end of plus thread stud 3 and left-hand thread stud 4 is respectively welded semicircle connecting plate
8, circular hole is offered on semicircle connecting plate 8.
Operator can be different according to slope inclined degree, rotate positive and negative silk thread bush 2 to adjust the angle of diagonal brace I-steel
Degree is inserted into reinforcing bar or other tools to keep the level of builder's staging in through-hole 7, can be easily to positive and negative silk screw thread
Sleeve 2 carries out rotation process, and hinge 5, which is bolted, to be fixed on removable rack 1, can be dismantled and be moved at any time as needed
The position of dynamic hinge 5, increases the versatility of rack.The utility model improvement cost is cheap, easy to operate, can improve live work
Industry environment accelerates speed of application under the premise of guaranteeing operation safety.
The above is only the preferred embodiment to the utility model, is not made in any form to the utility model
Limitation, it is all according to the technical essence of the utility model any simple modification made to the above embodiment, equivalent variations with
Modification, is all within the scope of the technical scheme of the utility model.
Claims (4)
1. a kind of adjustable builder's staging for heavy grade tunnel, which is characterized in that for the adjustable of heavy grade tunnel
Formula builder's staging is provided with removable rack, and removable rack, which is connected by a hinge, diagonal brace I-steel;
Positive and negative silk screw shell both ends screw in plus thread stud and left-hand thread stud respectively, and plus thread stud is connected by a hinge solid
Due on removable rack, left-hand thread stud, which is connected by a hinge, to be fixed on diagonal brace I-steel.
2. being used for the adjustable builder's staging in heavy grade tunnel as described in claim 1, which is characterized in that hinge passes through bolt
It is fastened on removable rack.
3. being used for the adjustable builder's staging in heavy grade tunnel as described in claim 1, which is characterized in that positive and negative silk thread bush
The middle part of cylinder opens up through-hole.
4. as described in claim 1 be used for heavy grade tunnel adjustable builder's staging, which is characterized in that plus thread stud and
The outer end of left-hand thread stud is respectively welded semicircle connecting plate, offers circular hole on semicircle connecting plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821265664.0U CN208858357U (en) | 2018-08-07 | 2018-08-07 | A kind of adjustable builder's staging for heavy grade tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821265664.0U CN208858357U (en) | 2018-08-07 | 2018-08-07 | A kind of adjustable builder's staging for heavy grade tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208858357U true CN208858357U (en) | 2019-05-14 |
Family
ID=66414099
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821265664.0U Expired - Fee Related CN208858357U (en) | 2018-08-07 | 2018-08-07 | A kind of adjustable builder's staging for heavy grade tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208858357U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108915717A (en) * | 2018-08-07 | 2018-11-30 | 重庆大学 | A kind of adjustable builder's staging for heavy grade tunnel |
CN110216869A (en) * | 2019-06-05 | 2019-09-10 | 重庆大学 | A kind of ice sculpture printer |
-
2018
- 2018-08-07 CN CN201821265664.0U patent/CN208858357U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108915717A (en) * | 2018-08-07 | 2018-11-30 | 重庆大学 | A kind of adjustable builder's staging for heavy grade tunnel |
CN108915717B (en) * | 2018-08-07 | 2023-12-08 | 重庆大学 | Adjustable construction bench for large-gradient tunnel |
CN110216869A (en) * | 2019-06-05 | 2019-09-10 | 重庆大学 | A kind of ice sculpture printer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104989413B (en) | Single shield TBM planes slide step device and its stepping method | |
CN208858357U (en) | A kind of adjustable builder's staging for heavy grade tunnel | |
CN206256911U (en) | A kind of push bench process Tunnel Engineering tube coupling stopping device | |
CN204898672U (en) | Discard device of pulling out of pile foundation | |
CN206860205U (en) | A kind of platform mechanical arm of bow member installation chassis | |
CN102305025B (en) | Anchor cable rig bracket | |
CN209604053U (en) | Combined bolting and shotcrete operation rock bolting jumbo | |
CN208309593U (en) | A kind of steel pipe structure with oblique member | |
CN203213955U (en) | Arch center pipe shed drilling rig | |
CN107654730B (en) | Slurry pipe connecting auxiliary device behind slurry shield trolley and using method thereof | |
CN206668287U (en) | A kind of combined steel pipe concrete bow member for supporting | |
CN108915717A (en) | A kind of adjustable builder's staging for heavy grade tunnel | |
CN202482767U (en) | Steel tube bailey beam column type support | |
CN204591288U (en) | A kind of push pipe pipe curtain construction equipment | |
CN207700189U (en) | A kind of pile-grafting machine with monitoring function | |
CN200989167Y (en) | Derrick and borehole center regulating centring device | |
CN202832238U (en) | All-dimensional moving base seat for steel pylon composite foundation anchoring drill rig | |
CN102003142B (en) | Screw anchor drilling machine | |
CN219671014U (en) | Roadbed foot wall template positioning tool | |
CN104695981A (en) | Jacking heightening system and lining trolley including system | |
CN205387945U (en) | Steel portal that subway shield zone hard rock changeover portion was used | |
CN219431855U (en) | Combined jumbolter | |
CN220246955U (en) | Foundation pit template supporting device | |
CN217298906U (en) | Anchor rod construction device for constructional engineering | |
CN215857683U (en) | Subway foundation pit connecting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190514 Termination date: 20210807 |